Attachment 1. Statement of Work.pdf

PDF 1 MB Posted

Attached to
727 AMS Cargo Racking
Solicitation number
FA558726Q0003
Issued by

About this file

This Statement of Work (SOW) details cargo rack safety modifications for the 727th Air Mobility Squadron (727 AMS) at Royal Air Force (RAF) Mildenhall in the United Kingdom. The project requires a contractor to install 21 rear X-bracings on cargo racking bays and add 63 full-length rubberized pads to internal support beams to enhance safety and prevent cargo and pallet damage. The current racking system measures 15 feet 5 inches by 73 feet, spanning seven bays over three levels, constructed of galvanized steel.

Key requirements include delivering materials to Building 599, completing installation within 5 working days, using only electric forklifts, and following strict security protocols. The contractor must provide all necessary supervision, transportation, equipment, materials, labor, and safety documentation. Work hours are 0630-2300 local time, Monday through Friday, excluding US federal and UK bank holidays. The project involves modifying an Air Mobility Command (AMC) en route facility critical to rapid cargo movement for USAFE UK agencies, with single-phase 240V power available on-site and a requirement to remove all packaging materials after completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

(SOW)

463L Cargo Rack Safety Modifcations -X Bracing

Royal Air Force (RAF) Mildenhall, Air Freight Terminal, Bldg. 599

October 2025

1.0 Introduction

Mission The 727 AMS is a subordinate unit of the 721 Air Mobility Operations Group (AMOG) and is the sole Air Mobility Command (AMC) en route location in the United Kingdom. 727 AMS is a component of AMC under the combatant command (COCOM) of US Transportation Command (USTRANSCOM) and operates the Arial Port for the movement of cargo and passengers.

1.1 Background

The 727 AMS is the single AMC presence in the United Kingdom. It is key to the rapid movement of cargo for all USAFE UK agencies. In order to store the large volume of nets, devises and storing used in the preparation of cargo movements we identified a requirement and procured a 463L storage rack.

Since the racking has been installed and being used we have identified some safety additions required to the design of the racking to include x-bracing at the rear of the racking. Also to ensure the racking and pallets do not damage one another we require the addition of rubberized pads adding to each racking section.

1.2 Scope

The contractor shall provide all the necessary supervision, transportation, support equipment, power tools, materials/fixings, PPE, labor, loading/unloading and positioning required to fabricate and install 21 rear X-bracings on each cargo racking bay and fabricate and install rubberized full-length pads to each support internal beam.

Specifications for Modification of Cargo Racking System:

The current racking system measures 15ft 5 inches by 73ft and is made up of seven bays over three levels totaling 21 bays. The existing racking is made from galvanized steel, and the bracing should be the same standard or higher. Rear back x-bracing should be added to each bay to mitigate any possibility of cargo falling off rear of bay. Also, full length 7ft 10 inches rubberized pads should be installed over each internal beam totaling 63 pads.

Specifications for preparation on sites and installation:

Materials should be delivered to site and off-loaded by vendor. Installation should take no more than 5 working days. Cargo will be removed from racking while these modifications are carried out. Method state-ment and RAMS are required for approval before work can take place.

Removal of packaging and debris:

On completion of the equipment installation, the contractor will be responsible for the removal from the warehouse of all packing materials and debris. A dumpster is available in the cargo yard for disposal of non-recyclable materials.

2.0 General Requirements

2.1 Business Relations

The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. Contractor should provide any corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.

2.2 Contract Management & Administration

2.2.1 Contract Management

The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

2.2.2 Contract Administration

The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

2.3 Subcontract Management

The Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

2.4 Hours of Work

Workdays are from Monday through Friday excluding US federal holidays and UK bank holidays.

Work hours are from 0630 to 2300 local UK time.

3.0 Specifications/Installation/Delivery Requirements

3.1 Contractor would be responsible for the delivery of racking storage system to site and any lifting equipment/manning required to download the equipment from the delivery vehicle and any equipment movement required during installation. If forklifts rental is required for this function any operations in warehouse must be electric. No diesel forklifts are authorized to operate in the warehouse.

4.0 Special Requirements

4.1 Security & Safety

4.1.1 Security

The warehouse in Bldg. 599 is a restricted area. All contractors are required to sign in/out daily to ensure accountability. Contractors will be signed into the installation each day and must be escorted off base at the end of each working day by a 727 AMS designee.

4.1.1.1 Operational Security (OPSEC)

The Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access

to. The required CIIL can be provided by the Contracting Officer.

4.1.2 Safety

4.1.2.1 Contractor shall provide the required RAMS and method statement for review prior to scheduling a date to carry out the work.

4.1.2.1.1 The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.

4.1.2.2 Contractor will participate with any real world or exercise building evacuations i.e. Fire drills, HAZ sills or suspicious packages.

4.2 Contractor Access to Installations

Access to DoD installations is limited to personnel with a valid installation access pass. Contract employees will need to be escorted on/off the base each day. A valid form of picture identification such as a driver’s license or passport will be required for entry. Once signed in and escorted to Bldg.

599, employees must not leave this location without the escort present, and they have left the installation.

4.3 Shipping Instructions/Consolidation Point

Equipment shall be delivered to Bldg. 599 and could be stored overnight with prior coordination if required.

4.4 Government Furnished Material

Single phase 240 voltage is available within the warehouse for installation is required.

Mains power will be available within a 2-meter distance of any work needing to be carried out using power tools. Government can provide cones if required to restrict access to work area to ensure personnel have safe working environment while this work is being carried out. Washrooms and toilets are available in this facility for use by the contractor. Contractor is responsible for providing all other required tools and equipment.

4.5 Environmental Requirements

All packing material should be removed from the warehouse by the contractor and disposed of appropriately in available dumpster on the installation.

5.0 Appendix: Related Documents

Floor plans are attached.

LAYOUT OF STORAGE RACKING FOR CARGO TRIWALLS