Radon Sampling Results LXEZ201094 Repair Mitigate Radon Multiple Facilities.pdf

PDF 16 KB Posted

Attached to
Radon Mitigation Bldgs 90, 246, 908, 3445
Solicitation number
FA527022R0009
Issued by

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Office Symbol /

Classification

Building # 1st Floor Area

(SF)

Recommended # of Monitors

Facility Name/

Designation

Room Name/Number Device

Installation Date

Retrieved

Date

Analytical

Results Date

Results PCIL WLM/yr

18 MDG 90 13,002 7 Mental Health Breakroom 20190806 20191126 1/24/2020 26.2 1.23

18 MDG 90 13,002 7 Mental Health Flight Chief office 20190806 20191126 1/24/2020 27.3 1.28

18 MDG 90 13,002 7 Mental Health Room 220 20190806 20191126 1/24/2020 25.3 1.19

18 MDG 90 13,002 7 Mental Health Room 101 20190806 20191126 1/24/2020 26.4 1.24

18 MDG 90 13,002 7 Mental Health Room 113 20190806 20191126 1/24/2020 31 1.46

18 MDG 90 13,002 7 Mental Health Room 118 20190806 20191126 1/24/2020 26.1 1.23

18 MDG 90 13,002 7 Mental Health Room 103 20190806 20191126 1/24/2020 24 1.13

18 CS 246 1,917 1 Maint. Facility Room 1 (main office pit) 20190802 20191122 1/24/2020 25.7 1.21

18 CS 246 1,917 1 Maint. Facility Room 1 (main office pit) -

DUPLICATE

20190802 20191122 1/24/2020 26.5 1.25

18 WG 908 4,721 3 Safety Sgt Phillips Desk 20190806 20191122 1/24/2020 19.5 0.92

18 EMS 3445 11,601 6 Honor Guard FTAC NCOIC office 20190807 20191218 1/24/2020 26 1.22

File details come from the government source that posted it. Updated .