Attach 1. 22Q0030 0002 PWS.pdf

PDF 171 KB Posted

Attached to
Grease Trap Cleaning Service at Yokota Airbase and Tama Annex.
Solicitation number
FA520922Q0030
Issued by

About this file

This performance work statement outlines cleaning services for grease traps at Yokota Airbase and Tama Annex in Japan. The contractor shall remove solids and pump out contents from grease traps monthly, transport waste for disposal according to law, and submit required permits and reports. Cleaning shall be performed between 0730-1630 Monday through Friday excluding US holidays. The contractor must have a contract manager available within two hours and a quality control plan submitted within ten days of award. The contractor will be responsible for any spills cleaned up and damages repaired with no cost to the government.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

GREASE TRAP CLEANING SERVICE

AT

YOKOTA AB AND TAMA ANNEX, JAPAN

Yokota AB, Japan 4 May 2022 20 July 2022 10 Aug 2022

△1

△2

Attachment 1 Performance Work Statement (PWS)

FA520922Q0003 0002

PERFORMANCE WORK STATEMENT△1

FOR

GREASE TRAP CLEANING SERVICE

FOR YOKOTA AB AND TAMA ANNEX

1. DESCRIPTION OF SERVICE.

1.1. Grease Trap Cleaning. The Contractor shall remove solids from basket(s) connecting inlet pipes. The Contractor shall pump out all contents, including grease/oil and sludge, and clean inside of grease traps. The Contractor shall flush down with water and pump out remaining residue, and clear obstructions in inlet/outlet pipes to ensure unrestricted flow, required by the unique configuration of the grease trap. Before completion, the Contractor shall add sufficient recharge water to restore the grease trap to proper operation and inspect all parts for defects. The recharged water must be higher than the lowest dividing plate. Problems shall be reported to the Contracting Officer Representative (COR) in writing and orally within 24 hours of discovery.

1.2 Transportation, and Disposal. The Contractor shall properly transport and dispose of collected waste in accordance with “Waste Management and Public Cleansing Law”.

1.3. Business Permits. The Contractor shall possess and submit following applicable business permits, certifications, and licenses to accomplish grease trap cleaning services in accordance JEGS and Japanese laws. The Contractor will ensure all documents are current.

The contractor shall possess and submit following permit

1) Permits of Industrial waste collection and transportation for Grease (産業廃棄物収集運搬業許可証)注: 汚泥

The Contractor shall submit following permits before performance starts.

2) Permit of Industrial waste disposal, Waste Sludge (Odei) (産業運搬所分業許可証) 注:汚泥 or Permit of Industrial Waste Treatment Business Permit、Waste Sludge (Odei) (産業廃棄物中

間処理許可証) 注: 汚泥

1.5. Submittal and Reporting

1.5.1 Work Schedule. The Contractor shall establish the monthly collection schedule in accordance with appendix A, Estimated Workload Data. The schedule for the next month shall be submitted to the COR by the 20th of each month for approval.

1.5.2. Waste Treatment Process. The Contractor shall submit the waste treatment and recycling process chart to the KO ten (10) days before contract start date.

1.5.3. Manifest. The Contractor shall prepare and control manifests in the specific form specified in Regulation of Waste Management and Public Cleaning Law. The manifests shall be submitted to the COR with the Contractor's monthly invoice.

1.5.4. Reports. The monthly report denoting collected quantity, specified by date and collection point, shall be submitted to the COR each month with the Contractor's invoice.

1.6. Spillage. The Contractor shall be responsible for spillage cleanup and recovery at locations before collection vehicle departs from both Yokota AB and Tama Annex. In the event of a spill, the Contractor shall be responsible for filling out and turning in a 374 CES/CEV Spill Report (Appendix B) to COR prior to leaving base. All spills must be reported to COR.

1.7. GENERAL INFORMATION

1.7.1. Quality Control (QC). The Contractor shall acquire samples from grease traps listed in Appendix B in order to develop a quality control plan and checklist to ensure all services are performed in accordance with JEGS, Japanese Laws, pertinent regulations, and commercial standards and practices. The QC plan will identify proper service, list ways the Contractor will prevent defective service, ensure that all Contractor activities are performed safely, and will at minimum address areas identified in paragraph 2 (Services Summary). The QC checklist will be a condensed list that is used to ensure application of the QC plan during all activities. The QC plan and checklist shall be submitted to the KO for coordination within ten (10) calendar days after contract award.

1.7.1.1. Quality Assurance. The Government will evaluate the Contractor’s performance by appointing a COR to monitor performance to ensure services are received. The COR will evaluate the Contractor’s performance through intermittent on-site inspections of the Contractor’s performance. The Government may inspect each task during/after performance.

1.7.1.2. Government Remedies. The KO shall follow FAR 52.212-4, Contract Terms and Conditions-Commercial Items, for the Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

1.7.2. Hours of Operation.

1.7.2.1. Normal Working Hours. The Contractor shall perform the contract services between the hours of 0730 to 1630, Monday through Friday including Japanese holidays, but excluding US legal holidays.

1.7.2.2. Recognized US Holidays. The recognized US legal holidays are listed below:

1st January New Year's Day 3rd Monday of January Martin Luther King Jr's Birthday 3rd Monday of February Washington's Birthday Last Monday of May Memorial Day

19th June Juneteenth Day 4th July Independence Day 1st Monday of September Labor Day 2nd Monday of October Columbus Day 11th November Veterans Day 4th Thursday of November Thanksgiving Day 25th December Christmas Day

* Holidays falling on a Saturday will be observed on the preceding Friday. Holidays falling on a Sunday will be observed on the following Monday.

1.7.3. Base Passes. The Contractor’s employees will be issued base passes (identification cards), which shall be carried by the individual bearers at all times while on Yokota Air Base and Tama Annex. The Contractor shall submit written requests for issuance of base passes to COR and shall be responsible for all base passes issued to his/her employees. The Contractor shall return all base passes to the Japanese Pass Section at Yokota Air Base upon termination of employment or completion of the contract.

1.7.4. Special Qualifications.

1.7.4.1. Contract Manager (CM): The Contractor shall provide a CM who shall be responsible for the performance of the work. The name of this person and alternate(s) who shall act for the Contractor when the manager is absent, shall be designated in writing to the KO within ten (10) days after contract start date.

1.7.4.2. The CM or his/her alternate, upon notification, shall be available during normal duty hours within two

(2) hours to meet on the installation with the COR to discuss problem areas.

1.7.4.3. The CM and alternate(s) must be able to read, write, speak, and understand English, or provide a translator.

1.8. Contractor Employees. The Contractor shall not employ persons for work on this contract if; he/she is identified to the Contractor by the KO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

1.8.1. The Contractor personnel shall present a neat appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee's names. The Contractor shall adhere to all base safety and traffic regulations and policies.

1.8.2. The Contractor shall not employ any person who is an employee of the US Government and employing that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies of the Department of the Air Force.

2.0. Damage. The Contractor shall exercise care not to damage any facilities and grounds at Yokota Air Base and Tama Annex. Any damages determined to have been caused by the Contractor shall be repaired by the Contractor at no expense to the Government. The Contractor shall be responsible for verification of the job site and the existing condition of all serviced equipment before beginning work.

3. SERVICES SUMMARY

SS Number and Performance Objective

PWS

Para

Performance Threshold Method of Assessment

SS 1: Grease Trap Cleaning 1.1.

Complete with no more than 2 deficiencies per month

Periodic Inspection

SS 2: Transportation 1.3. Complete requirement with 0 deficiencies Periodic Inspection SS 3: Provide submittals and reports 1.6. Complete requirement with 0 deficiencies 100% Inspection

4. GOVERNMENT FURNISHED SERVICES.

4.1. The Government will furnish water in existing facilities at no cost to the Contractor for the sole purpose of accomplishment of this contract.

4.2. The Government will provide, for emergency purposes only, the following services:

a. Security Police Telephone 911 or Commercial No. 042-507-6560

b. Fire Protection Telephone 911 or Commercial No. 042-507-6560

c. Hospital Emergency (Reimbursable expense) Telephone 911 or Commercial No. 042-507-6560

Any time the Contractor uses one of the above services, the Contract Manager (CM) shall immediately report to the COR with all of the details. The CM or alternate will be required to submit, in writing, within two (2) days, the details surrounding the use of this service to the KO.

5. APPENDIXES.

A. Estimated Workload Data B. Spill Report

APPENDIX A

ESTIMATED WORKLOAD DATA

1. GREASE TRAP (One Year)

Yokota Air Base

Bldg. Facility Name Quantity per Month

(kg) Quantity One Year (kg) Capacity of Trap (kg)

31 Officer’s Club 700→1100 8,400→13,200 686→1000

35 RT 16 700→1300 8,400→15,600 686→1200

80 AAFES @ Terminal 600→800 ※1 7,200→8,400 686→ ※1

327 Kirara Café 700→800 8,400→9,600 686→700 335 Samurai Café 1,000→1,400 12,000→16,800 686→1300 415 Burger King 7,300→15,500 87,600→186,000 15,000 536 Chili’s 6,400→7,000 76,800→84,000 6,000

570 YCC 3,200→4,800 38,400→57,600 900 / 900 / 1,000 / 1,800

621 Sunrise Bakery 700→800 8,400→9,600 686→700 703 Base Operations 300→200 3,600→2,400 200→150 994 JN Dining Facility 700→900 8,400→10,800 686→800 1213 Bowling 300→500 3,600→6,000 200→400 1214 Airline Catering 700→1,100 8,400→13,200 686→1,000 1239 West Elementary 200→900 2,400→10,800 686→800

1592 ADD

Child Development

Center 800 9,600 700

2066 NCO Club 7,300→15,500 87,600→186,000 15,000 4085 AAFES Bakery 7,000→15,500 84,000→186,000 15,000

4085B AAFES Bakery 1,100→2,200 13,200→26,400 1080/ Pump pit→2,000 4173 High School 6,400 76,800 4,000→6,000 4189 High School 200 2400 686 4155 Middle School *Added 200→700 2,400→8,400 686 4320 East Elementary 200→800 2,400→9,600 637→700 4330 Banzai Burrito 1,100→400 13,200→4,800 1,000→300 4408 Hospital 300→600 3,600→7,200 200→500

Total Quantity 47,100→80,000 565,200→958,800 69,777→75,236 47,100→80,000

Tama Annex

Bldg Facility Name Quantity per Month (kg) Quantity One Year (kg) Capacity of Trap (kg)

375 Tama Lodge 200 2,400 400

1010 Club House 600 7,200 900

Total Quantity 800 9,600 1,300

※1 Renovation of B.85 has not completed yet and the information of grease trap is tentative.

Note:

1. The collection points may be changed as required.

2. 1 kilogram = 1 liter

△1

△2 All Data marked in red and green were changed in this amendment.

APPENDIX B

Spill Report Oil and Hazardous Substances Pollution Contingency Plan

Yokota Air Base/Tama Annex

Section I – Release Data Gathering

1. Date/time you were notified ___________________________________________________________________

2. Who contacted you? _________________________________________________________________________

3. What date/time did you arrive on the scene? ______________________________________________________

4. Date/time of discharge _______________________________________________________________________

5. What was discharged (chemical, trade name, etc.)? _________________________________________________

6. How was the discharge confirmed? ______________________________________________________________

7. Volume of discharge (estimated/confirmed) _______________________________________________________

8. Location of discharge ________________________________________________________________________

9. Type of surface that received discharge __________________________________________________________

(Soil, concrete, asphalt, water rain, inside/outside – estimate ratio for a mixture of surfaces)

10. Severity of effects __________________________________________________________________________

(Include effects of spill on personnel, i.e. injuries, symptoms, etc., effects on environment, i.e. plants and animals affected, and effects on base operations, i.e. roads closed, buildings inaccessible, etc.)

11. Geographic area affected ____________________________________________________________________ (estimate square feet, acres, etc.)

12. What equipment was involved in the discharge? __________________________________________________

(include equipment identification numbers: aircraft tail number, vehicle registration number, serial number, etc.

and technical name i.e. C130H)

13. Cause of discharge _________________________________________________________________________

14. Who did you interview? (name, rank duty section and phone number)

15. What were the weather conditions? _____________________________________________________________

16. How was the discharge cleaned up? ____________________________________________________________

17. How were cleanup materials disposed of? ________________________________________________________

18. Measure taken to prevent recurrence____________________________________________________________

19. Local reaction and press coverage______________________________________________________________

20. Additional information ______________________________________________________________________

21. Brief narrative of incident ____________________________________________________________________

File details come from the government source that posted it. Updated .