Amendment_0004-_SOW.pdf

PDF 84 KB Posted

Attached to
Tower Maintenance Federal contract opportunity
Solicitation number
FA5240-16-Q-M0111
Issued by
Department of the Air Force Pacific Air Forces

About this file

Amended SOW

View the file

Other files for this federal contract opportunity

Other files attached to Tower Maintenance, newest first.
File Type Posted
Amendment_0004-_MFR_-_CO_CA_Signed.pdf PDF
QA_1_-_co_signed.pdf PDF
Pop_up_tower_manual__1.pdf PDF
Pop_up_Tower_Manual__2.pdf PDF
Amendment_0001-_Tower_MX_RFQ_-_CO_signed.pdf PDF
Amendment_0001-_MFR_-_CO_signed.pdf PDF
Amendment_0001-_SOW.pdf PDF
Tower_MX_RFQ_-_CO_signed.pdf PDF
Revised_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIMINARY STATEMENT OF WORK

PORTABLE POP-UP TOWERS

MAINTENANCE/SERVICE CONTRACT

ANDERSEN AIR FORCE BASE (GUAM)

8 AUGUST 2016

1. GENERAL The work covered by this contract consists of, but is not limited to, the repair of the built in hydraulic system, the maintenance, labor, services, tools, materials, equipment, transportation, supervision and all requirements to perform all operations in conjunction with maintenance and servicing of the Portable Pop-Up Towers once 100% safely operational, on

Andersen Air Force Base (AAFB), Guam in support of the 736 SFS Commando Warrior.

2. CONTRACTOR REQUIREMENTS

a. Repair built in hydraulic system (used to erect platform)

b. Ensure pop-up towers are 100% safe and operable prior to starting scheduled maintenance

(all towers must be able to raise and lower using the hydraulic system).

c. Remove existing locking mechanism which prevents the platform from dropping when the unit is erect and replace with a locking mechanism that will not require any personnel to be under the platform, when locking/unlocking.

d. The contractor shall provide monthly maintenance service,

e. Vendor must be experienced in servicing hydraulic systems, electrical systems and metal structure framework.

f. Remove wooden platform (to include the wooden hatch) and replace with steel grate

(secure steel grate to the metal framework, covering the whole platform). Place at least 1/2” pressure treated plywood on top of the steel grate (covering the whole platform).

g. Use stainless steel hinge for hatch.

h. All work shall be in accordance with the manufacturer’s requirements.

I. Full Equipment List:

* Portable Pop-Up Tower (8 each)

j. Estimated Service List:

A. The list below is an estimate of the maintenance and service needs for the Pop-Up

Towers. If additional service or maintenance items are needed, approval must first be obtained through the Contracting Officer prior to proceeding with repairs.

B. These estimates for minor services are based on average maintenance per quarter.

CHECKLIST

-Check hydraulic system for 100% serviceability

-Check Structure for Integrity and Safety; Repair as Needed

-Check Platform; Repair as Needed

-Bolt, nut, fasteners tightness – inspect; Repair as Needed

-General lube – grease fittings, etc.

3. AFTER SERVICE REPAIR – During regularly scheduled maintenance if an issue with any of the equipment is found the contractor must provide a quote to the 736 SFS/CW-S4 before proceeding with the repair or ordering any parts needed outside of preventative maintenance.

4. BASE ACCESS The contractor must notify the 736 SFS/CW-S4, 72 hours prior to inspecting/repairing tower(s) and arrange a time to meet at AAFB visitors center Bldg. 2403, provide a valid photograph, vehicle registration form, and proof of insurance to obtain an AF Form 75, visitor and vehicle pass if needed.

5. LOCATION All maintenance work shall be performed at tower(s) site.

6. WORK INTERRUPTION All work must be accomplished in such a manner that minimum inconvenience will be caused to the using agency.

7. PERFORMANCE The performance period will begin within 10 working days after receipt of contract.

8. QUALITY ASSURANCE

a. Inspection at Tower Site Location - After completion of service the vendor must inspect the tower(s) to ensure proper function and provide a copy of the repair invoice to the

736 SFS/CW-S4. If there’s any additional services required, a written quote must be submitted to 736 SFS/CW-S4 for approval prior to providing additional service.

Inspection Checklist Items

1. Did the vendor provide a copy of the service ticket?

2. During on-site inspection, were all items service items completed?

3. Are ALL towers in proper and safe working condition?

4. Are there any additional services required to any tower(s)? If so, will it be rescheduled?

b. Reminder for inspection - Contractor is to provide a reminder for quarterly service at least

5 days prior to services being conducted.

File details come from the government source that posted it. Updated .