Boiler_List_Appendix_A.pdf
PDF 534 KB Posted
- Solicitation number
- FA5209-15-T-0047
About this file
Appendix A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA520915P0076.pdf | ||
| Appendix_c.pdf | ||
| PWS_Amended_9_Mar_15.pdf | ||
| FA5209-15-T-0047.pdf | ||
| Q_ _A.pdf | ||
| USAG-J_FORM_1795_Appendix_B.pdf | ||
| Pricing_Exhibit_for_Boiler_inspention.pdf | ||
| FA5209-15-T-0047.pdf | ||
| Boiler_Inspection_PWS_18_Feb.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installation Bldg. No. UPV No. Maker Size of Unit Unit (Sq M) Inspection
Type
Zama 131 1 TAKUMA 7.70 MBTU 34.19 A & C
Zama 131 2 TAKUMA 7.70 MBTU 34.19 A & C
Zama 131 3 TAKUMA 7.70 MBTU 34.19 A & C
Zama 348 1 TAKUMA 17.96MBTU 92.9 A & C
Zama 348 2 TAKUMA 17.96MBTU 92.9 A & C
Zama 348 3 TAKUMA 17.96MBTU 92.9 A & C
Zama 348 4 MIURA 2.55MBTU 43.9 A & C
Zama 348 5 MIURA 2.55MBTU 43.9 A & C
Zama 1024 1 TAKUMA 7.10 MBTU 31.12 A & C
Zama 1024 2 TAKUMA 7.10 MBTU 31.12 A & C
S.F.H.A. 134 2 ISHIKAWAJIMA 16.70 MBTU 100.42 A & C
S.F.H.A. 134 3 ISHIKAWAJIMA 16.70 MBTU 100.42 A & C
S.G.D. 174-1 1 TAKUMA 21.00 MBTU 92.9 A & C
S.G.D. 174-1 2 TAKUMA 21.00 MBTU 92.9 A & C
S.G.D. 174-1 3 TAKUMA 10.50 MBTU 45.06 A & C
S.G.D. 174-1 4 TAKUMA 10.50 MBTU 45.06 A & C
S.G.D. 154-7 1 TAKUMA 7.88 MBTU 34.19 A & C
S.G.D. 154-7 2 TAKUMA 7.88 MBTU 34.19 A & C
Yokohama ND 210 1 I.H.I 6.40 MBTU 30.27 A & C
Yokohama ND 210 2 I.H.I 6.40 MBTU 30.27 A & C
Akasaka PC 1 1 MAEDA 1.41MBTU 6.7 A & C
Akasaka PC 1 2 MAEDA 1.41MBTU 6.7 A & C
Akasaka PC 8 1 MAEDA 1.79MBTU 8.3 A & C
Akasaka PC 8 2 MAEDA 1.79MBTU 8.3 A & C
Akasaka PC 8 3 MAEDA 1.79MBTU 8.3 A & C
Kawakami 2683 1 VERTICAL UPV 45.13 CuFt 1.2 K
Kawakami 2683 2 VERTICAL UPV 45.13 CuFt 1.2 K
Kawakami 2683 3 VERTICAL UPV 45.13 CuFt 1.2 K
Type A - Inspection for Boilers Each
A-1 Heating surface less than 40 square meters 14
A-2 Heating surface between 40 and 200 square meters 11
Type C - Inspection for Boilers
C-1 Heating surface less than 40 square meters 14
C-2 Heating surface between 40 and 200 square meters 11
Type K - Inspection for UPVs
K Volume between 0.5 and 5 cubic meters 3
APPENDIX A
BOILERS LIST
Estimated Number of Transportation PerYear
FA5209-15-T-0047
File details come from the government source that posted it. Updated .