Atch 3--Schedule_B_23Dec19.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
BAK-12 AAS -- Draft RFP Federal contract opportunity
Solicitation number
FA521520R0006
Issued by
Department of the Air Force Pacific Air Forces

About this file

This Excel file schedule outlines requirements for delivery of BAK-12 AAS engine bases to the Department of the Air Force Pacific Air Forces. The contractor must deliver 22 engine bases under CLIN 0001 by May 15, 2020 with inspections. An additional 14 engine bases are required under CLINs 0002-0004, with 7 bases to be delivered by August 15, 2020 and the remaining 7 by August 15, 2020. The file includes cost and unit information for the engine bases and totals for each CLIN and the overall project, though all costs are currently listed as $0.

The related solicitation FA521520R0006 is a draft RFP seeking quotes to provide the 22 BAK-12 AAS engine bases with the specifications outlined in the attached drawings. The bases must be painted gloss green per the specified standard and delivery date. The opportunity is designated a Special Notice available through the Department of the Air Force Pacific Air Forces.

View the file

Other files for this federal contract opportunity

Other files attached to BAK-12 AAS -- Draft RFP, newest first.
File Type Posted
Atch 4b) AFI20-106_Management_of_Aviation_Critical_Safey_Items.pdf PDF
Atch 2d) 201019010 Top Drawing.pdf PDF
Atch 2c) 201018919 Base Finish Macining Assy.pdf PDF
Atch 2a) BAK-12 SOW.docx DOCX document
Atch 4c) JALC_AVIATION_CSI_MGMT_HDBK_16MAR2011.pdf PDF
Draft Solicitation FA521520R0006.docx DOCX document
Atch 4a) 2019-11-19 BAK-12 and MAAS CSI determination.pdf PDF
Atch 1 - BAK 12 - Clauses & Provisions.docx DOCX document
Atch 5--ITO_BOA_HTPR_27Dec19.docx DOCX document
Atch 2b) 201018916 Base Weld Assy.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BAK-12 AAS Engine Bases
Delivery NLT 15 May 2020
CLIN 0001InspectionsCostUnitsCost
Engine Bases4$ - 0
$ - 0
Total$ - 0
Delivery NLT 15 May 2020
CLIN 0002LocationCostUnitsCost
Engine Bases4$ - 0
$ - 0
Total$ - 0
Delivery NLT 15 Aug 2020
CLIN 0003LocationCostUnitsCost
Engine Bases$ - 07$ - 0
$ - 0$ - 0
Total$ - 0
Delivery NLT 15 Aug 2020
CLIN 0004LocationCostUnitsCost
Engine Bases$ - 07$ - 0
$ - 0$ - 0
Total$ - 0
Profit and Overhead
SummaryCost
Total$ - 0

PROJECT COST $ - 0

image1.emf

File details come from the government source that posted it. Updated .