LXEZ201097 RFI1 CE Response.pdf
PDF 77 KB Posted
- Attached to
- Radon Mitigation Bldgs 90, 246, 908, 3445 Federal contract opportunity
- Solicitation number
- FA527022R0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW - LXEZ201097 (Revised 24 May 22).pdf | ||
| Solicitation Amendment FA527022R00090002 SF 30.pdf | ||
| RFI Q and A v2.pdf | ||
| ACM and LBP Bulk Sampling Report B90.pdf | ||
| Floor Plan B90.pdf | ||
| Floor Plan B908.pdf | ||
| Location Maps LXEZ201094.pdf | ||
| Radon Sampling Results LXEZ201094 Repair Mitigate Radon Multiple Facilities.pdf | ||
| Floor Plan B3445.pdf | ||
| Floor Plan B246.pdf | ||
| SOW REPAIR MITIGATE RADON 90 246 90 AND 3445 v2.pdf | ||
| ACM and LBP Bulk Sampling Report B3445.pdf | ||
| ACM and LBP Bulk Sampling Report B908.pdf | ||
| ACM and LBP Bulk Sampling Report B246.pdf | ||
| SOW REPAIR MITIGATE RADON 90 246 90 AND 3445 v2.docx | DOCX document | |
| RFI Q and A.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Project Information Sheet.pdf | ||
| Solicitation - FA527022R0009.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LXEZ201097, Repair Radon Mitigation Multi Facs (90, 246, 908, and 3445)
RFI Number #01
Date Responded
Project Number/Title LXEZ 201097, Repair Radon Mitigation Multi Facs (90, 246, 908, and 3445), Kadena AB, Okinawa
Question No.
Reference (Doc/Page/Section/Para)
Question
Government Response
Reply By: 718 CES/CENMC Date: 24 May 2022
1 Radon result for Bldg. 90 For Bldg. 90, the radon test results show breakroom as the room name/number. Is this the staff lounge, room 224 from the floor plan?
Yes.
2 Radon result for Bldg. 90 For Bldg. 90, the radon test results show flight chief office as the room name/number is the Commander, mental health flight, room 212?
Yes.
3 Radon result for Bldg. 908 For Bldg. 908, the radon test results shows Sgt. Phillips desk as the room name/number. The floor plan doesn’t have any room numbers labeled. Where was the radon measurement taken in this building??
No information of the room location is available. Please provide additional testing to obtain sufficient test results for the building.
4 Floor plan for Bldg. 246 For Bldg. 246, on the floor plan, which room is Room 1 (main office pit)?? The big office at the entrance??
Yes. The big office at the entrance is Room 1.
5 Radon sampling and results
Will the government allow new testing to be performed as part of this contract? Due to previous improper testing, proper radon mitigation designs can’t be performed.
Please see the attached Radon Question PDF for details and references.
Additional testing is allowed in this contract. Please provide additional testing for all buildings to meet Radon measurement requirements and standards as necessary. Please include additional sampling cost in bid proposal.