A4_Minimum_Requirement_A4-2.pdf

PDF 108 KB Posted

Attached to
Maintenance of Co-Generation Plant at Sagamihara Family Housing Area
Solicitation number
FA5209-17-T-0008
Issued by

About this file

Appendix A4-2

View the file

Other files

File Type Posted
FA5209-17-P-0029_PWS.pdf PDF
FA5209-17-P-0029.pdf PDF
Pre-Proposal_Conference_Minutes_17-T-0008.pdf PDF
A5_Replacement_Parts_A5-5.pdf PDF
A5_Replacement_Parts_A5-2.pdf PDF
A5_Replacement_Parts_A5-13.pdf PDF
A5_Replacement_Parts_A5-15.pdf PDF
A5_Replacement_Parts_A5-11.pdf PDF
A5_Replacement_Parts_A5-16.pdf PDF
A5_Replacement_Parts_A5-3.pdf PDF
A5_Replacement_Parts_A5-6.pdf PDF
A5_Replacement_Parts_A5-1.pdf PDF
A5_Replacement_Parts_A5-14.pdf PDF
A5_Replacement_Parts_A5-10.pdf PDF
A5_Replacement_Parts_A5-12.pdf PDF
A5_Replacement_Parts_A5-8.pdf PDF
A5_Replacement_Parts_A5-9.pdf PDF
Appendix_B.pdf PDF
A5_Replacement_Parts_A5-4.pdf PDF
A5_Replacement_Parts_A5-7.pdf PDF
A2_Plant_Equipment_A2-2.pdf PDF
A4_Minimum_Requirement_A4-3.pdf PDF
A4_Minimum_Requirement_A4-11.pdf PDF
A4_Minimum_Requirement_A4-5.pdf PDF
A4_Minimum_Requirement_A4-10.pdf PDF
PWS_(18_Oct_16).pdf PDF
A4_Minimum_Requirement_A4-1.pdf PDF
A4_Minimum_Requirement_A4-4.pdf PDF
A4_Minimum_Requirement_A4-9.pdf PDF
FA5209-17-T-0008.pdf PDF
A1_Site_Map.pdf PDF
A4_Minimum_Requirement_A4-7.pdf PDF
A3_Proposed_Annual_Maintenance_Schedule.pdf PDF
A2_Plant_Equipment_A2-4.pdf PDF
A4_Minimum_Requirement_A4-8.pdf PDF
A4_Minimum_Requirement_A4-6.pdf PDF
A4_Minimum_Requirement_A4-12.pdf PDF
A2_Plant_Equipment_A2-3.pdf PDF
A2_Plant_Equipment_A2-1.pdf PDF
A4_Minimum_Requirement_A4-13.pdf PDF
Notice_to_Offeror_(Revised).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A4. Minimum Required Maintenance - Detail Requirement

Large Small Equipment Item

Division Division Parts No. Maintenance Description Note/Remarks

(大区分) (小区分) (点検部分) (番号) (点検整備項目) A B C D E F (点検整備のポイント・注記)

Outside Visual Inspection Dirt, Deform, Damage, Rust

外観目視点検 汚損、損傷、発錆の有無 Leakage of Fuel Gas

燃料ガスの漏れ点検 Leakage of Cooling Water and/or Lubricant

冷却水、潤滑油の漏れ点検 Looseness of Each Bolts and Nuts Mounted Bolts & Nuts of Each Equipments and Systems

各部ボルト、ナットの緩み点検 機器・装置の取り付けボルト・ナット Ventilating Condition

換気状況の点検 Lighting Condition

照明機能の点検 Sound, Heat and Vibration

異常音、発熱、振動の点検 Open-Close Condition of Valves and Cocks

弁、コックの開閉状況点検 Operating Condition

運転状況の点検、確認 Ventilators Cleaning and Insulation Resistance Test

換気扇の点検 絶縁抵抗測定、洗浄は必要に応じて実施

Start, Stop, Operating Condition

始動、停止、運転確認 Test Operation of Safety Devices Repair Electric Contactors.

保護装置動作確認 接点メイク Operation Test Measurement of Operating Data Under Actual Load.

運転確認 実負荷運転にて運転データ取り

Overhaul Main Gas Filter, Clean Inside of Filter

主ガスフィルタ、開放、内部の清掃、点検 Replacement of The Filter in Sub Room

副室フィルタの交換

Overhaul and Clean Inside of Regulator

開放、内部の点検、清掃 Replacement of Diaphragm Every 32,000 operation hours

ダイヤフラムの交換 32,000時間毎

Leakage of The Inside, Operation Test

内部の漏れ、機能テスト Overhaul Valve Sheet, O-ring

開放、内部の点検 弁シート、Oリングなど Insulation Resistance Test for The Coil Measurement Should Be Done By The Equipment Level

電磁コイルの絶縁点検 単体で絶縁チェック

O

O

O

O

O

O

O

O

O

O

Maint Type

O

O

O

O

O

O

O

O

O

(点検種別)

O

O

O

O

O

O

O

Gas Regulator

(S201, 66Z, 95LD)

(ガスレギュレーター)

O

O

Synthetic

Maintenance

(総合点検)

Fuel

Gas

Supply

System

(燃料ガス 供給系統)

Gas

Piping

Units

(ガス 供給配管 ユニット)

Solenoid Valve

(電磁弁)

O

Filters

(フィルタ)

O General

(全体)

Operation Test

(総合試験)

O100

O

O

O

O O

O

O

O O

O

O

O

101 O O

O O

O

O

O O O O

O

O O O O

O O

O O OO

O

O

O O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

A4-2

File details come from the government source that posted it. Updated .