Attach 04_AJJY 23-1007 Final Drawings.pdf

PDF 20 MB Posted

Attached to
AJJY 23-1007 Repair Airfield Electrical Conduit and Glideslope Systems AAFB, Guam
Solicitation number
FA524025B0001
Issued by

About this file

These are final design drawings for the repair of airfield electrical conduit and glideslope systems at Andersen Air Force Base in Guam, with the project number AJJY 23-1007 and contract number FA5240-22-F-0073. The comprehensive set of 62 technical drawings covers electrical site plans, one-line diagrams, equipment removal and installation details, and site-specific infrastructure modifications for multiple runway and taxiway electrical systems.

The project involves extensive electrical infrastructure work, including removing and replacing electrical conduits, handholes, power centers, transformers, and associated equipment for various runway navigation systems such as localizer stations, glideslope shelters, and traffic light antennas. Key technical requirements include concrete encasement of ductbanks, ground rod installations, cable routing, and maintaining operational continuity of airfield navigation systems. The drawings specify precise installation locations, equipment specifications, and site-specific details for electrical infrastructure across the west and east sides of Andersen Air Force Base, with careful attention to existing utility coordination and minimal operational disruption.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-001

TITLE / COVER SHEET

CONDUIT & GLIDESLOPE SYSTEMS

ANDERSEN AFB, GUAM

LOCATION

PROJECT

MAP OF GUAM

LOCATION MAP

PLAN

NORTH

DESIGN TEAM

SETIADI ARCHITECTS, LLC

357 ROUTE 8 MAITE, GUAM 96910

PHONE: (671) 477-3556 TO 59 FAX: (671) 477-3559

EMCE CONSULTING ENGINEERS

ELECTRICAL ENGINEER:

133 ANTONIA COURT

TAMUNING, GUAM 96913

PHONE: (671) 649-0166 FAX: (671) 646-3623

DUEÑAS CAMACHO & ASSOCIATES, INC.

CIVIL / STRUCTURAL ENGINEER:

238 EAST MARINE CORPS DRIVE SUITE 201,

HAGATÑA, GUAM 96910

PHONE: (671) 477-7991 FAX: (671) 479-6315

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

PLAN

NORTH

PROJECT SITE

VICINITY MAP

PRIME CONSULTANT:

PROJECT SITERUNWAY 06L/24R

RUNWAY 06R/24L

RUNWAY 06R/24L

CONTROL TOWER

RUNWAY 06L/24R

1 621

20230816

FINAL DESIGN SUBMITTAL - 24 AUG 2023

G-002

INDEX OF DRAWINGS

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

INDEX OF DRAWINGS

SHT. NO.DWG. NO. DESCRIPTION

G-001

GENERAL SHEETS

TITLE/COVER SHEET E-001 GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS, & MOUNTING HEIGHT SCHEDULE

ED101 BUILDING 2800 ELECTRICAL - REMOVAL

ED102 BUILDING 2662 ELECTRICAL - REMOVAL

E-501 MISCELLANEOUS DETAILS - 1

E-502 MISCELLANEOUS DETAILS - 2

E-601 ONE LINE DIAGRAM - REMOVAL (WEST)

E-602 ONE LINE DIAGRAM - REMOVAL (EAST)

E-603 ONE LINE DIAGRAM - NEW (WEST)

ONE LINE DIAGRAM - NEW (EAST)

EDS100 OVERALL ELECTRICAL SITE PLAN - REMOVAL

EDS101

EDS102

EDS103

ES100 OVERALL ELECTRICAL SITE PLAN - NEW

ES101 ELECTRICAL SITE PLAN - NEW (EAST)

ES102 ELECTRICAL SITE PLAN 1 OF 2 - NEW (WEST)

ES103 ELECTRICAL SITE PLAN 2 OF 2 - NEW (WEST)

ES104 ENLARGED ELECTRICAL SITE PLANS - NEW (EAST)

ES105 ENLARGED ELECTRICAL SITE PLANS - NEW (EAST)

ES106 ENLARGED ELECTRICAL SITE PLANS - NEW (WEST)

ES107 ENLARGED ELECTRICAL SITE PLANS - NEW (WEST)

CU500 MISCELLANEOUS CIVIL DETAILS

S-001 STRUCTURAL DESIGN CRITERIA STR. GEN NOTES, REBAR SCHEDULE & TYP. DETAILS

4'X5'X5' SECONDARY HANDHOLE DETAIL

CU501 MISCELLANEOUS CIVIL DETAILS

S-101

PEDESTAL DETAILS-102

EDS104

EDS105

EDS106

EDS107

ELECTRICAL SITE PLAN - REMOVAL (EAST)

ELECTRICAL SITE PLAN 1 OF 2 - REMOVAL (WEST)

ELECTRICAL SITE PLAN 2 OF 2 - REMOVAL (WEST)

ENLARGED ELECTRICAL SITE PLANS - REMOVAL (EAST)

ENLARGED ELECTRICAL SITE PLANS - REMOVAL (EAST)

ENLARGED ELECTRICAL SITE PLANS - REMOVAL (WEST)

ENLARGED ELECTRICAL SITE PLANS - REMOVAL (WEST)

E-101 BUILDING 2800 ELECTRICAL - NEW

E-102 BUILDING 2662 ELECTRICAL - NEW

E-503 MISCELLANEOUS PHOTOS - EXISTING

E-504

E-505

MISCELLANEOUS PHOTOS - EXISTING

MISCELLANEOUS PHOTOS - NEW

G-002 INDEX OF DRAWINGS

TOPOGRAPHIC SURVEY

CIVIL

STRUCTURAL

INDEX OF DRAWINGS (CONTINUATION)

SHT. NO.DWG. NO. DESCRIPTION

ELECTRICAL

E-604

C-100 TOPOGRAPHIC/AS-BUILT SURVEY3 OF 62

C-101 TOPOGRAPHIC/AS-BUILT SURVEY4 OF 62

C-102 TOPOGRAPHIC/AS-BUILT SURVEY5 OF 62

C-103 TOPOGRAPHIC/AS-BUILT SURVEY6 OF 62

C-104 TOPOGRAPHIC/AS-BUILT SURVEY7 OF 62

C-105 TOPOGRAPHIC/AS-BUILT SURVEY8 OF 62

C-106 TOPOGRAPHIC/AS-BUILT SURVEY9 OF 62

C-107 TOPOGRAPHIC/AS-BUILT SURVEY10 OF 62

C-108 TOPOGRAPHIC/AS-BUILT SURVEY11 OF 62

C-109 TOPOGRAPHIC/AS-BUILT SURVEY12 OF 62

C-110 TOPOGRAPHIC/AS-BUILT SURVEY13 OF 62

C-111 TOPOGRAPHIC/AS-BUILT SURVEY14 OF 62

C-112 TOPOGRAPHIC/AS-BUILT SURVEY15 OF 62

C-113 TOPOGRAPHIC/AS-BUILT SURVEY16 OF 62

C-114 TOPOGRAPHIC/AS-BUILT SURVEY17 OF 62

C-115 TOPOGRAPHIC/AS-BUILT SURVEY18 OF 62

C-116 TOPOGRAPHIC/AS-BUILT SURVEY19 OF 62

C-117 TOPOGRAPHIC/AS-BUILT SURVEY20 OF 62

C-118 TOPOGRAPHIC/AS-BUILT SURVEY21 OF 62

C-119 TOPOGRAPHIC/AS-BUILT SURVEY22 OF 62

C-120 TOPOGRAPHIC/AS-BUILT SURVEY23 OF 62

C-121 TOPOGRAPHIC/AS-BUILT SURVEY24 OF 62

C-122 TOPOGRAPHIC/AS-BUILT SURVEY25 OF 62

C-123 TOPOGRAPHIC/AS-BUILT SURVEY26 OF 62

C-124 TOPOGRAPHIC/AS-BUILT SURVEY27 OF 62

2 622

VR

CH

C-100 3 623

C-101 4 624

C-102 5 625

C-103 6 626

C-104 7 627

C-105 8 628

C-106 9 629

C-107 10 6210

C-108 11 6211

C-109 12 6212

C-110 13 6213

C-111 14 6214

C-112 15 6215

C-113 16 6216

C-114 17 6217

C-115 18 6218

C-116 19 6219

C-117 20 6220

C-118 21 6221

C-119 22 6222

C-120 23 6223

C-121 24 6224

C-122 25 6225

C-123 26 6226

C-124 27 6227

1AC PAVEMENT RESTORATION DETAIL

1A@ TAXIWAY

1B@ PERIMETER ROAD

2CONCRETE ENCASED DUCTBANK REINFORCEMENT DETAIL

2A1 X 2 CONFIGURATION

2B2 X 2 CONFIGURATION

2D1 X 3 CONFIGURATION

2E2 X 3 CONFIGURATION

2F3 X 6 CONFIGURATION2C2 X 4 CONFIGURATION

NOTES:

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

28 6228 62

20230816 cj Rectangle

AutoCAD SHX Text 12"

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text 12"

AutoCAD SHX Text

2" THK AC PAVEMENT (SHOULDER)

AutoCAD SHX Text

EXISTING AC PAVEMENT TO REMAIN

AutoCAD SHX Text

EXISTING BASECOURSE

AutoCAD SHX Text

EXISTING COMPACTED SUBGRADE

AutoCAD SHX Text

FOR TAXIWAY A.C. PAVEMENT THICKNESS (SEE SCHEDULE)

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

DUCT SECTION SEE NOTE 4

AutoCAD SHX Text

TACK COAT

AutoCAD SHX Text SAWCUT TO A DEPTH EQUAL TO THICKNESS OF EXIST. AC PAVEMENT, TACK COAT VERTICAL FACE OF SAWCUT PRIOR TO PLACING OF NEW AC PAVEMENT.

AutoCAD SHX Text 12"

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text 12"

AutoCAD SHX Text

3" THK AC PAVEMENT

AutoCAD SHX Text

EXISTING AC PAVEMENT TO REMAIN

AutoCAD SHX Text

EXISTING BASECOURSE

AutoCAD SHX Text

EXISTING COMPACTED SUBGRADE

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

DUCT SECTION SEE NOTE 4

AutoCAD SHX Text

TACK COAT

AutoCAD SHX Text SAWCUT TO A DEPTH EQUAL TO THICKNESS OF EXIST. AC PAVEMENT, TACK COAT VERTICAL FACE OF SAWCUT PRIOR TO PLACING OF NEW AC PAVEMENT.

AutoCAD SHX Text

CONTROLLED LOW STRENGTH MATERIAL (CLSM) SEE NOTES 2

AutoCAD SHX Text

CONTROLLED LOW STRENGTH MATERIAL (CLSM) SEE NOTES 2

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C4

AutoCAD SHX Text C3

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

1. RESTORE ANY PAVEMENT MARKINGS THAT IS AFFECTED BY THE PAVEMENT RESTORATION WORK. RESTORE ANY PAVEMENT MARKINGS THAT IS AFFECTED BY THE PAVEMENT RESTORATION WORK. 2. USE CONTROLLED LOW STRENGTH MATERIAL (CLSM) FOR TRENCHES BELOW ROADWAYS AND TAXIWAYS. USE CONTROLLED LOW STRENGTH MATERIAL (CLSM) FOR TRENCHES BELOW ROADWAYS AND TAXIWAYS. 3. SUBMIT A MIX DESIGN FOR CLSM AT LEAST 15 DAYS PRIOR TO THE START OF CONSTRUCTION. FURNISH A SUBMIT A MIX DESIGN FOR CLSM AT LEAST 15 DAYS PRIOR TO THE START OF CONSTRUCTION. FURNISH A COMPLETE LIST OF MATERIALS, INCLUDING TYPE, BRAND, SOURCE, ADMIXTURE, APPLICABLE REFERENCE SPECIFICATIONS, AND TEST REPORTS SHOWING THAT THE MIX HAS BEEN SUCCESSFULLY TESTED TO PRODUCE CLSM MEETING THE PROPERTIES SPECIFIED AND IS SUITABLE FOR THE PROJECT CONDITIONS. 4. PROVIDE CLSM WITH A 28-DAY COMPRESSIVE STRENGTH BETWEEN 150 AND 500 PSI IN ACCORDANCE WITH ASTM PROVIDE CLSM WITH A 28-DAY COMPRESSIVE STRENGTH BETWEEN 150 AND 500 PSI IN ACCORDANCE WITH ASTM D4832. IT SHALL CONSIST OF A UNIFORM, FLOWABLE MIXTURE THAT IS SELF-LEVELING WHEN PLACED AND SELF-COMPACTING. INCLUDE ADMIXTURE TO REDUCE SHRINKING OF CLSM. 5. FOR DUCT SECTION, SEE DETAILFOR DUCT SECTION, SEE DETAIL

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C5

AutoCAD SHX Text C4

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C3

AutoCAD SHX Text C3

AutoCAD SHX Text C6

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C5

AutoCAD SHX Text C4

AutoCAD SHX Text C3

AutoCAD SHX Text C6

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text C11

AutoCAD SHX Text C10

AutoCAD SHX Text C12

AutoCAD SHX Text C7

AutoCAD SHX Text C8

AutoCAD SHX Text C13

AutoCAD SHX Text C14

AutoCAD SHX Text C15

AutoCAD SHX Text

TAXIWAY A.C. PAVEMENT THICKNESS SCHEDULE

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

TAXIWAY "E" (NORTH)

AutoCAD SHX Text

A.C. THICKNESSTHICKNESS

AutoCAD SHX Text 9"

AutoCAD SHX Text 8.5"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 5"

AutoCAD SHX Text

TAXIWAY "E" (SOUTH)

AutoCAD SHX Text

TAXIWAY "F" (NORTH)

AutoCAD SHX Text

TAXIWAY "F" (SOUTH)

AutoCAD SHX Text

TAXIWAY "K"

AutoCAD SHX Text ABOVE A.C. PAVEMENT THICKNESS SCHEDULE IS BASED ON THE AAFB AIRFIELD PAVEMENT LOAD EVALUATION REPORT DATED SEPTEMBER 2017.

AutoCAD SHX Text

CU500

AutoCAD SHX Text

AutoCAD SHX Text E-502

AutoCAD SHX Text

#4 RINGS AT 18" CENTERS ALONG LENGTH OF DUCT BANK

AutoCAD SHX Text

3000 PSI CONCRETE

AutoCAD SHX Text

#4 RINGS AT 18" CENTERS ALONG LENGTH OF DUCT BANK

AutoCAD SHX Text

3000 PSI CONCRETE

AutoCAD SHX Text

3000 PSI CONCRETE

AutoCAD SHX Text

6-#4 LONGITUDINAL REBARS (TYP)

AutoCAD SHX Text

4" C FOR COMMUNICATIONS

AutoCAD SHX Text

#4 RINGS AT 18" CENTERS ALONG LENGTH OF DUCT BANK

AutoCAD SHX Text

3000 PSI CONCRETE

AutoCAD SHX Text

4" C FOR COMMUNICATIONS

AutoCAD SHX Text

#4 RINGS AT 18" CENTERS ALONG LENGTH OF DUCT BANK

AutoCAD SHX Text

4" C FOR COMMUNICATIONS

AutoCAD SHX Text

3000 PSI CONCRETE

AutoCAD SHX Text

#4 RINGS AT 18" CENTERS ALONG LENGTH OF DUCT BANK

AutoCAD SHX Text C9

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C5

AutoCAD SHX Text C4

AutoCAD SHX Text C3

AutoCAD SHX Text C6

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

3000 PSI CONCRETE

AutoCAD SHX Text

4" C FOR COMMUNICATIONS

AutoCAD SHX Text

#4 RINGS AT 18" CENTERS ALONG LENGTH OF DUCT BANK

AutoCAD SHX Text C7

AutoCAD SHX Text

6-#4 LONGITUDINAL REBARS

AutoCAD SHX Text

4" C FOR COMMUNICATIONS

AutoCAD SHX Text

8-#4 LONGITUDINAL REBARS

AutoCAD SHX Text

4" C FOR COMMUNICATIONS

AutoCAD SHX Text

8-#4 LONGITUDINAL REBARS

AutoCAD SHX Text

10-#4 LONGITUDINAL REBARS

AutoCAD SHX Text

12-#4 LONGITUDINAL REBARS

AutoCAD SHX Text

DETECTABLE WARNING TAPE

AutoCAD SHX Text

DETECTABLE WARNING TAPE

AutoCAD SHX Text

MIN

AutoCAD SHX Text

MIN

AutoCAD SHX Text

AutoCAD SHX Text

MISCELLANEOUS DETAILS

AutoCAD SHX Text

DWG ACAD NUMBER

AutoCAD SHX Text

FILE NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SHEET

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

WAS PREPARED BY ME OR

AutoCAD SHX Text

UNDER MY DIRECT SUPERVISION

AutoCAD SHX Text

I CERTIFY THAT THIS WORK

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

ARCHITECTS - ENGINEERS

AutoCAD SHX Text

USING AGENCY

AutoCAD SHX Text

PROGRAM MANAGER

AutoCAD SHX Text

BIOENVIRONMENTAL ENGINEER

AutoCAD SHX Text

GROUND SAFETY

AutoCAD SHX Text

FIRE CHIEF

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

SUBMITTED

AutoCAD SHX Text

CHIEF OF OPERATIONS

AutoCAD SHX Text

CORROSION ENGINEER

AutoCAD SHX Text

ENVIRONMENTAL

AutoCAD SHX Text

CHIEF, CONSTRUCTION

AutoCAD SHX Text

CHIEF OF ENGINEERING

AutoCAD SHX Text

RECOMMENDED

AutoCAD SHX Text

APPROVED: BASE CIVIL ENGINEER

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

DQC MANAGER

AutoCAD SHX Text

AutoCAD SHX Text 20230717

AutoCAD SHX Text

EMS

AutoCAD SHX Text

CDC/RAB

AutoCAD SHX Text

EXP.

AutoCAD SHX Text

AutoCAD SHX Text

(CIVIL)

AutoCAD SHX Text A

AutoCAD SHX Text M.

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text o

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text U

AutoCAD SHX Text 04/30/2024

A3CONCRETE PAVEMENT RESTORATION DETAIL

C1CONSTRUCTION JOINT DETAILS

B1DOWEL BAR LOCATION DETAIL

B2CONSTRUCTION JOINT SEALANT DETAIL

A1BUTT DOWELED JOINT BETWEEN NEW AND EXISTING PAVEMENT

SECTION VIEW

CONCRETE PAVEMENT DEMOLITION AND RESTORATION NOTES:

C2FIXED BOLLARD DETAIL

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

PLAN VIEW

29 6229 62

20230816

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text

VARIES

AutoCAD SHX Text 15'(±)

AutoCAD SHX Text

13" THICK EXIST. CONC. PAVEMENT TO REMAIN. SEE NOTE 2.

AutoCAD SHX Text

EXISTING BASECOURSE

AutoCAD SHX Text

EXISTING COMPACTED SUBBASE

AutoCAD SHX Text

DUCT SECTION SEE NOTE 4 ON CU500

AutoCAD SHX Text

BUTT DOWELED JOINT SEE DETAIL

AutoCAD SHX Text

CONTROLLED LOW STRENGTH MATERIAL (CLSM) SEE NOTES 2 ON CU500

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

1. HOLES APPROXIMATELY INCH GREATER IN DIAMETER THAN THE HOLES APPROXIMATELY INCH GREATER IN DIAMETER THAN THE 18 INCH GREATER IN DIAMETER THAN THE DOWEL SHALL BE DRILLED IN THE EXISTING CONCRETE AND THE DOWELS SHALL BE BONDED IN THE DRILLED HOLES USING AN EPOXY RESIN GROUT. 2. PAVEMENT THICKNESS "H" AND CONSTRUCTION JOINT SPACING WERE PAVEMENT THICKNESS "H" AND CONSTRUCTION JOINT SPACING WERE BASED ON DESIGN DRAWINGS FOR P-3001 PROJECT. 3. CONTRACTOR TO SEQUENCE DEMOLITION AND RESTORATION OF CONTRACTOR TO SEQUENCE DEMOLITION AND RESTORATION OF EXISTING CONCRETE PAVEMENT TO ALLOW UNRESTRICTED OPERATIONAL ACCESS TO THE MUNITIONS BUNKERS FROM AIRFIELD AREA AT ALL TIMES. 4. CONCRETE PAVEMENT SHALL HAVE FLEXURAL STRENGTH OF 650 PSI CONCRETE PAVEMENT SHALL HAVE FLEXURAL STRENGTH OF 650 PSI AT 28 DAYS OF AGE.

AutoCAD SHX Text

PAINT AND OIL CONSTRUCTION SIDE OF DOWEL

AutoCAD SHX Text

1" DOWEL @ 15" O.C.

AutoCAD SHX Text

JOINT SEALANT, SEE DETAIL

AutoCAD SHX Text

SEE SPECIFICATION 32 13 13.06 FOR ALIGNMENT AND INSTALLATION REQUIREMENTS

AutoCAD SHX Text

BUTT JOINT

AutoCAD SHX Text

1/2 DOWEL LENGTH

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text

JOINT

AutoCAD SHX Text

DOWEL

AutoCAD SHX Text H=13"

AutoCAD SHX Text H/2

AutoCAD SHX Text

L=30" MIN.

AutoCAD SHX Text

6" MIN.

AutoCAD SHX Text

12" MAX.

AutoCAD SHX Text

0.6L MIN.

AutoCAD SHX Text

JOINT SEALANT, SEE DETAIL

AutoCAD SHX Text

DRILL AND EPOXY GROUT DOWEL

AutoCAD SHX Text

1" DOWEL @ 15" O.C.

AutoCAD SHX Text

PAINT AND OIL END OF DOWEL

AutoCAD SHX Text

1/2 DOWEL LENGTH

AutoCAD SHX Text H=13"

AutoCAD SHX Text H/2

AutoCAD SHX Text

EXISTING PAVEMENT

AutoCAD SHX Text

NEW PAVEMENT

AutoCAD SHX Text

H = PAVEMENT THICKNESS

AutoCAD SHX Text

PREFORMED COMPRESSION SEAL

AutoCAD SHX Text

LUBRICATE AS SPECIFIED

AutoCAD SHX Text

PCC PAVEMENT

AutoCAD SHX Text

1 1/2" MIN.

AutoCAD SHX Text 1/2" - 5/8"

AutoCAD SHX Text

PER JOINT SEALANT MANUFACTURER'S SPECS

AutoCAD SHX Text

BUTT DOWELED JOINT SEE DETAIL

AutoCAD SHX Text B2

AutoCAD SHX Text

CU501

AutoCAD SHX Text B2

AutoCAD SHX Text

CU501

AutoCAD SHX Text A1

AutoCAD SHX Text

CU501

AutoCAD SHX Text A1

AutoCAD SHX Text

CU501

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text 15'(±)

AutoCAD SHX Text 12'

AutoCAD SHX Text 12'

AutoCAD SHX Text

13" THICK EXIST. CONC. PAVEMENT TO REMAIN. SEE NOTE 2.

AutoCAD SHX Text

CU501

AutoCAD SHX Text

BUTT DOWELED JOINT SEE DETAIL

AutoCAD SHX Text A1

AutoCAD SHX Text

CU501

AutoCAD SHX Text

SEE NOTE 2

AutoCAD SHX Text

DEMOLISH AND RESTORE EXIST. CONCRETE PAVEMENT SEE NOTES 3 & 4

AutoCAD SHX Text

OUTLINE OF TRENCH BELOW

AutoCAD SHX Text

CONSTRUCTION JOINT SEE DETAIL

AutoCAD SHX Text C1

AutoCAD SHX Text

CU501

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

DETECTABLE WARNING TAPE

AutoCAD SHX Text

MIN

AutoCAD SHX Text

EMS

AutoCAD SHX Text

AutoCAD SHX Text

MISCELLANEOUS DETAILS

AutoCAD SHX Text 6" GALVANIZED PIPE FILLED WITHCONC. AND PAINTED ANTIQUE LINEN PER ARCHITECTURAL COMPATIBILITY AND BASE DESIGN STANDARDS (ACBDS)

AutoCAD SHX Text

SLOPE AWAY FROM THE PIPE

AutoCAD SHX Text

SCALE: NOT TO SCALE

AutoCAD SHX Text 3"

AutoCAD SHX Text

2500 PSI (MIN) CONC FILL AROUND POST

AutoCAD SHX Text

COATED W/ BITUMINOUS COATING 4" ABOVE GRADE

AutoCAD SHX Text

ROUNDED CONC. CAP

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text

LINE OF EXCAVATION

AutoCAD SHX Text

DWG ACAD NUMBER

AutoCAD SHX Text

FILE NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SHEET

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

WAS PREPARED BY ME OR

AutoCAD SHX Text

UNDER MY DIRECT SUPERVISION

AutoCAD SHX Text

I CERTIFY THAT THIS WORK

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

ARCHITECTS - ENGINEERS

AutoCAD SHX Text

USING AGENCY

AutoCAD SHX Text

PROGRAM MANAGER

AutoCAD SHX Text

BIOENVIRONMENTAL ENGINEER

AutoCAD SHX Text

GROUND SAFETY

AutoCAD SHX Text

FIRE CHIEF

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

SUBMITTED

AutoCAD SHX Text

CHIEF OF OPERATIONS

AutoCAD SHX Text

CORROSION ENGINEER

AutoCAD SHX Text

ENVIRONMENTAL

AutoCAD SHX Text

CHIEF, CONSTRUCTION

AutoCAD SHX Text

CHIEF OF ENGINEERING

AutoCAD SHX Text

RECOMMENDED

AutoCAD SHX Text

APPROVED: BASE CIVIL ENGINEER

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

DQC MANAGER

AutoCAD SHX Text

AutoCAD SHX Text 20230717

AutoCAD SHX Text

EMS

AutoCAD SHX Text

CDC/RAB

AutoCAD SHX Text

EXP.

AutoCAD SHX Text

AutoCAD SHX Text

(CIVIL)

AutoCAD SHX Text A

AutoCAD SHX Text M.

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text o

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text U

AutoCAD SHX Text 04/30/2024

AIR FORCE BASE

ANDERSEN

30 6230 62

31 6231 62

32 6232 62

ESx

ENCLOSED CIRCUIT BREAKER

ES 1.

ALL UNDERGROUND CONDUIT ROUTING MUST BE FIELD COORDINATED WITH EXISTING UNDERGROUND UTILITIES.

ENCLOSURES FOR ALL ELECTRICAL EQUIPMENT/DEVICES LOCATED OUTDOORS MUST BE WEATHERPROOF RATED AND NEMA 4X 316 SST LISTED. ENCLOSURES FOR ALL EQUIPMENT DEVICES LOCATED IN UNCONDITIONED INDOOR

SPACES (EX. GENERATOR ROOM) MUST BE 316 SST.

IDENTIFY AND MARK ALL OTHER UTILITIES NOT MANAGED AND LOCATED BY THE UTILITY COMPANIES/ENTITIES. SCAN THE CONSTRUCTION SITE WITH GROUND PENETRATING RADAR (GPR), ELECTROMAGNETIC, OR SONIC EQUIPMENT, AND MARK THE SURFACE OF THE GROUND OR PAVED SURFACE WHERE EXISTING UNDERGROUND UTILITIES, ARE DISCOVERED. VERIFY THE ELEVATIONS OF EXISTING PIPING, UTILITIES, AND ANY TYPE OF UNDERGROUND OR ENCASED OBSTRUCTION NOT INDICATED OR SPECIFIED TO BE REMOVED, THAT IS INDICATED OR DISCOVERED DURING SCANNING, IN LOCATIONS TO BE TRAVERSED BY PIPING, DUCTS, AND OTHER WORK TO BE CONDUCTED OR INSTALLED. VERIFY ELEVATIONS BEFORE INSTALLING NEW WORK CLOSER THAN NEAREST MANHOLE OR OTHER

STRUCTURE AT WHICH AN ADJUSTMENT IN GRADE CAN BE MADE.

ALL MATERIALS AND EQUIPMENT MUST BE NEW AND "LISTED" OR "LABELED" AS DEFINED BY THE NATIONAL ELECTRICAL

CODE (NEC). DRAWINGS ARE DIAGRAMMATICAL AND INDICATE DESIGN INTENT.

COORDINATE ALL WORK WITH OTHER TRADES TO AVOID CONFLICTS AND PROVIDE A COMPLETE AND OPERATIONAL ELECTRICAL SYSTEM. FIELD VERIFY EXISTING CONDITIONS AND ACTUAL DIMENSIONS PRIOR TO START OF WORK.

ALL WORK MUST COMPLY WITH UNIFIED FACILITIES CRITERIA (UFC), PUBLIC WORK UTILITY CRITERIA FOR DESIGN AND CONSTRUCTION. ELECTRICAL, SEWER, AND WATER, NATIONAL ELECTRICAL CODE (NEC), NATIONAL ELECTRICAL SAFETY CODE (NESC), ARCHITECTURAL COMPATIBILITY AND BASE DESIGN STANDARDS (ACBDS) AND OTHER APPLICABLE CODES. WHERE CONFLICT EXISTS BETWEEN REQUIREMENTS, THE MORE STRINGENT REQUIREMENT APPLIES. CONSTRUCTION PRACTICE MUST CONFORM TO THE AMERICAN ELECTRICIAN'S HANDBOOK BY CROFT AND APPLICABLE INSTRUCTIONS OF MANUFACTURERS OF

EQUIPMENT AND MATERIAL SUPPLIED FOR THIS PROJECT.

AMP AMPERE

AFC AVAILABLE FAULT CURRENT

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AIC AMPERE INTERRUPTING CAPACITY

BLDG BUILDING

C CONDUIT, CONDUCTOR

CI CONTRACTOR INSTALLED

CP CONTRACTOR PROVIDED

CT CURRENT TRANSFORMER

CU COPPER

DISC DISCONNECT

EWC ELECTRIC WATER COOLER

EQP EQUIPMENT

EXIST EXISTING

FLR FLOOR

G GROUND CONDUCTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFE GOVERMENT FURNISHED EQUIPMENT

GND GROUND

KCMIL THOUSAND CIRCULAR MILS

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWHR KILOWATT-HOUR

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEUT NEUTRAL

NF NON FUSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

POV PRIVATELY OWNED VEHICLE

PVC POLYVINYL CHLORIDE

THHN THERMOPLASTIC HIGH-HEAT

NYLON COATED

THWN

V VOLT

VA VOLT-AMPERE

WM WATT METER

XFMR TRANSFORMER

EXT EXTERIOR

NEMA

DIST DISTRIBUTION

CFCI

GFGI GOVERNMENT FURNISHED

GOVERNMENT INSTALLED

AMI ADVANCE METERING INFRASTRUCTURE

AWG AMERICAN WIRE GAUGE

BC BARE COPPER

GFP GROUND FAULT PROTECTION

MCB MAIN CIRCUIT BREAKER

MFR MANUFACTURER

MLO MAIN LUGS ONLY

MTD MOUNTED

MV MEDIUM VOLTAGE

PFB PROVISION FOR FUTURE BREAKER

PG PRIMARY GROUND

SN SOLID NEUTRAL

SST STAINLESS STEEL

SPD SURGE PROTECTION DEVICE

STC SECTIONALIZING TERMINAL

CABINET

SHH SECONDARY HANDHOLE

TG TEST GROUND

LPS LIGHTNING PROTECTION SYSTEM

EMT ELECTRICAL METALLIC TUBING

PMH PRIMARY MANHOLE

SW SWITCH

AT AMPERE TRIP

MH MANHOLE

SWGR SWITCHGEAR

SWBD SWITCHBOARD

(E) EXISTING

SG SECONDARY GROUND

MTS MANUAL TRANSFER SWITCH

ATS AUTOMATIC TRANSFER SWITCH

AF AMPERE FRAME

RM ROOM

RSC RIGID STEEL CONDUITEHH ELECTRICAL HANDHOLE

ECB ENCLOSED CIRCUIT BREAKER

EMH ELECTRICAL MANHOLE

IBT INTERSYSTEM BONDING

TERMINATION

SBB SECONDARY BONDING BUSBAR

NFS NON FUSIBLE SWITCH

THERMOPLASTIC HEAT & WATER

RESISTANT NYLON COATED

NEW ELECTRICAL SECONDARY

UNDERGROUND LINE

DEMOLITION

R RADIUS

GROUNDING ELECTRODE

FUSE

DISTRIBUTION TRANSFORMER

ABBREVIATIONSLINE TYPES

ONE LINE DIAGRAM

CONTRACTOR FURNISHED

CONTRACTOR INSTALLED

NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

GENERAL NOTES

2.

3.

4.

5.

6.

DETAILS ARE INTENDED TO SHOW METHOD AND MANNER OF ACCOMPLISHING WORK. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITION AND SUCH MODIFICATIONS MUST BE INCLUDED AS PART OF THE WORK.

7.

WHERE A RACEWAY ENTERS A BUILDING, OR OTHER STRUCTURE FROM OUTSIDE. IT SHALL BE SEALED TO PREVENT ENTRANCE OF MOISTURE, GASES, AND RODENTS. SPARE OR UNUSED RACEWAYS MUST ALSO BE SEALED. SEALANTS MUST BE IDENTIFIED FOR USE WITH CABLE INSULATION. CONDUCTOR INSULATION, BARE CONDUCTOR, SHIELD, OR OTHER

COMPONENTS.

8.

UNLESS OTHERWISE NOTED, ALL CONDUIT RUNS SHOWN ARE DIAGRAMMATIC. EXACT LOCATION OF ALL RUNS MUST BE DETERMINED IN THE FIELD. COORDINATE ALL ELECTRICAL WORK AND AVOID CONFLICT WITH WORK BY OTHER TRADES.

9.

UNLESS OTHERWISE INDICATED, EXISTING UTILITIES MUST REMAIN IN-SERVICE AND IN PLACE. IF RELOCATION OF EXISTING UTILITIES IS REQUIRED FOR THE CONTRACTOR'S CONVENIENCE, INTERRUPTION OF SERVICE MUST BE KEPT MINIMUM AND MUST BE DONE AT THE CONTRACTOR'S EXPENSE AND ONLY WITH THE APPROVAL OF THE CONTRACTING OFFICER.

10.

RESTORE TO THEIR ORIGINAL CONDITION OR BETTER, EXISTING INSTALLATION DAMAGED AS A RESULT OF CONSTRUCTION, INCLUDING PAVEMENT STRIPPING, EMBANKMENTS, CURBS, SIDEWALKS, SIGNS, FENCES, LANDSCAPING, STRUCTURES, UTILITIES, WALLS AND OTHER IMPROVEMENTS.

11.

E-001

GENERAL NOTES, SYMBOL LIST,

ABBREVIATIONS, & MOUNTING

HEIGHT SCHEDULE

VFI VACUUM FAULT INTERRUPTER

PWUC-BP PUBLIC WORKS UTILITIES CRITERIA

& BUSINESS PROCESSES

ACBDS ARCHITECTURAL COMPATIBILITY AND

BASE DESIGN STANDARDS

XLPE CROSS LINKED POLYETHYLENE

INSULLATION

CONTRACTOR TO FIELD VERIFY EXISTING DUCT LINES PRIOR TO STARTING WORK TO ENSURE NO IMPACT TO

CONSTRUCTION SCHEDULE/WORK.

12.

G GENERATOR

AUTOMATIC TRANSFER SWITCH

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

ESx EXISTING ELECTRICAL SECONDARY

UNDERGROUND LINE

DUCT SECTION

SPS

S - SECONDARY

SP - SPARE (WITH PULLWIRE)

DUCT SECTION (SEE 1/E-502)

S

SECONDARY FEEDER AND BRANCH CIRCUIT CONDUCTORS MUST BE COPPER AND INSTALLED IN RACEWAYS.

PROVIDE MINIMUM 6" HIGH CONCRETE PAD FOR ALL FLOOR MOUNTED ELECTRICAL EQUIPMENT INCLUDING, BUT NOT

LIMITED TO: SWITCHBOARDS AND TRANSFORMERS.

ADJUST THE LOCATIONS OF ELECTRICAL EQUIPMENT AND WIRING AS REQUIRED TO CLEAR BUILDING OBSTRUCTION AND OTHER EQUIPMENT AS NECESSARY TO COMPLY WITH NEC CLEARANCES. PROVIDE ALL BRACKETS, HANGERS, METAL CHANNELING, AND FASTENERS TO PROPERLY INSTALL THE ELECTRICAL EQUIPMENT AND WIRING.

ALL EXTERIOR AND UNCONDITIONED SPACE ENCLOSURES, FASTENERS, HARDWARE, CLIMBING RUNGS, METAL BOXES, FRAMING, ACCESS COVERS, HINGES CONDUIT SUPPORTS AND BOLTS, ETC. MUST BE 316 SST. IF METAL IS WELDED, PROVIDE LOW-CARBON TYPE 316L SST.

13.

14.

15.

16.

L 5'-6"

BOTTOMTOPCTO

REFERENCE POINT

CEILINGFLOOR

MOUNTING

HEIGHT

DEVICE

ON PLAN

MOUNTING HEIGHT SCHEDULE

(UNLESS OTHERWISE INDICATED)

MOUNTING HEIGHT SCHEDULE

SCHEDULE ALL ELECTRICAL WORK TO MINIMIZE OUTAGES. FOR UTILITY

CUTOVERS, INTERRUPTIONS, OUTAGES, AND CONNECTIONS REQUIRED DURING

THE EXECUTION OF WORK THAT AFFECT EXISTING SYSTEMS, SCHEDULE OUTSIDE

THE REGULAR WORKING HOURS OR ON WEEKENDS, AS APPROVED BY THE

CONTRACTING OFFICER. SCHEDULE UTILITY OUTAGES AND CONNECTIONS TO

MINIMIZE DISRUPTIONS TO THE GOVERNMENT. NO ADDITIONAL PAYMENT WILL BE

PROVIDED FOR UTILITY OUTAGES AND CONNECTIONS REQUIRED TO BE

PERFORMED OUTSIDE THE REGULAR WORK HOURS.

SUBMIT SHOP REQUESTS FOR UTILITY OUTAGES AND CONNECTIONS IN WRITING

TO THE CONTRACTING OFFICER FOR APPROVAL AT LEAST 90 CALENDAR DAYS IN

ADVANCE OF THE TIME REQUIRED. IN EACH REQUEST, STATE THE SYSTEM

INVOLVED, AREA INVOLVED, AFFECTED EXISTING FACILITIES/BUILDINGS

APPROXIMATE DURATION OF OUTAGE, AND THE NATURE OF WORK INVOLVED.

1.

FOR ALL ELECTRICAL UTILITY CUTOVERS/CONNECTIONS, PERFORM, SCHEDULE,

AND COORDINATE WORK SUCH THAT EXISTING SYSTEMS REMAIN IN PLACE AND

IN FULL OPERATION UNTIL SUCH TIME THAT THE NEW SYSTEM IS COMPLETE,

READY, AND ACCEPTED BY THE GOVERNMENT FOR TRANSFER. PROVIDE

TEMPORARY CONNECTIONS AND MEASURES TO PROTECT THE EXISTING SYSTEM.

2.

ELECTRICAL GENERAL NOTES FOR

UTILITY CUTOVERS AND CONNECTIONS:

MPC MINI POWER CENTER

GENERAL NOTES FOR CULTURAL AND

ENVIRONMENTAL REQUIREMENTS:

CULTURAL RESOURCES: PROJECT WAS PREVIOUSLY APPROVED UNDER 22-0019 CATEX#14, WHERE PROPOSED SCOPE OF WORK (SOW) WILL RE-USE EXISTING CABLE CONDUITS. THE SOW WAS RECENTLY MODIFIED TO INCLUDE ADDITIONAL TRENCHING FOR INSTALLING NEW ELECTRICAL CABLE AND WILL NOW REQUIRE A QUALIFIED ARCHAEOLOGICAL CONTRACTOR TO PREPARE AND EXECUTE AN ARCHAEOLOGICAL MONITORING & DISCOVERY PLAN (AMDP) IN COORDINATION WITH THE AAFB CR MANAGER. NO GROUND DISTURBANCE CAN OCCUR UNTIL THE AMDP IS APPROVED, AND ARCHAEOLOGICAL MONITOR IS PRESENT FOR THE DURATION OF THE TRENCHING WORK.

THE EAST END OF RUNWAY IS NEAR 2 RESTORATION SITES (UXO18A AND IRP SITE 81A). EXCAVATED SOILS IN THE VICINITY OF IR SITE 81A AND MR SITE UXO 18A NEED TO BE SAMPLED FOR PETROLEUM, PFAS, AND MUNITIONS CONSTITUENTS. IF PFAS IS DETECTED IN EXCESS OF EPA REGIONAL SCREENING LEVELS THE SOIL WOULD NEED TO BE DISPOSED OF OFF-ISLAND AT A CERCLA APPROVED LANDFILL. THE CONTRACTOR MUST PREPARE A WASTE MANAGEMENT PLAN DESCRIBING HOW THE EXCAVATED SOIL WILL BE SAMPLED AND ANALYTICAL METHODS TO BE USED.

THE PLAN SHOULD ALSO DESCRIBE HOW THE SOIL WILL BE HANDLED, MANAGED WHILE AWAITING RESULTS, AND TRANSPORTED TO THE DISPOSITION FACILITY. THE CONTRACTOR SHOULD ALSO PREPARE A HEALTH AND SAFETY PLAN TO DESCRIBE HOW ON-SITE PERSONNEL WORKING WITHIN THE IR/MR SITE BOUNDARIES WILL BE PROTECTED AND HOW EQUIPMENT WILL BE DECONTAMINATED BEFORE LEAVING THE SITE. THE PLANS SHOULD BE ROUTED THROUGH EV3 FOR COORDINATION AND APPROVAL BY THE REGULATORY AGENCIES PRIOR TO STARTING ANY WORK WITHIN THE IR/MR SITE

FOOTPRINT.

PROJECT WILL GENERATE SOLID WASTE/RECYCLABLE MATERIALS REQUIRING PROPER DISPOSAL/RECYCLING AT A GUAM EPA PERMITTED FACILITY AND RECORDKEEPING NEEDS TO BE COORDINATED WITH BASE SOLID WASTE/RECYCLING PROGRAM. COORDINATE WITH CEVP SOLID WASTE PROGRAM MANAGER FOR GUIDANCE 36 CES/CEVP 366-1851.

PROVIDE CABLE MARKING AS SPECIFIED IN SPECIFICATIONS 33 71 02.17.

SCOPE OF WORK NOTES:

IN ADDITION TO THE SCOPE OF WORK INDICATED IN THESE DRAWINGS, CONTRACTOR IS

RESPONSIBLE FOR THE FOLLOWING:

1. PROVIDE AS BUILT PLANS (DRAWINGS) SHOWING THE PROFILE OF THE

UNDERGROUND DUCTLINES, HANDHOLES, AND STUBS, COMPLETE INCLUDING DUCTLINE

(CONDUIT AND ENCASEMENT) SIZES AND QUANTITY. THE FORMAT OF THE DRAWING

MUST HAVE DUCTLINES ON TOP SECTION AND ITS CORRESPONDING PROFILE AT THE

BOTTOM OF THE PAGE. ALL OTHER UTILITIES (e.g. WATER, SEWER, STEAM, COMM LINES, ETC.) MUST BE SHOWN WHEN CROSSING OR IN PARALLEL WITH THE UNDERGROUND

ELECTRICAL DUCTLINES. THE SHOP DRAWINGS MUST BE STAMPED AND SIGNED BY A

PROFESSIONAL ELECTRICAL ENGINEER.

2. PROVIDE BUTTERFLY DIAGRAMS OF EACH HANDHOLE (NEW AND EXISTING) THAT IS

UTILIZED TO INSTALL NEW CABLING. DIAGRAMS MUST REFLECT ASBUILT CONDITIONS

AND MUST BE CERTIFIED BY A LICENSED MASTER ELECTRICIAN.

3. PERFORM AND PROVIDE ARC FLASH AND SHORT CIRCUIT CALCULATIONS BASED ON

ASBUILT CONDITIONS. CALCULATIONS MUST BE STAMPED AND SIGNED BY A

PROFESSIONAL ELECTRICAL ENGINEER.

4. PRIOR TO START OF WORK, CONTRACTOR MUST SUBMIT A DETAILED

SCHEDULE/PHASING PLAN TO CONTRACTING OFFICER FOR GOVERNMENT'S REVIEW AND

APPROVAL. THE PLAN MUST MEET THE FOLLOWING MINIMUM REQUIREMENTS:

a. ONLY ONE TAXIWAY WILL BE ALLOWED TO BE CLOSED AT ANY GIVEN TIME.

b. AT LEAST ONE RUNWAY IS REQUIRED TO OPERATIONAL AT ALL TIMES. ANY WORK

THAT WILL RESULT IN CLOSING OF BOTH RUMWAYS WILL NOT BE APPROVED.

- FOR NORTH RUNWAY, 06L GLIDESLOPE, 06L LOCALIZER, 24R LOCALIZER,

AND 24R GLIDESLOPE MUST BE OPERATIONAL TOGETHER.

- FOR SOUTH RUNWAY, 06R GLIDESLOPE, 06R LOCALIZER, 24L LOCALIZER,

AND 24L GLIDESLOPE MUST BE OPERATIONAL TOGETHER.

c. TACAN STATION MUST BE OPERATIONAL AT ALL TIMES.

d. PROVIDE TEMPORARY POWER PROVISIONS TO INCLUDE PORTABLE BACK-UP

GENERATORS WITH FUEL AS REQUIRED TO MAINTAIN AIRFIELD OPERATIONS.

CONTRACTOR IS RESPONSIBLE FOR THE MOBILIZATION,

INSTALLATION/CONNECTION, AND DEMOBILIZATION OF GENERATORS.

33 6233

TA

XI

W

AY

E C

H O

TAXIW

AY ECHO

TA

XI

W

AY

E

CH

O

RUNWAY 06L/24R

TA

XI

W

AY

F O

XT

R

O T

TAXIW

AY FO

XTRO

T

TAXILANE BRAVO

TAXILANE ALPHA

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TAXILANE ALPHA

TAXILANE ALPHA

TAXILANE BRAVO

TAXILANE BRAVO

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

J

UL

IE

T

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

K

IL

O

TA

XI

W

AY

K

IL

O

TAXIW

AY KILO

TAXIWAY DELTA

TMH TMH

TMH

TMH

TMH

TMH

TM

H

UHH

GPS

HEAD-UNIT

GPS

HEAD-UNIT

GPS

HEAD-UNIT

UMH

UMH

UMH

UMH

UHH

SDMH

SMH

UHH

CPAD

CB

UMH

UMH

LO

CA

LI

ZE

R

GLIDESLOPE

BUILDING

GLIDESLOPE

TOWER

UHH

UMH

CPAD

CPAD

CPAD

CP

AD

CPAD

SIGN

EA

R

TH

EN

S W

AL

E

BRASS

DISK

INV.=526.58

INV.=527.36

INV.=526.90

IN

V.

=5

.9

IN

V.

=5

.5

IN

V.

=5

.2

U

U

U

U

U

UHH

UMH

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

R O

AD

P

AV

EM

EN

T

ED

G

E O

F

AC

R O

AD

P

AV

EM

EN

T

TMH

TM

H

FUEL TANK

EDGE OF GRAVEL ROAD

A/C

ED

G

E O

F

AC

P

AV

EM

EN

T

TMH

ANCHOR(2)

EDGE OF AC PAVEMENT

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

ANCHOR(2)

CONCRETE

BUILDING

EDGE OF AC PAVEMENT

ANCHOR(2)

C O

N C

R

ETE JO

IN

T

ANCHOR(2)

ANCHOR(2)

SI

G

N

U

U

ANCHOR(2)

CONCRETE JOINT

RCP

RCP

RCP

ANCHOR(2)

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

EDGE OF AC PAVEMENT

U

TMH

C O

N C

R

ET

E

JO

IN

T

CONCRETE

BUILDING

NO. 2662

EDGE OF AC PAVEMENT

DIESEL

TANK

HEADWALL

TOP=541.91

℄IN

V.=538.72

EARTHEN

SWALE

CPAD

EARTHEN SW

ALE

HEADWALL

TOP=543.07

℄IN

V.=540.72

12"Ø

RCP

EDGE OF AC PAVEMENT

GRASS

APRON

AIR

CANNON

EA

R

TH

EN

S W

AL

E

TM

H

EDG

E O

F AC PAVEM

ENT

TL

TL

TL

EDGE OF AC PAVEMENT

EDGE OF AC PAVEMENT

GRASS

GRASS

EMH

N 4,931,881.5530

E 910,316.5307

EL. 606.06

CONCRETE

BUILDING

SEPTIC

TANK

TRN

ANTENNA

CPAD

CPAD

IL

S

SH

LE

TE

R

UHH

ANCHOR(2)

A/C

ANCHOR(2)

A/C

IL

S

SH

LE

TE

RCPAD

HEATED

DRAIN

GAUGE

EDGE OF AC

PAVEMENT

UHH

UHH

SWITCH

BOX

ED

GE

O F

AC

P

AV

EM

EN

T

EDG

E O

F AC PAVEM

ENT

IL

S

SH

LE

TE

R

IL

S

SH

LE

TE

R

IL

S

SH

LE

TE

R

CPAD

IL

S

SH

LE

TE

R

ANTENNA

SUPPORT

ANTENNA(2) UHH

CPAD

CPAD

TMH

TMH

TMH

TMH

A/C

A/C

A/ C

A/ C

A/C

CPAD

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANTENNA

TMH

IL

S

SH

LE

TE

R

ANTENNA(2)

UMH

ANTENNA(2)

MESOTECH/

CESI

UHH

ANTENNA

SUPPORT

E-31

144 56' 51.725" 13 35' 40.26"

144 56' 48.1" 13 35' 38.3"

144 56' 48.9" 13 35' 36.7"

144 56' 46.4" 13 35' 35.7"

144 56' 46.2" 13 35' 35.6"

144 56' 45.6" 13 35' 35.4"

144 56' 44.5" 13 35' 37.4"

144 56' 44.2" 13 35' 38.0"

144 56' 44.4" 13 35' 38.3"

144 56' 44.6" 13 35' 38.4"

144 56' 46.6" 13 35' 39.3"

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

OVERALL EXISTING ELECTRICAL SITE PLAN - REMOVAL 1

OVERALL EXISTING ELECTRICAL

SITE PLAN - REMOVAL

EDS100

EDS101

EDS102

EDS103

34 6234

RUNWAY 06L/24R

RUNWAY 06L/24R

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

K

IL

O

TA

XI

W

AY

K

IL

O

TAXIW

AY KILO

ESx

ESx

ESx

ES

x

TMH TMH

TMH

TMH

TMH

TM

H

UHH

GPS

HEAD-UNIT

GPS

HEAD-UNIT

GPS

HEAD-UNIT

UMH

UMH

UMH

UMH

UHH

SDMH

SMH

UHH

CPAD

CB

UMH

UMH

LO

CA

LI

ZE

R

GLIDESLOPE

BUILDING

GLIDESLOPE

TOWER

UHH

UMH

U

U

U

U

U

UHH

UMH

FUEL TANK

EDGE OF GRAVEL ROAD

A/C

TMH

EDGE OF AC PAVEMENT

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

ANCHOR(2)

CONCRETE

BUILDING

EDGE OF AC PAVEMENT

ANCHOR(2)

ANCHOR(2)

U

U

TMH

EMH

N 4,931,881.5530

E 910,316.5307

EL. 606.06

CONCRETE

BUILDING

SEPTIC

TANK

TRN

ANTENNA

CPAD

ED

GE

O F

AC

P

AV

EM

EN

T

EDG

E O

F AC PAVEM

ENT

IL

S

SH

LE

TE

R

IL

S

SH

LE

TE

R

CPAD

IL

S

SH

LE

TE

R

ANTENNA

SUPPORT

ANTENNA(2) UHH

CPAD

CPAD

TMH

TMH

TMH

TMH

A/ C

A/ C

A/C

CPAD

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

E-31

144 56' 48.1" 13 35' 38.3"

144 56' 48.9" 13 35' 36.7"

144 56' 46.4" 13 35' 35.7"

144 56' 46.2" 13 35' 35.6"

144 56' 45.6" 13 35' 35.4"

144 56' 44.5" 13 35' 37.4"

144 56' 44.2" 13 35' 38.0"

144 56' 44.4" 13 35' 38.3"

144 56' 44.6" 13 35' 38.4"

144 56' 46.6" 13 35' 39.3"

Cx

Cx

C x

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

C x

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx Cx

Cx

Cx

Wx

W x

Wx

Wx

W x

W x

W x

W x

Wx

Wx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

Fx

C x

Cx

Cx

TA

XI

W

AY

E C

H O

TAXIW

AY ECHO

TA

XI

W

AY

E

CH

O

RUNWAY 06L/24R

TA

XI

W

AY

F O

XT

R

O T

TAXIW

AY FO

XTRO

T

TAXILANE BRAVO

TAXILANE ALPHA

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TAXILANE ALPHA

TAXILANE ALPHA

TAXILANE BRAVO

TAXILANE BRAVO

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

J

UL

IE

T

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

K

IL

O

TA

XI

W

AY

K

IL

O

TAXIW

AY KILO

TAXIWAY DELTA

TMH TMH

TMH

TMH

TMH

TMH

TMH

UHH

GPS

HEAD-UNIT

GPS

HEAD-UNIT

GPS

HEAD-UNIT

UMH

UMH

UMH

UMH

UHH SDMH

SMH

UHH

CPAD

CB

UMH

UMH

LOCA

LIZER

GLIDESLOPE

BUILDING

GLIDESLOPETOWER

UHH

UMH

CPAD

CPAD

CPAD

CPAD

CPAD

SIGN

EART

HEN

SWA

LE

BRASSDISK

INV.=526.58

INV.=527.36

INV.=526.90

INV.=

528.9

INV.=

533.5

INV.=

535.2

U

U

U

U

U

UHH

UMH

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

TEDG

E OF

AC P

AVE

MEN

T

EDGE

OF A

C RO

AD P

AVEM

ENT

EDG

E OF

AC R

OAD

PAV

EME

NT TMH

TMH

FUEL TANK

EDGE OF GRAVEL ROAD

A/C

EDG

E OF

AC P

AVE

MEN

T

TMH

ANCHOR(2)

EDGE OF AC PAVEMENT

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

ANCHOR(2)

CONCRETE

BUILDING

EDGE OF AC PAVEMENT

ANCHOR(2)

CONCRETE JOINT

ANCHOR(2)

ANCHOR(2)

SIGN

530525

615 615

U

U

ANCHOR(2)

CONCRETE JOINT

RCP

RCP

RCP

ANCHOR(2)

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVEM

ENT

EDGE OF AC PAVEMENT

U

TMH

CON

CRE

TE JO

INT

CONCRETE

BUILDING

NO. 2662

EDGE OF AC PAVEMENT

DIESEL

TANK

HEADWALL

TOP=541.91

℄INV.=538.72

EARTHENSWALE

CPAD

EARTHEN SWALE

HEADWALL

TOP=543.07

℄INV.=540.72

12"ØRCP

EDGE OF AC PAVEMENT

GRASS

APRON

AIR

CANNON

EAR

THE

N SW

ALE

TMH

EDGE OF AC PAVEMENT

TL

TL

TL

EDGE OF AC PAVEMENT

EDGE OF AC PAVEMENT

GRASS

GRASS

EMH

N 4,931,881.5530

E 910,316.5307

EL. 606.06

CONCRETE

BUILDING

SEPTICTANK

TRN

ANTENNA

CPAD

CPAD

ILS SHLETER

UHH

ANCHOR(2)

A/C

ANCHOR(2)

A/C

ILS

SHLE

TER

CPAD

HEATED

DRAINGAUGE

EDGE OF ACPAVEMENT

UHH

UHH

SWITCH

BOX

EDG

E OF

AC P

AVEM

ENT

EDGE OF AC PAVEMENT

ILS

SHLE

TER

ILS SHLE

TER

ILS SHLE

TER

CPAD

ILS SHLE

TER

ANTENNASUPPORT

ANTENNA(2) UHH

CPAD

CPAD

TMH

TMH

TMH

TMH

A/C

A/C

A/C

A/C

A/C

CPAD

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANTENNA

TMH

ILS

SHLE

TER

ANTENNA(2)

UMH

ANTENNA(2)

MESOTECH/

CESI

UHH

ANTENNASUPPORT

E-31

144 56' 51.725" 13 35' 40.26"

144 56' 48.1" 13 35' 38.3"

144 56' 48.9" 13 35' 36.7"

144 56' 46.4" 13 35' 35.7"

144 56' 46.2" 13 35' 35.6"

144 56' 45.6" 13 35' 35.4"

144 56' 44.5" 13 35' 37.4"

144 56' 44.2" 13 35' 38.0"

144 56' 44.4" 13 35' 38.3"

144 56' 44.6" 13 35' 38.4"

144 56' 46.6" 13 35' 39.3"

Fx

Fx

AFAFAFAFFAFA

FAFAFA

ESx

ESx

ESx

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

EXISTING ELECTRICAL SITE PLAN - REMOVAL (EAST) 1

EXISTING ELECTRICAL SITE PLAN

REMOVAL (EAST)

EDS101

HH 34-28

(E) HH 34-29

(E) HH 34-30

(E) HH 34-31

(E) HH 34-32

(E) HH 34-33

(E) EHH

(E) BUILDING 2802

ESx

ESx

ESx

ESx

(E) EHH

EDS102

EDS103

LIGHT LINES INDICATE EXISTING.

HATCH MARKS INDICATE TO BE REMOVED.

GENERAL NOTES:

SEE SHEET E-601 AND E-602 ONE LINE DIAGRAM

FOR SCOPE OF REMOVAL WORK.

EDS101

24R GLIDESLOPE/FMQ-19

FOR ENLARGED PLAN,

SEE

EAST TRAFFIC LIGHT ANTENNA 1

FOR ENLARGED PLAN,

SEE

EDS104

EDS104

EDS104

(E) BUILDING 2800, FOR

ENLARGED PLAN, SEE 4

EDS104

06R LOCALIZER

FOR ENLARGED PLAN,

SEE 5

EDS104

EAST TRAFFIC LIGHT ANTENNA 3

FOR ENLARGED PLAN,

SEE 1

EDS105

24L GLIDESLOPE AND

24L BAK-12, FOR ENLARGED PLAN, SEE

06L LOCALIZER, EAST

TRAFFIC LIGHT ANTENNA 2, AND

24 SFL, FOR ENLARGED PLAN, SEE

EDS105

(E) EHH

(E) EHH

NOTES:

1 EXISTING FUEL LINE.

2 EXISTING WATER LINE.

3 EXISTING COMM LINE.

(E) EHH

EXISTING FUEL LINE, WATER LINE, AND COMM LINE

DUCTBANK ROUTING ARE BASED ON INFORMATION

PROVIDED BY THE GOVERNMENT. CONTRACTOR TO FIELD

VERIFY PRIOR TO STARTING WORK TO ENSURE NO IMPACT

TO CONSTRUCTION SCHEDULE/WORK.

(E) B52 CRASH LANDING

35 6235

W

AY

E C

H O

TA

XI

W

AY

E

CH

O

RUNWAY 06L/24R

TA

XI

W

AY

F O

XT

R

O T

TAXIW

AY FO

XTRO

T

RUNWAY 06L/24R

CPAD

CPAD

CPAD

CP

AD

CPAD

INV.=526.58

INV.=527.36

INV.=526.90

IN

V.

=5

.9

ED

G

E O

F

AC

R O

AD

P

AV

EM

EN

T

ED

G

E O

F

AC

R O

AD

P

AV

EM

EN

T

TMH

ANCHOR(2)

SI

G

N

ANCHOR(2)

RCP

RCP

ANCHOR(2)

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

EDGE OF AC PAVEMENT

U

CONCRETE

BUILDING

NO. 2662

EDGE OF AC PAVEMENT

DIESEL

TANK

HEADWALL

TOP=541.91

℄INV.=538.72

EARTHEN

SWALE

CPAD

EARTHEN SW

ALE

HEADWALL

TOP=543.07

℄INV.=540.72

12"Ø

RCP

EDGE OF AC PAVEMENT

GRASS

APRON

AIR

CANNON

EA

R

TH

EN

S W

AL

E

TM

H

EDG

E O

F AC PAVEM

ENT

TL

TL

TL

EDGE OF AC PAVEMENT

EDGE OF AC PAVEMENT

GRASS

GRASS

CPAD

IL

S

SH

LE

TE

R

UHH

ANCHOR(2)

A/C

IL

S

SH

LE

TE

RCPAD

HEATED

DRAIN

GAUGE

EDGE OF AC

PAVEMENT

UHH

UHH

SWITCH

BOX

IL

S

SH

LE

TE

R

A/C

A/C

ANCHOR(2)

ANCHOR(2)

ANTENNA

TMH

ANTENNA(2)

UMH

ANTENNA(2)

MESOTECH/

CESI

UHH

ANTENNA

SUPPORT

Cx

Cx

Cx

Cx

Cx

Cx

Cx

C x

C x

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

C x

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

C x

Cx

Cx

Cx

Cx

Cx

Cx

C x

TA

XI

W

AY

E C

H O

TAXIW

AY ECHO

TA

XI

W

AY

E

CH

O

RUNWAY 06L/24R

TA

XI

W

AY

F O

XT

R

O T

TAXIW

AY FO

XTRO

T

TAXILANE BRAVO

TAXILANE ALPHA

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TAXILANE ALPHA

TAXILANE ALPHA

TAXILANE BRAVO

TAXILANE BRAVO

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

J

UL

IE

T

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

K

IL

O

TA

XI

W

AY

K

IL

O

TAXIW

AY KILO

TAXIWAY DELTA

TMH TMH

TMH

TMH

TMH

TMH

TMH

UHH

GPS

HEAD-UNIT

GPS

HEAD-UNIT

GPS

HEAD-UNIT

UMH

UMH

UMH

UMH

UHH SDMH

SMH

UHH

CPAD

CB

UMH

UMH

LOCA

LIZER

GLIDESLOPEBUILDING

GLIDESLOPE

TOWER

UHH

UMH

CPAD

CPAD

CPAD

CPA

D

CPAD

SIGN

EART

HEN

SWA

LE

BRASSDISK

INV.=526.58

INV.=527.36

INV.=526.90

INV.=

528.9

INV.=

533.5

INV.=

535.2

U

U

U

U

U

UHH

UMH

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

TEDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC R

OAD

PAV

EME

NT

EDG

E OF

AC R

OAD

PAV

EME

NT TMH

TMH

FUEL TANK

EDGE OF GRAVEL ROAD

A/C

EDG

E OF

AC P

AVE

MEN

T

TMH

ANCHOR(2)

EDGE OF AC PAVEMENT

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

ANCHOR(2)

CONCRETE

BUILDING

EDGE OF AC PAVEMENT

ANCHOR(2)

CONCRETE JOINT

ANCHOR(2)

ANCHOR(2)

SIGN

530525

615 615

U

U

ANCHOR(2)

CONCRETE JOINT

RCP

RCP

RCP

ANCHOR(2)

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVEM

ENT

EDGE OF AC PAVEMENT

U

TMH

CON

CRE

TE J

OINT

CONCRETE

BUILDING

NO. 2662

EDGE OF AC PAVEMENT

DIESEL

TANK

HEADWALL

TOP=541.91℄INV.=538.72

EARTHENSWALE

CPAD

EARTHEN SWALE

HEADWALL

TOP=543.07

℄INV.=540.72

12"ØRCP

EDGE OF AC PAVEMENT

GRASS

APRON

AIR

CANNON

EAR

THEN

SWA

LE

TMH

EDGE OF AC PAVEMENT

TL

TL

TL

EDGE OF AC PAVEMENT

EDGE OF AC PAVEMENT

GRASS

GRASS

EMH

N 4,931,881.5530E 910,316.5307

EL. 606.06

CONCRETEBUILDING

SEPTICTANK

TRN

ANTENNA

CPAD

CPAD

ILSSHLE

TER

UHH

ANCHOR(2)

A/C

ANCHOR(2)

A/C

ILS

SHLE

TER

CPAD

HEATED

DRAINGAUGE

EDGE OF AC

PAVEMENT

UHH

UHH

SWITCH

BOX

EDGE

OF A

C PA

VEMENT

EDGE OF AC PAVEMENT

ILS

SHLE

TER

ILS SHLE

TER

ILS SHLE

TER

CPAD

ILSSHLE

TER

ANTENNASUPPORT

ANTENNA(2) UHH

CPAD

CPAD

TMH

TMH

TMH

TMH

A/C

A/C

A/C

A/C

A/C

CPAD

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANTENNA

TMH

ILS

SHLE

TER

ANTENNA(2)

UMH

ANTENNA(2)

MESOTECH/

CES

I

UHH

ANTENNASUPPORT

E-31

144 56' 51.725" 13 35' 40.26"

144 56' 48.1" 13 35' 38.3"

144 56' 48.9" 13 35' 36.7"

144 56' 46.4" 13 35' 35.7"

144 56' 46.2" 13 35' 35.6"

144 56' 45.6" 13 35' 35.4"

144 56' 44.5" 13 35' 37.4"

144 56' 44.2" 13 35' 38.0"

144 56' 44.4" 13 35' 38.3"

144 56' 44.6" 13 35' 38.4"

144 56' 46.6"13 35' 39.3"

ESx

ESx

ESx

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

EXISTING ELECTRICAL SITE PLAN 1 OF 2 - REMOVAL (WEST)1

EXISTING ELECTRICAL SITE PLAN

1 OF 2 - REMOVAL (WEST)

EDS102

SEE MATCHLINE SHEET EDS103

(E) HH 40-11

(E) HH 40-12

(E) HH 40-13

(E) HH 40-14

(E) HH 40-15

EDS107

(E) BUILDING 2662, FOR ENLARGED PLAN,

SEE

ESx

ESx

ESx

ES

x

ES

x

ESx

EDS101

EDS103

LIGHT LINES INDICATE EXISTING.

HATCH MARKS INDICATE TO BE REMOVED.

GENERAL NOTES:

SEE SHEET E-601 AND E-602 ONE LINE DIAGRAM -

REMOVAL FOR SCOPE OF WORK.

EDS102

ESx

WEST TRAFFIC LIGHT ANTENNA 2

FOR ENLARGED PLAN, SEE 3

EDS106

06L GLIDESLOPE/FMQ-19 STATION,

FOR ENLARGED PLAN,

SEE 1

EDS106

WEST TRAFFIC LIGHT ANTENNA 1

FOR ENLARGED PLAN, SEE 5

EDS106

06R GLIDESLOPE/FMQ-19,

FOR ENLARGED PLAN,

SEE 3

EDS107

24R LOCALIZER STATION

FOR ENLARGED PLAN,

SEE 4

EDS106

WEST TRAFFIC LIGHT ANTENNA 3

FOR ENLARGED PLAN, SEE 2

EDS106

06R BAK-12, FOR ENLARGED PLAN,

SEE 2

EDS107

EXISTING COMM LINE.

NOTE:

(E) HH 40-10

(E) HH 40-6

EXISTING FUEL LINE, WATER LINE, AND COMM LINE

DUCTBANK ROUTING ARE BASED ON INFORMATION

PROVIDED BY THE GOVERNMENT. CONTRACTOR TO FIELD

VERIFY PRIOR TO STARTING WORK TO ENSURE NO IMPACT

TO CONSTRUCTION SCHEDULE/WORK.

36 6236

W

AY

E C

H O

TAXIW

AY ECHO

TAXILANE BRAVO

TAXILANE BRAVO

TMH

CPAD

SIGN

EA

R

TH

EN

S W

AL

E

BRASS

DISK

IN

V.

=5

.5

IN

V.

=5

.2

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

TM

H

ED

G

E O

F

AC

P

AV

EM

EN

T

C O

N C

R

ETE JO

IN

T

ANCHOR(2)

CONCRETE JOINT

RCP

ED

G

E O

F

AC

P

AV

EM

EN

T

ED

G

E O

F

AC

P

AV

EM

EN

T

C O

N C

R

ET

E

JO

IN

T

ANCHOR(2)

A/C IL

S

SH

LE

TE

R

Cx

Cx

Cx

C x

C x

C x

Cx

Cx

Cx

Cx

C x

Cx

Cx

C x

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

C x

C x

C x

Cx

Cx

Cx

C x

C x

C x

Cx

Cx

Cx

Cx

C x

Cx

Cx

C x

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

Cx

C x

C x

C x

C x

C x

TA

XI

W

AY

E C

H O

TAXIW

AY ECHO

TA

XI

W

AY

E

CH

O

RUNWAY 06L/24R

TA

XI

W

AY

F O

XT

R

O T

TAXIW

AY FO

XTRO

T

TAXILANE BRAVO

TAXILANE ALPHA

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TA

XI

W

AY

G O

LF

TAXILANE ALPHA

TAXILANE ALPHA

TAXILANE BRAVO

TAXILANE BRAVO

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

RUNWAY 06L/24R

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

H O

TE

L

TA

XI

W

AY

J

UL

IE

T

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

J U

LI

ET

TA

XI

W

AY

K

IL

O

TA

XI

W

AY

K

IL

O

TAXIW

AY KILO

TAXIWAY DELTA

TMH TMH

TMH

TMH

TMH

TMH

TMH

UHH

GPS

HEAD-UNIT

GPS

HEAD-UNIT

GPS

HEAD-UNIT

UMH

UMH

UMH

UMH

UHH SDMH

SMH

UHH

CPAD

CB

UMH

UMH

LOCA

LIZER

GLIDESLOPEBUILDING

GLIDESLOPE

TOWER

UHH

UMH

CPAD

CPAD

CPAD

CPA

D

CPAD

SIGN

EART

HEN

SWA

LE

BRASSDISK

INV.=526.58

INV.=527.36

INV.=526.90

INV.=

528.9

INV.=

533.5

INV.=

535.2

U

U

U

U

U

UHH

UMH

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

TEDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC R

OAD

PAV

EME

NT

EDG

E OF

AC R

OAD

PAV

EME

NT TMH

TMH

FUEL TANK

EDGE OF GRAVEL ROAD

A/C

EDG

E OF

AC P

AVE

MEN

T

TMH

ANCHOR(2)

EDGE OF AC PAVEMENT

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

EDGE OF GRAVEL ROAD

ANCHOR(2)

CONCRETE

BUILDING

EDGE OF AC PAVEMENT

ANCHOR(2)

CONCRETE JOINT

ANCHOR(2)

ANCHOR(2)

SIGN

530525

615 615

U

U

ANCHOR(2)

CONCRETE JOINT

RCP

RCP

RCP

ANCHOR(2)

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVE

MEN

T

EDG

E OF

AC P

AVEM

ENT

EDGE OF AC PAVEMENT

U

TMH

CON

CRE

TE J

OINT

CONCRETE

BUILDING

NO. 2662

EDGE OF AC PAVEMENT

DIESEL

TANK

HEADWALL

TOP=541.91℄INV.=538.72

EARTHENSWALE

CPAD

EARTHEN SWALE

HEADWALL

TOP=543.07

℄INV.=540.72

12"ØRCP

EDGE OF AC PAVEMENT

GRASS

APRON

AIR

CANNON

EAR

THEN

SWA

LE

TMH

EDGE OF AC PAVEMENT

TL

TL

TL

EDGE OF AC PAVEMENT

EDGE OF AC PAVEMENT

GRASS

GRASS

EMH

N 4,931,881.5530E 910,316.5307

EL. 606.06

CONCRETEBUILDING

SEPTICTANK

TRN

ANTENNA

CPAD

CPAD

ILSSHLE

TER

UHH

ANCHOR(2)

A/C

ANCHOR(2)

A/C

ILS

SHLE

TER

CPAD

HEATED

DRAINGAUGE

EDGE OF AC

PAVEMENT

UHH

UHH

SWITCH

BOX

EDGE

OF A

C PA

VEMENT

EDGE OF AC PAVEMENT

ILS

SHLE

TER

ILS SHLE

TER

ILS SHLE

TER

CPAD

ILSSHLE

TER

ANTENNASUPPORT

ANTENNA(2) UHH

CPAD

CPAD

TMH

TMH

TMH

TMH

A/C

A/C

A/C

A/C

A/C

CPAD

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANCHOR(2)

ANTENNA

TMH

ILS

SHLE

TER

ANTENNA(2)

UMH

ANTENNA(2)

MESOTECH/

CES

I

UHH

ANTENNASUPPORT

E-31

144 56' 51.725" 13 35' 40.26"

144 56' 48.1" 13 35' 38.3"

144 56' 48.9" 13 35' 36.7"

144 56' 46.4" 13 35' 35.7"

144 56' 46.2" 13 35' 35.6"

144 56' 45.6" 13 35' 35.4"

144 56' 44.5" 13 35' 37.4"

144 56' 44.2" 13 35' 38.0"

144 56' 44.4" 13 35' 38.3"

144 56' 44.6" 13 35' 38.4"

144 56' 46.6"13 35' 39.3"

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

SEE MATCHLINE SHEET EDS102

EDS103

EXISTING ELECTRICAL SITE PLAN 2 OF 2 - REMOVAL (WEST)1

EXISTING ELECTRICAL SITE PLAN

2 OF 2 - REMOVAL (WEST)

(E) HH 40-9

(E) HH 40-8

(E) HH 40-7

ES

x

ES

x

ESx

ESx

ESx

EDS101

EDS102

EDS103

24L LOCALIZER STATION

FOR ENLARGED PLAN,

SEE 4

EDS107

LIGHT LINES INDICATE EXISTING.

HATCH MARKS INDICATE TO BE REMOVED.

GENERAL NOTES:

SEE SHEET E-601 AND E-602 ONE LINE DIAGRAM -

REMOVAL FOR SCOPE OF WORK.

EXISTING COMM LINE.

NOTE:

(E) HH 40-9L1

EXISTING FUEL LINE, WATER LINE, AND COMM LINE

DUCTBANK ROUTING ARE BASED ON INFORMATION

PROVIDED BY THE GOVERNMENT. CONTRACTOR TO FIELD

VERIFY PRIOR TO STARTING WORK TO ENSURE NO IMPACT

TO CONSTRUCTION SCHEDULE/WORK.

37 6237

ANCHOR(2)

IL

S

SH

LE

TE

RCPADTMH

A/ C

ANCHOR(2)

TMH

UHH

FUEL TANK

CONCRETE

BUILDING

W x

W x

W x

W x

Cx

Cx

Cx

Cx

ANCHOR(2)

CPAD

IL

S

SH

LE

TE

R

TMH

A/C

ANCHOR(2)

W x

C x

C x

Cx

ANCHOR(2)

ANTENNA

CPAD

IL

S

SH

LE

TE

R

ANTENNA

SUPPORT

ANTENNA(2)

UHH

TMH

A/ C

CPAD

ANCHOR(2)

C x

C x

Cx

Cx

Cx

TMH

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

ENLARGED PLAN - 06R LOCALIZER STATION5

ENLARGED ELECTRICAL

SITE PLANS - REMOVAL (EAST)

ENLARGED PLAN - BUILDING 28004

ENLARGED PLAN - 06L LOCALIZER STATION 324R GLIDESLOPE/FMQ-19 STATION - ENLARGED PLAN1

(E) PANELBOARD

(E) PULLBOX

(E) SPD

(E) DISCONNECT SWITCH

(E) EHH

(E) PANELBOARD

(E) PULLBOX

(E) SPD

(E) EAST TRAFFIC LIGHT

ANTENNA 2 (TO REMAIN)

(E) DISCONNECT SWITCH

(E) ECB-24 SFL

(E) HH 34-29

(E) HANDHOLE

B2800

(E) HH-34-28

(E) PANELBOARD

(E) PULLBOX

(E) SPD

EAST TRAFFIC LIGHT ANTENNA 1 - ENLARGED PLAN2

(E) EAST TRAFFIC LIGHT

ANTENNA 1

(E) HH-34-32

(E) HH 34-33

EDS104

(E) PULLBOX

(E) DISCONNECT

SWITCH

(E) PULLBOX

(E) PANELBOARD

(E) FMQ-19 PANELBOARD

TO (E) MAIN DISTRIBUTION

BOARD

(E) TMH

EXISTING WATER LINE.

GENERAL NOTE: APPLICABLE TO ENTIRE SHEET

LIGHT LINES INDICATE EXISTING TO REMAIN.

HATCH MARKS INDICATE TO BE REMOVED.

EXISTING COMM LINE.

NOTES: APPLICABLE TO ENTIRE SHEET

(E) TMH

(E) TMH

EXISTING FUEL LINE, WATER LINE, AND COMM LINE

DUCTBANK ROUTING ARE BASED ON INFORMATION

PROVIDED BY THE GOVERNMENT. CONTRACTOR TO FIELD

VERIFY PRIOR TO STARTING WORK TO ENSURE NO IMPACT

TO CONSTRUCTION SCHEDULE/WORK.

SEE SHEET E-601 AND E-602 ONE LINE DIAGRAM -

REMOVAL FOR SCOPE OF WORK.

38 6238

GLIDESLOPE

BUILDING

GLIDESLOPE

TOWER

UHH

A/C

Cx

Cx

Cx

Cx

Cx

Cx Cx

Cx

Cx

Cx

Cx

Cx

UMH U

Cx

ENLARGED PLAN - 24L GLIDESLOPE/FMQ-19 STATION2ENLARGED PLAN - EAST TRAFFIC LIGHT ANTENNA 31

(E) PANELBOARD

(E) PULLBOX

(E) SPD

(E) PANELBOARD

(E) EHH

(E) EAST TRAFFIC LIGHT ANTENNA 3

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

EDS105

(E) PULLBOX

(E) TMH

EXISTING WATER LINE.

GENERAL NOTE: APPLICABLE TO ENTIRE SHEET

LIGHT LINES INDICATE EXISTING TO REMAIN.

HATCH MARKS INDICATE TO BE REMOVED.

EXISTING COMM LINE.

NOTES: APPLICABLE TO ENTIRE SHEET

EXISTING FUEL LINE, WATER LINE, AND COMM LINE

DUCTBANK ROUTING ARE BASED ON INFORMATION

PROVIDED BY THE GOVERNMENT. CONTRACTOR TO FIELD

VERIFY PRIOR TO STARTING WORK TO ENSURE NO IMPACT

TO CONSTRUCTION SCHEDULE/WORK.

SEE SHEET E-601 AND E-602 ONE LINE DIAGRAM -

REMOVAL FOR SCOPE OF WORK.

ENLARGED ELECTRICAL

SITE PLANS - REMOVAL (EAST)

(E) FMQ-19 PANELBOARD

39 6239

U

CxCx

Cx

CPAD

TMHC

x

C x

C x

C x

C x

ANCHOR(2)

CPAD

IL

S

SH

LE

TE

R

UHH

ANCHOR(2)

A/C

TM

H

C x

AS SHOWN

AAFB

FA5240-22-F-0073

GUAM

AIR FORCE BASE

ANDERSEN

AJJY 23-1007 REPAIR AIRFIELD ELECTRICAL

CONDUIT & GLIDESLOPE SYSTEMS

FINAL DESIGN SUBMITTAL

CN

NP

EDS106

ENLARGED PLAN - 06L GLIDESLOPE/FMQ-19 STATION1 ENLARGED PLAN -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .