FA5575-14-R-0010-P00001_Amendment_1.pdf
PDF 89 KB Posted
- Attached to
- Install Frequency Converters Federal contract opportunity
- Solicitation number
- FA5575-14-R-0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Modifications-Clarifications_to_the_Technical_Design_for_the_USAFE-_QUUG-12-00005-01_-_Fiber_to_Core_4_Buildings.pdf | ||
| Attachment_7_-_Contractor_Cost_Breakdown.xlsx | XLSX spreadsheet | |
| FA5575-14-R-0010 _Frequency_Converters.pdf | ||
| Attachment_2_-_Spanish_Specifications.pdf | ||
| Attachment_5_-_PPI_Questionnaire.doc | DOC document | |
| Attachment_6_-_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| Attachment_1_-_English_Specifications.pdf | ||
| Attachment_3_-_Drawings.pdf | ||
| Attachment_4_-_PPI_reference_list.doc | DOC document | |
| Synopsis_FBO _Install_Frequency_Converters.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3N7A04031A003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Extend the site visit date from 27 June 2014 at 1000 hrs. to 10 July 2014 at 1000 hrs.
2. Extend the due date of proposals from 21 July 2014 at 1200 hrs. to 30 July at 1200 hrs.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5575-14-R-0010
X 9B. DATED (SEE ITEM 11)
20-Jun-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2014
CODE
496 ABS/LGC (FA5575)
APARTADO 221
41530 MORON
SEVILLA
FA5575 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5575-14-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Jul-2014 12:00 PM to 30-Jul-2014 12:00 PM.
The required performance has changed from Project QUUG 09-1019. Install Frequency Converters, Moron Air Base, SpainThe magnitude of the project is between $500,000 and $1,000,000 U.S. Dollars. This is furnished for the convenience of prospective contractors. The actual extent of work requirements will be governed by the specifications and drawings. Offers will be evaluated according to the criteria in Section M.A pre-proposal
Conference / Site Visit will be held 27 June 2014, 10:00 hours local time, in the Contracting Conference room, bldg.
106. Proposals must be received by the Contracting Officer no later than 12:00 hours local time on 21 July 2014.
Proposals submitted by fascmile will NOT be accepted.IN ACCORDANCE WITH THE OFFICE OF DEFENSE
COOPERATION POLICY 400-5 "(4) SPANISH MATERIAL, LABOR AND EQUIPMENT MUST BE USED IF
PERMITTED BY THE REQUIREMENTS OF THE CONTRACT SPECIFICATIONS."Notice to Offerors: Funds are not presently available with USAFE to fund this project. No award will be made under this solicitation until funds are available, so bid acceptance period should be valid through 30 Sep 2014. In the event of unforeseen budget anomalies and as a result of the Budget Control Act of 2011, the government reserves the right to cancel bids with no obligation to the offeror by the government. to Project QUUG 09-1019. Install Frequency Converters, Moron Air Base, SpainThe magnitude of the project is between $500,000 and $1,000,000 U.S. Dollars. This is furnished for the convenience of prospective contractors. The actual extent of work requirements will be governed by the specifications and drawings. Offers will be evaluated according to the criteria in Section M.A pre-proposal
Conference / Site Visit will be held 10 July 2014, 10:00 hours local time, in the Contracting Conference room, bldg.
106. Proposals must be received by the Contracting Officer no later than 12:00 hours local time on 30 July 2014.
Proposals submitted by fascmile will NOT be accepted.IN ACCORDANCE WITH THE OFFICE OF DEFENSE
COOPERATION POLICY 400-5 "(4) SPANISH MATERIAL, LABOR AND EQUIPMENT MUST BE USED IF
PERMITTED BY THE REQUIREMENTS OF THE CONTRACT SPECIFICATIONS."Notice to Offerors: Funds are not presently available with USAFE to fund this project. No award will be made under this solicitation until funds are available, so bid acceptance period should be valid through 30 Sep 2014. In the event of unforeseen budget anomalies and as a result of the Budget Control Act of 2011, the government reserves the right to cancel bids with no obligation to the offeror by the government..
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
10 July 2014 @ 10:00 hours, local time
(c) Participants will meet at--
Bldg 106, Moron Air Base
*NOTICE TO OFFERORS: IF YOU PLAN ON ATTENDING THE SCHEDULED SITE ABOVE, PLEASE
NOTIFY THE CONTRACTING OFFICER MSGT JOSHUA MORELL BY EMAIL AT
JOSHUA.MORELL@US.AF.MIL NO LATER THAN 12:00 LOCAL TIME 9 JULY 2014. ALSO, PLEASE
PROVIDE NAMES OF ALL INDIVIDUALS WHO WILL BE IN ATTENDANCE. IF THESE INSTRUCTIONS
FA5575-14-R-0010
ARE NOT FOLLOWED YOU MAY BE DENIED ACCESS TO THE SITE VISIT.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .