5 QandA_A20105_200410.pdf

PDF 365 KB Posted

Attached to
Repair Exterior Doors, Building 551, 563, 760 and 793 at Camp Zama, Kanagawa-ken, Japan
Solicitation number
FA520920B0007
Issued by

View the file

Other files

File Type Posted
5 Attachment_Q3.pdf PDF
SF30_FA520920B00070002.pdf PDF
Atch2_3a_A20105_Add.pdf PDF
Atch1_1a_SpecA20105Add.pdf PDF
SF30_FA520920B00070001.pdf PDF
0 Business w US Government.pdf PDF
Atch4_Other Contr Rqts.pdf PDF
Atch1_SpecA20105.pdf PDF
1 FA520920B0007.pdf PDF
USAG-J 1529.pdf PDF
Atch3_SubmittalSchedule.pdf PDF
List of Participants.pdf PDF
OF-17.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER

Date: 10 Apr 20

Solicitation No. FA520920B0007

Project No. A-20-105, Repair Exterior Doors, Building 551, 563, 760 and 793 at Camp Zama

Query No.

Target for Question

Reference Question by Offerors Gov’t Response/Clarification

1 Temporary Enclosure

Temporary enclosure during door replacement.

We plan to cover the inside with plywood and the outside with a guard fence. Is this acceptable?

That plan is acceptable. And please provide curing sheet to prevent the penetration of dust into inside.

2 Site Visit Information

Contract Specification

SECTION 08 11

13, Paragraph 1.4, Table I Performance

At the site visit, a Government personnel explained that the door should be specific fire prevention equipment, individually certified product (Tokutei Bouka Setsubi, Kobetsu Nintei Hin) with glass window. According to Building Standards Law (Kenchiku Kijyun Ho), certified products should be installed in fire resistant area.

However, neither panic bars nor glass laminated glazings with tempered and polished glazings are allowed to be installed on the certified product.

What should we do?

Individually certified product (Tokutei Bouka Setsubi, Kobetsu Nintei Hin) is not required.

However; doors shall comply with Table I Performance, paragraph 1.4 WIND PRESSURE

RESISTANCE, AIR TIGHTNESS, AND WATER

TIGHTNESS in SECTION 08 11 13, STEEL DOORS AND FRAMES. The door manufacture shall be able to issue the Certificate of these performance mentioned in Table I. And regarding glazing, It’s acceptable to use float glass instead of polished plate glass.

Site Visit

Drawings A-06

At the site visit, we noticed that the existing doors had mohair weatherstrip (hairy stuff) at the bottom. Rubber packing is more commonly used and provide high performance. If we install the rubber, a step15mm high at threshold is necessary. Is it okay to install rubber packing instead of mohair? (Please see Attachment)

Please prioritize the drawing, not the existing doors.

(A-06 TYPICAL NEW DOOR DETAILS)

Regarding the level difference of threshold, please make it closer to 13mm as long as possible.

4 Site Visit

Drawings Repair and paint work for the removed wall and floor should be at a minimum even if there are difference in material and the color from the existing?

Regarding the portions not shown by the drawing, Please repair and paint them to the good place to leave off like nearby internal and external corner.