Amendment_0001_(22_Jul_19).pdf

PDF 104 KB Posted

Attached to
Demolish 12 Buildings at Kawakami Ammunition Depot, Hiroshima, Japan
Solicitation number
FA5209-19-BA001
Issued by

About this file

Amendment 0001 (SF 30)

View the file

Other files

File Type Posted
Atch_14,_Q&A.pdf PDF
Amendment_0002.pdf PDF
Site_Visit_Memo_(19BA001).pdf PDF
Atch_13_(Revised_18_Jul_19).pdf PDF
Atch_1a-Spec_(W13705).pdf PDF
Atch_1c-12c,_SMS.pdf PDF
Atch_9a-Spec_(W15711).pdf PDF
Atch_6a-Spec_(W15708).pdf PDF
Atch_7a-Spec_(W15709).pdf PDF
Atch_4a-Spec_(W15706).pdf PDF
Atch_2a-Spec_(W14702).pdf PDF
02_FA520919BA001_(SF1442).pdf PDF
Atch_10a-Spec_(W19704).pdf PDF
01_Business_w_US_Govt.pdf PDF
Gate_Pass_Request_(USAG-J_1529).pdf PDF
Atch_12a-Spec_(W19706).pdf PDF
Atch_3a-Spec_(W15705).pdf PDF
Atch_13_(Other_Contr_Rqts).pdf PDF
Atch_8a-Spec_(W15710).pdf PDF
Atch_5a-Spec_(W15707).pdf PDF
Atch_11a-Spec_(W19705).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

1 2

0001 7/22/2019 0011327109 See Section C

FA5209

FA5209 374 CONS LGC

UNIT 5228

APO AP 96328-5228

APO, AP 96328-5228

United States Kanae Yamamoto, Telephone: 042-552-1046 Email: kanae.yamamoto.jp@us.af.mil

FA520919BA001

6/20/2019

See Section G

SEE CONTINUATION PAGE

Contracting Officer Email: gary.scullin.1@us.af.mil Telephone: DSN: 315-225-5426

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The Purpose of This Amendment Is: .

The purpose of this amendment is to make following minor corrections and additions in Standard Form 1442 (SF 1442) of this solicitation.

(1) Block 10, paragraph 4: "See Section K for details" is corrected to read "See Section L for details".

(2) Block 10, paragraph 5: "Block 12a" is corrected to read "Block 12a and 18".

(3) Section J, Attachment 11b. (Project No. W-19-705): Drawing No. T-01 (Sheet 1 of 2) is replaced with attached Addendum No. 1 dated 18 Jul 19 to correct a location map.

(4) Section J, Attachment 12b. (Project No. W-19-706): Drawing No. T-01 (Sheet 1 of 2) is replaced with attached Addendum No. 1 dated 18 Jul 19 to correct a location map.

(5) Section J, Attachment 13: "Other Contract Requirements" is replaced with attached revision dated 18 Jul 19 to delete "(Applicable to Mock Project at Attachment J-3)" from the title of I002.

(6) Section F: Following supplemental information is added.

"The on-site work for actual demolition of Building 2666 (Project No. W-14-702, CLIN 0002) shall be performed toward the end of all demolition work under this contract (CLIN 0001 through 0012).

Except for the on-site demolition work, all other contract work such as on-site survey and submissions of required material submittals for this project can be performed at any time during the performance period in accordance with the contract specification and through coordination with and approval by the Government."

"A comprehensive construction plan for this contract to include all projects under CLIN 0001 through 0012 shall be submitted to the Government for approval in accordance with paragraph 1.12.1, Section 01 11 01 of respective construction specifications listed in Section J."

FA520919BA0010001

File details come from the government source that posted it.