Q_ _A.pdf
PDF 8 KB Posted
- Solicitation number
- FA5209-15-T-0047
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA520915P0076.pdf | ||
| Appendix_c.pdf | ||
| PWS_Amended_9_Mar_15.pdf | ||
| FA5209-15-T-0047.pdf | ||
| USAG-J_FORM_1795_Appendix_B.pdf | ||
| Boiler_List_Appendix_A.pdf | ||
| Pricing_Exhibit_for_Boiler_inspention.pdf | ||
| FA5209-15-T-0047.pdf | ||
| Boiler_Inspection_PWS_18_Feb.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. Section Paragraph Question Answer
Performance-base
Specification
Paragraph 1.1 "Inspection"
What inspection report do you use for the Unfired Pressure Vessels for the K type inspections.
There is a Unified Facilities Criteria (UFC 3-430-07, Operations and
Maintenance: Inspection and Certification of Boilers and Unfired Pressure
Vessels). Please utilize Figure E-2, page 53 of UFC 3-430-07, that is a form for Unfired Pressure Vessel Inspection Report.
(http://www.wbdg.org/ccb/DOD/UFC/ufc_3_430_07.pdf) for K type inspection. PWS para 1.2.1.2 will be revised by amendment 0001 accordingly.
Performance-base
Specification
Paragraph 1.1 "Inspection"
What Federal specification mandates the K type inspection. This inspection is not identified in the AR 420_01 specification.
In accordance with Unified Facilities Criteria (UFC 3-430-07) and the latest edition of the Code of Boiler and Pressure Vessel Inspectors (BPVI), Government developed the PWS including inspection types (A, C and K). We reviewed the aforementioned regulations, and determined that there is no need to change the type K inspection; therefore, no revision is made to the PWS.
Performance-base
Specification
Paragraph 1.1 "Inspection"
It is my recommendation that the UPV have internal inspections to see if the UPV is corroding from the inside out.
Your suggestion has been noted. However, we determined that there is no need to change the type K inspection; therefore, no revision is made to the PWS.
Question and Answer
9-Mar-15
FA5209-15-T-0047, Boiler and Unfired Pressure Vessel (UPV) Inspection Service at U.S. Army Garrison, Japan
File details come from the government source that posted it. Updated .