This document is an Asbestos Refurbishment Survey Report prepared by Bromgrove Limited for Building 243 at RAF Mildenhall in Bury St Edmunds, United Kingdom. The survey was conducted on July 7, 2025, and quality-controlled on August 11, 2025, under Project Reference 25/356, with client contact Edward Hill.

The survey identified 14 asbestos-containing materials (ACMs) across the 1960s concrete-constructed base movie theater building, with material risk scores ranging from Very Low to Medium. Key findings include gaskets to pipe flanges (scored Medium priority, crocidolite fiber type), bitumen flooring in multiple locations (Very Low scores, chrysotile fiber type), window sill cement (Very Low score, chrysotile), and external materials including damp proof course and mastic to plant room doors (both Very Low scores, chrysotile). Twenty bulk samples were analyzed, with results confirming presence of chrysotile and crocidolite asbestos. The survey also identified three areas of limited access: inside metal waste pipe joins (access would cause significant damage), electrical boxes in the plant room (live service supply), and a locked timber access hatch. Excluded from the survey scope were areas under the building slab, operational plant and machinery, ground floor drains and ducts, and external drains. All identified ACMs carry a standard recommendation to "Remove if planned works may disturb," indicating controlled management protocols should be implemented prior to any refurbishment or maintenance activities affecting these materials.

View the file

Other files

File Type Posted
Q and A- FA487726Q0069.pdf PDF
Quote Sheet.pdf PDF
Solicitation - FA558726Q0069 - SAM.gov.pdf PDF
Base Theater AV Upgrade- Statement of Objectives.pdf PDF
Base Theater Floorplan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BROMGROVE LIMITED

Asbestos Refurbishment Survey.

Building 243

RAF Mildenhall

Survey Date: 7th July 2025

Project Ref: 25/356

Submitted By:

Bromgrove Limited 3rd Floor, Queensberry House, 106 Queens Road, Brighton, East Sussex, BN1 3XF United Kingdom

Report Details

Report By Bromgrove Ltd

Client U.S Military

Project 25/356

Site Address Building 243 RAF Mildenhall Bury St Edmunds

Site Coordinates 52.368759182693736, 0.4717195393870952

Site Location

Site Description Base Movie theater 1960s building concrete construction.

Scope of Work Refurbishment survey to the building to cover future works. We have carried out an asbestos survey to all areas of the building shown on the plans in this report. The survey was undertaken while the building was in use and furnished so access and ability to open up all areas was limited by these factors. Despite these constraints, we endeavoured to be as thorough as possible in our inspection. This report takes into account the previous asbestos survey information from the reports listed below:

- 1998_B0243_ASR

Areas Excluded:

• Under building slab

• Inside plant and machinery as operational at the time of survey.

• Drains and ducts on the ground floor.

• External drains and ducts

• For specific no/limited access areas see the Summary of Locations or Items of

Limited Access section in this report.

Purpose of Survey This survey is an asbestos refurbishment survey designed to provide information on asbestos materials in the building to cover future works and ongoing maintenance. It has not been carried out prior to a specific project but rather to cover the whole building and any potential future projects.

Surveyors Edward Hill

Survey Dates 7 Jul 2025

QC Date 11 Aug 2025

Asbestos Refurbishment Survey Asbestos Refurbishment Survey

Bromgrove Ltd > Our Ref: 25/356 Page 2 of 89

Totals

An overview of the data collected on site, during the survey

Very Low Low Medium High

13 0 1 0

Asbestos Refurbishment Survey Totals

Bromgrove Ltd > Our Ref: 25/356 Page 3 of 89

Table of Contents

Sign Off 5

Introduction 5

Executive Summary 5

Variations to Scope 5

Summary of Asbestos-Containing Materials 6

Summary of Non-Asbestos-Containing Materials 7

Summary of Locations or Items of Limited Access 8

Register 9

Inspected Locations and Items 11

Inspection Photographs 16

Appendices 80

Floorplans 80

Bulk Sample Test Certificates 83

Types of Asbestos Survey 86

Material Assessment Scores 87

Asbestos Materials 88

Asbestos Refurbishment Survey Table of Contents

Bromgrove Ltd > Our Ref: 25/356 Page 4 of 89

Sign Off

Quality Control

Edward Hill

11th Aug 2025

Introduction

This survey was conducted in accordance with HSG 264 (Asbestos: The Survey Guide). Bromgrove Ltd cannot accept any liability for loss, injury, damage or penalty issues that arise for reasons of survey scope limitations.

Bromgrove Ltd cannot be held responsible for asbestos potentially present in areas of the building not explicitly specified within the client instruction, not indicated on provided site plans or not physically possible to access.

Bromgrove Ltd cannot be held responsible for any damage caused as part of this survey carried out on your behalf.

Due to the nature and necessity of sampling for asbestos some damage is unavoidable and will be limited to that necessary for taking of the samples.

Executive Summary

Variations to Scope

All areas within scope were accessed during the survey

Asbestos Refurbishment Survey Sign Off

Bromgrove Ltd > Our Ref: 25/356 Page 5 of 89

Summary of Asbestos-Containing Materials

These suspected materials were assessed as asbestos-containing.

Building / Level /

Location

Item Material Material

Score

Recommendation Page

Main Building / 1 /

001 - Throughout

Building

Gaskets to pipe flanges

Gasket (Compressed) 7

Medium

Remove if planned works may disturb

Main Building / 1 /

010 - Store Room

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 /

011 - Corridor

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 /

012 - Plant Room

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 /

012 - Plant Room

Window Sill Cement 4

Very Low

Remove if planned works may disturb

Main Building / 1 /

013 - Lobby

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 /

017 - Rear Lobby

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 /

018 - Changing

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 /

019 - Changing

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 /

020 - Storage

Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 2 /

022 - Projection room/landing

Bitumen to floor Bitumen 4

Very Low

Remove if planned works may disturb

Main Building / 2 /

023 - Lobby/toilet

Bitumen to floor Bitumen 4

Very Low

Remove if planned works may disturb

Main Building /

External / 024 -

Externals

Damp proof course Bituminous Product 3

Very Low

Remove if planned works may disturb

Main Building /

External / 024 -

Externals

Mastic to plant room doors

Mastic 3

Very Low

Remove if planned works may disturb

Asbestos Refurbishment Survey Summary of Asbestos-Containing Materials

Bromgrove Ltd > Our Ref: 25/356 Page 6 of 89

Summary of Non-Asbestos-Containing Materials

These suspected materials were assessed as non-asbestos-containing.

Building / Level / Location Item Material Page

Main Building / 1 / 001 -

Throughout Building

Mastic to Ducting Mastic 17

Main Building / 1 / 002 - Entrance

Lobby

Access panel to column Insulation Board 20

Main Building / 1 / 004 - Servery Floor tiles and bitumen Vinyl tile and Bitumen 25

Main Building / 1 / 006 - Toilet Bitumen to floor Bitumen 29

Main Building / 1 / 007 - Female

Toilet

Bitumen to floor Bitumen 31

Main Building / 1 / 008 - Male

Toilet

Bitumen to floor Bitumen 33

Main Building / 1 / 009 - Janitors

Closet

Bitumen to floor Bitumen 35

Main Building / 1 / 015 -

Auditorium

Bitumen to floor Bitumen 46

Main Building / 1 / 015 -

Auditorium

Plaster to walls Plaster 47

Main Building / 1 / 016 - Stage Insulation under wooden floor Insulation 49

Main Building / 1 / 016a - Void

Under Stage

Dust & debris Insulation 52

Main Building / 1 / 021 - Plant room

Chipboard to the ceiling Chipboard 61

Main Building / 1 / 021 - Plant room

Hardset over plaster to ducting Hardset 64

Main Building / 1 / 021 - Plant room

Red mastic to ducting flanges Mastic 63

Main Building / 1 / 021 - Plant room

Thermal residue/debris Thermal Insulation 62

Main Building / 1 / 021 - Plant room

Thermal residue/debris Thermal Insulation 65

Main Building / External / 024 -

Externals

Bitumen stair nose Bituminous Product 76

Main Building / External / 024 -

Externals

Felt lining to roof Bituminous Felt 74

Asbestos Refurbishment Survey Summary of Non-Asbestos-Containing Materials

Bromgrove Ltd > Our Ref: 25/356 Page 7 of 89 table continued from previous page...

Building / Level / Location Item Material Page

Main Building / External / 024 -

Externals

Mastic to walls Mastic 75

Summary of Locations or Items of Limited Access

These locations or items could not be fully accessed during survey. Asbestos should be presumed to be present until a further assessment can be undertaken. Note that the survey scope may exclude other areas - see Report Details

(p. 2) and Variations to Scope (p. 5).

Building / Level /

Location

Inspect Access / Notes Photo 1 Photo 2 Page

Main Building / 1 /

001 - Throughout

Building

Inside metal waste pipe joins

No Access / Access would cause significant damage.

Main Building / 1 /

021 - Plant room

Electrical boxes No Access / Live

Service Supply

Main Building / 1 /

021 - Plant room

Timber access hatch No Access / Locked 67

Asbestos Refurbishment Survey Summary of Locations or Items of Limited Access

Bromgrove Ltd > Our Ref: 25/356 Page 8 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/4rnsG96Xh0hO4KV7ovO8/1000064422.jpg?added=2025-07-07T12%3A40%3A14.580421Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/4rnsG96Xh0hO4KV7ovO8/1000064422.jpg?added=2025-07-07T12%3A40%3A14.580421Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/bqjwcdSFVGmCWYha72lT/1000064421.jpg?added=2025-07-07T12%3A40%3A14.585852Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/bqjwcdSFVGmCWYha72lT/1000064421.jpg?added=2025-07-07T12%3A40%3A14.585852Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/0bBatDWO4NGe16i1HHJK/image_picker_03A1BD40-6528-4BD4-A152-0C235DD2338D-14077-00000166D2F4E213.jpg?added=2025-07-08T12%3A31%3A47.974730Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/0bBatDWO4NGe16i1HHJK/image_picker_03A1BD40-6528-4BD4-A152-0C235DD2338D-14077-00000166D2F4E213.jpg?added=2025-07-08T12%3A31%3A47.974730Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/sqNgQDjxdHxtq1gsBSv9/image_picker_9D45732E-1AEE-469F-A586-231876CC56F3-14077-00000166DB503896.jpg?added=2025-07-08T12%3A31%3A47.983571Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/sqNgQDjxdHxtq1gsBSv9/image_picker_9D45732E-1AEE-469F-A586-231876CC56F3-14077-00000166DB503896.jpg?added=2025-07-08T12%3A31%3A47.983571Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/bZ3O4T1uQvvy6zdw3Zsj/image_picker_9334709A-B7A6-41BD-95B8-8E398F8578B6-14077-000001675B5D6DD0.jpg?added=2025-07-08T12%3A33%3A59.451692Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/bZ3O4T1uQvvy6zdw3Zsj/image_picker_9334709A-B7A6-41BD-95B8-8E398F8578B6-14077-000001675B5D6DD0.jpg?added=2025-07-08T12%3A33%3A59.451692Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/lnpBLtci49DlgqezC3bx/image_picker_286CC8BA-1123-4465-8C44-FD30C4324C7D-14077-000001676173850B.jpg?added=2025-07-08T12%3A33%3A59.459426Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/UyzKUjPyiHQuXHJwrQfCaRLTLui1/uploads/lnpBLtci49DlgqezC3bx/image_picker_286CC8BA-1123-4465-8C44-FD30C4324C7D-14077-000001676173850B.jpg?added=2025-07-08T12%3A33%3A59.459426Z

Register

Building / Level / Location Item Material Strategy /

Sample Id

Extent Fibre Type Product

Type

Extent of

Damage

Surface

Treatment

Material

Score

Recommendation Page

Main Building / 1 / 001 -

Throughout Building

Gaskets to pipe flanges Gasket (Compressed) Presume Throughout

Building

Crocidolite 2 1 1 7

Medium

Remove if planned works may disturb

Main Building / 1 / 010 -

Store Room

Bitumen to floor Bitumen Strongly

Presume

3 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 011 -

Corridor

Bitumen to floor Bitumen Sample

4 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 012 -

Plant Room

Bitumen to floor Bitumen Strongly

Presume

8 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 012 -

Plant Room

Window Sill Cement Sample

4 m Chrysotile 1 1 1 4

Very Low

Remove if planned works may disturb

Main Building / 1 / 013 -

Lobby

Bitumen to floor Bitumen Strongly

Presume

24 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 017 -

Rear Lobby

Bitumen to floor Bitumen Sample

4 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 018 -

Changing

Bitumen to floor Bitumen Strongly

Presume

5 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 019 -

Changing

Bitumen to floor Bitumen Strongly

Presume

6 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 020 -

Storage

Bitumen to floor Bitumen Strongly

Presume

6 sq. m. Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / 2 / 022 -

Projection room/landing

Bitumen to floor Bitumen Strongly

Presume

25 sq. m. Chrysotile 1 1 1 4

Very Low

Remove if planned works may disturb

Asbestos Refurbishment Survey Register

Bromgrove Ltd > Our Ref: 25/356 Page 9 of 89

Building / Level / Location Item Material Strategy /

Sample Id

Extent Fibre Type Product

Type

Extent of

Damage

Surface

Treatment

Material

Score

Recommendation Page

Main Building / 2 / 023 -

Lobby/toilet

Bitumen to floor Bitumen Strongly

Presume

3.5 sq. m. Chrysotile 1 1 1 4

Very Low

Remove if planned works may disturb

Main Building / External /

024 - Externals

Damp proof course Bituminous Product Sample

Thoughtout walls

Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Main Building / External /

024 - Externals

Mastic to plant room doors

Mastic Sample

10 Lm Chrysotile 1 1 0 3

Very Low

Remove if planned works may disturb

Asbestos Refurbishment Survey Register

Bromgrove Ltd > Our Ref: 25/356 Page 10 of 89

Inspected Locations and Items

A summary of all locations and items inspected during the survey, including ACMs, non-ACMs and items & locations that could not be fully accessed.

Building / Level / Location Item Material Access / Notes Material

Score

Recommendation Page

Main Building / 1 / 001 - Throughout

Building

Gaskets to pipe flanges Gasket (Compressed) 7

Medium

Remove if planned works may disturb

Main Building / 1 / 001 - Throughout

Building

Inside metal waste pipe joins -- No Access / Access would cause significant damage.

Main Building / 1 / 001 - Throughout

Building

Mastic to Ducting Mastic 0

None

Main Building / 1 / 002 - Entrance

Lobby

Modern suspended ceiling tiles, solid plastered walls, modern vinyl flooring, non asbestos step nosing. MMMF pipe insulation in ceiling void.

Main Building / 1 / 002 - Entrance

Lobby

Access panel to column Insulation Board 0

None

Main Building / 1 / 002 - Entrance

Lobby

Cladding to columns Plasterboard and polystyrene to concrete columns.

Main Building / 1 / 002 - Entrance

Lobby

Flooring Modern vinyl to screed 22

Main Building / 1 / 003 - Ticket

Office

Modern suspended ceiling tiles, solid plastered walls, modern vinyl flooring, MDF partition wall

Main Building / 1 / 004 - Servery Modern suspended ceiling tiles, solid plastered walls, modern vinyl flooring, MDF partition wall, modern electrical panels

Main Building / 1 / 004 - Servery Boxing Timber to copper pipes 26

Main Building / 1 / 004 - Servery Floor tiles and bitumen Vinyl tile and Bitumen 0

None

Main Building / 1 / 005 - Office Modern suspended ceiling tiles, solid plastered walls, carpet to concrete flooring, MDF boxing to pipes

Main Building / 1 / 006 - Toilet Modern suspended ceiling tiles, MMMF pipe insulation, MDF boxing ceramic wall and floor tiles.

Asbestos Refurbishment Survey Inspected Locations and Items

Bromgrove Ltd > Our Ref: 25/356 Page 11 of 89

Building / Level / Location Item Material Access / Notes Material

Score

Recommendation Page

Main Building / 1 / 006 - Toilet Bitumen to floor Bitumen 0

None

Main Building / 1 / 007 - Female

Toilet

Modern suspended ceiling tiles, MMMF pipe insulation, MDF boxing ceramic wall and floor tiles, metal soil pipe in service void.

Main Building / 1 / 007 - Female

Toilet

Bitumen to floor Bitumen 0

None

Main Building / 1 / 008 - Male Toilet Modern suspended ceiling tiles, MMMF pipe insulation, MDF boxing ceramic wall and floor tiles, metal soil pipe in service void.

Main Building / 1 / 008 - Male Toilet Bitumen to floor Bitumen 0

None

Main Building / 1 / 009 - Janitors

Closet

Concrete ceiling, timber panel to ceiling, solid plastered walls, modern vinyl to concrete floor.

Main Building / 1 / 009 - Janitors

Closet

Bitumen to floor Bitumen 0

None

Main Building / 1 / 010 - Store Room Concrete ceiling, block walls, modern vinyl to concrete floor. 38

Main Building / 1 / 010 - Store Room Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 011 - Corridor Concrete ceiling, block walls, modern vinyl to concrete floor, non asbestos step Nosing

Main Building / 1 / 011 - Corridor Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 012 - Plant Room Modern suspended ceiling tiles, MMMF insulation to pipes, block walls, modern vinyl flooring, foam insulated tank

Main Building / 1 / 012 - Plant Room Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 012 - Plant Room Window Sill Cement 4

Very Low

Remove if planned works may disturb

Bromgrove Ltd > Our Ref: 25/356 Page 12 of 89

Score

Recommendation Page

Main Building / 1 / 013 - Lobby Modern suspended ceiling tiles, concrete ceiling above, MMMF pipe insulation inside timber boxing, solid walls

Main Building / 1 / 013 - Lobby Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 015 - Auditorium Plasterboard ceiling 48

Main Building / 1 / 015 - Auditorium Bitumen to floor Bitumen 0

None

Main Building / 1 / 015 - Auditorium Plaster to walls Plaster 0

None

Main Building / 1 / 016 - Stage MMMF insulation to ducting and pipes, timber floorboards, block walls, plasterboard boxing, modern rubber step nosing.

Main Building / 1 / 016 - Stage Boxing to side of stage Plasterboard 50

Main Building / 1 / 016 - Stage Insulation under wooden floor Insulation 0

None

Main Building / 1 / 016a - Void

Under Stage

Dust & debris Insulation 0

None

Main Building / 1 / 017 - Rear Lobby Plasterboard ceiling, block walls, modern vinyl flooring, modern rubber nosing. Wood access panel to ceiling void.

Main Building / 1 / 017 - Rear Lobby Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 018 - Changing Plasterboard ceiling, block walls, modern vinyl flooring, plastic cistern. 56

Main Building / 1 / 018 - Changing Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 019 - Changing Plasterboard ceiling, block walls, modern vinyl flooring, plastic cistern. 58

Main Building / 1 / 019 - Changing Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 020 - Storage Plasterboard ceiling, block walls, modern vinyl flooring, metal soil pipe. 60

Bromgrove Ltd > Our Ref: 25/356 Page 13 of 89

Score

Recommendation Page

Main Building / 1 / 020 - Storage Bitumen to floor Bitumen 3

Very Low

Remove if planned works may disturb

Main Building / 1 / 021 - Plant room Concrete to the floor, breeze block walls, corrugated metal sheeting to the ceiling. Large plants works, metal ducting with modern gaiters and pipework.

Main Building / 1 / 021 - Plant room Chipboard to the ceiling Chipboard 0

None

Main Building / 1 / 021 - Plant room Electrical boxes -- No Access / Live Service Supply 66

Main Building / 1 / 021 - Plant room Hardset over plaster to ducting Hardset 0

None

Main Building / 1 / 021 - Plant room Red mastic to ducting flanges Mastic 0

None

Main Building / 1 / 021 - Plant room Thermal residue/debris Thermal Insulation 0

None

Main Building / 1 / 021 - Plant room Thermal residue/debris Thermal Insulation 0

None

Main Building / 1 / 021 - Plant room Timber access hatch -- No Access / Locked 67

Main Building / 2 / 014 - Theatre

Ceiling Void

MMMF insulation to pipes and ducting, block walls, back of plasterboard ceiling visible.

Main Building / 2 / 022 - Projection room/landing

Modern vinyl to the floor, breeze block walls, MMMF tiled suspended ceiling. Electrical boxes mounted to the walls.

Main Building / 2 / 022 - Projection room/landing

Bitumen to floor Bitumen 4

Very Low

Remove if planned works may disturb

Main Building / 2 / 023 - Lobby/toilet Modern vinyl to the floor, breeze block walls, plaster finish to the plasterboard ceiling. Modern rubber step nosing. Plastic toilet cistern.

Main Building / 2 / 023 - Lobby/toilet Bitumen to floor Bitumen 4

Very Low

Remove if planned works may disturb

Bromgrove Ltd > Our Ref: 25/356 Page 14 of 89

Score

Recommendation Page

Main Building / External / 024 -

Externals

Concrete to the floor, brick built walls and felt lining to the roof with part metal and plastic cowls.

Main Building / External / 024 -

Externals

Bitumen stair nose Bituminous Product 0

None

Main Building / External / 024 -

Externals

Damp proof course Bituminous Product 3

Very Low

Remove if planned works may disturb

Main Building / External / 024 -

Externals

Felt lining to roof Bituminous Felt 0

None

Main Building / External / 024 -

Externals

Mastic to plant room doors Mastic 3

Very Low

Remove if planned works may disturb

Main Building / External / 024 -

Externals

Mastic to walls Mastic 0

None

Bromgrove Ltd > Our Ref: 25/356 Page 15 of 89

Inspection Photographs

See following pages for additional photographs, notes and scores for inspected locations and items...

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 16 of 89

Main Building > 1 > 001 - Throughout Building > Mastic to Ducting

Building Main Building Level 1

Location 001 - Throughout Building Item Mastic to Ducting

Material Mastic Extent Throughout ducting

Strategy / Sample Id Sample / 004 Fibre Type NADIS

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 17 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/g6ilOqhKKGcakMPnFVgm/1000064424.jpg?added=2025-07-07T12%3A45%3A40.320152Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/g6ilOqhKKGcakMPnFVgm/1000064424.jpg?added=2025-07-07T12%3A45%3A40.320152Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/5jZ4MFBVedkpYq7IfZjh/1000064423.jpg?added=2025-07-07T12%3A45%3A40.330488Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/5jZ4MFBVedkpYq7IfZjh/1000064423.jpg?added=2025-07-07T12%3A45%3A40.330488Z

Main Building > 1 > 001 - Throughout Building > Gaskets to pipe flanges

Location 001 - Throughout Building Item Gaskets to pipe flanges

Material Gasket (Compressed) Extent Throughout Building

Strategy / Sample Id Presume Presumed Fibre Type Crocidolite

Recommendation Remove if planned works may disturb

Material Assessment

Product Type (or Debris from Product) 2 Extent of Damage / Deterioration 1

Surface Type / Treatment 1 Asbestos Type 3

Material Score 7 / Medium

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 18 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/Sk34wW99Jyiyqvwou0Rx/8a6df509-668f-4e88-851a-f8d8fb138a645331884428615575169.jpg?added=2025-07-07T14%3A39%3A54.814628Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/Sk34wW99Jyiyqvwou0Rx/8a6df509-668f-4e88-851a-f8d8fb138a645331884428615575169.jpg?added=2025-07-07T14%3A39%3A54.814628Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/OMhWu9DUAaSctbkSswYy/667e787f-3d0e-4638-a75a-058d3453d319489870787308375624.jpg?added=2025-07-07T14%3A39%3A54.820788Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/OMhWu9DUAaSctbkSswYy/667e787f-3d0e-4638-a75a-058d3453d319489870787308375624.jpg?added=2025-07-07T14%3A39%3A54.820788Z

Main Building > 1 > 001 - Throughout Building > Inside metal waste pipe joins

Building Main Building Level 1

Location 001 - Throughout Building Item Inside metal waste pipe joins

Material Extent

Access / Notes No Access / Access would cause significant damage.

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 19 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/4rnsG96Xh0hO4KV7ovO8/1000064422.jpg?added=2025-07-07T12%3A40%3A14.580421Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/4rnsG96Xh0hO4KV7ovO8/1000064422.jpg?added=2025-07-07T12%3A40%3A14.580421Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/bqjwcdSFVGmCWYha72lT/1000064421.jpg?added=2025-07-07T12%3A40%3A14.585852Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/bqjwcdSFVGmCWYha72lT/1000064421.jpg?added=2025-07-07T12%3A40%3A14.585852Z

Main Building > 1 > 002 - Entrance Lobby > Access panel to column

Location 002 - Entrance Lobby Item Access panel to column

Material Insulation Board Extent 0.5 sq. m.

Strategy / Sample Id Sample / 001 Fibre Type NADIS

General Comments Glasroc

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 20 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/vFr0t1VvviM1TS6iGoJa/cbf3aeea-a45d-4cad-a674-d0a65015a70f3415811733428694467.jpg?added=2025-07-07T10%3A38%3A25.301332Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/vFr0t1VvviM1TS6iGoJa/cbf3aeea-a45d-4cad-a674-d0a65015a70f3415811733428694467.jpg?added=2025-07-07T10%3A38%3A25.301332Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/X219DZXvA3ccxxZB9hKN/e8b33f3f-aa38-4df0-b191-c3d57f954c224640470194876358040.jpg?added=2025-07-07T10%3A38%3A25.326480Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/X219DZXvA3ccxxZB9hKN/e8b33f3f-aa38-4df0-b191-c3d57f954c224640470194876358040.jpg?added=2025-07-07T10%3A38%3A25.326480Z

Main Building > 1 > 002 - Entrance Lobby > Cladding to columns

Location 002 - Entrance Lobby Item Cladding to columns

Material Plasterboard and polystyrene to concrete columns.

Extent

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 21 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/l080DC3DV5JYtbit9fAM/1000064385.jpg?added=2025-07-07T10%3A04%3A50.003279Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/l080DC3DV5JYtbit9fAM/1000064385.jpg?added=2025-07-07T10%3A04%3A50.003279Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/Rrh9smO1rjW4OrgRbnD8/d44e915d-75f4-4896-8b28-308d6eb2b8001841510279855684476.jpg?added=2025-07-07T10%3A04%3A50.010015Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/Rrh9smO1rjW4OrgRbnD8/d44e915d-75f4-4896-8b28-308d6eb2b8001841510279855684476.jpg?added=2025-07-07T10%3A04%3A50.010015Z

Main Building > 1 > 002 - Entrance Lobby > Flooring

Location 002 - Entrance Lobby Item Flooring

Material Modern vinyl to screed Extent

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 22 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/uPB1PpDi3cLVmJtGWwRL/1521b5ca-12c0-463d-8f3b-73ba9abe9bb88870419248822008281.jpg?added=2025-07-07T09%3A37%3A30.959392Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/uPB1PpDi3cLVmJtGWwRL/1521b5ca-12c0-463d-8f3b-73ba9abe9bb88870419248822008281.jpg?added=2025-07-07T09%3A37%3A30.959392Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/LkPA3gNQt5GrBsHqJeX6/74655823-119d-48b7-a463-94f8dc6ec70f5747007047498147625.jpg?added=2025-07-07T09%3A37%3A30.967573Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/LkPA3gNQt5GrBsHqJeX6/74655823-119d-48b7-a463-94f8dc6ec70f5747007047498147625.jpg?added=2025-07-07T09%3A37%3A30.967573Z

Main Building > 1 > 002 - Entrance Lobby > Location Notes

Location 002 - Entrance Lobby Item

Location Notes Modern suspended ceiling tiles, solid plastered walls, modern vinyl flooring, non asbestos step nosing. MMMF pipe insulation in ceiling void.

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 23 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/gmGv5TXrTHCHtllIZEP0/b7257bca-fee7-42cd-a935-d8f64a618e847167788382768458611.jpg?added=2025-07-07T09%3A26%3A04.984377Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/gmGv5TXrTHCHtllIZEP0/b7257bca-fee7-42cd-a935-d8f64a618e847167788382768458611.jpg?added=2025-07-07T09%3A26%3A04.984377Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/lYhCvVgklM6xBlpIhkJi/1000064384.jpg?added=2025-07-07T10%3A34%3A32.733686Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/lYhCvVgklM6xBlpIhkJi/1000064384.jpg?added=2025-07-07T10%3A34%3A32.733686Z

Main Building > 1 > 003 - Ticket Office > Location Notes

Location 003 - Ticket Office Item

Location Notes Modern suspended ceiling tiles, solid plastered walls, modern vinyl flooring, MDF partition wall

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 24 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/sGlJu2qaVOUw9VNm49HV/10fe90f2-0f8d-4824-a88c-3c1732f253e35324935876968212837.jpg?added=2025-07-07T10%3A50%3A50.770928Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/sGlJu2qaVOUw9VNm49HV/10fe90f2-0f8d-4824-a88c-3c1732f253e35324935876968212837.jpg?added=2025-07-07T10%3A50%3A50.770928Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/hBfKOgVPEHQmhQAluf77/5a1bac2b-162a-4579-8cc7-75c18b4623eb3299410516582237358.jpg?added=2025-07-07T10%3A50%3A50.778661Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/hBfKOgVPEHQmhQAluf77/5a1bac2b-162a-4579-8cc7-75c18b4623eb3299410516582237358.jpg?added=2025-07-07T10%3A50%3A50.778661Z

Main Building > 1 > 004 - Servery > Floor tiles and bitumen

Location 004 - Servery Item Floor tiles and bitumen

Material Vinyl tile and Bitumen Extent 15 sq. m.

Strategy / Sample Id Sample / 002 Fibre Type NADIS

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 25 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/GQhr0JYXmEbLDjwVbDiw/c56e627f-358d-43d3-aa54-c97d486697a12692933412949976924.jpg?added=2025-07-07T11%3A04%3A14.294332Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/GQhr0JYXmEbLDjwVbDiw/c56e627f-358d-43d3-aa54-c97d486697a12692933412949976924.jpg?added=2025-07-07T11%3A04%3A14.294332Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/tsSGFXL9Ehipsj1LFn0w/b65d5c60-32ac-446b-85e2-5af7b41f19e84182031906438296645.jpg?added=2025-07-07T11%3A04%3A14.298409Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/tsSGFXL9Ehipsj1LFn0w/b65d5c60-32ac-446b-85e2-5af7b41f19e84182031906438296645.jpg?added=2025-07-07T11%3A04%3A14.298409Z

Main Building > 1 > 004 - Servery > Boxing

Location 004 - Servery Item Boxing

Material Timber to copper pipes Extent

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 26 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/wAeSXMbrjmiQve20VWJ7/463422bf-f897-41d9-aa5e-8ab7a2d62fc04051251174338885137.jpg?added=2025-07-07T11%3A08%3A35.201513Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/wAeSXMbrjmiQve20VWJ7/463422bf-f897-41d9-aa5e-8ab7a2d62fc04051251174338885137.jpg?added=2025-07-07T11%3A08%3A35.201513Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/VuGx7K6WUi9Xp27ih1FH/3214b0bb-8abf-46a8-b9cc-4bd99489d53e5033590944594809751.jpg?added=2025-07-07T11%3A08%3A35.207796Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/VuGx7K6WUi9Xp27ih1FH/3214b0bb-8abf-46a8-b9cc-4bd99489d53e5033590944594809751.jpg?added=2025-07-07T11%3A08%3A35.207796Z

Main Building > 1 > 004 - Servery > Location Notes

Location 004 - Servery Item

Location Notes Modern suspended ceiling tiles, solid plastered walls, modern vinyl flooring, MDF partition wall, modern electrical panels

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 27 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/e5D1gDiTze1GtWyOZYNa/267d6e1c-9001-48e6-84cd-86b7ec2d9e785737400498966828526.jpg?added=2025-07-07T11%3A00%3A05.258818Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/e5D1gDiTze1GtWyOZYNa/267d6e1c-9001-48e6-84cd-86b7ec2d9e785737400498966828526.jpg?added=2025-07-07T11%3A00%3A05.258818Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/ZwWbtCg6UBhD7FXUnlSU/2b742f90-f66c-4f9e-b8b8-76e490c0f5638348301516460679687.jpg?added=2025-07-07T11%3A00%3A05.263780Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/ZwWbtCg6UBhD7FXUnlSU/2b742f90-f66c-4f9e-b8b8-76e490c0f5638348301516460679687.jpg?added=2025-07-07T11%3A00%3A05.263780Z

Main Building > 1 > 005 - Office > Location Notes

Location 005 - Office Item

Location Notes Modern suspended ceiling tiles, solid plastered walls, carpet to concrete flooring, MDF boxing to pipes

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 28 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/BgxWtPjhBxOYPUYR9zvF/ba673070-c734-4bb8-9d20-bbc20548c0ee2101980442670400621.jpg?added=2025-07-07T11%3A18%3A12.395801Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/BgxWtPjhBxOYPUYR9zvF/ba673070-c734-4bb8-9d20-bbc20548c0ee2101980442670400621.jpg?added=2025-07-07T11%3A18%3A12.395801Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/XhUjEbpaNS2I34nBI4Ro/f0cf5c3f-0a3e-4a91-a975-6fcc7bc20cae3313007718601595797.jpg?added=2025-07-07T11%3A21%3A17.923640Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/XhUjEbpaNS2I34nBI4Ro/f0cf5c3f-0a3e-4a91-a975-6fcc7bc20cae3313007718601595797.jpg?added=2025-07-07T11%3A21%3A17.923640Z

Main Building > 1 > 006 - Toilet > Bitumen to floor

Location 006 - Toilet Item Bitumen to floor

Material Bitumen Extent 3 sq. m.

Strategy / Sample Id Sample / 003 Fibre Type NADIS

General Comments Under ceramic tiles

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 29 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/9olU6yX3BherAHHuw9Mr/4679f172-c7e2-41f0-b39d-36a890105f1a6158953884705900093.jpg?added=2025-07-07T12%3A23%3A28.691095Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/9olU6yX3BherAHHuw9Mr/4679f172-c7e2-41f0-b39d-36a890105f1a6158953884705900093.jpg?added=2025-07-07T12%3A23%3A28.691095Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/QsOILcGQgkl48GNkpyQy/aa88b423-e134-4262-979c-f8cc634683b14661140393009714079.jpg?added=2025-07-07T12%3A23%3A28.704213Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/QsOILcGQgkl48GNkpyQy/aa88b423-e134-4262-979c-f8cc634683b14661140393009714079.jpg?added=2025-07-07T12%3A23%3A28.704213Z

Main Building > 1 > 006 - Toilet > Location Notes

Location 006 - Toilet Item

Location Notes Modern suspended ceiling tiles, MMMF pipe insulation, MDF boxing ceramic wall and floor tiles.

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 30 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/hgyoCp80E6R3DVrbtnif/24b55a62-a55a-401d-906e-849042955dcc3100115971674656322.jpg?added=2025-07-07T12%3A24%3A07.856441Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/hgyoCp80E6R3DVrbtnif/24b55a62-a55a-401d-906e-849042955dcc3100115971674656322.jpg?added=2025-07-07T12%3A24%3A07.856441Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/qXNEE5ka9Ep6XQ5zizJ2/cb8c9e64-fb7d-4e87-a1c7-21f650e994587335669115300319410.jpg?added=2025-07-07T12%3A24%3A07.859939Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/qXNEE5ka9Ep6XQ5zizJ2/cb8c9e64-fb7d-4e87-a1c7-21f650e994587335669115300319410.jpg?added=2025-07-07T12%3A24%3A07.859939Z

Main Building > 1 > 007 - Female Toilet > Bitumen to floor

Location 007 - Female Toilet Item Bitumen to floor

Material Bitumen Extent 10 sq. m.

Strategy / Sample Id Strongly Presume / 003 Presumed Fibre Type NADIS

General Comments Under ceramic tiles

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 31 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/BPunA6vfGERIIMmcbiff/8bac78b2-b556-4d2a-8921-8e232eec2f785133199622369358542.jpg?added=2025-07-07T12%3A27%3A27.235273Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/BPunA6vfGERIIMmcbiff/8bac78b2-b556-4d2a-8921-8e232eec2f785133199622369358542.jpg?added=2025-07-07T12%3A27%3A27.235273Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/pHTGdMWFWWZn72Kwr56e/624c5008-0290-4948-a7ca-f2fae113c4001319684050379058226.jpg?added=2025-07-07T12%3A27%3A27.249299Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/pHTGdMWFWWZn72Kwr56e/624c5008-0290-4948-a7ca-f2fae113c4001319684050379058226.jpg?added=2025-07-07T12%3A27%3A27.249299Z

Main Building > 1 > 007 - Female Toilet > Location Notes

Location 007 - Female Toilet Item

Location Notes Modern suspended ceiling tiles, MMMF pipe insulation, MDF boxing ceramic wall and floor tiles, metal soil pipe in service void.

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 32 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/mC1jhAmckX7NI9SS799L/e5e26f14-ede3-4e4e-b67f-f47bb69738e91433531149444195136.jpg?added=2025-07-07T12%3A32%3A19.899635Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/mC1jhAmckX7NI9SS799L/e5e26f14-ede3-4e4e-b67f-f47bb69738e91433531149444195136.jpg?added=2025-07-07T12%3A32%3A19.899635Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/EX4iye7GfDY1CbtGWDZz/aa95af33-a384-40f1-a06f-91c0a3f970763180948108717273339.jpg?added=2025-07-07T12%3A32%3A19.913757Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/EX4iye7GfDY1CbtGWDZz/aa95af33-a384-40f1-a06f-91c0a3f970763180948108717273339.jpg?added=2025-07-07T12%3A32%3A19.913757Z

Main Building > 1 > 008 - Male Toilet > Bitumen to floor

Location 008 - Male Toilet Item Bitumen to floor

Material Bitumen Extent 10 sq. m.

Strategy / Sample Id Strongly Presume / 003 Presumed Fibre Type NADIS

General Comments Under ceramic tiles

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 33 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/qd3kDdxUKrZxSR5HyEV4/d31692b8-7883-4da9-b2cd-c6b3a2785b974581003128086621256.jpg?added=2025-07-07T12%3A46%3A48.782963Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/qd3kDdxUKrZxSR5HyEV4/d31692b8-7883-4da9-b2cd-c6b3a2785b974581003128086621256.jpg?added=2025-07-07T12%3A46%3A48.782963Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/JrHgYW70gY3U62iUadJr/f239a6f1-774c-4be3-a696-02dfece8b9a3478287252991973557.jpg?added=2025-07-07T12%3A46%3A48.792274Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/JrHgYW70gY3U62iUadJr/f239a6f1-774c-4be3-a696-02dfece8b9a3478287252991973557.jpg?added=2025-07-07T12%3A46%3A48.792274Z

Main Building > 1 > 008 - Male Toilet > Location Notes

Location 008 - Male Toilet Item

Location Notes Modern suspended ceiling tiles, MMMF pipe insulation, MDF boxing ceramic wall and floor tiles, metal soil pipe in service void.

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 34 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/QUIv5VH4cw4ELobufR8H/6da559d3-48b2-4059-9b10-5ebeb523c6371121251966799963877.jpg?added=2025-07-07T12%3A46%3A30.485560Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/QUIv5VH4cw4ELobufR8H/6da559d3-48b2-4059-9b10-5ebeb523c6371121251966799963877.jpg?added=2025-07-07T12%3A46%3A30.485560Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/5lW8OawCFjpy2GDxLaxG/1000064422.jpg?added=2025-07-07T12%3A46%3A30.500530Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/5lW8OawCFjpy2GDxLaxG/1000064422.jpg?added=2025-07-07T12%3A46%3A30.500530Z

Main Building > 1 > 009 - Janitors Closet > Bitumen to floor

Location 009 - Janitors Closet Item Bitumen to floor

Material Bitumen Extent 10 sq. m.

Strategy / Sample Id Strongly Presume / 003 Presumed Fibre Type NADIS

General Comments Under ceramic tiles

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 35 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/fd6HRnxIhlb7yXarJpTv/00406dfd-6644-4598-b5ed-79fa47df574e2823156627668428623.jpg?added=2025-07-07T13%3A11%3A10.562973Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/fd6HRnxIhlb7yXarJpTv/00406dfd-6644-4598-b5ed-79fa47df574e2823156627668428623.jpg?added=2025-07-07T13%3A11%3A10.562973Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/Gv8yHhw6Calx5Nh2OpHS/366c191d-eccf-4888-a447-0377dce2efba4383966649351405160.jpg?added=2025-07-07T13%3A11%3A10.582135Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/Gv8yHhw6Calx5Nh2OpHS/366c191d-eccf-4888-a447-0377dce2efba4383966649351405160.jpg?added=2025-07-07T13%3A11%3A10.582135Z

Main Building > 1 > 009 - Janitors Closet > Location Notes

Location 009 - Janitors Closet Item

Location Notes Concrete ceiling, timber panel to ceiling, solid plastered walls, modern vinyl to concrete floor.

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 36 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/VEYjEzAFWleEXYWoOd59/737c91fb-7395-464f-9021-a008b58a52ee5762098895406003065.jpg?added=2025-07-07T13%3A10%3A51.882710Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/VEYjEzAFWleEXYWoOd59/737c91fb-7395-464f-9021-a008b58a52ee5762098895406003065.jpg?added=2025-07-07T13%3A10%3A51.882710Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/N53wJUX3Rvra8uX9y2LM/2090b16a-e58d-4ca2-b262-ab9a0696188b5817040885269225753.jpg?added=2025-07-07T13%3A10%3A51.893580Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/N53wJUX3Rvra8uX9y2LM/2090b16a-e58d-4ca2-b262-ab9a0696188b5817040885269225753.jpg?added=2025-07-07T13%3A10%3A51.893580Z

Main Building > 1 > 010 - Store Room > Bitumen to floor

Location 010 - Store Room Item Bitumen to floor

Material Bitumen Extent 3 sq. m.

Strategy / Sample Id Strongly Presume / 005 Presumed Fibre Type Chrysotile

Recommendation Remove if planned works may disturb

General Comments Under vinyl and screed

Material Assessment

Product Type (or Debris from Product) 1 Extent of Damage / Deterioration 1

Surface Type / Treatment 0 Asbestos Type 1

Material Score 3 / Very Low

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 37 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/b6pntnNGMH200Nk7GBIk/45b37d88-e4a1-4f76-b86e-838df9afa9a08182259625434385831.jpg?added=2025-07-07T13%3A13%3A21.334267Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/b6pntnNGMH200Nk7GBIk/45b37d88-e4a1-4f76-b86e-838df9afa9a08182259625434385831.jpg?added=2025-07-07T13%3A13%3A21.334267Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/GuR4QyAZiWBfVNhjJSJ5/ce0f4bce-e3e7-4fc0-aaba-069c0dd345d62393082883465972945.jpg?added=2025-07-07T13%3A13%3A21.356266Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/GuR4QyAZiWBfVNhjJSJ5/ce0f4bce-e3e7-4fc0-aaba-069c0dd345d62393082883465972945.jpg?added=2025-07-07T13%3A13%3A21.356266Z

Main Building > 1 > 010 - Store Room > Location Notes

Location 010 - Store Room Item

Location Notes Concrete ceiling, block walls, modern vinyl to concrete floor.

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 38 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/0LRGTegfVIsOH8G8Eyzx/dafb57ab-c349-4ba5-afbd-e6d9507300cf1897213037856599241.jpg?added=2025-07-07T13%3A12%3A32.726141Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/0LRGTegfVIsOH8G8Eyzx/dafb57ab-c349-4ba5-afbd-e6d9507300cf1897213037856599241.jpg?added=2025-07-07T13%3A12%3A32.726141Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/FedEd9TDyPFX6f5cyoEY/7891cc05-07a6-4259-8e6c-ee6a94a128708310485260254899362.jpg?added=2025-07-07T13%3A12%3A32.731234Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/FedEd9TDyPFX6f5cyoEY/7891cc05-07a6-4259-8e6c-ee6a94a128708310485260254899362.jpg?added=2025-07-07T13%3A12%3A32.731234Z

Main Building > 1 > 011 - Corridor > Bitumen to floor

Location 011 - Corridor Item Bitumen to floor

Material Bitumen Extent 4 sq. m.

Strategy / Sample Id Sample / 005 Fibre Type Chrysotile

Recommendation Remove if planned works may disturb

General Comments Under vinyl and screed

Material Assessment

Product Type (or Debris from Product) 1 Extent of Damage / Deterioration 1

Surface Type / Treatment 0 Asbestos Type 1

Material Score 3 / Very Low

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 39 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/hiMitY17BuqkCGPbqw1y/dd464029-ba22-47b7-a2b7-2b8d20e7ca0d4870611856341840719.jpg?added=2025-07-07T13%3A14%3A30.187093Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/hiMitY17BuqkCGPbqw1y/dd464029-ba22-47b7-a2b7-2b8d20e7ca0d4870611856341840719.jpg?added=2025-07-07T13%3A14%3A30.187093Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/fp4RDOhxpKI50W8NaeIa/1f225494-42d4-4209-90bf-05fa1483b4948167067709172752685.jpg?added=2025-07-07T13%3A14%3A30.192155Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/fp4RDOhxpKI50W8NaeIa/1f225494-42d4-4209-90bf-05fa1483b4948167067709172752685.jpg?added=2025-07-07T13%3A14%3A30.192155Z

Main Building > 1 > 011 - Corridor > Location Notes

Location 011 - Corridor Item

Location Notes Concrete ceiling, block walls, modern vinyl to concrete floor, non asbestos step Nosing

Asbestos Refurbishment Survey Survey Inspection Detail

Bromgrove Ltd > Our Ref: 25/356 Page 40 of 89 https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/FBJC93whzTYfAKDll5j0/2d1dfa54-0f36-4c8b-8d21-c0d15f98bba85124741701191758485.jpg?added=2025-07-07T13%3A14%3A04.359651Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/FBJC93whzTYfAKDll5j0/2d1dfa54-0f36-4c8b-8d21-c0d15f98bba85124741701191758485.jpg?added=2025-07-07T13%3A14%3A04.359651Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/GFpV5OYd3693oPTHskPn/c7529316-f198-4855-b35f-75158930dab07399787945467000401.jpg?added=2025-07-07T13%3A14%3A04.363677Z https://storage.googleapis.com/flow-mobile-3ab69.appspot.com/users/7A55OiYCxSUOr2BcQqUfHTTTzQ93/uploads/GFpV5OYd3693oPTHskPn/c7529316-f198-4855-b35f-75158930dab07399787945467000401.jpg?added=2025-07-07T13%3A14%3A04.363677Z

Main Building > 1 > 012 - Plant Room > Bitumen to floor

Location 012 - Plant Room Item Bitumen to floor

Material Bitumen Extent 8 sq. m.

Strategy / Sample Id Strongly Presume / 005 Presumed Fibre Type Chrysotile

Recommendation Remove if planned works may disturb

General Comments Under vinyl and screed

Material Assessment

Product Type (or Debris from Product) 1 Extent of Damage / Deterioration 1

Surface Type / Treatment 0 Asbestos Type 1

Material Score 3 / Very Low

Asbestos Refurbishment Survey Survey…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .