| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ATFP Harden Critical Facilities | 0.00 € | $0.00 | ||||||||
| WORK ORDER NUMBER | WORK LOCATION | |||||||||
| QUUG 18 1011 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Supply and install manual bollard hot-dip galvanized 245 mm diameter. | |||||||||
| Ea | ||||||||||
| 2 | Painting bollards | |||||||||
| Ea | ||||||||||
| 3 | Excavation & pouring footing concrete 210 Kg/cm² for bollards | |||||||||
| m³ | ||||||||||
| 4 | Leveling drainage channels | |||||||||
| Ls | ||||||||||
| 5 | Construction ground berm | |||||||||
| m³ | ||||||||||
| 6 | reinforced concrete slab for channels | |||||||||
| m³ | ||||||||||
| 7 | Rip-Rap stone channels | |||||||||
| m² | ||||||||||
| 8 | Miscellaneous | |||||||||
| Ls | ||||||||||
| Total | 0.00 | 0.00 | 0.00 | |||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |