Attachment_2_Addendum_No.2.pdf
PDF 72 KB Posted
- Solicitation number
- FA5209-15-R-0030
About this file
Attachment 2 Addendum No.2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0004.pdf | ||
| Amend_0003.pdf | ||
| FA5209-15-R-0030-0002.pdf | ||
| Attachment_1_Exhibits_A_thru_F.xlsx | XLSX spreadsheet | |
| Attachment_(Q A).pdf | ||
| Pre-proposal_conference_minutes.pdf | ||
| Question_ _Answer_No._1.pdf | ||
| FA5209-15-R-0030-0001.pdf | ||
| Attachment_1.pdf | ||
| Attachment_2.pdf | ||
| 01_Exhibits_A_thru_F.xlsx | XLSX spreadsheet | |
| 01_Exhibits_A_thru_F.xlsx | XLSX spreadsheet | |
| 06._Atch_5b_PP_Questionnaire.pdf | ||
| 07._Atch_5b_PP_Questionnaire_(use-will_not).doc | DOC document | |
| 09._OF17.pdf | ||
| 07._Atch_5b_PP_Questionnaire_(use-will_not).pdf | ||
| 05._Atch_3_Schedule_of_Material_Submittals.pdf | ||
| 08._Government_Policy_Letter.pdf | ||
| 03._Atch_1_Contract_Specification_20150513.pdf | ||
| 04._Atch_2_GFM_list_(SGFP_from_PDREP_May_27).pdf | ||
| 00._FA5209-15-R-0030.pdf | ||
| 01_Exhibit_as_of_20150916.xlsx | XLSX spreadsheet | |
| 06._Atch_5a_Cover_Ltr_for_Questinnaire_(Ltr_to_Contracting_Activity).docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
TO
CONTRACT SPECIFICATION
FOR
WHOLE HOUSE MAINTENANCE
(JH-00016-5J)
AT
CAMP ZAMA AND SAGAMIHARA FAMILY HOUSING AREA
20 OCT 2015
1. This addendum changes the original requirement specified at Section 1, paragraph
VI.T.2.a.(a) in the contract specification as follows:
“(a) Door and/or Window Replacement Work: A maximum of 30 calendar days will be allowable to replace a door/window considering manufacturing time.
Once a door/window is manufactured, the contractor shall schedule replacement work with COR. The Contractor shall complete a door/window replacement work (both removal and installation) within 1 working day. If plural doors/windows are ordered in a task order, the Contractor shall schedule replacement work with COR in advance to minimize inconvenience of resident. When a door(s)/window(s) is ordered with other items in a task order, performance time for the item(s) will be separately specified in a task order.”
(END OF ADDENDUM)