A4_Minimum_Requirement_A4-11.pdf

PDF 98 KB Posted

Attached to
Maintenance of Co-Generation Plant at Sagamihara Family Housing Area
Solicitation number
FA5209-17-T-0008
Issued by

About this file

Appendix A4-11

View the file

Other files

File Type Posted
FA5209-17-P-0029_PWS.pdf PDF
FA5209-17-P-0029.pdf PDF
Pre-Proposal_Conference_Minutes_17-T-0008.pdf PDF
A5_Replacement_Parts_A5-5.pdf PDF
A5_Replacement_Parts_A5-2.pdf PDF
A5_Replacement_Parts_A5-13.pdf PDF
A5_Replacement_Parts_A5-15.pdf PDF
A5_Replacement_Parts_A5-11.pdf PDF
A5_Replacement_Parts_A5-16.pdf PDF
A5_Replacement_Parts_A5-3.pdf PDF
A5_Replacement_Parts_A5-6.pdf PDF
A5_Replacement_Parts_A5-1.pdf PDF
A5_Replacement_Parts_A5-14.pdf PDF
A5_Replacement_Parts_A5-10.pdf PDF
A5_Replacement_Parts_A5-12.pdf PDF
A5_Replacement_Parts_A5-8.pdf PDF
A5_Replacement_Parts_A5-9.pdf PDF
Appendix_B.pdf PDF
A5_Replacement_Parts_A5-4.pdf PDF
A5_Replacement_Parts_A5-7.pdf PDF
A2_Plant_Equipment_A2-2.pdf PDF
A4_Minimum_Requirement_A4-3.pdf PDF
A4_Minimum_Requirement_A4-5.pdf PDF
A4_Minimum_Requirement_A4-10.pdf PDF
PWS_(18_Oct_16).pdf PDF
A4_Minimum_Requirement_A4-1.pdf PDF
A4_Minimum_Requirement_A4-4.pdf PDF
A4_Minimum_Requirement_A4-9.pdf PDF
FA5209-17-T-0008.pdf PDF
A1_Site_Map.pdf PDF
A4_Minimum_Requirement_A4-7.pdf PDF
A3_Proposed_Annual_Maintenance_Schedule.pdf PDF
A4_Minimum_Requirement_A4-2.pdf PDF
A2_Plant_Equipment_A2-4.pdf PDF
A4_Minimum_Requirement_A4-8.pdf PDF
A4_Minimum_Requirement_A4-6.pdf PDF
A4_Minimum_Requirement_A4-12.pdf PDF
A2_Plant_Equipment_A2-3.pdf PDF
A2_Plant_Equipment_A2-1.pdf PDF
A4_Minimum_Requirement_A4-13.pdf PDF
Notice_to_Offeror_(Revised).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A4. Minimum Required Maintenance - Detail Requirement

Large Small Equipment Item

Division Division Parts No. Maintenance Description Note/Remarks

(大区分) (小区分) (点検部分) (番号) (点検整備項目) A B C D E F (点検整備のポイント・注記)

Overhaul and Cleaning

Maintenance period shall be determined by operational conditions.

分解、清掃、点検 使用環境条件により点検間隔が異なる Pressure Test 4 kg/cm² 10 min

圧力テスト 4キロにて10分

Check Damage, Rust and Dirty Condition

外観全般、錆、損傷、汚れ等の点検 Insulation Resistance Test for Coils

巻線の絶縁抵抗測定

Grease Up

グリース補給 Check Sound and Heat Conditions Replacement of Bearing at 32,000 hours

ベアリングの過熱、異常音の有無確認 ベアリング交換は32,000時間

Check Damage, Rust and Dirty Condition

外観全般、錆、損傷、汚れ等の点検 Insulation Resistance Test for Coils

巻線の絶縁抵抗測定

Insulation Resistance Test for Coils

巻線の絶縁抵抗測定

Check Rust, Damage and Deform Conditions

錆、変形、損傷等の確認

Check Loose Terminals, Color Change by Heat and

Dirty Conditions of Main Electric Circuits

主回路配線の緩み、過熱変色、汚損等の確認 Check Loose Terminals, Color Change by Heat and

Dirty Conditions of Control Circuits and Accessories

Equipments

制御、補機回路配線の緩み、過熱変色、汚損等の確認

Operation Test

開閉操作点検

Check Loose Terminals, Color Change by Heat and

Dirty Conditions of Auxiliary Electric Circuits

付属回路配線の緩み、過熱変色、汚損等の確認 Check Operating Lamps

表示灯の確認

O

762 O O O O O O

O O

761 O Circuit

Breakers

(遮断器)

O

751 O O O

O O O

Wirings

(配線)

750 O O

General

(盤内外全般)

Electric

Circuit

Panel

For

Generator

(発電機盤)

O O O

O O

721 O O O

O O O

Direct Current

Dynamo

(励磁機)

720 O

O

Bearings

(軸受)

710 O O O O O O

O O O

701 O O

Electricity

Generator

(発電機)

Stator

(固定子)

Rotor

(回転子)

O O O

Air Cooler

(空気冷却器)

690 O O O

Generation

System

(発電装置)

Super

Charger

Systems

(過給機系統

Gas

Engine

(ガス機関)

Maint Type

(点検種別)

A4-11

File details come from the government source that posted it. Updated .