Attachment 1, Pricing Schedule
FA5613-18-R-0007
Note to Offerors: CLINs 0007, 1007, 2007, 3007 and 4007 are for consumable parts for Repair and are prefilled with the estimated amounts for the respective periods. Offerors shall not change these amounts. Total amounts requested for each period and the overall grand total amount shall be inclusive the amounts for Parts for Repair.
Base Period 01 Oct 2018 – 31 May 2019, CLINs 0002 through 0007 NOTE: CLIN 0001 IS NOT REQUIRED IN THE BASE PERIOD, BECAUSE THE ANNUAL PREVENTIVE MAINTENANCE AND SAFETY INSPECTIONS WERE PERFORMED UNDER THE PRECEDING CONTRACT.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 152 |
| Each |
| EUR____________ |
| EUR________________ |
MONTHLY INSPECTIONS, FFP (Firm Fixed Price)
FOR THE FIRE DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 78 |
| Each |
| EUR____________ |
| EUR________________ |
ANNUAL PREVENTIVE MAINTENANCE, FFP (Firm Fixed Price)
FOR THE AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 156 |
| Each |
| EUR____________ |
| EUR________________ |
SEMI-ANNUAL SAFETY INSPECTIONS, FFP (Firm Fixed Price)
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 196 |
| Each |
| EUR____________ |
| EUR________________ |
ROUTINE REPAIR SERVICE CALLS, (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS), IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the total actual hours worked exceeds the total estimated 5 hours for Routine Repair in Appendices A & B, Estimated Workload Data Per Year, by more than 5% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 5%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Routine Repair in Appendices A amd B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 30 |
| Each |
| EUR____________ |
| EUR________________ |
EMERGENCY REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 3 hours for Emergency Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 10% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 10%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Emergency Repairs in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 1 |
| LOT |
| EUR 72,000.00 (NTE) |
| EUR 72,000.00 (NTE) |
PARTS FOR REPAIR, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018.
Total for Base Period, CLINs 0002 through 0007:
EUR_________________
First Option Period 01 Jun 2019 – 31 May 2020, CLINs 1001 through 1007
| ITEM NO |
| SUPPLIES/SERVICES |
| CURRENT QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 645 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE WITH SAFETY INSPECTIONS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS, IN ACCORDANCE WITH THE THE ATTACHED PERFORMANCE WORK STATEMENT (PWS), DATED 09 MAR 2018 |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 228 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| MONTHLY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 78 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 156 |
| Each |
| EUR___________ |
| EUR________________ |
| OPTION |
| SEMI-ANNUAL SAFETY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 293 |
| Each |
| EUR____________ |
| EUR________________ |
ROUTINE REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS), IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 5 hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 5% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 5%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 45 |
| Each |
| EUR____________ |
| EUR________________ |
EMERGENCY REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 3 hours for Emergency Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 10% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 10%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Emergency Repairs in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 1 |
| LOT |
| EUR112,000.00 (NTE) |
| EUR 112,000.00 (NTE) |
PARTS FOR REPAIR, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018.
Total for First Option Period, CLINs 1001 through 1007:
Second Option Period 01 Jun 2020 – 31 May 2021, CLINs 2001 through 2007
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 645 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE WITH SAFETY INSPECTIONS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS, IN ACCORDANCE WITH THE THE ATTACHED PERFORMANCE WORK STATEMENT (PWS), DATED 09 MAR 2018 |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 228 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| MONTHLY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 78 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 156 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| SEMI-ANNUAL SAFETY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 293 |
| Each |
| EUR____________ |
| EUR________________ |
ROUTINE REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 5 hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 5% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 5%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 45 |
| Each |
| EUR____________ |
| EUR________________ |
EMERGENCY REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 3 hours for Emergency Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 10% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 10%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Emergency Repairs in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 1 |
| LOT |
| EUR112,000.00 (NTE) |
| EUR 112,000.00 (NTE) |
PARTS FOR REPAIR, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018
Total for Second Option Period, CLINs 2001 through 2007:
Third Option Period 01 Jun 2021 – 31 May 2022, CLINs 3001 through 3007
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 645 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE WITH SAFETY INSPECTIONS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS, IN ACCORDANCE WITH THE THE ATTACHED PERFORMANCE WORK STATEMENT (PWS), DATED 09 MAR 2018 |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 228 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| MONTHLY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 78 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 156 |
| Each |
| EUR____________ |
| EUR______________ |
| OPTION |
| SEMI-ANNUAL SAFETY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 293 |
| Each |
| EUR____________ |
| EUR________________ |
ROUTINE REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 5 hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 5% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 5%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, as adjusted in theses Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 45 |
| Each |
| EUR____________ |
| EUR________________ |
EMERGENCY REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 3 hours for Emergency Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 10% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 10%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Emergency Repairs in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 1 |
| LOT |
| EUR112,000.00 (NTE) |
| EUR 112,000.00 (NTE) |
PARTS FOR REPAIR, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018.
Total for Third Option Period, CLINs 3001 through 3007:
Forth Option Period 01 Jun 2022 – 31 May 2023, CLINs 4001 through 4007
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 645 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE WITH SAFETY INSPECTIONS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS, IN ACCORDANCE WITH THE THE ATTACHED PERFORMANCE WORK STATEMENT (PWS), DATED 09 MAR 2018 |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 228 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| MONTHLY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 78 |
| Each |
| EUR____________ |
| EUR________________ |
| OPTION |
| ANNUAL PREVENTIVE MAINTENANCE, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| EUR_____________ |
| EUR______________ |
| OPTION |
| SEMI-ANNUAL SAFETY INSPECTIONS, FFP (Firm Fixed Price) |
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 293 |
| Each |
| EUR____________ |
| EUR________________ |
ROUTINE REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 5 hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 5% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 5%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Routine Repair in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 45 |
| Each |
| EUR____________ |
| EUR________________ |
EMERGENCY REPAIR SERVICE CALLS, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018, AND APPENDICES A AND B, ESTIMATED WORKLOAD DATA PER YEAR.
The contractor shall invoice and will be paid by service call, regardless of the actual duration of the repair work per call.
If the actual hours worked exceeds the total estimated 3 hours for Emergency Repair in Appendices A and B, Estimated Workload Data Per Year, by more than 10% at the end of the performance period, upon the request of the contractor, an adjustment may be made for the hours worked in excess of the 10%, in accordance with clause DFARS 252.243-7002, Request for Equitable Adjustment.
The basis for the adjustment are the total estimated hours for Emergency Repairs in Appendices A and B, Estimated Workload Data Per Year, as adjusted in these Appendices.
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED COST |
| 1 |
| LOT |
| EUR112,000.00 (NTE) |
| EUR 112,000.00 (NTE) |
PARTS FOR REPAIR, FFP (Firm Fixed Price), FOR THE OVERHEAD DOORS AND AUTOMATIC OPENING DOORS, IN ACCORDANCE WITH THE ATTACHED PWS, DATED 09 MAR 2018.
Total for Forth Option Period, CLINs 4001 through 4007:
GRAND TOTAL FOR BASE AND ALL OPTION PERIODS: