Attachment_6_-_Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- Install Frequency Converters Federal contract opportunity
- Solicitation number
- FA5575-14-R-0010
About this file
Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Modifications-Clarifications_to_the_Technical_Design_for_the_USAFE-_QUUG-12-00005-01_-_Fiber_to_Core_4_Buildings.pdf | ||
| FA5575-14-R-0010-P00001_Amendment_1.pdf | ||
| Attachment_7_-_Contractor_Cost_Breakdown.xlsx | XLSX spreadsheet | |
| FA5575-14-R-0010 _Frequency_Converters.pdf | ||
| Attachment_2_-_Spanish_Specifications.pdf | ||
| Attachment_4_-_PPI_reference_list.doc | DOC document | |
| Attachment_3_-_Drawings.pdf | ||
| Attachment_5_-_PPI_Questionnaire.doc | DOC document | |
| Attachment_1_-_English_Specifications.pdf | ||
| Synopsis_FBO _Install_Frequency_Converters.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 09-1019 | PROJECT TITLE |
INSTALL FREQUENCY CONVERTERS
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | |||||||||
| 1 | Construction Schedule | NTP+5 | |||||||
| 2 | Work Plan | NTP+5 | |||||||
| SECTION 01 11 01 | |||||||||
| 3 | Progress Schedule | 4 | NTP+5 | ||||||
| 4 | Mobility Plan | 4 | NTP+5 | ||||||
| 5 | Quality Control Plan | 4 | NTP+5 | ||||||
| 6 | Waste & construction debris management | 4 | Final Inspection | ||||||
| 7 | As-Built drawings | 4 | FI+15 | ||||||
| 8 | Spatial Data | 4 | FI+15 | ||||||
| 9 | Key Personnel | 4 | NTP+5 | ||||||
| 10 | Personel listing | 4 | NTP+5 | ||||||
| 11 | Safety Program | 4 | NTP+5 | ||||||
| 12 | Warranty letter | 4 | FI+30 | ||||||
| SECTION 16267 | |||||||||
| 13 | Frequency converters | 4 | 4 | 4 | |||||
| 14 | Remote monitoring and control system | 4 | 4 | ||||||
| 15 | Work plan | 4 | |||||||
| 16 | Routine factory test plan | 4 | Test - 21 | ||||||
| 17 | Performance test plan | 4 | Test - 15 | ||||||
| 18 | Test schedule | 4 | Test - 30 | ||||||
| 19 | Routine factory tests | 4 | Test + 15 | ||||||
| 20 | Qualification of manufacturer | 4 | |||||||
| 21 | CE marking | 4 | |||||||
| 22 | Initial inspection and tests | 4 | Upon test |
exec.
| 23 | Performance tests | 4 | Test + 15 |
| 24 | Training syllabus | 4 | Training |
- 4 weeks
| SECTION 16402 | |||||
| 25 | Multiple-conductor cables | 4 | |||
| 26 | Single-conductor cables | 4 | |||
| 27 | Grounding wire and hardware | 4 | |||
| 28 | Conduits and fittings (1 x each type) | 4 | |||
| 29 | Junction boxes | 4 | |||
| 30 | Splices and terminators | 4 | |||
| 31 | Circuit breakers | 4 | |||
| 32 | Panelboards | 4 | |||
| 33 | One-line diagram | 4 | |||
| 34 | 1000-Volt wirng test | 4 | Upon test |
exec.
35 Transformer test 4 Upon test exec.
36 Grounding system test 4 Upon test exec.
37 HVAC system report 4 Upon test exec.
| 38 | Single diagram of the "as-built" building electrical sys | 4 |
| 39 | Schematic diagram of electrical control system | 4 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | ||
| QUUG 09-1019 | TÍTULO DE PROYECTO: |
INSTALACIÓN DE CONVERTIDORES DE FRECUENCIA
SOLICITACIÓN / CONTRATO NO.
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||||
| 1 | Programa de obra | NTP+5 | |||||||
| 2 | Plan de obra | NTP+5 | |||||||
| SECCIÓN 01 11 01 | |||||||||
| 3 | Programa de avance de obras | 4 | NTP+5 | ||||||
| 4 | Plan de movilización | 4 | NTP+5 | ||||||
| 5 | Plan de control de calidad | 4 | NTP+5 | ||||||
| 6 | Gestión de residuos y escombros | 4 | Inspección final | ||||||
| 7 | Planos As-Builts | 4 | IF+15 | ||||||
| 8 | Datos espaciales | 4 | IF+15 | ||||||
| 9 | Personal clave | 4 | NTP+5 | ||||||
| 10 | Listado de personal | 4 | NTP+5 | ||||||
| 11 | Plan de seguridad | 4 | NTP+5 | ||||||
| 12 | Carta de garantía | 4 | IF+30 | ||||||
| SECCIÓN 16267 | |||||||||
| 13 | Convertidor de frecuencia | 4 | 4 | 4 | |||||
| 14 | Sistema de control y monitorización remota | 4 | 4 | ||||||
| 15 | Plan de trabajo | 4 | |||||||
| 16 | Programa de ensayos en fábrica | 4 | Ensayo - 21 | ||||||
| 17 | Programa de ensayos de rendimiento | 4 | Ensayo - 15 | ||||||
| 18 | Programa de ensayos | 4 | Ensayo - 30 | ||||||
| 19 | Ensayos rutinarios en fábrica | 4 | Ensayo + 15 | ||||||
| 20 | Cualificaciones del fabricante | 4 | |||||||
| 21 | Marcado CE | 4 | |||||||
| 22 | Pruebas e inspección inicial | 4 | Tras real. |
ensayo
| 23 | Ensayos de rendimiento | 4 | Ensayo + 15 |
| 24 | Programa de formación | 4 | Formación |
- 4 sem.
| SECCIÓN 16402 | |||||
| 25 | Cables multipolares | 4 | |||
| 26 | Cables unipolares | 4 | |||
| 27 | Cable de puesta a tierra y accesorios | 4 | |||
| 28 | Tubos y accesorios (1 x cada tipo) | 4 | |||
| 29 | Cajas de conexión | 4 | |||
| 30 | Empalmes y terminales | 4 | |||
| 31 | Interruptores magnetotérmicos | 4 | |||
| 32 | Cuadros eléctricos | 4 | |||
| 33 | Esquema unifilar | 4 | |||
| 34 | Ensayo de aislamiento del cableado 0.6/1 kV. | 4 | Tras real. |
ensayo 35 Prueba de transformadores 4 Tras real.
ensayo 36 Informes de pruebas de puesta a tierra 4 Tras real.
ensayo 37 Informe del sisema de climatización 4 Tras real.
ensayo
| 38 | Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra | 4 |
| 39 | Diagrama esquemático del sistema de control eléctrico | 4 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N
File details come from the government source that posted it. Updated .