This document is a self-scoring matrix for a draft Request for Proposals (RFP) for a Multiple Award Construction Contract (MACC) solicitation at Ramstein AB and Spangdahlem AB in Germany. The MACC is an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for design-build, sustainment, maintenance, alteration, repair, renovation, and minor construction projects.

The self-scoring matrix outlines the evaluation criteria and scoring methodology, which will use the Highest Technically Rated Offeror (HTRO) process to select contractors based on technical factors, without considering price. The matrix includes categories for relevant construction experience, design experience, certifications/innovation, staffing, and geographic expertise. Offerors can earn up to 19,600 total points by demonstrating capabilities in these areas. A minimum technical score threshold will be required to be eligible for contract award. The anticipated RFP release date is October 2024, with proposals due by November 2024. The total program value is estimated at $950 million over 9 years, with individual task orders ranging from $1,000 to $20 million.

View the file

Other files

File Type Posted
RFI_MACC for KMC_Redacted.pdf PDF
DRAFT RFP Attachment 8_Question Answer_Government Response.pdf PDF
Draft RFP Attachment 8_Questions and Answers Gov Response.xlsx XLSX spreadsheet
Draft RFP Attachment 2e_Appendix E_MACC Cross Reference DRAFT V2.xlsx XLSX spreadsheet
Draft RFP Attachment 2c_Appendix C_Work Sample Cover Sheet V2.docx DOCX document
Draft RFP Attachment 2_DRAFT MACC Section L_Instructions to Offerors V2.pdf PDF
Draft RFP Attachment 2a_Appendix A_Joint Venture Agreements and Subs.xlsx XLSX spreadsheet
Draft RFP Attachment 3_DRAFT MACC Section M_Evaluation Criteria V2.pdf PDF
Draft RFP Amendment 0004 Cover Letter.pdf PDF
Draft RFP Attachment 7_Industry Day Record of Attendance.pdf PDF
Draft RFP Attachment 6_MACC Industry Day Presentation Slides.pdf PDF
Draft RFP Attachment 4a_UPDATED MACC Industry Day Information Sheet .pdf PDF
Draft RFP Attachment 5_Questions and Answers Form.xlsx XLSX spreadsheet
Draft RFP Attachment 2g_Appendix G_PIEE Solicitation Module Vendor Access Instructions.pdf PDF
Cover Letter - MACC Draft RFP.pdf PDF
Draft RFP Attachment 2f_Appendix F_Past Performance Information Sheet.docx DOCX document
Draft RFP Attachment 3_DRAFT MACC Section M_Evaluation Criteria.pdf PDF
Draft RFP Attachment 1_MACC General Requirements.pdf PDF
Draft RFP Attachment 2b_Appendix B_Sample Subcontractor Consent Letter.docx DOCX document
Draft RFP Attachment 2e_Appendix E_MACC Cross Reference DRAFT.xlsx XLSX spreadsheet
Draft RFP Attachment 4_MACC Industry Day Information Sheet.pdf PDF
Draft RFP Attachment 2c_Appendix C_Work Sample Cover Sheet.docx DOCX document
Draft RFP Attachment 2a_Appendix A_Teaming Agreements and Subcontractors.xlsx XLSX spreadsheet
Draft RFP Attachment 2_DRAFT MACC Section L_Instructions to Offerors.pdf PDF
Draft RFP Attachment 2d_Appendix D_MACC Self Scoring Matrix DRAFT.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Self-Score Sheet

Ramstein AB and Spangdahlem AB MACC
Solicitation No.: FA561324R0007
Appendix D
ElementEnter Yes OR No for each question as applicablePoint ValueScore
Instruction to Offeror SectionSection 1 – RELEVANT CONSTRUCTION EXPERIENCE
Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have been awarded after 01 Jan 2014 and 80% completed no later 30 Jun 2024)
Category 1Commercial, Industrial & Residential Bldg. Multi Trade
Category 1aSubmit a Project for each threshold, up to 4 total multiple trade projects for each0-4 ProjectsPoint Value EachTotal Across
Section 4.6.1.1.1.Prime Contractor under €250K Multiple Trade: Note: each project submitted receives a max point value of 100pts.1000
Section 4.6.1.1.1.Prime Contractor €250K to €1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts2000
Section 4.6.1.1.1.Prime Contractor over €1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts.3000
Category 1bIdentify the number of trades according STLB-Bau or European/US equivalent managed for each project above.0-12 ProjectsPoint Value EachTotal Across
Section 4.6.1.1.2.Number of trades <5 Note: each project submitted receives a max point value of 50pts.500
Section 4.6.1.1.2.Number of trades 5-10 Note: each project submitted receives a max point value of 200pts.2000
Section 4.6.1.1.2.Number of trades >10 Note: each project submitted receives a max point value of 300pts.3000
Category 2Construction for the US Government
Section 4.6.1.2.Submit a Project executed for the US Government for each threshold, up to 4 total projects for each0-4 ProjectsPoint Value EachTotal Across
Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts.3000
Category 3Multiple Construction Multi Trade
Section 4.6.1.3.Submit 2 to 5 Projects executed in parallel during a period of at least 6 months, with at least 10 trades according STLB-Bau or european/US equivalent for each2-5 ProjectsPoint Value EachTotal Across
Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts.1000
Category 4Utility System Construction (e.g. distribution lines, power plants, utility distribuition bldgs etc.)
Section 4.6.1.4.Submit a Project for each threshold, up to 3 total projects for each0-3 ProjectsPoint Value EachTotal Across
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.1000
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.2000
Category 5Construction in Secured Areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.)
Section 4.6.1.5.Submit a Project for each threshold, up to 3 total projects for each0-3 ProjectsPoint Value EachTotal Across
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.1000
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.2000
Category 6Individual Trade (Individual trade shall be at least 60% of total project)
Section 4.6.1.6.Submit a Project for each threshold, up to 2 total individual trade projects for each0-2 ProjectsPoint Value EachTotal Across
Prime Contractor Under €500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Under €500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Under €500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Under €500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Under €500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Under €500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Under €750K ROOFING: Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €750K ROOFING: Note: each project submitted receives a max point value of 200pts.2000
Prime Contractor Under €750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts1000
Prime Contractor Over €750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.2000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
Instruction to Offeror SectionSection 2 - DESIGN EXPERIENCE
Relevant Design Projects: (The submitted projects must meet the conditions listed, must have been performed in Germany, must have been awarded after 01 Jan 2014, and 80% completed no later 30 Jun 2024)
Category 7Experience as Prime on Design-Build Projects (KTR Designing then Building)
Category 7aSubmit a Project with Design Build effort, up to 2 total projects0-2 ProjectsPoint Value EachTotal Across
Section 4.6.2.1.1.Prime Contractor over $1M construction cost: Note: each project submitted receives a max point value of 400pts.4000
Category 7bFor one of the Projects above submit all design documents in compliance with HOAI Phase 3 and VDI 6026 Design PlanningYes or NoPoint Value EachTotal Across
Section 4.6.2.1.2.Statement of Work: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 200pts.
KG 330/340: interior and exterior walls (vertical construction elements)200
KG 350: Ceilings (horizontal construction elements)200
KG 360: Roofs200
KG 410: Wastewater, water, and gas systems200
KG 474: Fire-extinguishing systems200
KG 420: Heat-supply systems200
KG 430: Ventilation and air conditioning systems200
KG 440: Electrical systems200
KG 450: Communications, security and information systems200
KG 480: Building automation and automation of engineering structures200
Section 4.6.2.1.2.Drawings: Note: completeness and accuracy of documents and compliance with local code requirementsreceives a max point value of 400pts.
KG 330/340: interior and exterior walls (vertical construction elements)400
KG 350: Ceilings (horizontal construction elements)400
KG 360: Roofs400
KG 410: Waste water, water, and gas systems400
KG 474: Fire-extinguishing systems400
KG 420: Heat-supply systems400
KG 430: Ventilation and air conditioning systems400
KG 440: Electrical systems400
KG 450: Communications, security and information systems400
KG 480: Building automation and automation of engineering structures400
Section 4.6.2.1.2.Calculations: Note: completeness and accuracy of documents and compliance with local code requirementsreceives a max point value of 400pts.
KG 330/340: interior and exterior walls (vertical construction elements)400
KG 350: Ceilings (horizontal construction elements)400
KG 360: Roofs400
KG 410: Waste water, water, and gas systems400
KG 474: Fire-extinguishing systems400
KG 420: Heat-supply systems400
KG 430: Ventilation and air conditioning systems400
KG 440: Electrical systems400
KG 450: Communications, security and information systems400
KG 480: Building automation and automation of engineering structures400
Category 8Experience with German Construction Permitting requiring approval by local county administration
Section 4.6.2.2.Submit 3 Projects as a Prime which required construction permittingYes or NoPoint ValueTotal Across
Only one: Yes = 200pts. / No = 0pts2000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
Instruction to Offeror SectionSection 3 - CERTIFICATIONS/INNOVATION
Category 9Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Category 9aCertification for Construction according Water Resources Law (WHG; Wasserhaushaltsgesetz)Yes or NoPoint Value EachTotal Across
Section 4.6.3.1.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 9bCertification for Waterline Construction (DVGW; Deutscher Verein des Gas- und Wasserfaches)
Section 4.6.3.2.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 9cCertification for Wastewater and Sewer Construction and Maintenance (RAL-GZ 961)
Section 4.6.3.3.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 9dEmployment Safety Certification (e.g. OSHA, AMS)
Section 4.6.3.4.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 9ePrequalification Certification according § 6 VOB/A
Section 4.6.3.5.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 9fEnvironmental Management Systems (ISO 14001 Certification)
Section 4.6.3.6.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
Instruction to Offeror SectionSection 4 - STAFFING
Category 10Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column C.
Category 10aTrade/Construction Workers
Section 4.6.4.1.Submit number of personnel, pick only oneYes or NoPoint Value EachTotal Across
1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.1000
>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts2000
Category 10bArchitects/Engineers
Section 4.6.4.2.Submit number of personnell, pick only one
1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.1000
>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.2000
Category 10cCertified Safety Manager (SiGeKo or equivalent)
Section 4.6.4.3.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 10dCertified Building Energy Consultant
Section 4.6.4.4.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 10eCertified Fire Protection Specialist according DIN 14675 or equivalent
Section 4.6.4.5.Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Category 10fCertfied Training for Hazardous Material abatement TRGS (Technical Rules for Hazardous Substances)
Section 4.6.4.6Certificate: Only one Yes which = 200pts max /No = 0pts.2000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
Instruction to Offeror SectionSection 5 - GEOGRAPHIC EXPERTISE
Category 11Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Category 11aExisting manned office within 25km of RABYes or NoPoint Value EachTotal Across
Section 4.6.5.1.Certificate: Only one Yes which = 50pts max /No = 0pts.500
Category 11bExisting manned office within 25km of SAB
Section 4.6.5.2.Certificate: Only one Yes which = 50pts max /No = 0pts.500
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
TOTAL POINTS SCORED:- 0
MAXIMUM POINTS = 19,600
MINIMUM SCORE REQUIRED =TBD

Remarks: for Section 1 & 2 Projects can be submitted multiple times

HTRO Methodology

This acquisition will be conducted in accordance with the procedures outlined in FAR Part 15, Source Selection Processes and Techniques. In accordance with FAR Part 15, the acquisition will utilize the Highest Technically Rated Offeror (HTRO) method to select offerors based on their self-scored points, with a minimum score requirement.

The HTRO option-1, which excludes price and other non-technical factors, will be employed for the evaluation methodology. This option is particularly suitable for multiple award Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts when awarding to all offerors who score above a threshold technical score; i.e. MACC. The Government will evaluate all offerors' self-score above the threshold to validate their submitted scores. Past Performance will then be evaluated. Cost/Price and past performance will be evaluated at the task order level.

Example Max Pts.

Ramstein AB and Spangdahlem AB MACC
Solicitation No.: FA561324R0004
Attachment X
ElementEnter Yes OR No for each question as applicablePoint ValueScore
Instruction to Offeror SectionSection 1 – RELEVANT CONSTRUCTION EXPERIENCE
Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 7 years of the release date of the MACC solicitation, and 80% completed no later 30 Jun 2024)
Category 1Commercial, Industrial & Residential Bldg. Multi Trade
Category 1aSubmit a Project for each threshold, up to 4 total multiple trade projects for each0-4 ProjectsPoint Value EachTotal Across
Section 4.6.1.1.1.Prime Contractor under €250K Multiple Trade: Note: each project submitted receives a max point value of 100pts.4100400
Section 4.6.1.1.1.Prime Contractor €250K to €1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts4200800
Section 4.6.1.1.1.Prime Contractor over €1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts.43001200
Category 1bIdentify the number of trades according STLB-Bau or european/US equivalent managed for each project above.0-12 ProjectsPoint Value EachTotal Across
Section 4.6.1.1.2.Number of trades <5 Note: each project submitted receives a max point value of 50pts.0500
Section 4.6.1.1.2.Number of trades 5-10 Note: each project submitted receives a max point value of 200pts.02000
Section 4.6.1.1.2.Number of trades >10 Note: each project submitted receives a max point value of 300pts.123003600
Category 2Construction for the US Government
Section 4.6.1.2.Submit a Project executed for the US Government for each threshold, up to 4 total projects for each0-4 ProjectsPoint Value EachTotal Across
Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts.4200800
Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts.43001200
Category 3Multiple Construction Multi Trade
Section 4.6.1.3.Submit 2 to 5 Projects executed in parallel during a period of at least 6 months, with at least 10 trades according STLB-Bau or european/US equivalent for each2-5 ProjectsPoint Value EachTotal Across
Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts.5100500
Category 4Utility System Construction (e.g. distribution lines, power plants, utility distribuition bldgs etc.)
Section 4.6.1.4.Submit a Project for each threshold, up to 3 total projects for each0-3 ProjectsPoint Value EachTotal Across
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.3100300
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.3200600
Category 5Construction in secured areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.)
Section 4.6.1.5.Submit a Project for each threshold, up to 3 total projects for each0-3 ProjectsPoint Value EachTotal Across
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.3100300
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.3200600
Category 6Individual Trade (Individual trade shall be at least 60% of total project)
Section 4.6.1.6.Submit a Project for each threshold, up to 2 total individual trade projects for each0-2 ProjectsPoint Value EachTotal Across
Prime Contractor Under €500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 200pts.2200400
Prime Contractor Under €500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts.2200400
Prime Contractor Under €500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.2200400
Prime Contractor Under €500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts.2200400
Prime Contractor Under €500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts.2200400
Prime Contractor Under €500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 200pts.2200400
Prime Contractor Under €750K ROOFING: Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €750K ROOFING: Note: each project submitted receives a max point value of 200pts.2200400
Prime Contractor Under €750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts2100200
Prime Contractor Over €750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.2200400
SUBTOTAL SCORE FOR THIS SECTION ONLY:15100
Instruction to Offeror SectionSection 2 - DESIGN EXPERIENCE
Relevant Design Projects: (The submitted projects must meet the conditions listed, must have been performed in Germany, must have taken place within the last 7 years of the release date of the MACC solicitation, and 80% completed no later 30 Jun 2024)
Category 7Experience as Prime on Design-Build Projects (KTR Designing then Building)
Category 7aSubmit a Project with Design Build effort, up to 2 total projects0-2 ProjectsPoint Value EachTotal Across
Section 4.6.2.1.1.Prime Contractor over $1M construction cost: Note: each project submitted receives a max point value of 400pts.2400800
Category 7bFor one of the Projects above submit all design documents in compliance with HOAI Phase 3 and VDI 6026 Design PlanningYes or NoPoint Value EachTotal Across
Section 4.6.2.1.2.Statement of Work: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 200pts.Yes200200
Drawings: Note: completeness and accuracy of documents and compliance with local code requirementsreceives a max point value of 400pts.Yes400400
Calculations: Note: completeness and accuracy of documents and compliance with local code requirementsreceives a max point value of 400pts.Yes400400
Category 8Experience with German Construction Permitting requiring approval by local county administration
Section 4.6.2.2.Submit 3 Projects as a Prime which required construction permittingYes or NoPoint ValueTotal Across
Only one: Yes = 200pts. / No = 0ptsYes200200
SUBTOTAL SCORE FOR THIS SECTION ONLY:2000
Instruction to Offeror SectionSection 3 - CERTIFICATIONS/INNOVATION
Category 9Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Category 9aCertification for Construction according Water Resources Law (WHG; Wasserhaushaltsgesetz)Yes or NoPoint Value EachTotal Across
Section 4.6.3.1.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 9bCertification for Waterline Construction (DVGW; Deutscher Verein des Gas- und Wasserfaches))
Section 4.6.3.2.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 9cCertification for Wastewater and Sewer Construction and Maintenance (RAL-GZ 961)
Section 4.6.3.3.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 9dTRGS (Technical Rules for Hazardous Substances) Certification
Section 4.6.3.4.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 9eEmployment Safety Certification (e.g. OSHA, AMS)
Section 4.6.3.5.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 9fPrequalification Certification according § 6 VOB/A
Section 4.6.3.6.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 9gEnvironmental Management Systems (ISO 14001 Certification)
Section 4.6.3.7.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
SUBTOTAL SCORE FOR THIS SECTION ONLY:1400
Instruction to Offeror SectionSection 4 - STAFFING
Category 10Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column C.
Category 10aTrade/Construction Workers
Section 4.6.4.1.Submit number of personnel, pick only oneYes or NoPoint Value EachTotal Across
≤5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.1000
>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0ptsYes200200
Category 10bArchitects/Engineers
Section 4.6.4.2.Submit number of personnell, pick only one
≤3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.1000
>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 10cCertified Safety Manager (SiGeKo or equivalent)
Section 4.6.4.3.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 10dCertified Building Energy Consultant
Section 4.6.4.4.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
Category 10eCertified Fire Protection Specialist according DIN 14675 or equivalent
Section 4.6.4.5.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes200200
SUBTOTAL SCORE FOR THIS SECTION ONLY:1000
Instruction to Offeror SectionSection 5 - GEOGRAPHIC EXPERTISE
Category 11Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Category 11aExisting office within 25km of RABYes or NoPoint Value EachTotal Across
Section 4.6.5.1.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes5050
Category 11bExisting office within 25km of SAB
Section 4.6.5.2.Certificate: Only one Yes which = 200pts max /No = 0pts.Yes5050
SUBTOTAL SCORE FOR THIS SECTION ONLY:100
TOTAL POINTS SCORED:19,600
MAXIMUM POINTS = 19,600
MINIMUM SCORE REQUIRED =

Remarks: for Section 2 & 3 Projects can be submitted multiple times