Atch2_3a_A20105_Add.pdf

PDF 16 KB Posted

Attached to
Repair Exterior Doors, Building 551, 563, 760 and 793 at Camp Zama, Kanagawa-ken, Japan
Solicitation number
FA520920B0007
Issued by

View the file

Other files

File Type Posted
5 Attachment_Q3.pdf PDF
SF30_FA520920B00070002.pdf PDF
5 QandA_A20105_200410.pdf PDF
Atch1_1a_SpecA20105Add.pdf PDF
SF30_FA520920B00070001.pdf PDF
0 Business w US Government.pdf PDF
Atch4_Other Contr Rqts.pdf PDF
Atch1_SpecA20105.pdf PDF
1 FA520920B0007.pdf PDF
USAG-J 1529.pdf PDF
Atch3_SubmittalSchedule.pdf PDF
List of Participants.pdf PDF
OF-17.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

A-20-105

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SECTION 03 20 00

1.3 Work Procedure

SECTION 03 20 00

3.1 Detailed Drawings

SECTION 03 20 00

3.11 Quality Control And Inspection Reports

SECTION 03 30 01

1.5 work procedure (Concrete)

SECTION 03 30 01

1.5 work procedure(Formwork)

SECTION 03 30 01

1.5.2.1 Formwork

SECTION 03 30 01

1.5 Inspection/Test Reports

SECTION 03 30 01

1.5.3.4 Safety Data Sheets

B

B

C

B

B

B

C

X

2 X

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

IC

E N

S E

S

Repair Extr Doors, B551,563,760&793

C A

L C

U L

A T

O N

S H

E E

T S

T E

S T

R E

P O

R T

S

FA520920B00070001

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

T A

L O

G D

A T

A

C O

L O

R S

E L

E C

T

IO

N S

O P

E R

A T

M A

IN

T

X

W O

R K

P R

O C

E D

U R

E

P L

A N

S

O

T H

E R

S

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

IN

S

T A

L L

A T

IO

N

IN

S

T R

U C

T

IO

N S

IN

S

T R

U C

T

IO

N S

C E

R T

IF

IC

A T

IO

N

S

5 X

4 X

X

X

6 X

8 B

A. W/in 30 days after NTP

B. 30 days prior to commencement of applic. work

C. W/in 5days after commencement of applic. work

D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only *** CMB Only

File details come from the government source that posted it. Updated .