PERFORMANCE WORK STATEMENT

(PWS)

FOR

QUUG 18 1011

HARDEN CRITICAL FACILITIES

CIVIL ENGINEERING 496 ABS/CEORM

(8 August 2018)

PERFORMANCE WORK STATEMENT (PWS)

TABLE OF CONTENTS

SECTION PAGE

1. DESCRIPTION OF SERVICES 5-6

2. SERVICES SUMMARY 6

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES 6

4. GENERAL INFORMATION 6/8

5. GENERAL CONDITIONS 9-41

6. APPENDICES 42-84

7. DRAWINGS 01-05

1. DESCRIPTION OF SERVICES. The contractor shall provide all the management, tools, supplies, equipment and labor needed to install manual bollards, level the rainwater drainage channels and building ground and stone rip rap channel according to the attached plans.

1.1. Description of Work.

The work will consist of:

1.1.1. Supply and installation of manual bollards according to attached plans, the bollards will be painted, primer and two finishing coats, white and red unless otherwise indicated.

1.1.2. Level the drainage channels maintaining the existing initial and final invert elevation and building a ground berm according to attached plans. the berms will be planted to maintain uniformity with surrounding terrain, the grass will be maintained by the contractor for 90 days.

1.1.3. Level the drainage channels maintaining the existing initial and invert elevation and building a stone rip rap channel according to attached plans.

1.2. Brand Names.

Names indicated for materials are for the purpose of establishing a standard selection only.

Other manufacturers' materials are acceptable provided they conform to all specified requirements. Names indicated for the quality of model, give the quality standard to be achieved. Other manufacturer's materials are acceptable if it is equal to the quality and function of the suggested model. All selected material is subject to the approval of Contracting Officer.

1.3. Special Requirements.

The contractor will accomplish preliminary topographic survey of the drainage and stone rip-rap channels, maintaining existing initial and final invert elevations, leveling existing surfaces to check in situ interferences between the new channels with service lines and existing manholes. The contractor will submit workshop plans for approval. Once approved by the contracting officer this layout the contractor will be authorized to grade and build the natural berm and channels in their final location.

1.4. Final Cleaning.

Final cleaning of installations affected by this contract.

1.5. Period of Performance.

The period of performance for this contract is two hundred and ten (210) days of field work.

The contractor will provide its deadline with its proposal.

The items mentioned and the list of main tasks do not limit in any way the responsibility of the contractor to perform all work required by the contract to provide a complete and operational installation.

2. SERVICES SUMMARY.

Performance Objective SOW Performance Threshold Activities. Par 1.1 100%

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Use of Base Utilities: Base utilities are available to the Contactor at no additional expense to the Contractor. The following utilities shall be available from the existing Base utility connections in reasonable quantities:

a. Electricity 120/208 volts, 60 Hz.

b. Water.

All of the equipment, materials and labor required to accomplish the aforementioned items stipulated shall be supplied by the Contractor, as part of this contract.

4. GENERAL INFORMATION.

4.1. Security Requirements. The contractor will request installation access through 496

ABS/CE.

4.2. Physical Security. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, property, and materials shall be secured.

4.3. Hours of Operation.

4.3.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: Monday to Friday, 08:00-17:00. The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the Government.

4.3.2. Recognized Holidays. The contractor is not required to provide service on Spanish national holidays and local Moron de la Frontera holidays. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.4. Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:

4.4.1. Lights shall be used only in areas where and when work is actually being performed.

4.4.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.

4.4.3. Water faucets or valves shall be turned off after the required use has been accomplished.

4.4.4. Government telephones shall be used only for official government business.

4.5. Records. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS.

4.6. Environmental Controls:

4.6.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.

4.6.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to Moron AB Fire Dept at 117. The liability for the spill or release of such substances rests solely with the contractor and its agent.

4.6.3. Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.

4.7. Government Observations. Government personnel, other than contracting officers (COs) and quality assurance personnel (QAPs), may from time-to-time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.

4.8. Safety Requirements. In performing work under this contract, the contractor shall:

4.8.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

4.8.2. Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes.

4.8.3. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.

4.8.4. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.

4.8.5. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.

4.8.6. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.

4.8.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.

4.8.8. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

4.8.9. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.

4.9. Special Qualifications. The Contractor shall submit any commercial certifications and a reference of past performance on similar works performance to the existing as a means to verify experience in this field of work.

4.10. Continuation of Essential DOD Contractor Services During Crisis IAW DoDI 3020.37.

IAW AFI 63-124, para 2.7.1, and DODI 3020.37 this requirement is not considered mission essential.

4.11. Contract Restriction: In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Office of Defense Cooperation Policy Directive 400- 5 "(4) Spanish material, labor, and equipment must be used if permitted by the requirements of the contract specifications."

5. GENERAL CONDITIONS

5.1. GENERAL: The work consists of furnishing all labor, materials, utilities, transportation, equipment, and services to execute the project described previously, in accordance with the drawings and specifications, complete and ready for use by means of a firm fixed price construction contract. Measurements shown on the drawings and specifications are given for reference use only. It is the Contractor’s responsibility to verify any and all of measurements.

5.2. GENERAL DESCRIPTION: The work consists in, but is not limited to, executing the line items indicated in the scope of work. All line items indicated in the scope of work do not limit nor reduce the Contractor’s responsibility to perform all work as required by the project in order to provide a complete and operable facility.

5.3. LOCATION: The work is located in Morón Air Base, Spain, as shown on the contract drawings.

5.4. DRAWINGS ACCOMPANYING SPECIFICATIONS: The drawings accompanying this specification are a part thereof. Drawings are the property of the Government and shall not be used for any purpose other than that contemplated by the specifications. The drawings indicated in the specifications are in A1 size.

5.5. WARRANTY: For this contract, the Contractor shall provide a two year standard commercial warranty for with all line items of the scope of work, including materials and workmanship. The warranty shall cover all defects noticed and reported to the Contractor within one year after acceptance of the work. The Contractor shall repair or replace defective materials at his expense within a reasonable time and as approved by the Contracting Officer. The Contractor must comply with any additional warranty periods stablished by the Spanish codes and regulations. The Contractor shall submit the warranty letter within 15 calendar days after to the acceptance of the work by the Contracting Officer.

5.6. BASE ACCESS:

5.6.1. Permits or Authorizations: The Contractor shall obtain all permits or authorizations required to access Morón Air Base. Once the works have finalized, the Contractor will return the permits or authorizations. Contractor is responsible to provide the required escorts as required to execute the works.

5.6.2. Delays and Interruptions: The Contractor is advised that delays are liable to occur, due to security reasons, during the access/egress process of personnel and materials from the Morón Air Base. Additionally, the Contractor shall immediately interrupt the work when it is required if security warning/risk situations occur.

5.7. WORK CLEARANCE REQUEST: Within 5 calendar days after the notice to proceed (NTP) date, the Contractor shall request AF Form 103 “BCE Work Clearance Request” to Construction Management in order to obtain all the information pertaining to the current status of

Base utilities. Additional requests shall be submitted to Construction Management 15 calendar days in advance, as minimum. The Contractor shall not perform any work under any circumstances without having the approved Work Clearance at the construction site (hard copy) and not before having marked at the site with stakes and/or pins the location of the utilities.

Work Clearance Request shall only be processed once all materials and documentation necessary to commence work have been submitted and approved. The Contractor shall be responsible for any damage caused to Base utilities shown on the AF Form 103 and project drawings and shall be responsible for the repairs without additional cost to the Government.

5.8. BASE UTILITIES:

5.8.1. The Government shall do what is reasonable so that the consumptions of the Base utilities required by the Contractor are available to him from the existing outlets and supplies, as specified in the contract, without charge. The Contractor shall carefully keep all utilities available to him without wasting their consumptions.

5.8.2. The Contractor, at its expense and in a professional manner satisfactory to the

Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines and associated accessories.

5.8.3. Use of Base Utilities: Water, sewage and electrical utilities of the Base shall be available to the Contactor, when it is feasible and their consumptions are reasonable, for the supply to the following buildings: Offices, latrines, break rooms and laboratories.

Other utilities, apart from the listed below, shall be supplied by the Contractor at no cost to the Government.

The following utilities shall be available from the existing Base utilities:

1. Electricity: 120/208 volts, 60 Hz.

2. Non-potable water.

5.8.4. Base utility disconnection and connection: Within 15 calendar days after the notice to proceed (NTP) date, the Contractor shall request the disconnection and connection and shall indicate:

1. Type of affected utility

2. Type of connection and/or disconnection to be performed

3. Utility use

4. Required consumption

5. Maximum duration

The Contractor shall be responsible for making the connections and/or disconnections, conversion, transportation of Base utilities to the work site and/or Contractor's staging area, including the provision and installation of materials, devices and mechanisms that prevent the backflow of water to the Base service (backflow preventers) and the provision and installation of the transformers, if required.

The Contractor shall submit additional requests with a minimum of 15 calendar days in advance of the estimated date for the required connection and/or disconnection of the corresponding utility.

5.8.5. Base Utility Outages: When a utility outage is necessary, the Contractor shall request the utility outage, at least 15 calendar days in advance of the work, and shall indicate:

1. Type of affected utility

2. Type of cut to be performed

3. Maximum duration

The Contractor shall be responsible for making the outage, including the provision and installation of materials, devices and mechanisms.

5.8.6. Temporary connections to Base utilities: Temporary overhead connections to Base utilities are prohibited.

5.8.7. Base utility restoration: All Base utilities shall be restored to their original conditions prior to satisfying final contractual payment.

5.8.8. Operations of control devices of the Base utilities: The Contractor shall not activate, operate nor alter any control device of the Base utilities including water, sewage, electricity and communication.

The Government shall activate, operate and alter said control devices.

If a control device of a Base utility has to be activated, operated or altered, the Contractor shall submit a request with a minimum of 15 calendar days in advance of the estimated date for the required maneuver of the corresponding utility control device.

5.8.9. Standard Hours for connection, disconnection and outages of Base utilities: All connection, disconnection and/or outage works of Base utilities shall be programmed between 08:00 and 17:00 hours (between 08:00 and 16:00 during the period from 15 June to 15 September) from Monday to Friday, except holidays.

5.9. HOT WORK: The Contractor shall submit for approval a written request to Construction Management 15 calendar days prior to any welding, as oxyacetylene or plasma cutting work.

Said request shall indicate welding procedures and fire prevention measures. All welding work performed during the project execution shall be carried out by qualified welders only. The copies of the welder certificates, issued by an approved agency, shall be kept in the construction inspector’s files.

5.10. VEHICULAR, MACHINERY AND EQUIPMENT TRAFFIC:

5.10.1. Transit Control Plan: All works requiring vehicular or pedestrian traffic disruptions on the Base shall require an approved transit control plan. Said plan shall be approved at least 10 calendar days prior to carrying out said disruption.

Said plan shall include:

1. Start date of the traffic disruption

2. Duration of the traffic disruption

3. Proposed alternative routes

4. Signs, barriers, cones, flags and/or flagmen to be implemented

The Contractor shall establish alternate procedures if unforeseen circumstances take place. The responsibility of the provision, erecting, keeping and removing all signs, barriers, cones and flags shall be solely the Contractor. Once the work is completed, the Contractor shall remove the signaling elements such as signs, barriers, cones and/or flags.

5.10.2. Access Route Plan: 10 calendar days after the notice to proceed (NTP) date, the Contractor shall submit an access route plan to Construction Management for its approval by Contracting Officer or authorized representative.

5.10.3. Trucks: Trucks loaded with loose material (volatile dust, construction debris or other objects that could fall from them) shall be duly covered. Said covers (tarpaulins, etc.) shall be securely secured and placed on the load before accessing the Base roads.

5.11. PROGRESS SCHEDULE (AF Form 3064): (See solicitation/Contract FAR clause 52.236-15, Schedules for Construction Contracts, Apr 1984). Within the 10 calendar days after the notice to proceed (NTP) date or another period determined by the Contracting Officer, the Contractor shall develop and submit a practicable schedule to Construction Management for its approval by Contracting Officer or authorized representative. The plan shall show:

1. Activity sequence that the Contractor proposes to perform the work

2. Dates proposed by the Contractor for the start and completion of the salient features of the work (including the acquiring of materials, plant and equipment)

The progress schedule of the work shall be delivered in the line graphic format at an adequate scale indicating the percentage of work scheduled every 15 calendar for its execution during the performance period. The programmed works shall correspond to the line items of the cost estimate of the contract. If the Contractor fails to submit a progress schedule of the works within the established period, the Contracting Officer may withhold the approval of the progress payments until the Contractor submits the required progress schedule.

5.12. MOBILITY PLAN: The Contractor shall submit a mobility plan to Construction Management for its approval by Contracting Officer or authorized representative. Said plan shall show:

1. Location and area of the work site

2. Location and area of the offices

3. Location and area of the parking area

4. Location and area of the material storage areas

The Contractor shall submit the plan within 15 calendar days after the notice to proceed (NTP) date. The Contractor shall include in the mobility plan the proposed system to supply the utilities required at each site.

5.12.1. Construction Site Fencing: The construction site, offices, parking area, latrines, and material storage areas shall be fenced in by means of a two-meter high fence with gates and locks, unless otherwise approved the Government. The Contracting Officer or authorized representative shall specify the type of fencing, height and color. Fences shall be screened with a green opaque mesh to prevent the view of the inside of the fenced area from the outside. Fencing shall be completely secured at top and bottom to prevent the access to the fenced area. The fence and mesh shall be adequately anchored to prevent their failing during high wind gusts.

The Contractor shall include in the Mobilization Plan:

1. Photos, catalogs or samples of the fence to be used

2. Photos, catalog or samples of the mesh to be used

The Contractor shall not start the installation of the fencing and mesh until the plan is approved in writing by the Contracting Officer or authorized representative. The responsibility of providing, erecting, keeping and removing all the fences and meshes shall be solely the Contractor. The Contractor shall replace or repair, within the following 24 hours or as determined by the Contracting Officer or authorized representative, all fence or mesh sections that have been damaged or deteriorated. Once the works have been finalized, the Contractor shall remove the fences and meshes.

5.12.2. Offices: Temporary prefabricated buildings required for administrative reasons (office space, conference room and break room) shall be in good conditions.

Temporary prefabricated buildings requiring paint, repairs or are in bad conditions shall not be allowed at the site. Said temporary prefabricated buildings shall show on the outside a plaque of 0.5 x 0.5 meters maximum dimensions, indicating the name of the company and telephone number (s) of the person (s) designated as POC for the Contractor. Once the works are finalized, the Contractor shall remove the temporary prefabricated buildings.

5.12.3. Latrines: Prefabricated temporary buildings required for personnel latrines shall be in good conditions. The prefabricated temporary buildings requiring paint, repairs or are in bad conditions shall not be allowed on the work site. These buildings shall be kept in perfect use conditions and sanitized, shall be treated for insects and shall be emptied and cleaned with a detergent for sanitary use once a week. The frequency of emptying and cleaning shall be adjusted according to needs. The prefabricated temporary buildings shall be located at no less than 50 meters from the existing buildings of Base if they cannot be located near a sewage manhole. Once the works have been completed, the Contractor shall remove the temporary facilities and shall leave the area clean and sanitized.

5.12.4. Parking: The Contractor, their employees and subcontractors shall park all vehicles, including heavy machinery, equipment y vehicles, in areas where they do not pose an obstruction in the corresponding work site. All possible efforts must be made so that the vehicles are not parked in an area where they will be clearly visible from the outside.

5.12.5. Material Storage: Material storage containers shall be in good conditions. The storage of materials, in containers or not, at the work site shall be at the Contractor’s risk. The use of private security guards at the work site shall require the previous Spanish Air Force Security Forces approval. The Contractor shall not use the work site to store material. Once the works have finished, the Contractor shall remove the excess stored material.

5.13. PROJECT SIGN: Not used.

5.14. QUALITY CONTROL PLAN: Within 15 calendar days after the notice to proceed (NTP) date and after the approval of the Work Plan, the Contractor shall submit to Construction Management for its approval by Contracting Officer or authorized representative a complete Quality Control Plan in English and Spanish, which may be consulted by the workers at the Contractor's offices at the site. The plan shall contain at minimum the following:

1. Names and qualifications of the proposed quality control chief and inspectors.

2. Organization Chart: Include the teaming partners/key subcontractors, if required, for works required for the project. The teaming partners/key subcontractors indicated shall be those that shall effectively participate in the project and shall be the same than those submitted in the contract bid. The lack of this information or variation with previously submitted teaming partners/key subcontractors shall be cause for the disapproval of the QC Plan. In this case, the Contractor has to submit a new one before the works start.

3. Responsibility of the Quality Control Inspectors, Quality Control Chief and the Superintendent.

4. Inspection types to be performed. The Contractor shall fully develop a Program of Points Inspection (PPI) covering all types of works involved in the project. Development of the PPI shall be based in any and all of the following documents:

a. Project drawings and specifications.

b. Applicable regulations, standards and industry codes.

c. Specific regulations for certain products, installations or facilities.

d. Manufacturer’s recommendations.

The type and number of Inspection Points (IP) shall be the required to obtain an acceptable level of inspection for achieving the best quality results. The Contracting Officer or authorized representative shall evaluate if the type and number of Inspection Points are sufficient to obtain the acceptable quality level.

5. Inspection procedures and actions to be taken for failed or unsatisfactory inspections.

6. Inspection Reporting Forms. Submit all reporting forms for any type of inspection to be performed under this project. As a minimum, a specific form shall be developed for each section of the specifications, covering all necessary inspection points for such work. Minimum information required for each IP shall be:

a. Description of the IP

b. Applicable documents

c. Type and frequency of inspection

d. Lot applied for the inspection

e. Responsible of the performed inspection

f. Inspection result

g. Date of inspection

h. Reference to non-compliance document/register, if not in compliance

i. Information about pass/rejection criteria for the IP

j. Other.

7. List of planned "Hold Inspection Points" with the estimated dates from the construction schedule.

8. "Schedule of Material Submittals" form of the project with column titled "Required Submission Date" filled in by the Contractor with the dates estimated by the Contractor for the submission of the corresponding item. Said estimated dates shall be based on the period for the delivery and review of the submissions and re-submissions, the period for the purchase orders, acquisitions and receptions at the work site of the items, the approved Work Plan of the Contractor and the completion date of the contract (see clause 30, Material, Equipment and/or Plan Submissions). If the Work Plan is modified, the Contractor shall update the "Schedule of Material Submittals" form

9. Request for Information (RFI): submit the Request for Information form and RFI Log Form to be used. This shall be used to submit and track any RFI’s during construction.

10. Material Testing: Submit the name and qualifications of the testing agency or laboratory planned for testing. All test reports shall be submitted in time for review and approval. The work activity related to these tests can only be continued when the test report has been approved. If any test report fails, the following work activities shall not be executed until after the fault has been corrected. The Quality Control Chief of the Contractor shall be responsible for checking that all reports are reviewed by him and taking the necessary actions to resolve any failed test.

11. Perform daily reports of all activities carried out during the contract term.

These daily reports shall be kept at the work site and shall be available for review at all times. A copy of the daily reports performed from Monday to Friday (or Sunday if the Contractor works during the weekend) shall be submitted weekly to Construction Management. The daily report shall include, at least, the following:

a. Inspection date

b. Weather conditions

c. Inspection of the equipment and materials delivered at the work site and their delivery date

d. Names of people who have visited the work site during the day and visit date

e. Inspection of the deficiencies found during the day and the taken corrective actions

f. Inspection and acceptance of the materials and workmanship.

g. Work performed during the day, including the used personnel and equipment

h. Any field change or modification approved by the Contracting Officer.

5.14.1. Daily Report electronic file naming. Each Daily Report shall be named as indicated on this paragraph, failure in doing so will result in rejection of the daily report and the Contractor has to resubmit it. Daily Report file names shall have the following format: XX-X-XXXX, YY-YYYY, Daily Report, from ZZZZ WW VV to SSSS UU TT, where:

1. XX-X-XXXX stands for the contract number last seven digits, after removing the first “FA5575-“ digits.

2. YY-YYYY stands for the project number

3. ZZZZ stands for the year in which the inspection is made on Monday

4. WW stands for the month in which the inspection is made on Monday

5. VV stands for the month in which the inspection is made on Monday

6. SSSS stands for the year in which the inspection is made on the last day of the weekly period (Friday or Sunday)

7. UU stands for the month in which the inspection is made on the last day of the weekly period (Friday or Sunday)

8. TT stands for the month in which the inspection is made on the last day of the weekly period (Friday or Sunday)

5.14.2. Acceptance of the Construction Quality Control (QC) Plan: Acceptance of the QC

Plan is required before the start of the work. The Contracting Officer reserves the right to require changes in the QC Plan, operations and key personnel, including the dismissal of personnel, to ensure the specified work quality.

5.14.3. The Contractor shall be responsible for keeping the records.

5.15. PRE-FINAL AND FINAL INSPECTIONS: The pre-final and final inspections shall be conducted jointly with the Contractor, the Government inspector and a representative of the Contracting Office. The Contractor shall request a pre-final inspection once the works are completed in accordance with the inspector's judgement. After the solving of all the discrepancies found during the pre-final inspection, if any, the Contractor shall request a final inspection. All punch list items must have been completely fixed before final acceptance of the project works. The Contractor shall request to Construction Management the pre-final or final inspection at least 15 calendar days in advance of the desired date.

5.16. WORKDAY:

5.16.1. Normal Working Hours: The Contractor shall perform all work during normal working hours unless the Contracting Officer or authorized representative issues a special authorization to deviate from said work schedule. Normal working hours shall be from 08:00 to 17:00, from Monday to Friday, except holidays.

5.16.2. Special Working Hours: If the Contractor wishes to work outside the normal working hours, on Saturdays, Sundays or holidays, he shall submit a request to the Contracting Officer with at least 10 calendar days in advanced.

5.17. CONSERVATION AND MAINTENANCE OF THE EXISTING FACILITIES:

Before the start of any work activity, the Contractor will carry out an inspection of the existing facilities at the work site, or adjacent to it, as well as the pavements proposed by the Contractor on the Transit Control Plan and on the Access Route Plan. The Contractor shall submit a report in writing, attaching photographs, to Construction Management of all the defects found during said inspection. The Contractor shall repair, without additional cost for the Government and before the final acceptance of the project works, all the defects of the existing facilities and/or pavements that have not been included on the report or have been deteriorated further damaged by the Contractor's negligence or by the use of the facilities and/or pavements by the Contractor.

The Contractor shall conserve and protect all existing facilities at the work site, or adjacent to it, that shall not to be removed or that do not have to be affected by the work required by this contract. The Contractor shall restore, at no cost to the Government, the facility affected during the execution of the works to its original condition before the final acceptance of the project works.

5.18. ENVIRONMENTAL PROTECTION PLAN: Within 15 calendar days after the notice to proceed (NTP) date, the Contractor shall submit to Construction Management for its approval by Contracting Officer or authorized representative an Environmental Protection Plan, in English and Spanish versions, which may be consulted by the workers at the Contractor's offices at the site. The program shall comply with the following Spanish regulations and shall include, but not be limited to, the following:

5.18.1. Classified Activities:

1. Decreto 2414/1961, reglamento de actividades molestas, insalubres, nocivas y peligrosas (RAMINP). BOE de 07/12/1961

2. Orden del Ministerio de Gobernación de 15/03/1963, se aprueba una instrucción por la que se dictan normas complementarias para la aplicación del reglamento de actividades molestas, insalubres, nocivas y peligrosas. BOE N°. 79 de 02/04/1963

3. Decreto 297/1995, reglamento de calificación ambiental. BOJA No. 3 de 11/01/1996

5.18.2. Water:

1. Real Decreto 60/2011, normas de calidad ambiental en el ámbito de la política de aguas. BOE No. 19 of 22/01/1201

2. Real Decreto 849/1986, de 11 de abril, por el que se aprueba el Reglamento del Dominio Público Hidráulico que desarrolla los títulos preliminar, I, IV, V, VI, VII y VIII del texto refundido de la Ley de Aguas, aprobado por el Real Decreto Legislativo 1/2001, de 20 de julio. BOE No. 103 de 30/04/1986

3. Real Decreto Legislativo 1/2001, de 20 de julio, por el que se aprueba el texto refundido de la Ley de Aguas. BOE No. 176 de 24/07/2001

4. Orden del Ministerio de Medio Ambiente, Rural y Marino (ARM)/1312/2009, de 20 de mayo, por la que se regulan los sistemas para realizar el control efectivo de los volúmenes de agua utilizados por los aprovechamientos de agua del dominio público hidráulico, de los retornos al citado dominio público hidráulico y de los vertidos al mismo. BOE No. 128 de 27/05/2009

5. Real Decreto 606/2003, de 23 de mayo, por el que se modifica el Real Decreto 849/1986, de 11 de abril, por el que se aprueba el Reglamento del Dominio Público Hidráulico, que desarrolla los Títulos preliminar, I, IV, V, VI y VIII de la Ley 29/1985, de 2 de agosto, de Aguas. BOE NO. 135 OF 6/6/2003

6. Orden de 18 de agosto de 2008, por la que se aprueban los modelos de la Agencia Andaluza del Agua de solicitudes de deslinde en cauces públicos, constitución, modificación y separación de comunidades de usuarios de aguas públicas, comunicación de aprovechamientos iguales o inferiores a 7.000 m³, investigación de aguas subterráneas, autorizaciones para las actuaciones a realizar en el dominio público hidráulico y la zona de policía de cauces, y de concesiones, y se establece su presentación telemática o en soporte papel. BOJA no. 180 of 10/9/2008

5.18.3. Atmosphere:

1. Reglamento (CE) n°. 1497/2007 de la Comisión, por el que se establecen, de conformidad con el Reglamento (CE) no 842/2006 del Parlamento Europeo y del Consejo, requisitos de control de fugas estándar para los sistemas fijos de protección contra incendios que contengan determinados gases fluorados de efecto invernadero. Diario Oficial de la Unión Europea (DOUE) Nº. 333 de 19/12/2007

2. Reglamento (CE) n°. 304/2008 de la Comisión, por el que se establecen, de conformidad con el Reglamento (CE) nº 842/2006 del Parlamento Europeo y del Consejo, los requisitos mínimos y las condiciones del reconocimiento mutuo de la certificación de las empresas y el personal en lo relativo a los sistemas fijos de protección contra incendios y los extintores que contengan determinados gases fluorados de efecto invernadero. DOUE Nº. 92 de 03/04/2008

3. Reglamento (UE) n°. 517/2014 del Parlamento Europeo y del Consejo, sobre los gases fluorados de efecto invernadero y por el que se deroga el reglamento (CE) n°. 842/06. DOUE Nº. 195 de 20/05/2014

4. Real Decreto 833/1975, que desarrolla la Ley 38/1972 de protección del ambiente atmosférico. BOE No. 96 of 22/04/1975

5. Decreto 3025/1974, limitación de la contaminación atmosférica producida por vehículos automóviles. BOE No. 0 of 07/11/1974

6. Decreto 74/1996, por el que se aprueba el reglamento de calidad del aire.

BOJA No. 30 of 07/03/1996

7. Decreto 247/2001, de 13 de noviembre, por el que se aprueba el Reglamento de Prevención y Lucha contra los Incendios Forestales. BOJA n°. 144 de 15/12/2001

8. Orden de 21 de mayo de 2009, por la que se establecen limitaciones de usos y actividades en terrenos forestales y zonas de influencia forestal. BOJA no.

102 of 29/05/2009

5.18.4. Energy:

1. Ley 25/1964, reguladora de la energía nuclear. BOE No. 107 of 04/05/1964

2. Real Decreto 1427/1997, aprueba la instrucción técnica complementaria MI-IP 03 "instalaciones petrolíferas para uso propio". BOE No. 254 of 23/10/1997

3. Real Decreto 1836/1999, reglamento sobre instalaciones nucleares y radiactivas. BOE No. 313 of 31/12/1999

4. Real Decreto 1523/1999, instalaciones petrolíferas. Modificación del reglamento aprobado por RD 2085/94 de 20 de octubre y las ITC MI - IP03 y MI- IP04. BOE of 22/10/1999

5. Real Decreto 842/2002, de 2 de agosto, por el que se aprueba el Reglamento electrotécnico para baja tensión. BOE n.° 224 de 18/9/2002

5.18.5. Ambient Impact Evaluation:

1. Directiva 2010/75/UE del Parlamento Europeo y del Consejo, sobre las emisiones industriales (prevención y control integrados de la contaminación).DOUE de 17/12/2010

2. Ley 7/2007, de gestión integrada de la calidad ambiental. BOE No. 190 of

09/08/2007

3. Decreto 356/2010, se regula la autorización ambiental unificada, se establece el régimen de organización y funcionamiento del registro de autorizaciones de actuaciones sometidas a los instrumentos de prevención y control ambiental, de las actividades potencialmente contaminadoras de la atmósfera y de las instalaciones que emiten compuestos orgánicos volátiles, y se modifica el anexo I de la Ley 7/2007, de 9 de julio, de gestión integrada de la calidad ambiental. BOJA No. 157 of 11/08/2010

5.18.6. General:

1. Ley 21/1992, de Industria. BOE No. 176 of 23/07/1992

2. Ley 26/2007, de responsabilidad ambiental. BOE No. 255 of 24/10/2007

3. Ley 42/2007, del Patrimonio Natural y de la Biodiversidad. BOE N° 299 de 14/12/2007

4. Real Decreto 2090/2008, por el que se aprueba el reglamento de desarrollo parcial de la Ley 26/2007, de 23 de octubre, de responsabilidad medioambiental.

BOE No. 308 of 23/12/2008

5. Ley 11/2014, por la que se modifica la ley 26/2007, de 23 de octubre, de responsabilidad medioambiental. BOE No. 162 of 04/07/2014

6. Ley 32/2014, modificación de la ley 21/1992. BOE No. 309 of 23/12/2014

5.18.7. Installations (Technical-legal):

1. Real Decreto 919/2006, se aprueba el reglamento técnico de distribución y utilización de combustibles gaseosos y sus instrucciones técnicas complementarias ICG 01 a 11. BOE No. 211 of 04/09/2006

2. Real Decreto 1416/2006, aprueba la instrucción técnica complementaria MI-IP 06 "Procedimiento para dejar fuera de servicio los tanques de almacenamiento de productos petrolíferos líquidos". BOE No. 1416 of 25/12/2006

3. Real Decreto 1027/2007, por el que se aprueba el reglamento de instalaciones térmicas en los edificios. BOE No. 207 of 29/08/2007

4. Real Decreto 1826/2009, modifica RD 1027/2007 de instalaciones térmicas (RITE). BOE No. 298 of 11/12/2009

5. Real Decreto 1388/2011, se dictan las disposiciones de aplicación de la directiva 2010/35/UE del Parlamento Europeo y del Consejo de 16 de junio de 2010 sobre equipos a presión transportables y por la que se derogan las directivas 76/767/CEE, 84/526/CEE, 84/526/CEE, 84/527/CEE y 1999/36/CE. BOE No. 249 of 15/10/2011

5.18.8. Natural Environment and Landscape:

1. Real Decreto 1311/2012, uso sostenible de los productos fitosanitarios.

BOE No. 223 of 15/09/2012

2. Decreto 208/1997, por el que se aprueba el reglamento forestal de Andalucía. BOJA no. 117 of 7/10/1997.

3. Decreto 155/1998, por el que se aprueba el Reglamento de Vías Pecuarias de la Comunidad Autónoma de Andalucía. BOJA no. 87 of 3/8/1998.

5.18.9. Hazardous Goods:

1. Instrumento de adhesión al acuerdo europeo sobre transporte internacional de mercancías peligrosas por carretera (ADR). BOE Nº 163 de 9/07/1973

2. Enmiendas propuestas por Portugal a los Anexos A y B del Acuerdo Europeo sobre Transporte Internacional de mercancías peligrosas por carretera (ADR) (publicado en el "Boletín Oficial del Estado" del 9 al 17 de julio de 1973, números del 163 al 170), hecho en Ginebra el 30 de septiembre de 1957.

5.18.10. Wastes:

1. Directiva 2008/98/CE del Parlamento Europeo y del Consejo, sobre los residuos y por la que se derogan determinadas Directivas. DOUE Nº 312 de 22/11/2008

2. Real Decreto 833/1988, reglamento para la ejecución de la ley 20/1986 básica de residuos tóxicos y peligrosos. BOE No. 182 of 30/07/1988

3. Real Decreto 952/1997, modifica el reglamento para la ejecución de la ley 20/1986, básica de residuos tóxicos y peligrosos. BOE No. 160 of 05/07/1997

4. Ley 11/1997, de envases y residuos de envases. BOE No. 99 of 25/04/1997

5. Real Decreto 782/1998, reglamento para la ejecución de la ley 11/1997, de 24 de abril, de envases y residuos de envases. BOE No. 104 of 01/05/1998

6. Real Decreto 1481/2001, eliminación de residuos mediante depósito en vertedero. BOE No. 25 of 29/01/2002

7. Orden del Ministerio de Medio Ambiente MAM/304/2002, operaciones de valorización y eliminación de residuos y lista europea de residuos. BOE No. 43 of 19/02/2002

8. Real Decreto 105/2008, por el que se regula la producción y gestión de los residuos de construcción y demolición. BOE No. 38 of 13/02/2008

9. Real Decreto 106/2008, sobre pilas y acumuladores y la gestión ambiental de sus residuos. BOE No. 37 of 12/02/2008

10. Ley 22/2011, de residuos y suelos contaminados. BOE No. 181 of 29/07/2011

11. Real Decreto 180/2015, se regula traslado de residuos en el interior del territorio del Estado. BOE No. 83 of 07/04/2015

12. Real Decreto 1254/1999, se aprueban medidas de control de los riesgos inherentes a los accidentes graves en los que intervengan sustancias peligrosas.

BOE No. 172 of 20/07/1999

13. Orden 12/07/2002, por la que se regulan los documentos de control y seguimiento a emplear en la recogida de residuos peligrosos en pequeñas cantidades. BOJA No. 97 of 20/08/2002

14. Decreto 73/2012, se aprueba el reglamento de residuos de Andalucía.

BOJA No. 81 of 26/04/2012

15. Real Decreto 679/2006, por el que se regula la gestión de los aceites industriales usados. BOE No. 132 de 3/6/2006

16. Decreto 104/2000, por el que se regulan las autorizaciones administrativas de las actividades de valorización y eliminación de residuos y la gestión de residuos plásticos agrícolas. BOJA no. 47 of 22/4/2000

17. Orden de 12 de julio de 2002, por la que se regulan los documentos de control y seguimiento a emplear en la recogida de residuos peligrosos en pequeñas cantidades. BOJA no. 97 of 20/8/2002

5.18.11. Noise and Vibrations:

1. Ley 37/2003, ley del ruido. BOE No. 276 of 18/11/2003

2. Real Decreto 1367/2007, por el que se desarrolla la ley 37/2003, de 17 de noviembre, del ruido, en lo referente a zonificación acústica, objetivos de calidad y emisiones acústicas. BOE No. 254 of 23/10/2007

3. Orden 26/07/2005, odelo tipo de ordenanza municipal de protección contra la contaminación acústica. BOJA No. 158 of 26/07/2005

4. Decreto 6/2012, reglamento de protección contra la contaminación acústica en Andalucia. BOJA No. 24 of 06/02/2012

5. Real Decreto 212/2002, de 22 de febrero, por el que se regulan las emisiones sonoras en el entorno debidas a determinadas máquinas de uso al aire libre. BOE n°. 52 de 1/03/2002

6. Real Decreto 524/2006, de 28 de abril, por el que se modifica el Real Decreto 212/2002, de 22 de febrero, por el que se regulan las emisiones sonoras en el entorno debidas a determinadas máquinas de uso al aire libre. BOE no. 106 of 4/5/2006

7. Real Decreto 1644/2008, de 10 de octubre, por el que se establecen las normas para la comercialización y puesta en servicio de las máquinas. BOE no 246 of 11/10/2008

5.18.12. Hazardous Substances:

1. Real Decreto 379/2001, reglamento de almacenamiento de productos químicos y sus ITC MIE APQ 1, 2, 3, 4, 5, 6 y 7. BOE No. 112 of 10/05/2001

5.18.13. Soil and Subsoil:

1. Decreto 2857/1978, reglamento general para el régimen de la minería.

BOE No. 45 of 11/12/1978

2. Real Decreto 9/2005, por el que se establece la relación de actividades potencialmente contaminantes del suelo y los criterios y estándares para la declaración de suelos contaminados. BOE No. 15 of 18/01/2005

3. Ley 22/1973, de minas. BOE No. 176 of 24/07/1973

5.18.14. Various:

1. Real Decreto 957/2002, se regulan las inspecciones técnicas en carretera de los vehículos industriales que circulen en territorio español. BOE No. 227 of 21/09/2002

2. Real Decreto 2042/1994, inspección técnica de vehículos. BOE No. 275 of 17/11/1994

3. Ley 37/2015, de 29 de septiembre, de carreteras. BOE no. 234 of 30/9/2015

4. Ley 8/2001, de 12 de julio, de Carreteras de Andalucía. BOJA no. 85 of 26/07/2001

5.18.15. Integrated Natural Resources Management Plan for Morón Air Base (2015

- 2020)

5.18.16. Final Environmental Governing Standards for Spain, May 2014

5.18.17. Conservation and Maintenance of the Existing Vegetation: The Contractor shall conserve and protect the existing vegetation (trees, shrubs, grass) on the work site or adjacent to it that has not to be removed or has not to be affected by the works required by this contract. The Contractor shall only remove the trees and/or shrubs when specifically indicated on the specifications and drawings and shall avoid damaging the remaining vegetation. If any tree branch is split during the execution of the works due to the handling of the equipment or due to some carelessness of the workers, the Contractor shall prune those affected branches with a clean cut and apply a pruning paste to said cut. The Contractor shall cut the vegetal cover and/or turf at the work site so that it does not exceed 10 cm in height. The Contractor shall restore, at no additional cost to the Government, to its original condition the area affected during the execution of the project works before the final acceptance of project works.

5.18.18. Site Cleaning: The Contractor shall remove debris, waste materials and garbage and shall keep the site always tidy. All waste materials and garbage shall be placed in containers provided by the Contractor, which shall be removed daily outside of the Base to an authorized dump during the progress of the work. The Contractor shall ensure that all volatile wastes are placed in suitable containers to prevent that the wind blows them to adjacent areas and/or the aerodrome. Once the works are completed, the Contractor shall remove the containers.

5.18.19. Access Route Cleaning: The Contractor shall be solely responsible for any material dumped/spilled by trucks, vehicles, machinery or equipment on the access routes. Said material deposited on the access routes shall be removed by the Contractor immediately. The Contractor shall be responsible for ensuring that all access routes are kept clean at all times. No amount of material deposited on the access routes shall be tolerated.

5.18.20. Waste and Debris: The Contractor, within 15 calendar days after the

Notice to Proceed date, shall submit a certificate from the authorized dump or waste management plant to the Construction Management for its approval by Contracting Officer or authorized representative with the estimated quantities of waste and debris managed during the period of the execution of the works. The delivery tickets shall be previously delivered to Construction Management for their review during the work execution.

5.18.21. Hazardous Material: Before transporting any hazardous material, the

Contractor shall contact the Chief of Construction Management to coordinate its handling, transportation and storage. The Contractor shall be responsible for complying with all applicable environmental regulations related to handling, transportation and storage of hazardous materials and/or waste.

5.18.22. Noise Control and Prevention: The Contractor shall comply with all applicable state, autonomous community, municipality and Base regulations related to the control and prevention of the noise. The Contractor shall take the measures required to prevent and control the noise in the vicinity of the construction area.

5.18.23. Dust Control and Prevention: The Contractor shall comply with all applicable state, autonomous community, municipality and Base regulations related to the control and prevention of the dust. The Contractor shall take the measures required to prevent and control the dust in the vicinity of the construction area.

5.18.24. Storm Water Pollution Control and Prevention: The Contractor shall comply with all applicable state, autonomous community, municipality and Base regulations related to the control and prevention of the pollution of the storm water. The Contractor shall take the measures required to prevent and control the pollution of the surface and ground storm waters.

5.19.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.