Appendix A - HVAC equipment
RFP#: FA520919RA010
Project Name: EMCS System Install and DDC Controls
Appendix A – HVAC Equipment
The HVAC equipment to be controlled:
Building 314
Two-Pipe System from Central Plant 2- Air Handling Units with 6 zone control 2- Return Fans 2- Chilled and HW Circulating Pumps 1-Steam condensation return pump 8- single phase exhaust fans 7- 3 ph. exhaust fans 4- HEX Heat Exchange ERV units 4- Convectors 2- VR DX UNIT A W/ 10 Indoor Units
Building 315
Two-Pipe System from Central Plant 2- Chilled and HW Circulating Pumps 8- single phase exhaust fans 8- 3 ph. exhaust fans 3 ph. Supply Fan SFE 3- AHU’s 1,2, and 3 5- Fan Coil Units 7- VAV boxes 1- Split AC Unit
Building 316 Building 602
Two-Pipe System from Central Plant 2- Chilled and HW Circulating Pumps 13- single phase exhaust fans 4- 3 ph. exhaust fans 3- ACU Supply Fans
Two-Pipe System/ Auto Changeover 1- Chiller 1- Heat Exchanger Steam to HW 2- Chilled/ Hot Water Pumps 2 – Air Handling Units 1- Return Fan 3Ø
3- ACU Return Fans 6- HEX Heat Exchange units 3- Convectors 2- VR DX UNITA W/ 6 Indoor Units
7- Convectors 19- 1Ø exhaust fans 4- 3Ø exhaust fans 4- 3Ø outside air fans 1-Heating Coil
Building 345 Building 313
4 – Air Handling Units w/ heating water coils EF- Not Available
1- Air cooled Chiller 1- Chilled/ Hot Water Pumps 1-Steam condensation return pump 1- Heat Exchanger Steam to HW 1-Ventilation unit
2- Chiller 2- Cooling Tower 1- Heat Exchanger Steam to HW 2- Chilled and HW Circulating Pumps 2- Cooling Tower Pump
1-Steam condensation return pump Building 445 Building 820
Two-Pipe System/ Auto Changeover 1- Chiller 1- Absorption chiller 1- Cooling Tower 1- Cooling Tower 1- Chilled water Circulating Pumps 1- Steam to HW convertor 1- Cooling Tower Pump 3- Chilled and Hot Water circulating pumps 2- Split AC Unit 1- Condenser water pump 2 – Air Handling Units 3- Air Handling Units 3- Fan convector units 3- Return Fan Units 12-Unit Heater 8- Fan convector units 3-Packaged AC unit 15- single phase exhaust fans 9- 1Ø exhaust fans 2- 3 ph. air intake fans 13- 3Ø exhaust fans 2- Domestic Hot Water circulating pumps 1-Steam condensation return pump 1-Steam condensation return pump
Building 907 Building 920
1- Chiller 1- Chiller 25 - Fan coil unit 2- Chilled and Hot Water circulating pumps 1- Heat Exchanger Steam to HW 1- Heat Exchanger Steam to HW 2- Chilled/ Hot Water Pumps 2 - Air Handling Units 2-Heat Convector 2-Packaged AC unit 13-unit heaters 1-Steam condensation return pump 7- 1Ø exhaust fans 2-Return fan 3- 3Ø exhaust fans 4-Convector 1-Steam condensation return pump 19-VAV units 6- 1Ø exhaust fans 2- 3Ø exhaust fans
Appendix A - HVAC equipment
RFP#: FA520919RA010
Project Name: EMCS System Install and DDC Controls
Building 410
1 –compressor and DX coil located in Inside fan unit package w/ heating water coils, with humidification.
1 – Air cooled condenser 1- Steam to HW convertor 2-Heating Hot Water Circulating Pumps 1-Steam condensation return pump 5-VAV units 1- Return Fans 11- Single phase exhaust fans 1-3 ph. exhaust fan