This is a Questions and Answers document (Amendment 2) for federal contract opportunity FA560626QA050 concerning LCO2 Tank Rental, resulting from a site visit held on September 11, 2026.

The document addresses four key inquiries from the site visit. Regarding consumption requirements, the government estimates dry-ice usage of 300-500 kg per week, with annual production projected at 12,000-24,000 kg. The contractor is responsible for installing all connections including electrical, air, and liquid interfaces. Air compressor specifications require an air supply of 8 Bar (116 PSI) to 10 Bar (145 PSI) at 150L/min (5.3 CFM). Finally, no installation of a concrete pad on site is required. These responses clarify technical and logistical requirements for the LCO2 tank rental service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2, FA560626QA050, LCO2 Tank Rental, additional Questions and Answers from the site visit, held on Friday, 11 September 2026 at 10:00 hrs CEST

1) Q. Estimated dry-ice usage?

A. 300-500kg per week/12,000-24,000kg is our estimated production per year

2) Q. Contractors installing all connections?

A. Yes, all connections (electrical, air, liquid, etc.)

3) Q. Air Compressor requirements?

A. Air supply, 8 Bar = 116 PSI, 10 Bar = 145 PS, 150L/min = 5.3 CFM

4) Q. Installation of concrete pad on site need?

A: no installation of concrete pad required.