Appendix_c.pdf
PDF 70 KB Posted
- Solicitation number
- FA5209-15-T-0047
About this file
Appendix C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA520915P0076.pdf | ||
| PWS_Amended_9_Mar_15.pdf | ||
| FA5209-15-T-0047.pdf | ||
| Q_ _A.pdf | ||
| USAG-J_FORM_1795_Appendix_B.pdf | ||
| Boiler_List_Appendix_A.pdf | ||
| Pricing_Exhibit_for_Boiler_inspention.pdf | ||
| FA5209-15-T-0047.pdf | ||
| Boiler_Inspection_PWS_18_Feb.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFC 3-430-07
24 July 2003 including Change 4, 24 March 2014
\4\ Figure E-2 Unfired Pressure Vessel Inspection Report
/4/
EXP DATE
DATE OF INSPECTION
TYPE OF INSPECTION
A. ( ) INTERNAL ( ) EXTERNAL ( )
B. ( ) PRESSURE TEST
C. ( ) OPERATIONAL TEST
1. FROM: 12. CERTIFICATE ISSUED
2. TO: 13. BOILER INSPECTOR
3. MANUFACTURER: NAVFAC No. LICENSE No.
4. PROPERTY No. 5. MFG SERIAL No. 14. REASON FOR NOT ISSUING A
CERTIFICATE
6. BUILDING No. 7. YEAR BUILT
8. NATIONAL BOARD NUMBER 9. PRESSURE
DESIGN OPER. TEST
10. CAPACITY (CU. FT.) 11. UPV USE
SAFETY VALVES
15. MANUFACTURER 16. CAPACITY (CFM) 17. NUMBER OF VALVES
18 SIZE 19. SETTING (PSI) 20. VALVE CONDITION
21. INSPECTOR’S COMMENTS
22. ATTACHMENTS 23. SIGNATURE
FA5209-15-T-0047-Amendment 0001
Appendix C
| ufc_3_430_07 |
| Figure E-2 Unfired Pressure Vessel Inspection Report |
File details come from the government source that posted it. Updated .