This document provides a price breakdown for fire alarm system maintenance services at U.S. Air Force bases in Italy. The solicitation seeks quotes for periodic inspections, testing, maintenance and emergency repair services for fire alarm systems at Aviano Air Base and Ghedi Air Base. Pricing is provided for labor rates, travel fees, spare parts, and fixed costs. Services include annual and multi-year mandatory inspections, testing and maintenance. Emergency response and repairs are also required to be provided on a lump sum basis. The work will be performed over multiple option periods and is broken into separate line items for the two bases.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 1 Cycle TOT Hrs. Q.ty
Labor € € 2 € Material € 1 €
CLIN 1 Cycle TOT Hrs. Q.ty
Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum documentation other than drawings (single page)
BASIC PERIOD
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic ITM for Remote Notification System within 1 year period
Unit Cost
Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 1 of 14
CLIN TOT Hrs.
Labor € € Material €
CLIN 1 Cycle TOT Hrs. Q.ty
Travel Fees € 2 € Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum
Hourly Cost Year Cost
AVIANO ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 2 yrs/3yr/5yr/10yrs due
Hourly Cost 1 Cycle Cost Year Cost
GHEDI ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Unit Cost
GHEDI ‐ Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) documentation other than drawings (single page)
PRICE BREAKDOWN Page 2 of 14
Labor € € Material €
CLIN TOT Hrs. Q.ty
Labor € € 1 € Material € 1 €
CLIN TOT Hrs. Q.ty
Labor € € 1 € Material € € 1 €
GHEDI ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 2 yrs/3yr/5yr/10yrs due
Hourly Cost Year Cost
GHEDI ‐ Initial Acceptance Inspection, Request For Documentation, and Submitting Result ‐ conducted during first cycle of Basic Period visits
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Initial Acceptance Inspection, Request For Documentation, and Submitting Result ‐ conducted during first cycle of Basic Period visits
Hourly Cost 1 Cycle Cost Year Cost
PRICE BREAKDOWN Page 3 of 14
Labor € € 2 € Material € 1 €
CLIN 1 Cycle TOT Hrs. Q.ty
Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum
AVIANO ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Hourly Cost 1 Cycle Cost Year Cost
FIRST OPTION PERIOD
Hourly Cost 1 Cycle Cost Year Cost after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) documentation other than drawings (single page)
AVIANO ‐ Periodic ITM for Remote Notification System within 1 year period
Unit Cost
Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies
PRICE BREAKDOWN Page 4 of 14
Travel Fees € 2 € Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum
GHEDI ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Unit Cost
Hourly Cost 1 Cycle Cost Year Cost documentation other than drawings (single page)
GHEDI ‐ Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 5 of 14
Labor € € 2 € Material € 1 €
CLIN 1 Cycle TOT Hrs. Q.ty
Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic ITM for Remote Notification System within 1 year period
SECOND OPTION PERIOD
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Unit Cost
Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 6 of 14
Labor € € Material €
CLIN 1 Cycle TOT Hrs. Q.ty
Travel Fees € 2 € Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum
GHEDI ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Hourly Cost Year Cost
AVIANO ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 2 yrs due
Hourly Cost 1 Cycle Cost Year Cost
Unit Cost
GHEDI ‐ Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 7 of 14
Labor € € Material €
Hourly Cost Year Cost
GHEDI ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 2 yrs due
PRICE BREAKDOWN Page 8 of 14
Labor € € 2 € Material € 1 €
CLIN 1 Cycle TOT Hrs. Q.ty
Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum documentation other than drawings (single page)
THIRD OPTION PERIOD
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic ITM for Remote Notification System within 1 year period
Unit Cost
Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 9 of 14
Labor € € Material €
CLIN 1 Cycle TOT Hrs. Q.ty
Travel Fees € 2 € Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum
Hourly Cost Year Cost
AVIANO ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 3yrs due
Hourly Cost 1 Cycle Cost Year Cost
GHEDI ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Unit Cost
GHEDI ‐ Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 10 of 14
Labor € € Material €
GHEDI ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 3yrs due
Hourly Cost Year Cost
PRICE BREAKDOWN Page 11 of 14
Labor € € 2 € Material € 1 €
CLIN 1 Cycle TOT Hrs. Q.ty
Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum documentation other than drawings (single page)
FOURTH OPTION PERIOD
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Hourly Cost 1 Cycle Cost Year Cost
AVIANO ‐ Periodic ITM for Remote Notification System within 1 year period
Unit Cost
Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 12 of 14
Labor € € Material €
CLIN 1 Cycle TOT Hrs. Q.ty
Travel Fees € 2 € Labor € € 2 € Material € 1 €
CLIN
FIXED COST (travel and call fees) duty hours (8.00‐17.00 Mon‐ Fri) €
HOURLY COST
duty hours (8.00‐17.00 Mon‐ Fri) €
TECHNICAL ASSISTANCE
on site assistance labor rate € generation of Facility Record labour rate € drawings ‐ AUTOCAD € documentation on electronic media €
SPARE PARTS NTE Lump Sum
Hourly Cost Year Cost
AVIANO ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 2 yrs due
Hourly Cost 1 Cycle Cost Year Cost
GHEDI ‐ Periodic Mandatory Inspections, Tests, & Maintenance within 1 year period
Unit Cost
GHEDI ‐ Emergency Calls & Repairs ‐ Lump Sum ‐ within 1 year period Repair Identified Descrepancies after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00) after duty hours (17.00‐8.00 Fri‐Mon and italian holidays 0.00‐24.00)
PRICE BREAKDOWN Page 13 of 14
Labor € € Material €
GHEDI ‐ Mandatory Periodic Inspections, Tests, & Maintenance ‐ 2 yrs due
Hourly Cost Year Cost
PRICE BREAKDOWN Page 14 of 14
| 06 |
| 07 |
| 08 |
| 09 |
| 10 |