SOW updated 24 FEB 25.pdf

PDF 110 KB Posted

Attached to
Zemmer Relocation Federal contract opportunity
Solicitation number
FA560625Q2006
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This Statement of Work details requirements for relocating all items from the Zemmer warehouse to Spangdahlem Air Base building 173. The contractor must provide all labor, tools, parts, materials, and equipment needed for the relocation.

The scope includes moving approximately 1,800 cubic meters of items inside the warehouse (forklifts, office furniture, shelves, workbenches, pallet jacks, equipment) and 1,700 cubic meters of items outside (large containers, generators). Specific requirements include disassembling and reinstalling a Bruinzeel mobile shelving unit and Viessmann walk-in refer unit at the new location, providing a non-diesel powered forklift, and completing the move starting March 17, 2025. Work must be performed during normal duty hours (Monday-Friday, 07:30-16:30), and an Ozone Depleting Substance Certification is required. This is part of Department of the Air Force solicitation FA560625Q2006, with site visits to be coordinated by February 20, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Zemmer Relocation, newest first.
File Type Posted
ZEMMER site visit questions_response.pdf PDF
ZEMMER relo COMBO print 2.pdf PDF
Statement of need (WRM warehouse re-location) updated.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Services Non-Personal: Contractor to provide all labor, tools, parts, materials, equipment, required to relocate all items from our Zemmer warehouse to Spangdahlem Air Base building 173.

Title of Project:

Relocate / move all items from Zemmer warehouse to Spangdahlem Air Base building 173.

Scope of Work:

1. All items located inside the warehouse (including forklifts, office furniture, shelves, workbenches, palett jacks, equipment items, and items on palettes) -about 1,800 cubic meters of volume = 63,600cubic feet.

2. All items located outside of the warehouse (including large containers, large generators, etc.) – about 1,700 cubic meters of volume = 60,000cubic feet.

3. Disassembling and re-installation of mobile shelving unit at the new location Made by: Bruinzeel storage systems. ( Rolling Shelves)

4. Disassembling and re-installation of walk-in refer unit at the new location Made by: Viessmann.

5. Provide non diesel-powered forklift to move cargo and move pallets inside the warehouse or to designated drop off area.

6. Move will need to take happen starting 17 March 2025.

Work can only be performed during normal duty hours Monday – Friday 07:30 – 16:30.

Ozone Depleting Substance Certification (ODS) required.

Ozone Depleting Substance Certification (ODS) required.