A4_Minimum_Requirement_A4-9.pdf

PDF 94 KB Posted

Attached to
Maintenance of Co-Generation Plant at Sagamihara Family Housing Area
Solicitation number
FA5209-17-T-0008
Issued by

About this file

Appendix A4-9

View the file

Other files

File Type Posted
FA5209-17-P-0029_PWS.pdf PDF
FA5209-17-P-0029.pdf PDF
Pre-Proposal_Conference_Minutes_17-T-0008.pdf PDF
A5_Replacement_Parts_A5-5.pdf PDF
A5_Replacement_Parts_A5-2.pdf PDF
A5_Replacement_Parts_A5-13.pdf PDF
A5_Replacement_Parts_A5-15.pdf PDF
A5_Replacement_Parts_A5-11.pdf PDF
A5_Replacement_Parts_A5-16.pdf PDF
A5_Replacement_Parts_A5-3.pdf PDF
A5_Replacement_Parts_A5-6.pdf PDF
A5_Replacement_Parts_A5-1.pdf PDF
A5_Replacement_Parts_A5-14.pdf PDF
A5_Replacement_Parts_A5-10.pdf PDF
A5_Replacement_Parts_A5-12.pdf PDF
A5_Replacement_Parts_A5-8.pdf PDF
A5_Replacement_Parts_A5-9.pdf PDF
Appendix_B.pdf PDF
A5_Replacement_Parts_A5-4.pdf PDF
A5_Replacement_Parts_A5-7.pdf PDF
A2_Plant_Equipment_A2-2.pdf PDF
A4_Minimum_Requirement_A4-3.pdf PDF
A4_Minimum_Requirement_A4-11.pdf PDF
A4_Minimum_Requirement_A4-5.pdf PDF
A4_Minimum_Requirement_A4-10.pdf PDF
PWS_(18_Oct_16).pdf PDF
A4_Minimum_Requirement_A4-1.pdf PDF
A4_Minimum_Requirement_A4-4.pdf PDF
FA5209-17-T-0008.pdf PDF
A1_Site_Map.pdf PDF
A4_Minimum_Requirement_A4-7.pdf PDF
A3_Proposed_Annual_Maintenance_Schedule.pdf PDF
A4_Minimum_Requirement_A4-2.pdf PDF
A2_Plant_Equipment_A2-4.pdf PDF
A4_Minimum_Requirement_A4-8.pdf PDF
A4_Minimum_Requirement_A4-6.pdf PDF
A4_Minimum_Requirement_A4-12.pdf PDF
A2_Plant_Equipment_A2-3.pdf PDF
A2_Plant_Equipment_A2-1.pdf PDF
A4_Minimum_Requirement_A4-13.pdf PDF
Notice_to_Offeror_(Revised).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A4. Minimum Required Maintenance - Detail Requirement

Large Small Equipment Item

Division Division Parts No. Maintenance Description Note/Remarks

(大区分) (小区分) (点検部分) (番号) (点検整備項目) A B C D E F (点検整備のポイント・注記)

Check Dirty Level

汚れ状況の点検、確認 Cleaning

清掃、点検 Leakage Test

漏洩確認 Replacement of Rubber Packing for Plates

プレートゴムパッキン交換

Check Water Level

水位の点検、確認 Operation Test for Pressure Relief Cap Tested By Cap Tester

圧力キャップの機能の点検 キャップテスタにてチェックする

Check Flexible Pipes on Cooling Water Piping Crack

冷却水タワミ管の点検 亀裂の有無 Replacemt of Flexible Pipes on Cooling Water Piping

冷却水タワミ管の交換 Inject Inhibitor, Replacement of Cooling Water Density: Up to 5%

防錆剤の投入・冷却水の交換 濃度5%以上保持(ヤンマーロイヤルフリーズ)

Replacement of Pump Bearings and Seals Motor Bearing will be replaced at 32,000 hours

ポンプ軸受、シールの交換 モータ軸受は32,000時間にて交換

Replacement of Pump Bearings and Seals Motor Bearing will be replaced at 32,000 hours

ポンプ軸受、シールの交換 モータ軸受は32,000時間にて交換

Replacement of Pump Bearings and Seals Motor Bearing will be replaced at 32,000 hours

ポンプ軸受、シールの交換 モータ軸受は32,000時間にて交換

Check and Operation Test

作動、点検 Overhaul and Cleaning

分解、清掃、点検

Replacement of Wax Elements Replacement of wax elements in temperature control valves on heat recovery

ワックスエレメントの交換 熱回収用温調弁ワックスエレメントも交換

Operation Test

作動確認

Cleaning of the water storage tank

下部水槽清掃 Replacement of the bearing box

ベアリングBOXの交換

Replacement of the V-belt

Vベルト交換

Cooling

Water

Systems

(冷却水系統)

Gas

Engine

(ガス機関)

O

O592

O

O

O

Electric Modulated 3-way

Valve

(三方電動弁)

571 O O

O O

O O

O O

O

Cooling Water

Temperature

Control Valve

(Wax Type)

(冷却水温調弁) (ワックス式)

570 O O O O

O O

Circulation Pump for

Cooling Tower

(冷却塔循環ポンプ)

Circulation of Cooling Water

(循環冷却水)

O O

Hot Water Pump for Jacket

(ジャケット温水ポンプ)

O

O O O

Cooling Water Pump

(クーラー冷却水ポンプ)

531 O

O

O

521 O O

O

Expansion Tank for

Cooling Water

(冷却水膨張タンク)

520 O O O O O O

O O

O O O

O O

511 O Extra

Heat Exchangers

(余剰熱交) (クーラー熱交)

510 O O O O

Maint Type

(点検種別)

Cooling Tower

(冷却塔)

A4-9

File details come from the government source that posted it. Updated .