This document contains a performance work statement and schedule of maintenance tasks for fire alarm systems at two Air Force bases in Italy. Required services include monthly, quarterly, semi-annual, and annual inspections and testing of fire alarm control panels, initiating devices, notification appliances, water-based suppression systems, dry chemical and wet chemical extinguishing systems. Specific tasks involve checking pressures, testing alarms, inspecting detectors, manual pull stations, piping and nozzles. The solicitation seeks quotes for fire alarm system maintenance at Aviano Air Base and Ghedi Air Base to be performed in accordance with the requirements outlined in the attached performance work statement and schedule of maintenance tasks. The closing date for receipt of quotes was February 27, 2020 and the document was issued by the Department of the Air Force, United States Air Forces in Europe - Air Forces Africa.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tasks

Monthly UFC - Table 2-1 Unmonitored control panel & annunciator equipment 1 Inspection - Report UNI 11224 Fire Detection & Alarm Systems 10 Inspection & Test - Report (Note 1) Additional request Clean conventional smoke detectors (each time other 20% of total) 1 Ordinary Maintenance - Report Additional request Clean addressable smoke detectors (all those over 50% dirt reading) 1 Ordinary Maintenance - Report UFC - Table 2-1 Monitored control panel & annunciator equipment 3 Inspection & Test - Report UFC - Table 2-1 Initiating devices (manual stations, flame optical & gas detectors) 5 Inspection & Test - Report UFC - Table 2-1 Notification appliances & voice communication 1 Inspection & Test - Report UFC - Table 2-1 Digital alarm transmitters & receivers 1 Inspection & Test - Report

2 Years UFC - Table 2-1 Initiating devices (manual stations, heat, smoke/optical detectors, supervisory devices) 6 Inspection & Test - Report 5 Years UFC - Table 2-1 Smoke detectors (remove devices not required by UFC 3-600-01) 1 Inspection & Test - Report 10 Years UNI 11224 System general overhaul 1 Ordinary Maintenance - Report

Building Inspection UFC - Table 2-1 Entire system 2 Inspection - Report

Tasks

NFPA 25 - 5.2.4.2, 5.2.4.3, 5.2.4.4 Check pressures (dry, preaction, and deluge systems) Inspection - Report NFPA 25 - 13.4.3.1 Preaction/Deluge Valves Alarm Valve (exterior - during cold weather) Inspection - Report NFPA 25 - 13.4.4.1.1 Dry Pipe Valves/ Quick-Opening Alarm Valve (exterior - during cold weather) Inspection - Report NFPA 25 - 13.3.2.1 Control Valves (except the ones locked or supervised) Inspection - Report (Note 1) UNI 12845 - 20.2.2.2 Check & annotate pressures Inspection - Report (Note 1) UNI 12845 - 20.2.2.3 Testing Gong Inspection & Test - Report UNI 12845 - 20.2.2.6 Space heating systems & heating cables Inspection & Test - Report NFPA 25 - 5.2.4.1, 5.2.4.3 Check pressures (wet, dry, preaction, and deluge systems) Overrided by UNI 12845 - 20.2.2.2 (Weekly) NFPA 25 - 13.3.2.1.1 Control Valves (locked or supervised) Inspection - Report NFPA 25 - 13.4.1.1 Wet Alarm Valve (exterior) Inspection - Report NFPA 25 - 13.4.3.1.6 Preaction/Deluge Valves Alarm Valve (exterior) Inspection - Report NFPA 25 - 13.4.4.1.4 Dry Pipe Valves/ Quick-Opening Alarm Valve (exterior) Inspection - Report UFC 3-601-02 - Table 2-2 - Wet Control valves (without seal, lock, or electric supervision):verify valve position. 1 Inspection - Report UFC 3-601-02 - Table 2-3 - Dry Control valves (without seal, lock, or electric supervision):verify valve position. 1 Inspection - Report UFC 3-601-02 - Table 2-4 - Deluge Control valves (without seal, lock, or electric supervision):verify valve position. 1 Inspection - Report UFC 3-601-02 - Table 2-5 - Pre-Action Control valves (without seal, lock, or electric supervision):verify valve position. 1 Inspection - Report UFC 3-601-02 - Table 2-9 - Foam Control valves (without seal, lock, or electric supervision):verify valve position. 1 Inspection - Report NFPA 25 - 13.7.1 Fire Department Connections Inspection - Report NFPA 25 - 13.2.5.1, 13.2.5.2 Main Drain Test Test - Report UNI 12845 - 20.3.2.2 Verify Fire Risk Level (if same or modified) 1 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.3 Sprinkler Heads, Heat Operated Valves (multiple control) & Spray Nozzles 3 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.4 Piping & Piping Hangers 4 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.5 Water Supply & Related Alarms 1 Inspection & Test - Report (Note 2) UNI 12845 - 20.3.2.6 Power Supply 1 Inspection & Test - Report UNI 12845 - 20.3.2.7 Sectioning Valves 1 Inspection & Test - Report UNI 12845 - 20.3.2.8 Flow Switches 1 Inspection & Test - Report UNI 12845 - 20.3.2.9 Spare Parts 1 Inspection & Ordinary Maintenance - Report

UNI 12845 - 20.3.3.2

Dry alarm valves Le parti mobili delle valvole di allarme a secco, e qualsiasi acceleratore o esaustore, negli impianti a secco e nelle estensioni sussidiarie devono essere fatte funzionare in conformità alle istruzioni del fornitore.

11+14 Inspection & Test - Report

UNI 12845 - 20.3.3.3 Connection to FACP forwarding activation to Fire Department 1 Inspection & Test - Report Foam concentrate Verify adequate supply. 1 Inspection - Report Foam proportioning system Test pump to ensure operability. Inspect proportioning system for proper valve alignment and system condition 2 Inspection & Test - Report

Control valves (without seal, lock, or electric supervision) Verify valve position 1 Inspection - Report Water flow alarm devices 2 Inspection & Test - Report

Automatic Fire Detection Systems, Manual Stations, and Monaco Transceivers

Note 1: UNI 11224 Overrides "Annual" and "2 Years" tasks listed on UFC-Table 2-1.

Weekly

Monthly

Quarterly

Semi-Annual

UFC - Table 2-9 - Foam

Annual

Semi-Annual

Water Based Fire Suppression Systems

2 December 2019

MANDATORY ITM SERVICE

2 December 2019

Alarm valves & trim Visually check the exterior of valves, gauges, trim alignment 2 Inspection - Report Main drain 4 Inspection & Test - Report Fire Department truck connection 2 Inspection - Report Control valves (without seal, lock, or electric supervision) 1 Inspection - Report Water flow alarm devices 2 Inspection & Test - Report Dry pipe alarm valve & trim Inspect the exterior of valves, gauges, trim alignment 2 Inspection - Report Main drain 4 Inspection & Test - Report Fire Department truck connection 2 Inspection - Report Dry pipe alarm valve enclosure heating 1 Inspection - Report Low temperature Alarm 1 Inspection & Test - Report Low points drain 1 Inspection & Ordinary Maintenance - Report Control valves (without seal, lock, or electric supervision) 1 Inspection - Report Water flow alarm devices 2 Inspection & Test - Report Deluge alarm valve & trim Inspect the exterior of valves, gauges, trim alignment 2 Inspection - Report Main drain 4 Inspection & Test - Report Fire Department truck connection 2 Inspection - Report Valve and Riser Heated Enclosure (if provided) 1 Inspection - Report Low temperature Alarm 1 Inspection & Test - Report Control valves (without seal, lock, or electric supervision) 1 Inspection - Report Water flow alarm devices 2 Inspection & Test - Report Pre-Action valve & trim Inspect the exterior of valves, gauges, trim alignment 2 Inspection - Report Main drain 4 Inspection & Test - Report Fire Department truck connection 2 Inspection - Report Valve and Riser Heated Enclosure (if provided) 1 Inspection - Report Low temperature Alarm 1 Inspection & Test - Report Control valves (without seal, lock, or electric supervision) 1 Inspection - Report Foam concentrate Take sample and test in accordance with manufacturer’s instructions 1 Inspection & Test - Report Foam Concentrate Strainers Inspect exterior to ensure that blow down valve is closed 1 Inspection & Test - Report Foam concentrate Inspect for quality and evidence of sludge or deterioration.

Take sample and test in accordance with manufacturer’s instructions 2 Inspection & Test - Report

Foam generators Inspect to verify condition and proper valve alignment 1 Inspection - Report UFC - Table 2-2 - Wet Control valves Operate valve through entire travel to verify function. Lubricate valves stem 2 Overrided by NFPA 25 Annual test

Control valves Operate valve through entire travel to verify function. Lubricate valves stem 2 Overrided by NFPA 25 Annual test Dry pipe alarm valves

1. Trip valve to verify operability.

2. Inspect internal condition before resetting, and clean valve seat.

3. Check priming water level (before and after trip test).

3 Overrided by NFPA 25 Annual test

Quick-opening devices Test to verify operability 1 Overrided by NFPA 25 Annual test Low air pressure alarm 1 Overrided by NFPA 25 Annual test Automatic air pressure maintenance devices Inspect to verify proper operation 1 Overrided by NFPA 25 Annual test Control valves Operate valve through entire travel to verify function. Lubricate valves stem 2 Overrided by NFPA 25 Annual test Deluge alarm valves

1. Trip to verify operability.

2. Verify that manual actuators are operable.

3. Inspect the internal condition and clean valve seat before resetting.

3 Overrided by NFPA 25 Annual test

Low points drain Drain all low points after deluge valve test and before cold weather 1 Overrided by NFPA 25 Annual test Control valves Operate valve through entire travel to verify function. Lubricate valves stem 2 Overrided by NFPA 25 Annual test Pre-Action alarm valves

1. Trip to verify proper operation.

2. Verify manual actuators (if provided).

3. Inspect internal condition and clean valve seat before resetting.

3 Overrided by NFPA 25 Annual test

Low points drain 1 Overrided by NFPA 25 Annual test Air Supply (if present) Test the automatic air pressure maintenance device. Test the low air supply alarm. 2 Overrided by NFPA 25 Annual test

Control valves Operate valve through entire travel to verify function. Lubricate valves stem 2 Overrided by NFPA 25 Annual test

UFC - Table 2-4 - Deluge

UFC - Table 2-5 - Pre-Action

Annual

2 years

UFC - Table 2-2 - Wet

UFC - Table 2-3 - Dry

UFC - Table 2-4 - Deluge

UFC - Table 2-5 - Pre-Action

UFC - Table 2-9 - Foam

UFC - Table 2-12 - High Expansion

UFC - Table 2-3 - Dry

Foam proportioning system

1. Conduct full flow test to ensure proper system function.

2. Verify proper concentration.

2 Inspection & Test - Report

Actuators Verify operability of manual and automatic actuators 1 Inspection & Test - Report Distribution system

1. Verify nozzle (sprinkler) coverage during flow test.

2. Inspect piping hangers, sprinklers, and nozzles for condition and location.

2 Inspection & Test - Report

Foam concentrate strainers Inspect and clean after flow test 1 Inspection & Ordinary Maintenance - Report Foam generator Conduct test to verify operability (Water-powered may be done with water only) 1 Inspection & Test - Report

Actuators Verify operability of manual and automatic actuators 1 Inspection & Test - Report Foam proportioning system

1. Conduct full flow test to ensure proper system function. (Test may be done through a test connection or through the foam generators. Only discharge until full foam flow appears from each generator; then end foam injection.)

2. Verify proper concentration.

2 Inspection & Test - Report

Control valves Operate valve through entire travel to verify function. Lubricate valves stem 2 Inspection & Ordinary Maintenance - Report

UNI 12845 - 20.3.5.3

Sectioning valves, alarm valves & check valves Tutte le valvole di intercettazione dell’alimentazione idrica, le valvole di allarme e di non ritorno devono essere esaminate e sostituite o revisionate se ecessario.

1 Inspect. & Ord. Maintenance - Report (Note 3)

NFPA 25 - 13.4.5.2.2.2

Dry Pipe Valves/Quick-Opening Devices Every 3 years and whenever the system is altered, the dry pipe valve shall be trip tested with the control valve fully open and the quick-opening device, if provided, in service

Test - Report

NFPA 25 - 13.4.3.2.5 PreAction Valvess Preaction systems shall be tested once every 3 years for gas leakage Test - Report

NFPA 25 - 13.4.5.2.9 Dry Pipe Valves/Quick-Opening Devices Dry pipe systems shall be tested once every 3 years for gas leakage Test - Report

NFPA 25 - 5.3.1.1.2

Where sprinklers are subjected to harsh environments, including corrosive atmospheres and corrosive water supplies, on a 5-year basis, either sprinklers shall be replaced or representative sprinkler samples shall be tested

Test - Report

NFPA 25 - 5.3.1.1.4

Representative samples of solder-type sprinklers with a temperature classification of extra high [325°F (163°C)] or greater that are exposed to semicontinuous to continuous maximum allowable ambient temperature conditions shall be tested at 5-year intervals

Test - Report

NFPA 25 - 11.4.7.3 Foam-Water Sprinkler In-line balanced pressure type Balancing valve diaphragm Test - Report

NFPA 25 - 13.2.7 Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge Test - Report

NFPA 25 - 13.4.1.2 Alarm Valves Interior and Strainers, filters, orifices Inspection - Report NFPA 25 - 13.4.2.1 Check valves - Interior inspection Inspection - Report NFPA 25 - 13.4.4.1.6 Dry Pipe Valves/Quick-Opening Devices Strainers, filters, orifices Inspection - Report NFPA 25 - 13.4.4.1.7 Deluge Valves Strainers, filters, orifices Inspection - Report NFPA 25 - 13.4.4.1.8 PreAction Valves Strainers, filters, orifices Inspection - Report

NFPA 25 - 13.5.1.2 Pressure-Reducing Valves and Relief Valves - A full flow test shall be conducted on each valve at 5-year intervals and shall be compared to previous test results Inspection - Report

NFPA 25 - 14.2 and 14.3 Internal Piping Condition and Obstruction Investigation Inspection - Report UFC - Table 2-2 - Wet Alarm Valve Clean and inspect internally to verify condition 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Anti-freeze loops Confirm correct solution mixture. 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Strainers Inspect internally and clean to verify condition. 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Strainers Inspect internally and clean to verify condition 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-5 - Pre-Action Strainers Clean and inspect the interior to verify condition 1 Inspection & Ordinary Maintenance - Report

Balancing valve

1. Flush to prevent concentrate buildup on diaphragm. 1 Inspection & Ordinary Maintenance - Report

Strainers (water supply) Inspect and clean if necessary. 1 Inspection & Ordinary Maintenance - Report

NFPA 25 - 5.3.1.1.1.6 Dry sprinklers that have been in service for 10 years shall be replaced or representative samples shall be tested and then retested at 10-year intervals Test - Report

NFPA 25 - 11.4.4.1 Bladder tank sight glass, where provided, shall be removed and cleaned Maintenance - Report NFPA 25 - 11.4.4.2 The foam concentrate tank shall be hydrostatically tested to the specified working pressure Test - Report

In-line balanced pressure type UFC - Table 2-2 - Wet Gauges Recalibrate or replace gauges. 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Gauges Recalibrate or replace gauges. 1 Inspection & Ordinary Maintenance - Report

Gauges Recalibrate or replace gauges. 1 Inspection & Ordinary Maintenance - Report

UFC - Table 2-9 - Foam

10 Years

UFC - Table 2-9 - Foam

UFC - Table 2-12 - High Expansion

3 Years

5 years

Deluge valve

1. Conduct full flow test. 1 Inspection & Test - Report

UFC - Table 2-5 - Pre-Action Gauges Recalibrate or replace gauges. 1 Inspection & Ordinary Maintenance - Report

UFC - Table 2-9 - Foam Foam concentrate tank

1. Drain, flush, and perform internal inspection for corrosion. If pressure vessel, perform hydrostatic test.

1 Inspection & Ordinary Maintenance - Report

UFC - Table 2-2 - Wet Fast Response sprinklers& Extra High temperature sprinklers Test sample sprinklers to verify response characteristics 1 Inspection & Test - Report

UFC - Table 2-3 - Dry Fast Response sprinklers& Extra High temperature sprinklers Test sample sprinklers to verify response characteristics 1 Inspection & Test - Report

UFC - Table 2-5 - Pre-Action Fast Response sprinklers& Extra High temperature sprinklers Test sample sprinklers to verify response characteristics 1 Inspection & Test - Report

UFC - Table 2-2 - Wet Standard sprinklers Replace or test a sample of sprinklers to verify response characteristics 1 Inspection & Test - replace if needed - Report UFC - Table 2-3 - Dry Standard sprinklers Replace or test a sample of sprinklers to verify response characteristics 1 Inspection & Test - replace if needed - Report

UFC - Table 2-5 - Pre-Action Closed-Head sprinklers Replace or test sample closed-head sprinklers to verify response characteristics 1 Inspection & Test - replace if needed - Report

After Activation UFC - Table 2-4 - High Expansion Strainers Inspect and clean after system actuation or flow test 1 Inspection & Ordinary Maintenance - Report

UFC - Table 2-2 - Wet Main Drain (following maintenance or repair action requiring the water supply to be shut off) Conduct main drain test to verify supply (valve position). 1 Inspection & Test - Report

UFC - Table 2-3 - Dry

Main Drain (following maintenance or repair action requiring the water supply to be shut off)

1. Conduct main drain test to verify supply (valve position).

2. Document static and residual pressure readings on a 3x5 tag and secure it to the system pressure gauge.

2 Inspection & Test - Report

UFC - Table 2-4 - Deluge

Main Drain (following maintenance or repair action requiring the water supply to be shut off)

1. Conduct main drain test to verify supply (valve position).

2. Document static and residual pressure readings on a 3x5 tag and secure it to the system pressure gauge.

2 Inspection & Test - Report

UFC - Table 2-5 - Pre-Action

Main Drain (following maintenance or repair action requiring the water supply to be shut off)

1. Conduct main drain test to verify supply (valve position).

2. Document static and residual pressure readings on a 3x5 tag and secure it to the system pressure gauge.

2 Inspection & Test - Report

UFC - Table 2-9 - Foam Main Drain (following maintenance or repair action requiring the water supply to be shut off) Conduct main drain test to verify supply (valve position). 1 Inspection & Test - Report

UFC - Table 2-12 - High Expansion

Main Drain (following maintenance or repair action requiring the water supply to be shut off)

1. Conduct main drain test to verify supply (valve position).

2. Document static and residual pressure readings on a 3x5 tag and secure it to the system pressure gauge.

2 Inspection & Test - Report

UFC - Table 2-2 - Wet

Entire System :

Visually check:

1. Pipe hangers.

2. Sprinklers for obstruction.

3. Piping for leaks.

4. Riser condition.

1 Inspection - Report

UFC - Table 2-3 - Dry

Entire System :

Visually check:

1. Pipe hangers.

2. Heads for obstruction.

3. Piping for leaks.

4. Riser condition.

5. Sprinkler spares.

1 Inspection - Report

Following System Modification or Repair

As part of building inspection

UFC - Table 2-4 - Deluge

20 Years

50 Years

UFC - Table 2-4 - Deluge

Entire System :

1. Visually check:

a. Pipe hangers.

b. Sprinklers for obstruction.

c. Piping for leaks.

d. Riser condition.

e. Sprinkler spares.

2. Ensure:

a. Detectors unblocked/uncovered.

b. Panels secured and indicator lamps functional.

c. Notification appliances in place.

d. Manual stations in place and unobstructed.

2 Inspection - Report

UFC - Table 2-5 - Pre-Action

Entire System :

1. Visually check:

a. Pipe hangers.

b. Sprinklers for obstruction.

c. Piping for leaks.

d. Riser condition.

e. Sprinkler spares.

2. Ensure:

a. Manual stations in place and unobstructed.

b. Detectors unblocked/uncovered.

c. Panels secured and indicator lamps functional.

d. Notification appliances in place.

2 Inspection - Report

UFC - Table 2-9 - Foam

Entire System :

1. Visually check:

a. Pipe hangers.

b. Sprinklers/nozzles for obstruction.

c. Piping for leaks.

d. Riser condition.

2. Ensure:

a. Detectors unblocked/uncovered.

b. Panels secured and indicator lamps functional.

c. Notification appliances in place.

d. Manual stations in place and unobstructed.

3. Check sprinkler spares.

3 Inspection - Report

UFC - Table 2-12 - High Expansion

Entire System :

1. Visually check:

a. Pipe hangers.

b. Generators for obstruction (air intake or foam discharge).

c. Generator nozzles for obstruction and generator screens for damage.

d. Piping for leaks.

e. Riser condition.

2. Ensure:

a. Detectors unblocked/uncovered.

b. Panels secured and indicator lamps functional.

c. Notification appliances in place.

d. Manual stations in place and unobstructed.

2 Inspection - Report

Note 3: UNI 12845 overrides "5 Years" tasks listed on UFC-Table 2-2

As part of building inspection (continue)

Note 1: UNI 12845 overrides entirely "Monthly" tasks listed on UFC-Table 2-2, 2-3, 2-4, 2-5, 2-9, & 2-12 and NFPA 25 - 5.2.4.1, 5.2.4.3 Note 2 - Some water supply lines have PIV with tamper switches that are required to be tested.

Semi-Annual UFC - Table 2-13 - Standpipe Hose connection and pressure reducing valves Inspect for damage, leaking, missing caps, and obstruction. 1 Inspection - Report

Piping Inspect for damage and pipe supports. 1 Inspection - Report Control valves Operate valve through entire travel to verify function. Lubricate stem 2 Inspection & Ordinary Maintenance - Report

UFC - Table 2-13 - Standpipe

Standpipe

1. Conduct flow test to verify flow capacity and minimum discharge pressure. (Test must confirm only flow/pressure—not duration—of supply).

2. Hydrostatic test to ensure integrity (dry standpipe systems only).

1 Inspection & Test - Report

NFPA 25 - 6.3.1 Flow test Test - Report NFPA 25 - 6.3.2 Hydrostatic test Test - Report

NFPA 25 - 13.5.2.2 Hose Connection Pressure-Regulating Devices - A full flow test shall be conducted on each device at 5-year intervals and compared to previous test results Test - Report

NFPA 25 - 13.5.3.2 Hose Rack Assembly Pressure-Regulating Devices - A full flow test shall be conducted on each device at 5-year intervals and compared to previous test results Test - Report

As part of building inspection UFC - Table 2-13 - Standpipe

Entire System

1. Visually check:

a. Pipe hangers.

b. Connections for obstruction.

c. Piping for leaks.

d. Riser condition.

1 Inspection & Test - Report

Tasks

UNI 12845 - 20.2.2.2 Check & annotate 3 Inspection & Test - Report UNI 12845 - 20.2.2.4 Testing fire pump for automatic activation 4 Inspection & Test - Report UNI 12845 - 20.2.2.5 Testing diesel fire pump after automatic activation 2 Inspection & Test - Report UNI 12845 - 20.2.2.6 Anti-freeze System (space heaters & heating cables) 1 Inspection & Test - Report UNI 12845 - 20.2.3 Backup batteries (where applicable) 1 Inspection & Ordinary Maintenance - Report

Pump House 1 Inspection - Report Control valves & isolating valves 1 Inspection - Report Pressure gauges 1 Inspection - Report Controllers

1. Verify that automatic controllers are in the automatic (AUTO) setting.

2. Inspect electric connections.

3. Operate manual and automatic stations.

3 Inspection - Report

Batteries 1 Inspect. & Ord. Maintenance - Report (Note 1)

Pumps

1. Start and churn to verify operability. (Where equipment permits, allow water to flow back to the source.) [Electric pumps shall operate for 10 minutes and engine-driven pumps shall operate for 30 minutes.]

2. Verify operation of relief valves.

3. Verify full level (for engine-driven pumps).

4. Inspect exhaust system for leaks (for engine-driven pumps).

5. For engine driven pumps, start again using second battery set and churn to verify operability.

(Where equipment permits, allow water to flow back to the source.)

5 Inspection & Test - Report

Quarterly UNI 12845 - 20.3.2.6 Power Supply Qualsiasi alimentazione elettrica secondaria derivante dai generatori diesel deve essere controllata per verificarne il corretto funzionamento. 1 Inspection & Test - Report

UNI 12845 - 20.3.4.2 Automatic fire pump flow test 1 Inspection & Test - Report UNI 12845 - 20.3.4.3 Missing Diesel fire pump automatic activation test 2 Inspection & Test - Report UNI 12845 - 20.3.4.4 Floating valves in water reservoirs 1 Inspection & Ordinary Maintenance - Report

UNI 12845 - 20.3.4.5 Suction chamber & pump filter I filtri sull’aspirazione delle pompe e le camere di sedimentazione con relative paratie filtranti devono essere ispezionati almeno annualmente e puliti se necessario. 1 Inspection & Ordinary Maintenance - Report

Control valves Operate and lubricate valves to ensure operability. 1 Inspection - Report

Fire Pumps & Air Compressors

Weekly

Monthly UFC - Table 2-16

Annual

Standpipe Systems

2 Years UFC - Table 2-13 - Standpipe

5 Years

Controllers

1. Calibrate pressure switches.

2. Exercise circuit breakers and switches to verify operability.

3. Inspect fuses.

3 Inspection & Ordinary Maintenance - Report

Pumps

1. Check coupling alignment to ensure that the shaft is aligned.

2. Check pump shaft end play.

3. Lubricate bearings.

4. Lubricate couplings.

5. Lubricate right-angle drives.

5 Inspection & Ordinary Maintenance - Report

Fuel (engine-driven pumps)

1. Sample fuel to verify quality. 1 Inspection - Report

Relief valves Calibrate valves. 1 Inspection & Ordinary Maintenance - Report Emergency power supply Test to verify availability and capacity for pump motor. 1 Inspection & Test - Report

UNI 12845 - 20.3.5.2

Accumulating tanks & pressurized vessels Tutti i serbatoi devono essere esaminati esternamente per verificare l’eventuale presenza di corrosione. Devono essere svuotati, puliti se necessario ed esaminati internamente per verificare la presenza di un’eventuale corrosione.

Dove necessario tutti i serbatoi devono essere riverniciati e/o deve essere ripristinata la protezione contro la corrosione.

2 Inspection & Ordinary Maintenance - Report

UNI 12845 - 20.3.5.3

Sectioning valves, alarm valves & check valves Tutte le valvole di intercettazione dell’alimentazione idrica, le valvole di allarme e di non ritorno devono essere esaminate e sostituite o revisionate se necessario.

1 Inspection & Ordinary Maintenance - Report

NFPA 25 - 9.2.6.1.1 Interior — steel tanks without corrosion protection Inspection - Report

UFC - Table 2-16

Pumps Conduct flow test to verify pump output. Test may be through a flow meter returning the water to a storage reservoir or through the test header. Recirculation of water to the suction piping is not permitted. In a multi-pump installation, each pump may be tested separately at not less than 100 percent design capacity for 30 minutes.

1 Inspection & Test - Report

NFPA 25 - 9.2.6.1.2 Interior — All tanks other than steel tanks without corrosion protection Inspection - Report NFPA 25 - 9.3.1 Tank's level indicators Inspection & Test - Report

NFPA 25 - 13.2.7 Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge Test - Report

10 Years UNI 12845 - 20.3.6 Water reservoirs (only Bldg. 219) 1 Inspection & Ordinary Maintenance - Report

2 Years UFC - Table 2-16

3 Years

5 Years

Note 1: UFC-Table 2-16 overrides "Monthly" tasks listed on UNI 12845 - 20.2.3.

Piping Inspect piping for obstructions and proper support. 1 Inspection - Report Storage vessels Inspect agent container for condition. Verify storage pressure of propellant 2 Inspection & Test - Report Agent Verify quantity and quality of agent. 1 Inspection & Test - Report Actuators

1. Inspect manual actuators for accessibility.

2. Inspect detection devices (fusible links or heat detectors) for contamination, and clean.

3. Test actuation system without agent release. (Coordinate with annual replacement of fixed temperature sensing elements.)

4. Verify that interfaces (gas shutoff, power shutoff) operate properly.

4 Inspection & Test - Report

Annual UFC - Table 2-18 - Dry Chemical Actuators Replace fixed temperature sensing elements (fusible links/metal alloy type). 1 Ordinary Maintenance - Report

5-12 Years UFC - Table 2-18 - Dry Chemical Storage vessels Conduct hydrostatic test for pressure cylinders in accordance with OSHA and DOT standards. 1 Ordinary Maintenance - Report part of building inspection UFC - Table 2-18 - Dry Chemical

Entire System

1. Visually check:

a. Pipe hangers.

b. Nozzles for obstruction.

c. Pipe condition.

2. Ensure:

a. Detectors unblocked/ uncovered.

b. Panels secured and indicator lamps functional.

c. Notification appliances in place.

d. Manual stations in place and unobstructed.

e. Nozzle covers (blow-off caps) in place.

f. Pressure gauge within operating range.

2 Inspection - Report

Tasks

Piping Inspect piping for obstructions and proper support. 1 Inspection - Report Storage vessels Inspect agent container for condition. Verify storage pressure of propellant 2 Inspection & Test - Report Agent Verify quantity and quality of agent. 1 Inspection & Test - Report Actuators

1. Inspect manual actuators for accessibility.

2. Inspect detection devices (fusible links or heat detectors) for contamination and clean or replace as necessary.

3. Test actuation system without agent release. (Coordinate with annual replacement of fixed temperature sensing elements)

4. Verify that interfaces (gas shutoff, power shutoff) operate properly.

4 Inspection & Test - Report

Annual UFC - Table 2-19 - Wet Chemical Actuators Replace fixed temperature sensing elements (fusible metal alloy type). 1 Ordinary Maintenance - Report

5-12 Years UFC - Table 2-19 - Wet Chemical Storage vessels Conduct hydrostatic test for pressure cylinders in accordance with OSHA and DOT standards. 1 Ordinary Maintenance - Report

As part of building inspection UFC - Table 2-19 - Wet Chemical

Entire System

1. Visually check:

a. Pipe hangers.

b. Nozzles for obstruction and proper alignment.

c. Riser condition.

2. Ensure:

a. Detectors unblocked/uncovered.

b. Panels secured and indicator lamps functional.

c. Notification appliances in place.

d. Manual stations in place and unobstructed.

e. Nozzle covers (blow-off caps) in place.

f. Pressure gauge within operating range.

2 Inspection - Report

Semi-Annual UFC - Table 2-18 - Dry Chemical

Semi-Annual UFC - Table 2-19 - Wet Chemical

Dry Chemical Systems - Includes Commercial Kitchen Suppression

Wet Chemical Systems - Includes Commercial Kitchen Suppression

Piping Inspect piping and nozzles for condition and orientation. 1 Inspection - Report Flexible Hoses Inspect for damage. 1 Inspection - Report Storage vessels Inspect the exterior of storage containers (tanks, spheres, cylinders). 1 Inspection - Report Agent & Propellant

1. Verify adequate quantity of agent.

2. Verify adequate pressure of agent/propellant and pressure gauge within operating range.

2 Inspection & Test - Report

Actuators

1. Inspect manual actuators for accessibility.

2. Test actuation without agent release.

2 Inspection & Test - Report

Auxiliary equipment Test to verify that interfaces (equipment shutdown, dampers, and door closures) operate properly and are activated by the system actuation 1 Inspection & Test - Report

Valves Verify that the valves are in proper alignment. 1 Inspection - Report

2 Years UFC - Table 2-21 Protected enclosure/room Inspect the enclosure to verify integrity and ability to maintain agent concentration 1 Inspection & Test - Report

5 Years UFC - Table 2-21 Storage vessels Perform complete external inspection of non-discharged cylinders to ensure suitability for use 2 Inspection & Test - Report

Protected enclosure/room Inspect the enclosure to verify integrity and ability to maintain agent concentration. 1 Inspection & Test - Report

After modification to compartment/protected enclosure If uncertainty exists, follow the enclosure procedures in NFPA 2001 1 Inspection & Ordinary Maintenance - Report

As part of building inspection UFC - Table 2-21

Entire System

1. Visually check:

a. Pipe hangers.

b. Nozzle for obstruction.

c. Piping for leaks.

d. Riser condition.

2. Ensure:

a. Detectors unblocked/uncovered.

b. Panels secured and indicator lamps functional.

c. Notification appliances in place.

d. Manual stations in place and unobstructed.

e. Nozzle covers in place.

f. Pressure gauge within operating range.

2 Inspection - Report

As Required UFC - Table 2-21

Clean Agent (Gas) Extinguishing Systems

Annual UFC - Table 2-21

File details come from the government source that posted it. Updated .