A4_Minimum_Requirement_A4-10.pdf
PDF 107 KB Posted
- Solicitation number
- FA5209-17-T-0008
About this file
Appendix A4-10
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A4. Minimum Required Maintenance - Detail Requirement
Large Small Equipment Item
Division Division Parts No. Maintenance Description Note/Remarks
(大区分) (小区分) (点検部分) (番号) (点検整備項目) A B C D E F (点検整備のポイント・注記)
Drain Out from The Bypass Pipe of Starter
始動補助管のドレン抜き Overhaul and Cleaning
分解、清掃、点検
Overhaul and Cleaning
Maintenance period shall be determined by operational conditions.
分解、清掃、点検 使用環境条件により点検間隔が異なる
Overhaul and Cleaning
分解、清掃、点検
Replacement of O-ring
Oリング交換
Check and Tightness
点検、増締め Replacement, Hot Tight
交換,ホットタイト
Check and Tightness Check Rusting Condition
点検、増締め 発錆の有無確認
Clean Air Intake Filters
給気フィルタの洗浄 Replacement of Air Intake Filters
給気フィルタの交換 Replacement of Special Filters Outside Covers will be replaced at every 4,000 hours
特殊フィルターの交換 外筒のみ4,000時間毎交換
Overhaul and Cleaning
分解、清掃、点検 Check Corroding Conditions
腐食状況の点検 Check Expansion Joints Replacement at 32,000 hours
排気伸縮継手の点検 32,000時間にて交換
Measure Back-Pressure Usable Limit: Under 500mmAq
排気背圧の測定 使用限度500mmAq以下 Check Flexible Pipe Conditions Replacement by Conditions
排気タワミ管の損傷状況点検 状況により交換 Check Gas Leakage from Flange Connections
フランジ部のガス漏れ点検 Check Heat Insulations
断熱材の損傷状況点検
Overhaul, Cleaning and Measurement Protection for LO pipe is required.
分解、清掃、点検、計測 分解時、異物の侵入を防止する為にLO通路配管養生の事
Check and Replacement of Bearings
軸受部の点検、交換 Check and Replacement of Mechanical Seals
メカニカルシール部の点検、交換 Replacement
交換
Gas
Engine
(ガス機関)
Exhaust
Gas
Systems
(排気系統)
O O O
O
O O O
681 O O O
Super
Charger
Systems
(過給機系統
Super Charger
(過給機)
O O O
O O O
O O O
671 O O O
O O O
Muffler
(排気煙導)
Exhaust Manifold
(排気マニホールド)
O
O
O O
O
O
O O O
652 O O
651 O O O Air Intake Filters
(給気フィルター)
650 O O
O
Air Intake Duct
(給気ダクト) 640 O O O
631 O O
O O
Rubber Joint
Band Connection
(ゴム継手・バンド類)
630 O
O O O
621 O
O
Venturi Mixer
(ベンチュリミキサ) 610 O O O O O
601 O O
Air Intake
Systems
(給気系統)
Air Intake Manifold
(給気マニホールド)
600 O O
Explosion Protective
Valve
(防爆弁)
O O O O
Maint Type
(点検種別)
A4-10
File details come from the government source that posted it. Updated .