Attachment_6_-_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Install Frequency Converters Federal contract opportunity
Solicitation number
FA5575-14-R-0010
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 09-1019PROJECT TITLE

INSTALL FREQUENCY CONVERTERS

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction ScheduleNTP+5
2Work PlanNTP+5
SECTION 01 11 01
3Progress Schedule4NTP+5
4Mobility Plan4NTP+5
5Quality Control Plan4NTP+5
6Waste & construction debris management4Final Inspection
7As-Built drawings4FI+15
8Spatial Data4FI+15
9Key Personnel4NTP+5
10Personel listing4NTP+5
11Safety Program4NTP+5
12Warranty letter4FI+30
SECTION 16267
13Frequency converters444
14Remote monitoring and control system44
15Work plan4
16Routine factory test plan4Test - 21
17Performance test plan4Test - 15
18Test schedule4Test - 30
19Routine factory tests4Test + 15
20Qualification of manufacturer4
21CE marking4
22Initial inspection and tests4Upon test

exec.

23Performance tests4Test + 15
24Training syllabus4Training

- 4 weeks

SECTION 16402
25Multiple-conductor cables4
26Single-conductor cables4
27Grounding wire and hardware4
28Conduits and fittings (1 x each type)4
29Junction boxes4
30Splices and terminators4
31Circuit breakers4
32Panelboards4
33One-line diagram4
341000-Volt wirng test4Upon test

exec.

35 Transformer test 4 Upon test exec.

36 Grounding system test 4 Upon test exec.

37 HVAC system report 4 Upon test exec.

38Single diagram of the "as-built" building electrical sys4
39Schematic diagram of electrical control system4

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 09-1019TÍTULO DE PROYECTO:

INSTALACIÓN DE CONVERTIDORES DE FRECUENCIA

SOLICITACIÓN / CONTRATO NO.

(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Programa de obraNTP+5
2Plan de obraNTP+5
SECCIÓN 01 11 01
3Programa de avance de obras4NTP+5
4Plan de movilización4NTP+5
5Plan de control de calidad4NTP+5
6Gestión de residuos y escombros4Inspección final
7Planos As-Builts4IF+15
8Datos espaciales4IF+15
9Personal clave4NTP+5
10Listado de personal4NTP+5
11Plan de seguridad4NTP+5
12Carta de garantía4IF+30
SECCIÓN 16267
13Convertidor de frecuencia444
14Sistema de control y monitorización remota44
15Plan de trabajo4
16Programa de ensayos en fábrica4Ensayo - 21
17Programa de ensayos de rendimiento4Ensayo - 15
18Programa de ensayos4Ensayo - 30
19Ensayos rutinarios en fábrica4Ensayo + 15
20Cualificaciones del fabricante4
21Marcado CE4
22Pruebas e inspección inicial4Tras real.

ensayo

23Ensayos de rendimiento4Ensayo + 15
24Programa de formación4Formación

- 4 sem.

SECCIÓN 16402
25Cables multipolares4
26Cables unipolares4
27Cable de puesta a tierra y accesorios4
28Tubos y accesorios (1 x cada tipo)4
29Cajas de conexión4
30Empalmes y terminales4
31Interruptores magnetotérmicos4
32Cuadros eléctricos4
33Esquema unifilar4
34Ensayo de aislamiento del cableado 0.6/1 kV.4Tras real.

ensayo 35 Prueba de transformadores 4 Tras real.

ensayo 36 Informes de pruebas de puesta a tierra 4 Tras real.

ensayo 37 Informe del sisema de climatización 4 Tras real.

ensayo

38Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra4
39Diagrama esquemático del sistema de control eléctrico4

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .