Attachment_2_Addendum_No.2.pdf

PDF 72 KB Posted

Attached to
IDIQ Contract for Whole House Maintenance at Camp Zama and Sagamihara Family Housing Area in Kanto Plain, Japan
Solicitation number
FA5209-15-R-0030
Issued by

About this file

Attachment 2 Addendum No.2

View the file

Other files

File Type Posted
Amendment_0004.pdf PDF
Amend_0003.pdf PDF
FA5209-15-R-0030-0002.pdf PDF
Attachment_1_Exhibits_A_thru_F.xlsx XLSX spreadsheet
Attachment_(Q A).pdf PDF
Pre-proposal_conference_minutes.pdf PDF
Question_ _Answer_No._1.pdf PDF
FA5209-15-R-0030-0001.pdf PDF
Attachment_1.pdf PDF
Attachment_2.pdf PDF
01_Exhibits_A_thru_F.xlsx XLSX spreadsheet
01_Exhibits_A_thru_F.xlsx XLSX spreadsheet
06._Atch_5b_PP_Questionnaire.pdf PDF
07._Atch_5b_PP_Questionnaire_(use-will_not).doc DOC document
09._OF17.pdf PDF
07._Atch_5b_PP_Questionnaire_(use-will_not).pdf PDF
05._Atch_3_Schedule_of_Material_Submittals.pdf PDF
08._Government_Policy_Letter.pdf PDF
03._Atch_1_Contract_Specification_20150513.pdf PDF
04._Atch_2_GFM_list_(SGFP_from_PDREP_May_27).pdf PDF
00._FA5209-15-R-0030.pdf PDF
01_Exhibit_as_of_20150916.xlsx XLSX spreadsheet
06._Atch_5a_Cover_Ltr_for_Questinnaire_(Ltr_to_Contracting_Activity).docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

TO

CONTRACT SPECIFICATION

FOR

WHOLE HOUSE MAINTENANCE

(JH-00016-5J)

AT

CAMP ZAMA AND SAGAMIHARA FAMILY HOUSING AREA

20 OCT 2015

1. This addendum changes the original requirement specified at Section 1, paragraph

VI.T.2.a.(a) in the contract specification as follows:

“(a) Door and/or Window Replacement Work: A maximum of 30 calendar days will be allowable to replace a door/window considering manufacturing time.

Once a door/window is manufactured, the contractor shall schedule replacement work with COR. The Contractor shall complete a door/window replacement work (both removal and installation) within 1 working day. If plural doors/windows are ordered in a task order, the Contractor shall schedule replacement work with COR in advance to minimize inconvenience of resident. When a door(s)/window(s) is ordered with other items in a task order, performance time for the item(s) will be separately specified in a task order.”

(END OF ADDENDUM)