2-1.PWS.p1-24.pdf

PDF 1 MB Posted

Attached to
Household Goods Packing and Crating Services at Yokota Air Base
Solicitation number
FA520918R0004
Issued by

About this file

Attachment 1: Performance Base Statement (PWS) Page 1~24 (File 1 of 4)

View the file

Other files

File Type Posted
PreconMinutes-18R0004.pdf PDF
2-4.PWS.p72-87.pdf PDF
2-2.PWS.p25-48.pdf PDF
3.Exhibits.pdf PDF
5.Atch3-2.PPISurvey.pdf PDF
0-2.NTO.pdf PDF
2-3.PWS.p49-71.pdf PDF
0-1.GovtPoliciesLtr.pdf PDF
0-4.SF1449.pdf PDF
6.Atch4.PP-RefList.pdf PDF
4.Atch3-1.PPQ_Cvrltr.pdf PDF
1.Atch2_PreAwd.Survey.pdf PDF
0-3.OF_17.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 to Solicitation No. FA520918R0004

PERFORMANCE WORK STATEMENT (PWS)

FOR

HOUSEHOLD GOODS PACKING AND CRATING SERVICES

AT

YOKOTA AIR BASE

21 Feb 2018

PART I – DESCRIPTION OF SERVICES

A. SCOPE OF WORK

The Contractor shall furnish all personnel, equipment, facilities, supplies, services, and materials, except as specified herein as government-furnished, for the preparation of the personal property of

Department of Defense (DOD) personnel for shipment and/or storage and related services through the

DPM. Work to be performed shall be those services in the Schedules awarded to the Contractor as outlined in individual Contract Line Item Number (CLIN) items (see Appendix C). Table 1, Task/

Type of Move Matrix, shows which tasks normally apply to each type of move. Specific requirements for each task are described below. If specific instructions or requirements are not provided, commercial standards of services and best business practices are acceptable.

1. Premove Survey. The Contractor shall determine the nature of personal property offered for shipment either by physical inspection or telephone survey with the customer. The survey shall be conducted at a time and date mutually agreed upon between the Contractor and the customer. Any pack/pickup date changes shall be coordinated with the ordering officer.

2. Weighing.

a. The government will provide scales (one (1) truck scale and one (1) platform scale) that may be used to perform this service. See Appendix J Office Facility below. When the Contractor utilized its Contractor-furnished scale under this contract, the gross, tare, and net weight of all shipments shall be determined through the use of scales property certified by an inspector of weight and measures in accordance with (IAW) the applicable laws and regulations of Japan.

The Contractor shall submit the certificate of its scale to the Contracting Officer at the frequency required by the GOJ or local prefectural laws and regulations. The Contractor's personnel designated to operate the scales shall be licensed or otherwise qualified as weight masters if required by the GOJ laws and regulations. When a metric scale is utilized, the

Contractor shall use 1 kilogram per 2.2 pound for conversion.

b. The Contractor shall submit weight tickets, reflecting gross, tare, and net weight, in duplicate, properly certified IAW the GOJ laws and regulations to the ordering officer with documentation (Contract Data Requirements List [CDRL] 0002).

c. When scales are not available or their use is not practical, the application of a constructive weight of 7 pounds per cubic foot shall be used provided prior written approval is obtained from the ordering officer. (See Paragraph A.2.e for constructive weight of professional books, papers, and equipment [PBP&E], also known as PRO or PRO-Gear).

d. When PBP&E are included as part of the shipment, the weight of each item individually described on the inventory shall be entered on the same line of the inventory next to the description. The total weight of such articles shall be annotated separately on the inventory and packing list. The PBP&E weight may be obtained using bathroom or platform type scales. If it is not possible or practical for the Contractor to weigh the items at the time of packing and pickup, and there is no cube indicated on the inventory, a constructive weight of

7 pounds per cubic foot shall be used for PBP&E.

e. The weight tickets shall contain the name and address of the weighing station, date, name of

Contractor, van or trailer number, name of customer, call number assigned by the ordering officer, and signature of the individual who operates the scale.

f. For inbound personal property, the Contractor shall bill on the origin net weights obtained from the Transportation Control and Movement Document (TCMD) or other movement document and need not submit a weight certificate, unless a reweigh is ordered. When a reweigh is ordered, the Contractor shall bill on the reweigh weight.

g. If the TCMD, movement document, or container does not reflect the net weight for inbound shipments or if the TCMD is unavailable at the destination, the Contractor shall bill on the origin gross weights obtained from the TCMD, or other available sources, such as containers or supporting documentation. The Contractor is required to use all means available

(containers, supporting documentation) to obtain a net weight prior to submitting the bill. If the bill is submitted on the origin gross weight, the Contractor is paid for the gross weight based on the net weight bid price.

h. The Contractor shall perform reweigh services when ordered. The reweigh shall normally be requested at the time the delivery order is placed and shall be performed IAW instructions set forth in Paragraph A.2.a. When so advised by the ordering officer, a designated representative of the ordering officer or the customer will be permitted to accompany, in a separate conveyance, the Contractor to witness the reweigh. This would be at no extra charge and the Contractor would not provide the separate conveyance.

i. When a reweigh is ordered, the Contractor shall furnish the ordering officer weight tickets in duplicate within 7 workdays of completion of the service.

j. When the weighing of a shipment at origin is witnessed by the Personal Property Shipping

Office (PPSO), the back of all copies of the weight ticket shall be annotated with the statement

“weight observed” and verified by the signature of the PPSO. The number 7 copy of the

TCMD (property received copy) shall be similarly annotated prior to mailing to the destination

PPSO. When computer-generated TCMDs are used, the copy going to the destination PPSO shall be annotated.

k. Billing Procedures. For Continental United States (CONUS) activities, to include Hawaii and

Alaska, shipments are payable on the basis of 100-pound minimum weight for unaccompanied baggage (UB) and a 500-pound minimum weight for household goods (HHG), net or gross weight, as indicated in the bid item. For overseas activities, excluding Hawaii and Alaska, shipments are payable on the actual net weight shipped.

l. Actual pieces, weight, and cube of UB shipments shall be provided to the Transportation

Office (TO)/PPSO prior to the issuance of the TCMD.

3. Time Requirements.

a. The ordering officer will normally give the Contractor notice to commence services ordered herein at least 1 full workday prior to the date specified. Oral orders will be confirmed in writing within 2 workdays following order acceptance by the Contractor. The Contractor shall be available to receive orders between the hours 0800 and 1700. Upon request, the

Contractor shall provide information as to whether the service shall be performed between the hours of 0800 to 1200 hours or between the hours of 1200 to 1700 hours, based upon the best information available. “Workdays” refer to Monday through Friday except for U.S. legal holidays throughout this PWS (See also Part III 12 below).

b. In unusual situations, it may be necessary for the ordering officer to direct performance of services at specified times or days. When services are ordered for other than normal duty days and hours, then overtime charges are applicable under Exhibit, Pricing Schedule, Schedule I, Item A014 (and corresponding items if Options are exercised), Schedule II, Item A029 (and corresponding items if Options are exercised), and Schedule III, Item

A034 (and corresponding items if Options are exercised) Additional Services.

c. The Contractor shall not begin pickup or delivery services at a member/employee’s residence before 0800 hours or after 1700 hours without prior approval of the ordering officer and member/employee. The Contractor shall not begin any service that will not allow completion by 2100 hours without approval by the ordering officer and the member/employee by 1630 hours of the scheduled date. When services cannot be completed on the scheduled date, the Contractor shall notify the ordering officer and the member/employee. In case of an approved suspension of operations, the Contractor shall assure his/her return the next workday at 0800 hours to complete the services.

d. If containerization is ordered at the Contractor’s facility, the HHG or UB shall be picked up on the date and within the hours specified. Unless a longer period is authorized by the ordering office, the maximum containerization time allowed at the Contractor’s facility shall be 3 workdays following the specified pickup date for HHG and 2 workdays following the specified pickup date for UB.

e. The Contractor shall accept from commercial carriers and pickup from commercial, air, water, and military terminals inbound shipments of HHG or UB. The Contractor shall notify the ordering officer upon arrival of a shipment but not later than 1200 hours of the next workday. Delivery shall be affected within 3 workdays following the date of the

Contractor’s arrival notification unless otherwise specified. For shipments in storage, the

Contractor shall affect delivery to the residence within 3 workdays following notification for delivery by the ordering officer (e.g., if the ordering officer calls on Monday, the personal property shall be delivered on or before Thursday). The Contractor shall not deviate from the specified delivery date unless approved by the ordering officer.

4. Preparation, Packing, Loading, and Containerization.

a. Personal property shall be prepared, packed, loaded, and containerized for all types of shipments destined for the CONUS or Outside CONUS (OCONUS). It is the Contractor’s responsibility to coordinate with the ordering officer container size and configuration for each mode of shipment prior to packing containers.

b. The Contractor shall perform all preparation and packing in a manner requiring the least cubic measurement, producing packages that withstand normal movement without damage to the container or contents and at a minimum of weight. All shipments shall be protected from the elements (rain, snow, or sun) and theft at all times.

(1) Items of unusual nature may require disassembly service by a third party. The Contractor shall not arrange for third-party servicing without the authorization of the ordering officer.

The charges for third-party service shall be billed by the Contractor as a separate charge on the invoice and supported with two copies of the third-party company’s invoice.

Examples of such items are shrunks, wall units, grandfather clocks, and grand pianos.

(2) The Contractor shall not be required to disassemble swing sets, outdoor recreation equipment, television and radio antennas, and similar articles. The customer will disassemble these items. Items disassembled by the customer will be shown in the remarks section of the inventory as Disassembled by the Owner (DBO).

(3) Customer-Packed Items. The Contractor shall inspect and repack items already packed by the customer, with the exception of Exhibits, Pricing Schedule, Schedule I, Item A006

(and corresponding items if Options are exercised), Outbound Service-Unaccompanied

Baggage Packed by Customer, and Item A007 (and corresponding items if Options are exercised), Outbound Service-Unaccompanied Baggage Packed By Customer-

Consolidated Shipments/Government Facility. The Contractor assumes liability for whatever they pack. The Contractor has the right to inspect all items and will use the appropriate carton(s) to pack all items (i.e., clothes in wardrobe boxes) thereby affording items the proper protection. PPSOs will ensure that items are shipped in sealed cartons for stacking in truck/crates and to avoid pilferage. Therefore, one of two things must occur:

(a) Let the Contractor pack all contents in cartons and then stack empty plastic totes or tubs separately for onward movement, or

(b) Let the customer provide an already-packed tote/tub. The Contractor shall then inspect and decide the following:

1 Empty the tote/tub and place its contents in a carton, or

2 Ship the tote/tub as is with contents. It will be the Contractor’s responsibility to place the tote/tub in a proper carton or container for safe movement. Tape may not be placed directly on the tote/tub.

The above decision is at the carrier’s discretion. Customer cannot insist that the contents must remain in the tote/tub since the carrier assumes liability for the tote/ tub and the contents.

(4) Trunks and Footlockers. Trunks and footlockers may contain a properly packed quantity of HHG that is reasonable for the construction and condition of the container.

c. When the ordering officer authorizes tailgating, the load shall not extend beyond the surface of the tailgate or beyond the surface of the vehicle. The tailgated items shall be protected from inclement weather by a suitable covering.

d. Containerization. Containerization of outbound HHG and UB shall be done at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. The Contractor shall perform all exterior containerization services as prescribed in Paragraph A.7 for the type of articles, destination, and method of shipment designated by the ordering officer.

(1) Reserved.

(2) Boats. Boats may include, but are not limited to, the following: canoes, skiffs, light rowboats, kayaks, and sailboats. The Contractor shall be required to accept a boat and/or boat trailer less than 14 feet in length or over 14 feet in length (member only) but less than

500 pounds in weight from ma member/employee. Employees are limited to domestic shipment of boats and their associated trailer that can be transported in a moving van (e.g., canoe, kayak, rowboat, outboard/inboard motorboat [14 ft or less]). Components and boat accessories that will not fit into an American Society for Testing and Materials (ASTM)

D4169-14, Standard Practice for Performance Testing of Shipping Containers and Systems or Military Surface Deployment and Distribution Command (SDDC) Pamphlet 55-12, Transportation and Travel Commercial Containers for Department of Defense Household

Goods Shipments, container shall be containerized IAW ASTM D6251/D6251M-11, Standard Specification for Wood-Created Panelboard Shipping Boxes. The customer will be responsible for any special crating or materials needed to move the boat by DPM.

e. Security Seals. All exterior HHG/UB containers and boxes, including overflow and oversize boxes and rug tubes/cartons, shall be sealed with accountable seals at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. Sealing shall be completed prior to any movement and the seal (control) numbers entered on the inventory, cross-referencing the container number. Two seals, as a minimum, for UB, shall be used per box and seals shall secure the access overlap top and ends. If only two seals out of a set of four are used, the seals not used shall be destroyed at the time of sealing or given to the customer. Four seals, as a minimum, on HHG, shall be used per box and seals shall secure the access overlap door and side panels.

f. Removal of Debris. Packing and loading at the origin shall include, as a minimum, removing from the member’s/employee’s residence all empty Contractor-provided containers, packing materials, and other debris accumulated incident to packing and loading unless specifically waived by the customer in writing.

5. Tagging, Inventorying, and Packing List. The Contractor, in coordination with the customer, shall prepare an accurate, legible, HHG/UB descriptive inventory similar to Appendix A, Figure A-1, Household Goods Descriptive Inventory. The Contractor shall count and examine all goods tendered for shipments, receipt for them, and make written exception for any goods not in apparent good order. All tagging shall be accomplished prior to the removal of goods from the residence.

a. Inventory Identification. Each carton shall be marked to indicate the general contents and member’s/employee’s last name. Each carton shall be tagged and inventoried as a separate inventory line item. Identify the cartons by type and cube with an indication of general contents, such as, linens, pots and pans, mirror carton, 3.5 cubic feet.

b. Inventory Symbols. The “Exception Symbols” and “Location Symbols,” as shown in

Appendix A, Figure A-2, shall be used to describe locations and exceptions. Locations and exceptions shall be true and accurate. The omission of exception symbols shall indicate good condition except for normal wear. Describe in as much detail as possible items of furniture;

for example, television sets shall be identified as being either “color” (C) or “black and white” (B&W) and console or portable. The Contractor shall annotate on the inventory item(s), such as TVs, stereo components, computer hardware, VCRs, and video cameras, by make, model, and serial number when these are visible on the outside of the item.

c. Reserved.

d. For PBP&E, ensure the term “PRO-GEAR (PRO)” is used to identify such articles on the inventory, together with the cube and weight of the individual carton; a line entry item for each container, such as, carton PRO 3 cubic ft., 53 lbs. These items identified by the customer will be separated from other items of the shipment, weighed separately, and placed in separate boxes or cartons to provide safe transportation. The symbol PRO shall be used. The total weight of the packed professional items shall be recorded on the last page of the inventory and on the packing list for outbound HHG and UB shipments.

e. Items disassembled by the Contractor shall be shown in the remarks section of the inventory as Contractor Disassembled (CD). Items disassembled by the customer shall be shown in the remarks section of the inventory as DBO. When an article is packed in an original container furnished by the customer, the inventory shall indicate the type of article and shall be shown as Contractor Packed (CP).

f. Motorcycles, mopeds, and motor scooters shall be inventoried as one line item, listing their serial number, make, year, model, and odometer reading. For international shipments, ensure one copy of the title and/or registration is attached to all copies of the TCMD.

NOTE: Motorcycles and mopeds that do not conform to vehicle emissions standards motor vehicle safety standards of the destination country cannot be shipped as part of a HHG shipment. Therefore, the Contractor shall notify the COR for clarification when the Member/employee has a motorcycle or motor scooter to be shipped.

g. When the ordering officer permits the Contractor to partially containerize a shipment at the warehouse, each item removed from the residence shall be annotated on the inventory as Containerized Warehouse (CW).

h. Inventory Form. The inventory form shall bear the signature of the customer, and date signed, together with the signature of the Contractor’s representative and date signed certifying to its accuracy and completeness.

i. The Contractor shall prepare the inventory in five (5) copies for outbound HHG and UB shipments and in three copies for local drayage moves. The original and all copies shall be legible and shall bear the name and complete mailing address of the Contractor. The original inventory shall be furnished to the ordering officer, the Contractor shall retain one copy, and one copy shall be given to the customer (CDRL 0003, Household Goods Descriptive

Inventory). For HHG and UB, the Contractor shall place in a waterproof envelope secured to the No. 1 container: one copy of the inventory; one copy of the DD Form 1299, Application for the Shipment and/or Storage of Personal Property, Figure 1, and if an overseas shipment, one copy of the member’s/employee’s orders and custom’s document. Additionally, for HHG, the Contractor shall place an envelope containing the following documents in an easily accessible location inside the No. 1 container: one copy of the packing list and Exception

Sheet for shipments released from non-temporary storage (NTS). For UB shipments, the

Contractor shall place one copy of the member’s/employee’s orders inside the carton prior to sealing. The customer will be required to furnish all the necessary copies of his or her orders.

j. Annotate the receiving document or inventory to show any overage, shortage, and damage found, including visible damage to external shipping containers and condition of security seals each time custody of the property changes from a storage contractor (warehouseman) to the contractor or from one contractor or carrier to another. When available, use the same inventory prepared at origin to verify delivery and condition of the articles at destination.

k. Packing Lists. The packing list identified in Appendix A, Figure A-2, Packing List of

Household Goods, or a similar format, shall be used. The Contracting Officer will advise the

Contractor as to the required packing list prior to the start date of the contract. The Contractor shall prepare a packing list at the time the goods are packed, noting the number of each piece, the weight, and the cubic measurement.

l. Reserved

(1) Reserved.

(2) Reserved.

(3) Reserved.

6. Appliance Servicing and Unservicing. The Contractor shall service and unservice appliances IAW manufacturer’s specifications. If third-party servicing or unservicing is required and approved by the ordering officer, the Contractor shall bill the services as prescribed in Paragraph A.4.b.(1).

7. Containers and Vehicles

a. Government-owned containers (GOCs). GOCs are containers constructed IAW Commercial

Standard ASTM-D4169-14. GOCs also include those containers listed in SDDC Pamphlet 55-12, those meeting ASTM-D6251, and wooden overflow and oversize containers purchased by the government or received by the Contractor. GOCs shall be used to the extent as they are available for Schedule I, Items A001 through A005 (and corresponding items if Options are exercised), before using Contractor-furnished containers.

(1) All GOCs and Contractor-furnished containers shall be free of defects (holes, loose or broken framing, missing skids, caulking repairs, or separated plywood). Unacceptable containers are those that have been extended to accommodate oversize or overflow items, any panel bowed or bulging beyond their normal conformity, those with deteriorated plywood (either rotted or delaminated), those caulked on outside seams or joints, and those patched without the use of caulking compound. Patches on the outside surfaces are not acceptable because they increase the overall dimension and are subject to being scraped off during handling. The floor shall be solid and all skids installed and in sound condition.

(2) All GOCs and Contractor-furnished containers must conform to United States (U.S.)

Department of Agriculture requirements for Wood Packaging Materials (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM must be constructed from Heat Treated (HT) lumber (HT to 56 degrees centigrade for 30 minutes) and certified by an accredited agency recognized by the American Lumber Standards

Committee (ALSC), Incorporated, or an equivalent organization recognized by the host nation’s government for WPM procured outside the United States IAW WPM policy and

WPM enforcement regulations (http://www.alsc.org) (*) Non-DoD Website. Wood fumigated with methyl bromide is not authorized for use in the shipment of HHGs as damage may occur to the HHGs. All materials must include certification markings IAW

ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with International

Standards for Phytosanitary Measures Publication No. 15, International Standards for

Phytosanitary Measures (ISPM): Guidelines for Regulating Wood Packaging Material

(WPM) in International Trade and be marked with an ALSC approved dunnage stamp.

Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. Additional information on

WPM requirements can be found at http://www.aphis.usda.gov (*).

b. Containers for articles such as large pieces of marble or glass table tops that require more protection than the standard packing techniques shall be constructed IAW ASTM

D6039/D6039M-11, Standard Specification for Crates, Wood, Open and Covered. These http://www.alsc.org/ http://www.aphis.usda.gov/ containers shall be used for interior packing purposes.

c. Skids. Any container that will be handled with a forklift will be constructed with two or more skids. All wooden containers entering the Defense Transportation System (DTS) with a gross weight of 100 pounds or more or with length and width dimensions of 48 inches by 24 inches or more will be equipped with two skids of not less than a minimum of 3 inches high and 3-1/2 inches wide. Skid sizes will be IAW ASTM-D6251.

d. Banding. Containers of plywood construction will be banded IAW Commercial Standard

ASTM D3953-13, Standard Specification for Strapping, Flat Steel and Seals, or of equal quality with nonmetal banding.

e. Coopering of GOCs shall be performed when authorized by the ordering officer. Patches shall not increase the overall container dimensions. All repairs shall be done prior to delivery to residence.

f. Vehicles. The Contractor shall ensure that all vehicles used in the movement of personal property shall be of a safe and sound condition so as not to permit damage to personal property.

8. Marking Exterior Shipping Containers. The Contractor shall mark all GOCs by stenciling with letters at least 1 inch high. Freehand marking shall not be used. Felt-tip markers shall not be used.

All old shipment markings shall be obliterated prior to delivery to residence. Each container shall be stenciled with all required elements prior to departure from the warehouse.

a. Permanent markings on containers shall be legible and conform to Commercial Standard

ASTM-D4169-14 and SDDC Pamphlet 55-12. The following permanent markings shall be stenciled in black letters 1-1/2 inches high, Appendix A., Figures A-3, Location of

Permanent Markings on ASTM-D4169-14 Wood HHG Box, and A-4, Location of

Permanent Markings on MIL-STD-1489 HHG Box:

On one side and one end:

USE NO HOOKS STORE

UNDER COVER US

PROPERTY

SDDC APPROVED

In the appropriate places:

CENTER OF BALANCE

LIFT HERE

FORKLIFT HERE

b. On Commercial Standard ASTM-D4169-14 and SDDC Pamphlet 55-12 containers, the following additional permanent markings shall be stenciled on one side and one end toward the top of the container in black letters 2 inches high. The Contractor shall stencil the word

“UP” with an arrow pointing to the top of the container. Then under “UP” on an orange background not to exceed 8 x 10 inches in black letters approximately 2 inches high, the

Contractor shall stencil “DPM.” The word “EXPEDITE” shall be symmetrically spaced below in 1-1/2-inch high black letters. (See Appendix A, Figures A-3 and A-4.)

c. Shipments identified as “BLUEBARK” shall be stenciled in 1-inch letters with the code word

BLUEBARK above the TCMD number.

d. As a minimum, the property member’s/employee’s last name shall be legibly hand written or stenciled on all containers for identification purposes prior to departure from the origin residence or other pickup point.

e. Permanent markings on DPM HHG, Appendix A, Figure A-5, Container Marking for

Household Goods, and UB, Figure A-7, Markings of Unaccompanied Baggage containers shall be legible and conform to Commercial Standard ASTM-D4169-14 and SDDC Pamphlet

55-12. DPM HHG and UB containers shall have a completed Military Shipping Label (MSL) affixed on one side and one end panel for all shipments entering the DTS, except for passenger bags and similar packages, which shall have an MSL affixed to one surface. The MSL, Appendix A, Figure A-6, Military Shipping Label for Personal Property, requires human-readable information as well as linear and two-dimensional bar codes. The human- readable and linear bar-coded portions of the MSL are prepared as described below and the two-dimensional bar code is prepared IAW Appendix G. If the shipping container does not lend itself to the application of the label, or if the label would cover or interfere with other required markings, the label shall be attached to a general purpose tag or a placard. The general purpose tag or placard shall be tied, wired, or otherwise fastened to the shipment unit or movement conveyance.

f. The following listed human readable data and Code 39 linear bar codes shall be placed on each MSL. Some entries are keyed to numbered blocks on the MSL, and some are in addition to that form’s requirements. The human readable unit of measure shall be provided in U.S.

standard terms (e.g., pieces, inches, feet, and pounds for measured items) and the data values shall be rounded up to the nearest whole number with leading zeros suppressed. Also see

Military Standard-129, Department of Defense Standard Practice, Military Marking For

Shipment and Storage, and ANSI MH10.8.1.

(1) Transportation Control Number (TCN): Human readable and linear bar code using 1/2-inch high Code 39 format.

(2) Transportation Account Code (TAC), PPGBL/BL number, and carrier.

(3) From: The consignor Department of Defense Activity Address Code (DODAAC) and in-the-clear address.

(4) Type Service: In-the-clear text (e.g., TGBL Cd J). The clear-text descriptions may be derived from the personal property TCN field 15 descriptions.

(5) Ship to/POE: Three-digit air/sea port of embarkation (POE) code, and enough space for

5 lines of up to 35 characters for the in-the-clear address.

(6) Transportation Priority: Bold text 3/4 inches tall.

(7) POD: Three-digit air/sea port of debarkation (POD) code or blank.

(8) Consignee/Mark For: Member’s/employee’s name, followed by the consignee

DODAAC and/or Mark For in-the-clear address, and linear bar code using 1/2-inch high

Code 39 format.

(9) Weight: Actual gross weight (this piece) with unit of measure. Do not zero fill.

(10) RDD: Three-digit code or blank for Required Delivery Date. Blank for classified unit move.

(11) Cube: Cube (this piece) with unit of measure. Do not zero fill.

(12) Tare Weight: Weight of container before loading personal property.

(13) Date Shipped: Four-position code or in-the-clear date. Blank for unit move.

(14) Net Weight: Weight of personal property loaded into a container.

(15) Piece Number: The piece number (of total pieces) of this shipment and a linear bar code using 1/2-inch high Code 39 format. Do not zero fill. The piece number and total pieces may be expressed as “Piece Number of Total Pieces” to save space on the label.

(16) Total Pieces: Total number of pieces in this shipment unit. Do not zero fill.

(17) PDF417 2D symbol IAW PWS with Appendix G.

NOTE. Social Security Number shall not be stenciled on the container unless it is a part of the TCN. Failure to comply will be considered a violation and action will be taken by the PPSO.

g. Carriers may optionally stencil shipment markings in addition to the MSL on the outside of containers. Freehand marking is not acceptable. Markings shall be proportional to the available space on the container. Old markings not applicable to the current shipment shall be permanently obliterated before the container’s arrival at the member’s/employee’s residence.

One copy of the member’s/employee’s orders shall be placed in each container used to ship

UB. When an order applies to more than one customer, the name of the customer to whom the baggage belongs shall be identified.

h. Overflow Containers. Overflow containers (Schedule I, Item A003 (and corresponding items if Options are exercised) shall be limited to use for those items that accumulate over and above that which can be packed into an ASTM-D4169-14 or SDDC Pamphlet 55-12 container. The construction of an overflow container shall be IAW ASTM-D6251. The overflow container normally is of lesser size than ASTM-D4169 or SDDC Pamphlet 55-12 containers and shall be limited to one per shipment.

i. Oversize Containers. Oversize containers (Schedule I, Item A003 (and corresponding items if

Options are exercised) shall be limited to use for a single item that exceeds the dimensions of and cannot be accommodated in ASTM-D4169-14 or SDDC Pamphlet 55-12 container and therefore requires a specially built container. One or more of this type may be required per shipment. These containers shall be constructed IAW ASTM-D6251 and the exterior container dimensions furnished to the ordering officer.

j. Other Shipments. Containers constructed for other shipments (Schedule I, Item A003 (and corresponding items if Options are exercised) shall be constructed IAW ASTM-D6251. Other shipments are defined as small shipments that require a lesser size box (container) than specified in Commercial Standard ASTM-D4169 or SDDC Pamphlet 55-12.

k. The Contractor shall report, store and, when directed by the ordering officer, reposition government-owned HHG containers. When repositioning is ordered, the Contractor shall load the GOCs on vehicles and deliver them to the site identified by the ordering officer.

(1) The outbound Contractor, when directed by the ordering officer, shall pick up and store empty GOCs from other local carrier or government facilities within the contract area of performance. When the contract is awarded to different Contractors, storage of the

GOCs is the responsibility of the outbound Contractor unless otherwise directed by the ordering officer. The storage of containers contemplated under this contract means, as a minimum, that containers, if not stored within a building, shall be stored in a manner to protect from precipitation, ground water or other moisture.

(2) GOC Report. The Contractor shall submit a GOC report (a local form or for Air Force

Installations, AF Form 384, Government-Owned Container Control Record). The report shall be submitted to the ordering officer 15 days after the contract start date and thereafter on the first workday of each month (CDRL 0005, Report of Government-

Owned Containers). The Contractor shall keep an accurate, up-to-date count of all GOCs.

(3) Serviceable/Unserviceable Containers. The Contractor shall not commingle serviceable or unserviceable containers. After inspection by the ordering officer, these two categories of containers shall be segregated. The ordering officer and Contractor will mutually agree upon the inspection and disposition schedule. Unserviceable containers shall be disposed of at no cost to the government.

(4) The new outbound Contractor shall pick up the serviceable empty GOCs from the previous Contractor(s) not later than 30 calendar days after commencement of the contract.

9. Outbound Documentation and Movement.

a. TCMD and similar documents covering outbound HHG shipments shall be picked up from the ordering officer by the Contractor each workday or obtained IAW locally established procedures, such as mail or courier. Distribution of completed TCMDs shall be as outlined below.

b. On outbound HHG shipments, the shall complete by typing the following information on the original TCMD and all copies:

(1) Block 26 (Packages). Enter the number and kind of containers, such as 1 F/L or 2

CTNS.

(2) Block 27 (Description of Shipment). Enter the aggregate weight and cube of the total number of each different type of container shown in Block 26.

(3) Block 28 (Weight). Enter the gross, tare, and net weight.

c. On outbound UB shipments, the Contractor shall provide information on actual pieces, weight, and cube to the TO/PPSO within 1 day after pickup so that the TO/PPSO can prepare the

TCMD. Information will include:

(1) Packages to include the number and kind of containers, such as 1 F/L, 2 CTNS.

(2) The aggregate weight and cube of the total number of each different type of container.

(3) The gross, tare, and net weight.

d. On all outbound shipments moving by a TCMD, the Contractor shall surrender the original and copies 2, 3, and 4 of the TCMD to the carrier when the shipment is picked up. The Contractor shall return copies 5, 6, and 7 of the TCMD to the ordering officer not later than the close of business the next workday after the day the shipment is picked up (CDRL 0008, TCMD).

Computer-generated TCMDs are not numbered. In instances where computer-generated

TCMDs are used, enough copies will be made to ensure the right number of copies will be submitted. All copies of the TCMD returned to the ordering officer will bear a legible pickup date, carrier pro number stickers, and signature of the carrier’s representative. The Contractor shall furnish the ordering officer the completed inventory, packing list, and weight tickets not later than 4 workdays from the date of pickup for HHG and 3 workdays from the date of pickup for UB shipments.

e. On outbound overseas shipments, the Contractor shall complete by typing the following information on the original TCMD (Appendix A, Figure A-10) and all copies:

(1) Block 22 (Pieces). Enter the total number of pieces in the shipment.

(2) Block 23 (Weight). Enter the gross, tare and net weight.

(3) Block 24 (Cube). Enter the total cube of the shipment.

f. One completed copy of the TCMD will be placed in the waterproof envelope on the number one container, three copies will be given to the carrier, and one annotated copy will be returned to the Contracting Officer’s Representative.

g. Reserved.

h. Reserved.

i. Reserved.

j. The Contractor is required to submit a weekly report showing outbound shipments on-hand which was picked up prior to the previous Wednesday (CDRL 0009, Contractor’s Weekly

Report).

k. When the Contractor’s facility is located in a town, city, or metropolitan area other than the location of the PPSO, telephone notification of completed containerization or arrival of shipments will be considered as meeting the requirements for written notification. However, the Contractor will mail the written notification to the ordering officer within 1 workday following the day of telephone notification.

l. Reserved.

10. Storage.

a. Identification. All outbound shipments shall be properly identified by the member’s/employee’s name, TCMD number, and call or lot number. Such identification shall be in plain view on each lot.

b. Vehicles will not be used for the storage of shipments. Pickup and drayage includes placing the goods within the facility on the pickup date specified in the order; however, at the latest, the shipment will be placed in the facility no later than the day following pickup. When the

Contractor chooses to allow the personal property to remain on the truck until the next working day, Contractor shall be held liable for any loss or damage occurring during this time without regard to cause.

c. All personal property shall be stored to maintain a minimum of 2 inches of clearance from the floor to the undermost portion of the personal property. This elevation requirement will apply after 3 workdays handling-in period. Items waiting for the completion of handling-in services will be protected at all times. In addition, the property will not be stored in contact with exterior walls. Height of HHG stacked loose shall not exceed 10 feet. Extension ladders, TV antennas, swing sets, and similar items are excluded from this height requirement.

d. Shipping Containers. The contents of containerized shipments shall not be removed from containers when placed in storage. Shipment shall not be decontainerized prior to delivery to residence unless ordered by the ordering officer.

e. Storage Charges. Storage charges for outbound HHG and UB shipments shall not commence earlier than the sixth workday following date of ordering officer’s receipt of Contractor’s notification of completion of containerization service. Storage charges shall apply for each 30-day period or computed as a fraction thereof. Date of release from storage shall not be considered in computation of storage charges.

f. Storage charges for inbound HHG and UB shipments shall not commence earlier than the sixth workday following date of Contractor’s notification to the ordering officer of arrival of shipment. Storage charges shall apply for each 30-day period or computed as a fraction thereof. Date of release from storage shall not be considered in computation of storage charges.

g. When the Contractor cannot release a shipment from storage or deliver a shipment on the date requested by the ordering officer, the storage charges shall cease on the requested date instead of the actual date of release.

h. The Contractor is required to submit an on-hand report for all inbound shipments at the

Contractor’s facility (CDRL 0010, Report of Shipments on Hand). This report will list all inbound shipments in storage and/or waiting to be delivered. Negative reports are required.

The TO will identify when reports are to be submitted.

i. The ordering officer will follow Service guidelines when authorizing additional storage. The ordering officer will notify the Contractor of the expiration date of storage at government expense.

11. Facilities. Contractor’s facilities shall meet the guidelines outlined in PWS Appendix H.

a. Inspection of Contractor’s Facility. The Contractor’s facility will be initially inspected and approved by a representative from the contracting office or PPSO for compliance with this contract and the standards and regulations stated or referenced therein. Thereafter, inspections will be on a quarterly basis or, if deemed necessary, on a more frequent basis.

Inspections will be conducted using PWS Appendix H. If a facility is found to be unsatisfactory, it may be declared ineligible to receive further orders under the contract.

b. Upon receipt of contract award, the Contractor shall furnish to the Contracting Officer evidence of the kinds and minimum amounts of insurance covering work to be performed. The

Contractor shall maintain at least the minimum insurance coverage required as specified in the

Federal Acquisition Regulation Part 28.307-2 Liability, throughout the contract period for the following policies: (1) Workmen's Compensation Insurance: as required by the applicable GOJ laws and regulations; (2) Comprehensive General Liability Insurance minimum ¥50,000,000 for each warehouse, and Automobile Liability Insurance: Refer to Part III, para 10 below.

Each policy will contain an endorsement that cancellation or material change in the policy will not be effective until after a 30-day written notice is furnished to the Contracting Officer.

12. Cargo Insurance. The Contractor shall provide a certification of cargo insurance reflecting coverage on a continuous basis in at least the amount shown below to cover legal liability. The certificate will contain the statement that the insurance company will provide the designated installation Contracting

Officer with a 30-day written notice of any change, expiration, or cancellation of said policy. The underwriter of cargo insurance will have a rating of “A” or better in the current issue of Best’s

Insurance Guide. The certificate will be prepared with original signatures (scanned copy is acceptable) and provided to the designated installation Contracting Officer. The minimum cargo liability coverage required for both domestic and international shipments is $50,000.00 (or its equivalent yen amount) per shipment.

13. DPM Delivery, Unloading, and Unpacking.

a. The Contractor shall furnish the ordering officer with the written receiving notice not later than the next workday following the arrival of the inbound shipment. For each individual shipment, the receiving notice will contain the name and rank/grade of the property customer, TCMD number, number of pieces, size and type of containers, weight, and name of the carrier. When markings on the containers or documents indicate the shipment is of a deceased customer (BLUEBARK), this information will also be provided. The above information will be obtained from the available documents or containers.

b. Unloading and unpacking, upon delivery to the residence, will include the one-time laying of rugs, assembling of disassembled furniture, unservicing of appliances, and the one-time placement of furniture and like items in the room of the dwelling or a room designated by the property customer. The Contractor will not be required to move items after once placed as designated. Third-party services as set forth in Paragraph A.4.b(1) will be performed when authorized. Unless specifically waived by the customer, in writing, unpacking services will be performed. The Contractor will have the customer certify and sign on the inventory or delivery document that unpacking was or was not performed.

Unpacking Service. The unpacking service will consist of the unpacking, on a one-time basis, of all barrels, boxes, cartons, and crates. The contents will be placed in a room designated by the customer. This includes the placement of articles in cabinets, in cupboards, or on shelving in the kitchen when convenient and consistent with safety of the article(s) and proximity of the area desired by the customer, but does not include arranging the article(s) in a manner desired by the customer. The unpacking of and removing from the member’s/employee’s premises all empty containers, packing material, and other debris will be performed at the time the goods are delivered to the residence and to the member’s satisfaction.

14. Claims. The provision of full replacement value (FRV) to all DOD customers provides for the replacement, repair, or payment for the non-depreciated value of lost or damaged items. The liability limits for FRV are the greater of $5,000.00 per shipment or $4.00 times either the net weight of the HHG shipment or the gross weight of UB shipment, in pounds, not to exceed

$50,000.00. For detailed claims and liability procedures, see PWS Appendix F.

PART II – GOVERNMENT-FURNISHED PROPERTY AND SERVICES. None.

PART III – GENERAL REQUIREMENTS

1. Application. This PWS contains basic instructions for the packaging, packing, tagging, inventorying, containerization, marking, loading, storing, unpacking, and inspecting of

HHG and UB. This PWS applies to domestic and international DPM shipments. It does not apply to domestic or international Through Government Bill of Lading shipments.

2. Personnel. The Contractor shall furnish adequate supervision, labor, materials, supplies, and equipment necessary to perform all the services contemplated under this contract. The

Contractor’s office shall be staffed at all times during normal working hours with personnel authorized to book shipments and arrange for services under the contract. All Contractors shall have available an English reading, speaking, and writing employee at all times during packing and unpacking services.

a. Contract Manager. The Contractor will provide a contract manager (CM) who shall be responsible for the performance of the work performed under this PWS. The name of this individual and an alternate(s) who shall act the Contractor when the CM is absent will be designated in writing to the Contracting Officer. The CM and alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operations of the work performed under this contract. The CM and alternate will be individuals who are capable of conversing in, and comprehending English. The Contractor manager shall not be

Subcontractor's employees.

b. The CM or alternate will not perform any other services under this PWS without coordination through the COR. The CM shall report any problems that are encountered in any work locations to the Contracting Officer.

c. Remove of Contractor's Employees. The Contractor will utilize only experienced, responsible and capable employees in the performance of this contract. The Contracting Officer may require that the Contractor remove from the Government job any of his/her employees who endanger persons, or property, or whose continued employment under this contract is inconsistent with the interests of military security.

d. Third Country nationals (TCN). The Security Forces on each base control entry to the base.

Under certain circumstances, the TCN might be denied entry. It is the Contractor's responsibility to coordinate with Security Forces at each base when there is a question about particular circumstances.

e. The Contractor shall not employ any person who is an employee of the US Government and/or

Master Labor Contract employees if employing that person would create a conflict of interest or become in the violation of the Procurement Integrity Act (See Federal Acquisition

Regulation Section 3.104). Additionally, the Contractor shall not employ any person who is an employee of the Department of Defense, either military or civilian, unless such person seeks and receives approval according to DOD 5500.7-R, the Joint Ethics Regulation (JER).

3. Materials. The Contractor shall provide boxes, cartons, mattress cartons and/or plastic bags

(plastic bags may only be used when a direct delivery address has been designated by the origin

PPSO), tape, labels, packing lists, filler material, paper pads, wrapping, and any other type material to ensure proper packing for damage free movement. All materials will be new or in sound condition. All previous markings pertaining to any previous shipment will be completely obliterated and all material will be free of any substance injurious to the articles being packed and to the customer. New material will be used for packing mattresses, box springs, linens, bedding, and clothing. Plastic mattress shipping bags will not be used for shipments being consigned to long term NTS.

4. Documentation…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.