10.SolicitationAttach_4-c_SOW_for_ZNRE_15_1130.pdf

PDF 69 KB Posted

Attached to
Multiple-Award Roofing IDIQ Contracts at Yokota Air Base & Off-base Sites, Japan
Solicitation number
FA5209-16-R-0012
Issued by

About this file

Statement of Work for Seed Project

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ZNRE15-1130

SEED PROJECT

FOR

IDIQ ROOF CONTRACT

ZNRE15-1130

REPAIR ROOF, EXCHANGE

ADMINISTRATION,

B4018

STATEMENT OF WORK

DEPARTMENT OF THE AIR FORCE

374TH CIVIL ENGINEER SQUADRON

YOKOTA AIR BASE, JAPAN

DATE: 4 April 2016

Attachment No. 4-c for Solicitation No. FA5209-16-R-0012

2 /3

ROOFING (IDIQ) CONTRACT

STATEMENT OF WORK (SOW)

FOR

SEED PROJECT: ZNRE 15-1130

REPAIR ROOF, EXCHANGE ADMINISTRATION, B4018

YOKOTA AIR BASE, JAPAN

Date: 4 April 2016

I. GENERAL:

A. PRINCIPAL FEATURES OF WORK:

This Statement of work (SOW) provides, specifies and defines the summary of work to be undertaken by the Contractor within the Contract Specifications of the Multiple-Award Roofing (IDIQ) Contracts. The Contractor shall verify site conditions, provide all engineering support and conduct all field surveys, design and measurements as necessary to complete this project as specified in the SOW. The Contractor shall submit all the required documents according to the instructions specified here below. All performance under this project shall meet or exceed US Government and Japanese Construction Standards. The Contractor shall provide all professional labor, materials, equipment and any other necessary items to complete this project to ensure a complete and usable facility.

B. GENERAL SCOPE: Repairing and providing protective water proofing of the roof of bldg.

4018.

1. Background, Justifications and Overall Objective:

The building was constructed in 1976. The roof repair work was not performed in the past. The existing built-up roofing is beyond its useful service life.

2. Description of Scope of Work:

The contractor shall professionally, perform the following works:

a. Provide scaffolding with safety net for the roof work.

b. Remove antenna fixed to the roof with special care in the way that does not affect the activities of the staff inside the building.

c. Remove all weeds growing up through roof cracks and cleaning with high pressure water.

d. Apply cement mortar with resin mortar (minimum 30mm thickness) to smooth and slope on repaired concrete roof slab including parapet with concrete coping before applying waterproof membrane coating system.

e. Apply waterproof coating system (urethane type 3kg/square meters, primer, ventilation sheet, and protective paint finish).

f. Parapet with concrete coping and entrance eaves shall apply waterproof membrane coating system with reinforced fabric sheets.

g. Paint existing drain caps. Provide roof vents.

h. Provide other associated temporary work as necessary to protect interiors of facilities from adverse weather conditions during construction. Perform necessary repair, repaint, cutting the tree branches to have clear working area and protection to address damage to facilities resulting from negligence.

i. Reinstalling the Antenna in its position on the roof and repainting.

j. Final site work check and cleaning

3 /3

II. EXISTING CONDITIONS CONSIDERATION

The Contractor is responsible for correcting any unplanned / unapproved adverse impacts to the facility due to their work and for surveying the site before commencing the on-site work at no additional cost to the Government.

III. PERTINENT INFORMATION

A. Field measurements and pre construction preparation work: The Contractor shall perform field reconnaissance, visual surveys, and site investigations in accordance with requirements of this project.

During the site data collection, the Contractor shall record all existing conditions and obtain engineering information and data for the accomplishment of this project. All material sampling, testing, and removal shall be performed in accordance with the JEGS.

B. Statutory Cost Limitation: (IAW DFARS 252.236-7006): This project is not applicable to Statutory Cost Limitation.

IV. GENERAL INFORMATION

A. Performance Period: The performance period for construction will be 150 calendar days after Notice to Proceed (NTP) is issued. NTP will be issued within 30 days after contract award.

B. Working Hours: Follow the Contract Specifications for the basic multiple-award IDIQ contracts.

V. ATTACHMENT:

Project drawings

I. GENERAL:
A. PRINCIPAL FEATURES OF WORK:
This Statement of work (SOW) provides, specifies and defines the summary of work to be undertaken by the Contractor within the Contract Specifications of the Multiple-Award Roofing (IDIQ) Contracts. The Contractor shall verify site conditions, provide...

B. GENERAL SCOPE: Repairing and providing protective water proofing of the roof of bldg. 4018.

II. EXISTING CONDITIONS CONSIDERATION
The Contractor is responsible for correcting any unplanned / unapproved adverse impacts to the facility due to their work and for surveying the site before commencing the on-site work at no additional cost to the Government.
III. PERTINENT INFORMATION
IV. GENERAL INFORMATION
A. Performance Period: The performance period for construction will be 150 calendar days after Notice to Proceed (NTP) is issued. NTP will be issued within 30 days after contract award.
B. Working Hours: Follow the Contract Specifications for the basic multiple-award IDIQ contracts.
V. ATTACHMENT:
Project drawings

File details come from the government source that posted it. Updated .