This Statement of Work (SOW) details the requirements for installing a Secondary Crash Network (SCN) system at Eareckson Air Station, Alaska. The project involves furnishing, configuring, installing, and testing a standalone voice-initiated mass notification system that will support up to 16 parties directly involved in Eareckson AS flying missions. The SCN will be implemented across multiple buildings (490, 600, 618, 629, 718, and 3049), with specific requirements for equipment placement, including one core system, two initiator consoles, and eleven drop phones.
Key technical specifications include setting up the network on a separate, independent infrastructure that remains operational when the base network is down, with capabilities to record conversations, make simultaneous conference calls, provide visual indicators when handsets are picked up, and include noise reduction features. The contractor must comply with various telecommunications standards, provide emergency power solutions, and complete the entire installation within 365 days of award. Additional requirements include submitting a detailed test plan, providing on-site training to staff, delivering as-built drawings, and offering a one-year workmanship warranty. The project is being managed by the 611th Air Communications Squadron and requires contractors to have a minimum of 3 years of experience in telecommunications systems installations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA521525Q00160001 SF 30.pdf | ||
| FA521525Q0016 Questions and Answers.pdf | ||
| FA521525Q0016 - Eareckson Secondary Crash Network.pdf | ||
| FA521525Q0016 - Eareckson Secondary Crash Network.pdf | ||
| Eareckson Secondary Crash Network SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Eareckson AS Secondary Crash Network
611ACOMS-2023-00009-00001
Eareckson AS
611th Air Communications Squadron 01Apr2025
1. Scope: This Statement of Work (SOW) defines the effort required to furnish, configure, install and test into service a secondary crash network (SCN) system to support multiple Eareckson AS missions. This upgrade shall provide a completely standalone voice initiated and controlled mass notification system for up to 16 parties that directly support the Eareckson AS flying missions. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this statement of work (SOW). The Contractor shall comply with the current Telecommunications Industry Association (TIA) telecommunication installation and testing commercial standards, and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.
1.1. Background: This site is maintained by a Base Operations Support (BOS) contractor. Any request for support (i.e. labor, equipment), the contractor may go directly to the BOS contractor in according with (IAW) the applicable site support letter. Any support from the BOS contractor shall be contracted directly with the contractor requiring support.
2. Applicable Documents:
2.1. The following list is not all-exclusive. The Contractor shall comply with applicable commercial code and standards.
AFI 10-701 – Operations Security (OPSEC) DAFMAN 13-204 v2 – AIRFIELD MANAGEMENT DAFMAN 91-203 – Air Force Consolidated Occupational Safety Instruction TIA-526-7-A – Measurement of Optical Power Loss of Installed Single-mode Fiber
Cable Plant TIA-568.0-E – Generic Telecommunications Cabling for Customer Premises TIA-569-E – Telecommunications Pathways and Spaces TIA-606-D – Administration Standard for Telecommunications Infrastructure TIA-607-D – Generic Telecommunication Bonding and Grounding (Earthing) for
Customer Premises RUS Bulletin 345-65 (PE-33) – Specification for Shield Bonding Connectors RUS Bulletin 1735F-401 – Standards for Splicing Copper and Fiber Cable RUS Bulletin 1753F-207 (PE-87) – REA Specification for Terminating Cables NFPA 70 – National Electric Code
2.2. Documents can be made available upon request.
3. Requirements:
3.1. General Requirements
3.1.1. Unless otherwise noted in writing by the CO, the CO is the only person with the authority to change, modify, deny or approve any part and has sole authority for all aspects of contract, SOW’s, contract changes, approvals, payments and project changes.
3.1.2. The Contractor shall provide all material, equipment, labor, supervision, housing, food, and transportation for material and to/from the job site required to accomplish the requirements of this SOW.
3.1.3. The contractor shall be responsible for all personnel and material transportation to and from the job site and any accommodations for the duration of the project.
3.1.4. Safety Requirements – The contractor shall adhere to all NFPA, OSHA, EPA and all federal, state and local regulations while performing the requirements of this SOW.
3.1.5. Accident/Incident Reporting and Investigation – The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel. Notification shall be provided to the PRSC Det-2 office (317-392-3140). The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Base POC. If the Government elects to investigate of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.
3.1.6. Work Area(s) – At day’s end, the Contractor shall remove all debris and surplus materials from the workplace. Equipment and materials required to complete the work effort may remain on site if they are organized/stored in a manner that does not cause a safety hazard.
3.1.7. Security – Stated work and associated products shall be performed at the UNCLASSIFIED level. However, some of this work may take place in secure areas where Contractor employees must be escorted. The Contractor must coordinate access at least five (5) calendar days ahead of time.
3.1.8. Base Access – Access to Eareckson is restricted. The Contractor shall provide a valid driver’s license, date of birth, and social security number to the 611 ASUS SAR Office within 5 calendar days after schedule submission.
3.1.9. Operational Security (OPSEC) Requirements – Network infrastructure drawings are on the Eareckson AS Critical Information List and must be protected. The Contractor shall take appropriate measures to protect detailed information pertaining to the EFI&T effort, to include appropriate marking of documents as “Controlled Unclassified Information (CUI),” and ensuring limited distribution of documents and schematics/drawings to only those individuals with a valid need to know. In accordance with AFI 10-701, Operations Security, the contractor shall develop an OPSEC plan to ensure the protection of CUI data either furnished by the government or produced by the contractor.
3.1.10. Ultra Low Sulfur Diesel and JP-8 are available on site to purchase. See Attachment 1 base support letter, para 12.
3.1.11. All demolished and scrap materials used/generated in this project must be removed and disposed of in accordance with site policy.
3.1.12. All work must be completed within 365 days of award.
3.1.13. Contractor Personnel
3.1.13.1. Project Manager – The Contractor shall provide a Project Manager (PM) responsible for contract performance and continuity. The Contractor shall identify the Project Manager’s or alternate's range of authority to act for the Contractor relating to daily contract operation.
3.1.13.2. Site Point of Contact – The Contractor shall designate the Contractor's on-site team leader as the Site POC. The Site POC shall be on site during duty hours for the duration of the project, up to and until final acceptance by the Government PM and shall oversee all facets of the installation tasks. The Site POC shall be the interface for all work site communications with the Government, including quality, safety, and discrepancy matters.
3.1.13.3. Personnel Requirements – The Project Manager and Site POC shall be able to read, write, speak, and understand English and shall be on site to coordinate permits, clearances, and receive shipments/material related to the task order.
3.1.13.4. Minimum Contractor Qualifications – All work shall be performed by an experienced Telecommunications Contractor. The Contractor shall have a minimum of 3 years of experience in Telecommunications Systems installations.
3.1.13.5. System for Award Management (SAM) – The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Installation via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://www.sam.gov SAM replaces the previous ECMRA application that was hosted on https://www.ecmra.mil. See https://www.dmdc.osd.mil/ecmra_splash/.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the SAM help desk.
3.1.14. Transportation - For any travel of personnel and shipment of material and/or equipment, refer to Eareckson AS site support letter.
3.1.14.1. Personnel Travel – Due to the complexity of travel, a Not to Exceed (NTE) CLIN 0002 (Contract Line-Item Number) will be established for contractor personnel transportation to and from the site from the contractor’s point of origin. Transportation covers labor, per diem, lodging, and travel expenses IAW the JTR. Total amount will be determined by the Government as mission need arises, current ceiling will be set at not to exceed $23,000. Prior to the Project Kickoff Meeting, the Contractor shall submit their proposed travel plan to the contracting office for review and discussion during the Kickoff Meeting. When 80% of the approved travel amount has been utilized, the Contractor shall notify the Contracting and Program Manager Offices.
3.1.15. Third Party Support: Certain site-specific services may be available to the Contractor on a space available or limited basis. Types of support are detailed in the attached Eareckson AS site support letter along with required coordination and contacts for support.
3.1.16. Billeting: Refer to attached Eareckson AS site support letter.
3.1.17. Base Support – The Contractor shall identify any base support requirements (for example, laydown and storage areas) necessary to complete this project in their proposal. The contractor shall return all government furnished lay-down and storage areas to their original condition upon completion of the project.
3.1.18. Manuals and Practices – The Contractor shall provide the latest version of operation, installation, and maintenance manuals and practices/users guide for each system installed as provided by the original manufacturer with all new equipment.
3.1.19. Warranty – The Contractor shall provide a one-year workmanship warranty. The warranty period shall start from the date of system acceptance.
3.1.20. Restricted Access Areas – Eareckson AS has restricted areas where access is limited and requires Government escorts. The contractor shall coordinate with the 611th ACOMS/SCX fourteen (14) calendar days in advance for escorts and accessibility
3.1.21. Post-Award Meeting (Project Kickoff Meeting) - The Contractor shall host the Project Kickoff Meeting to be held within 30 days of the Notice to Proceed (NTP). The meeting may be held on Joint Base Elmendorf-Richardson (JBER) or Microsoft Teams. The meeting date and time shall be coordinated by the Contractor no less than 15 days prior to the meeting date. The Contractor shall include the Government project delivery team and contractor personnel responsible for project execution and quality control. The purpose of the Project Kickoff Meeting will include, but not be limited to, identifying management goals, key issues, project scheduling, travel plan, and policies related to the project. The Contractor shall prepare and submit a meeting agenda for review. At the Project Kickoff Meeting, the meeting dates and times for additional meetings shall be discussed and tentatively decided. The Contractor shall keep records of each meeting, phone conversations and written correspondence (including email) affecting decisions relating to the performance of this contract. The Contractor shall produce draft meeting minutes, submit the minutes to all meeting attendees for review and comment, and finalize the meeting minutes. The post-award meeting is expected to last approximately 1 hour.
3.2. Specific Requirements: CLIN 0001
3.2.1. The Contractor shall EFI&T into service a SCN consisting of one (1) core system, two (2) initiator consoles, and eleven (11) drop phones.
The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standards and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.
3.2.1.1. The Contractor shall make the required intra-building fiber and copper OSP cross connects within and from Bldg 618 to Bldg 490, 600, 629, 718, and 3049. See Figures 1 and 2.
3.2.1.2. The SCN system must meet all requirements within DAFMAN 13-204 v2 and be compliant with The Trade Agreements Act (TAA) of 1979.
3.2.1.2.1. The SCN shall be set up on a separate & independent network which allows it to remain operational when the base network goes down.
3.2.1.2.2. The SCN system shall be set up to record all conversations conducted using the system.
3.2.1.2.3. The SCN system shall be equipped to make simultaneous calls (conference call) to reduce the delay of emergency notifications.
3.2.1.2.4. The SCN system shall have a visual feature which activates as each two-way party on the SCN picks up the handset.
3.2.1.2.5. The SCN system shall have a noise reduction feature such as push-to-talk handsets or mute function to filter out background noise.
Table 1: Equipment Location Bldg Office User Room # Comm Room # FODP Comm
Room # Equipment
490 Fire Station 4 21 21 1 phone 600 Security Base G011 G024 G017 Initiator Console w/2 phones 600 Det CC Office A133 A145 A057 1 phone 600 Fire Dispatch B117 B120 B120 1 phone 600 Medical Clinic B309 B120 B120 1 phone 618 Tech Control 022 022 022 Main Console 618 Site Manager 008 022 022 1 phone 629 Alt Security
Base 2 4 4 1 phone
718 ATC Tower Tower Cab 2 2 Initiator Console w/2 phones
3049 Barrier Tech 121 122 124 1 phone
*Note, all distances are approximations and should NOT be used for ordering materials or determining duct lengths.
Figure 1: Bldg 600 Secondary Crash Network
3.2.2. Bldg 600 – Det CC Office/Security Base/Fire Dispatch/Medical
3.2.2.1. Room G011 (Security Base) – An SCN initiator console and it’s two (2) associated phones shall be installed in the Security Base office, room G011. The contractor will provide and install a small computer UPS to provide emergency power the initiator console. The FOTs for the initiator console and phones shall be installed in the in room G024 and connected through contractor installed CAT 5e wiring to room G011 down the hall through metal conduit running through the hallway. Contractor will install a new wall jack in room G011. The contract shall install a 1 KVA, 100 VAC, 60Hz UPS to provide emergency power to the FOTs. See Figure 1 for more information.
3.2.2.2. Room A133 (Det CC Office) – An SCN phone shall be installed in the Detachment Commander’s office, room A133. The FOT for the phone shall be installed in room A145 and connected through CAT 5e premise wiring. The contractor shall install a 1 KVA, 110 VAC, 60 Hz UPS to provide emergency power to the FOT. See Figure 1 for more information.
3.2.2.3. Room B117 (Fire Staging) – An SCN phone shall be installed in the Fire Dispatch office, room B117. The FOT for the phone shall be installed in room B120 and connected through CAT 5e premise wiring. The contractor shall install a 1 KVA, 110 VAC, 60 Hz UPS to provide emergency power to the FOT. See Figure 1 for more information.
3.2.2.4. Room B309 (Medical Clinic) – An SCN phone shall be installed in the Medical Clinic office, room B309. The FOT for the phone shall be installed in room B120 and connected through CAT 5e premise wiring. The contractor shall install a 1 KVA, 110 VAC, 60 Hz UPS to provide emergency power to the FOT. See Figure 1 for more information.
Figure 2: Eareckson AS Secondary Crash Network
3.2.3. Bldg 490 – Fire Station
3.2.3.1. Room 4 (Alt Fire Dispatch) – An SCN phone shall be installed in the Alt Fire Dispatch office, room 4. The fiber optic transceiver (FOT) for the phone shall be installed in room 21 and connected through CAT 5e premise wiring. The contractor shall install a 1 KVA, 110 VAC, 60 Hz UPS to provide emergency power to the FOT. See Figure 2 for more information.
3.2.4. Bldg 618 – Tech Control Facility/Site Manager
3.2.4.1. Room 022 (Tech Control Floor) – The SCN Core Equipment shall be installed within equipment rack 101.2. The contractor shall provide and install a 2KVA, 110 VAC, 60 hz UPS in the bottom of the cabinet. Additionally, the contractor shall provide and install a 1U, 12 outlet PDS above the UPS for powering the SCN Core Equipment and FOT modems. Lastly, the contractor shall provide and install a shelf to securely mount all nine (8) FOTs.
Room 022 has FODPs with connectivity to the rest of Eareckson AS SCN drops. It is the responsibility for the contractor to provide the appropriate fiber optic jumpers connecting each FOT to their respective FODP. Note all FODPs contain single-mode, ST fiber.
3.2.4.2. Room 008 (Site Manager Office) – A SCN phone shall be installed in the Site Manager’s Office, Room 008, and connected to the SCN Core Equipment via CAT 5e premise wiring to room 21 and then contractor installed CAT 5e cabling to room 22. See Figure 2 for more information.
3.2.5. Bldg 629 – GATR Site/Alt Security Base
3.2.5.1. Room 2 (Alt Security Base) – An SCN phone shall be installed in the Alt Security Base, room 2. The FOT for the phone shall be installed in room 4 and connected through contractor installed 5e wiring. The contractor shall install a wall jack within room 2. The contractor shall install a 1 KVA, 110 VAC, 60 Hz UPS to provide emergency power to the FOT.
See Figure 2 for more information.
3.2.6. Bldg 718 – Air Traffic Control Tower
3.2.6.1. Tower Cab – An SCN initiator console and it’s two (2) associated phones shall be installed in the Air Traffic Control Tower Cab. The contractor will provide and install a small computer UPS to power the initiator console. The FOTs for the initiator console and phones shall be installed in the Tower Cab. The contract shall install a 1 KVA, 110 VAC, 60Hz UPS to provide emergency power to the FOTs. See Figure 2 for more information.
3.2.7. Bldg 3049 – Power Plant/Barrier Tech
3.2.7.1. Room 121 (Barrier Tech) – An SCN phone shall be installed in the Barrier Technician office, room 121. The FOT for the phone shall be installed in room 122 and connected to room 121 through contractor installed CAT 5e wiring. The contractor shall install a 1 KVA, 110 VAC, 60 Hz UPS to power the FOT. As no ethernet connectivity is available in the office, the contractor shall install an ethernet wall jack connecting to the FOT in room 122. See Figure 2 for more information.
3.3. Test Plan – The contractor shall submit a written test plan that details how they will test the SCN system. In addition, the contractor shall submit written step-by-step and troubleshooting instructions to system operator(s) for conducting periodic system tests. The SCN system shall be tested and demonstrated to the Government that the system is fully operational and meets or exceeds the specified requirements and that the system is fully ready to be placed into service.
3.4. Onsite Training – Upon completion of the installation process, the Contractor shall provide user training to site staff.
3.4.1. The Contractor shall provide the 611th ACOMS with the Training Plan (CDRL A003) at least 30 days prior to installation.
3.4.2. The Contractor shall provide step-by-step operational training on the utilization of all features of the new system.
3.4.3. The Contractor shall provide basic system troubleshooting training, to include setup, configuration, operations, user diagnostic, repair, and replacement to system maintainers.
3.4.4. Instructional sessions shall be permitted to be videotaped and retained for future training purposes.
3.4.5. Training materials, including any training slides, guidance, and documentation, shall be electronically provided to site personnel and 611th ACOMS. The Government shall retain the right to duplicate and distribute the training materials for future training purposes.
4. Submittals:
4.1 All project submittals must be accompanied by a completed AF Form 3000, Material Approval Submittal. All AF3000 will be submitted to the CO for signature. If there is a change in process or material, different from what was proposed and awarded, the CO or PM’s signature on the AF3000 does not constitute an approved change order. Any changes must be coordinated with the CO prior to submission of the AF3000 for signature.
4.2. The Contractor shall submit to the Contracting Officer and 611 ACOMS project manager a schedule timeline within 15 days of award for all major project milestones that include at a minimum: material orders, shipments, and project completion. Report any delays and upcoming problems and causes for concern. (A002)
4.3. The Contractor will provide an update to the schedule provided in 4.2 with any significant changes to CO and 611 ACOMS Project Manager (significant changes understood as changes that shift the schedule by more than 5 business days).
4.4. All required project close-out documentation submitted within 10 days of project completion, including:
4.4.2. Finalized DD Form 1354, Transfer and Acceptance of Military Real Property.
4.4.3. Red-Line and As-Built Drawings. The contractor shall submit drawing showing the “as built” configuration in Visio format, along with PDF format. The As Built Drawings shall include at a minimum the equipment locations, rack elevations, FODP/ethernet P/P, and port numbers. (CDRL A001)
4.4.4. Manuals and Practices. The Contractor shall provide the latest version of operation, installation, overview system schematics and maintenance manuals and practices/users guide for each system installed, as provided by the original manufacturer with all new equipment.
4.5. Software and Licenses. The contractor shall provide a physical copy of all software to site personnel and 611th ACOMS/SCX. Licenses shall be provided to site personnel and 611th
ACOMS/SCX.
4.6. The contractor shall submit the project invoice in Wide Area Workflow (WAWF) through the Procurement Integrated Enterprise Environment (PIEE) portal, within 30 days of project completion and inspection, IAW DFARS Clause 252.232-7006 of the awarded contract.
4.6.1. Project completion is defined as all work has been completed IAW the SOW, all submittals required in Sections 4 above have been received/accepted by the Government and inspection/acceptance has occurred.
Table 2. Deliverables CDRL Data Item Data Item Title
A001 As-Built DI-DRPR-80151A/T
A002 Schedule Timeline DI-MISC-81382/T
A003 Training Plan DI-ILSS-81070/T
5. Attachments and Appendices:
Appendix
Bldg 490, Rm 21
Bldg 490, Rm 4
Bldg 600, Room A057
Bldg 600, Rm A145
Bldg 600, Rm B120
Bldg 600, Rm B120
Bldg 600, Rm B222 (Port mislabeled as going to B117, goes to B120)
Bldg 600, Rm B319
Bldg 600, Rm G017
Bldg 600, Rm G024
Bldg 600, Rm G024
Bldg 618, Rm 022
Bldg 618, Rm 022
Bldg 618, Rm 021
Bldg 629, Rm 4
Bldg 629, Rm 4
Bldg 629, Rm 2
Bldg 718, 1st Floor (Only room on 1st floor)
Bldg 718, 2nd Floor (Only room on 2nd floor)
Bldg 718, Tower Cab
Bldg 3049, Rm 124
Bldg 3049, Rm 122
5.2 Attachments
Attachment 1: Eareckson AS Site Support Letter