This is a Question & Answer document dated January 13, 2025, for Solicitation No. FA520925Q0007 regarding the purchase of twelve full-size locally manufactured pickup trucks for Yokota Air Base, Japan.
The Q&A clarifies several key specifications: the government will provide licensing and insurance; only gasoline-powered vehicles are acceptable; technical publications can be submitted in Japanese only; and the minimum pickup bed length must be 8 ft with 122 cm of unobstructed floor space between wheel housings. The document addresses various vendor inquiries about vehicle specifications, including acceptance of a lower horsepower rating (150 HP vs. 305 HP), Toyota standard torque, and 2-ton maximum loading capacity, which were all approved. Amendment 0002 removed requirements for Parts List and Shop Repair Manual in Japanese. Technical publications must be provided at delivery time, and product specification sheets are preferred in English but acceptable in Japanese if English versions are unavailable. The Q&A sessions are now closed with no additional questions being accepted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information
//FINAL// Question & Answer (2) As of 13 Jan 2025
Solicitation No. FA520925Q0007
Purchase of Pickup Truck, Yokota Air Base, Japan
No. 1
Question: Is the Contractor responsible for the licensing and insurance for vehicles?
Answer: No. The Government will be providing the licensing and insurance. The local vendor will not be required to insure the vehicle, only need the standard warranty for any manufacturing issues or concerns.
No. 2
Question: Can my company participate in this requirement?
Answer: The Government will follow the evaluation criteria specified in the solicitation. Please refer to applicable sections of the Standard Form (SF) 1449, especially FAR 52.212-1, Addenda to FAR 52.212-1 (SF 1449, page 40-41), and FAR 52.212-2 (SF 1449, page 43).
No. 3
Question: With regard to the requirement of technical publication in the Government Minimum Characteristics
Item Information (GMCII), Attachment 1 to Solicitation, both Japanese and English versions of the technical publications are required. However, we have the only Japanese version available. Would the Government be able to accept the Japanese version only?
Answer: Yes, submitting the only Japanese version of the technical publications is acceptable. The amendment to the solicitation will be issued in order to update the GMCII document.
No. 4
Question: Regarding the line 5 of the paragraph 1 in the GMCII (Attachment 1 to Solicitation), does “the specified length flush style” have any specific requirements stated?
Answer: The load length of pickup bed is 8 ft. (Minimum). See page 2 of the GMCII document.
No. 5
Question: Regarding participation in the solicitation, since our company cannot prove the non-use of Chinese products in all details of our products, we have been checking whether this case is applicable for a waiver, as it has been in the past. What is the situation this time?
Answer: The Contractor shall comply with reporting requirement of the Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
No. 6
Question: There is no pickup truck for Japanese market manufactured in Japan. Instead of a pickup truck, would the Government accept a three side drop flatbed truck, i.e., Toyota Dyna, with the following specifications?
1) Engine Power (Minimum): 132PS
2) Engine Torque (Minimum): 179Nm
Answer: The minimum characteristics will be updated. The amendment to the solicitation will be issued in order to update the GMCII document.
No. 7
Question: We are unable to match any vehicle in the local market that matches your customer’s requirements.
We would like to propose a Nissan Atlas; however, it does not meet the requirements as noted below.
Is it acceptable, so that we can provide a quote?
Pickup Bed, Load Length: 8 ft. or XXX cm (Minimum), A minimum of 122 cm of Unobstructed Floor Space between the Wheel housings.
Gross Vehicle Weight Rating (GVWR): 6500 lbs. or XXXX kg (equivalent) Fuel Type: Gasoline Engine Power (Minimum): 305 horsepower or XX (equivalent) Engine Torque (Minimum): 269 (lb ft) or XX (equivalent)
Answer: The fuel type shall be gasoline. The minimum characteristics will be updated. The amendment to the solicitation will be issued in order to update the GMCII document.
No. 8
Question: With regard to paragraph 2 in the GMCII (Attachment 1 to Solicitation), please provide answers to these questions below.
1) Fuel Type: Is diesel acceptable instead of gasoline?
2) Engine Power (Minimum): Is 150 HP acceptable instead of 305 HP?
3) Engine Torque (Minimum): Is Toyota standard torque acceptable?
4) Is the maximum loading capacity of 2 tons acceptable?
Answer: 1) No. The fuel type shall be gasoline.
2) Yes.
3) Yes.
4) Yes.
No. 9
Question: Do you have any idea which pickup truck the end user is looking for? Japanese Truck? Or U.S
Truck?
Answer: The vehicle must meet the specifications stated in this solicitation. The Contractor shall provide twelve (12) full-size locally manufactured pickup trucks with a regular cab in accordance with commercial practice and local standards.
No. 10 (NEW)
Question: Per manufacturer’s policy, parts catalogues and shop repair manual are no longer provided to end users. Those technical publications are available only for the manufacturer’s authorized dealers and repair shops. If the Government inquires us (a successful offeror) or the designated dealer, we will provide the Government with necessary part number and related information. So please kindly amend the specification.
Answer: The Amendment 0002 was issued on 13 Jan 2025 to remove “Parts List (Japanese)” and “Shop Repair Manual (Japanese)” from the requirement.
No. 11 (NEW)
Question: Shall the Contractor submit the required Technical Publications before or after the contract award?
Answer: The Technical Publications shall be provided to the Government at the time of delivery.
No. 12 (NEW)
Question: Should the specification sheet be submitted in Japanese or English as a part of Attachment 2, Product
Information, at the time of submitting a quotation?
Answer: English is preferred. However, if the English version of a catalog of the offered item is unavailable, the Japanese version is acceptable. When time allows, an offeror is requested to translate major information to English. If the information is available in both languages, please submit both the English and Japanese versions.
== End of Q&A Sessions ==
The Q&A has been closed. No additional questions will be accepted or answered.
| No. 1 |
| Question: |
| Answer: |
| No. 2 |
| Question: |
| Answer: |
| No. 3 |
| Question: |
| Answer: |
| No. 4 |
| Question: |
| Answer: |
| No. 5 |
| Question: |
| Answer: |
| No. 6 |
| Question: |
| Answer: |
| No. 7 |
| Question: |
| Answer: |
| No. 8 |
| Question: |
| Answer: |
| No. 9 |
| Question: |
| Answer: |
| No. 10 |
| Question: |
| Answer: |
| No. 11 |
| Question: |
| Answer: |
| No. 12 |
| Question: |
| Answer: |
File details come from the government source that posted it. Updated .