4_Exhibits_4May15.pdf

PDF 168 KB Posted

Attached to
General Trucking Services Kanto and Northern Japan
Solicitation number
FA5209-15-R-0012
Issued by

About this file

4. Exhibits Pricing Schedule

View the file

Other files

File Type Posted
SF30_0001.pdf PDF
Minutes_2Jun15(Rev)_5Jun15.pdf PDF
5_Jun_15_Q-A.pdf PDF
2_Jun_15_Q-A_5Jun15(Rev).pdf PDF
3_Jun_15_Q-A.pdf PDF
2_Jun_15_Q-A.pdf PDF
Minutes_2Jun15.pdf PDF
6_Atch2_PPISurvey Cover_letter_4May15.pdf PDF
3_SF1449_4May15.pdf PDF
8_OF_17.pdf PDF
1_Goverment_Policy_4May15.pdf PDF
7_Atch3_Past_Performance_Information_4May15.pdf PDF
2_NOT_4May15.pdf PDF
5_Atch1_PWS_4May15.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits to Solicitiation No. FA5209-15-R-0012

Item No.

Estimated (Est.) Qty

Unit Unit Price

(U/P) Est. Amount

GROUP I:

All listed unit prices shall be per truck of general freight per one way.

A001 Between and

(52 km)

A001AA 2-Ton Truck 1 EA ¥ ¥ A001AB 3-Ton Truck 1 EA ¥ ¥ A001AC 4-Ton Truck 5 EA ¥ ¥ A001AD 8-Ton Truck 90 EA ¥ ¥ A001AE 10-Ton Truck 480 EA ¥ ¥ A001AF 12-Ton Truck 1 EA ¥ ¥

A002 Between and

(24 km)

A002AA 2-Ton Truck 1 EA ¥ ¥ A002AB 3-Ton Truck 1 EA ¥ ¥ A002AC 4-Ton Truck 1 EA ¥ ¥ A002AD 8-Ton Truck 270 EA ¥ ¥ A002AE 10-Ton Truck 300 EA ¥ ¥ A002AF 12-Ton Truck 1 EA ¥ ¥

A003 Between and

(20 km)

A003AA 2-Ton Truck 1 EA ¥ ¥ A003AB 3-Ton Truck 1 EA ¥ ¥ A003AC 4-Ton Truck 1 EA ¥ ¥ A003AD 8-Ton Truck 250 EA ¥ ¥ A003AE 10-Ton Truck 150 EA ¥ ¥ A003AF 12-Ton Truck 1 EA ¥ ¥

A004 From to

(12 km)

A004AA 2-Ton Truck 1 EA ¥ ¥ A004AB 3-Ton Truck 1 EA ¥ ¥ A004AC 4-Ton Truck 1 EA ¥ ¥ A004AD 8-Ton Truck 170 EA ¥ ¥ A004AE 10-Ton Truck 10 EA ¥ ¥ A004AF 12-Ton Truck 1 EA ¥ ¥

A005 From to

(10 km)

A005AA 2-Ton Truck 1 EA ¥ ¥ A005AB 3-Ton Truck 1 EA ¥ ¥ A005AC 4-Ton Truck 1 EA ¥ ¥ A005AD 8-Ton Truck 140 EA ¥ ¥ A005AE 10-Ton Truck 20 EA ¥ ¥ A005AF 12-Ton Truck 1 EA ¥ ¥

Sagami General Depot Sagamihara Family Housing Area, Kamitsuruma, Minami-ku, Sagamihara-shi, Kanagawa-ken

Camp Zama, Zama-shi, Kanagawa-ken

EXHIBIT A : PRICING SCHEDULE

(Distances are estimates only)

BASE YEAR: 12 months After Date of Contract (ADC) from the Effective Date in Block 3 of SF1449

Description

The Contractor shall perform the services in the areas defined under paragraph (para.) 1.1.1 of the Performance Work Statement (PWS).

Sagami General Depot, Kamiyabe, Chuo-ku, Sagamihara-shi, Kanagawa-ken

Yokota Air Base, Fussa-shi, Tokyo-to

US Fleet Activities, Yokosuka, Hon-cho, Yokosuka-shi, Kanagawa-ken

USN Air Facility, Atsugi, Ogami, Ayase-shi, Kanagawa-ken

Item No.

Est.

Qty

Unit U/P Est. Amount

A006 From to

(33 km)

A006AA 2-Ton Truck 1 EA ¥ ¥ A006AB 3-Ton Truck 1 EA ¥ ¥ A006AC 4-Ton Truck 95 EA ¥ ¥ A006AD 8-Ton Truck 7 EA ¥ ¥ A006AE 10-Ton Truck 1 EA ¥ ¥ A006AF 12-Ton Truck 1 EA ¥ ¥

A007 Between and

(32 km/35 km/38 km)

A007AA 2-Ton Truck 1 EA ¥ ¥ A007AB 3-Ton Truck 1 EA ¥ ¥ A007AC 4-Ton Truck 2 EA ¥ ¥ A007AD 8-Ton Truck 24 EA ¥ ¥ A007AE 10-Ton Truck 48 EA ¥ ¥ A007AF 12-Ton Truck 1 EA ¥ ¥

A008 Between USN Air Facility, Atsugi and

(38 km)

A008AA 2-Ton Truck 24 EA ¥ ¥ A008AB 3-Ton Truck 11 EA ¥ ¥ A008AC 4-Ton Truck 10 EA ¥ ¥ A008AD 8-Ton Truck 80 EA ¥ ¥ A008AE 10-Ton Truck 336 EA ¥ ¥ A008AF 12-Ton Truck 1 EA ¥ ¥

A009 Between and

(41 km)

A009AA 2-Ton Truck 35 EA ¥ ¥ A009AB 3-Ton Truck 7 EA ¥ ¥ A009AC 4-Ton Truck 7 EA ¥ ¥ A009AD 8-Ton Truck 60 EA ¥ ¥ A009AE 10-Ton Truck 5 EA ¥ ¥ A009AF 12-Ton Truck 4 EA ¥ ¥

A010 Between and

(75 km/71 km)

A010AA 2-Ton Truck 15 EA ¥ ¥ A010AB 3-Ton Truck 40 EA ¥ ¥ A010AC 4-Ton Truck 310 EA ¥ ¥ A010AD 8-Ton Truck 200 EA ¥ ¥ A010AE 10-Ton Truck 15 EA ¥ ¥ A010AF 12-Ton Truck 3 EA ¥ ¥

USN Air Facility, Atsugi Yokota Air Base

US Fleet Activities, Yokosuka

US Fleet Activities, Yokosuka or USN Ordnance Department, Hinata Futo, Urago-cho, Yokosuka-shi, Kanagawa-ken

Description

Yokohama North Dock, Mizuho-cho, Kanagawa-ku, Yokohama-shi, Kanagawa-ken or Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken or Minami-Honmoku Futo, Minami-Honmoku, Naka-ku, Yokohama-shi, USN Housing Facility, Negishi-Keibajo, Negishi-dai, Naka-ku, Yokohama-shi, Item No.

Est.

Qty

Unit U/P Est. Amount

A011 Between and

(29 km)

A011AA 2-Ton Truck 1 EA ¥ ¥ A011AB 3-Ton Truck 1 EA ¥ ¥ A011AC 4-Ton Truck 1 EA ¥ ¥ A011AD 8-Ton Truck 12 EA ¥ ¥ A011AE 10-Ton Truck 160 EA ¥ ¥ A011AF 12-Ton Truck 1 EA ¥ ¥

A012 Between and

(55 km)

A012AA 2-Ton Truck 1 EA ¥ ¥ A012AB 3-Ton Truck 1 EA ¥ ¥ A012AC 4-Ton Truck 2 EA ¥ ¥ A012AD 8-Ton Truck 9 EA ¥ ¥ A012AE 10-Ton Truck 140 EA ¥ ¥ A012AF 12-Ton Truck 2 EA ¥ ¥

A013 Between and

(25 km)

A013AA 2-Ton Truck 1 EA ¥ ¥ A013AB 3-Ton Truck 1 EA ¥ ¥ A013AC 4-Ton Truck 3 EA ¥ ¥ A013AD 8-Ton Truck 40 EA ¥ ¥ A013AE 10-Ton Truck 80 EA ¥ ¥ A013AF 12-Ton Truck 1 EA ¥ ¥

A014 Between and

(25 km/27 km/30 km)

A014AA 2-Ton Truck 1 EA ¥ ¥ A014AB 3-Ton Truck 1 EA ¥ ¥ A014AC 4-Ton Truck 3 EA ¥ ¥ A014AD 8-Ton Truck 60 EA ¥ ¥ A014AE 10-Ton Truck 90 EA ¥ ¥ A014AF 12-Ton Truck 1 EA ¥ ¥

A015 Between and

(89 km)

A015AA 2-Ton Truck 1 EA ¥ ¥ A015AB 3-Ton Truck 1 EA ¥ ¥ A015AC 4-Ton Truck 4 EA ¥ ¥ A015AD 8-Ton Truck 15 EA ¥ ¥ A015AE 10-Ton Truck 5 EA ¥ ¥ A015AF 12-Ton Truck 5 EA ¥ ¥

USN Ordnance Department, Hinata Futo Combined Arms Training Center, Camp Fuji, Nakabata, Gotemba-shi, Shizuoka-ken

Yokohama North Dock

Sagamihara Family Housing Area or Camp Zama or Camp Zama via Sagamihara Family Housing Area

Item No.

Est.

Qty

Unit U/P Est. Amount

A016 Between and

(79 km)

A016AA 2-Ton Truck 10 EA ¥ ¥ A016AB 3-Ton Truck 10 EA ¥ ¥ A016AC 4-Ton Truck 30 EA ¥ ¥ A016AD 8-Ton Truck 50 EA ¥ ¥ A016AE 10-Ton Truck 5 EA ¥ ¥ A016AF 12-Ton Truck 1 EA ¥ ¥

A017 thru A020 Reserved.

① ESTIMATED TOTAL AMOUNT FOR GROUP I: ¥

Description

US Fleet Activities, Yokosuka Yokohama Kaiun KK, Mizuho Branch Office, Oaza-Fujiyama-Kuriharashinden, Mizuho-machi, Nishi-Tama-gun, Tokyo-to

Item No.

Est.

Qty

Unit U/P Est. Amount

GROUP II: The Contractor shall perform the services in the area defined under paragraph 1.1.2 of the PWS.

All listed unit prices shall be per truck of general freight per one way.

A021 Between and

(740 km/738 km)

A021AA 4-Ton Truck 34 EA ¥ ¥ A021AB 8-Ton Truck 130 EA ¥ ¥ A021AC 10-Ton Truck 150 EA ¥ ¥ A021AD 12-Ton Truck 5 EA ¥ ¥

A022 Between and

A022AA 4-Ton Truck 15 EA ¥ ¥ A022AB 8-Ton Truck 70 EA ¥ ¥ A022AC 10-Ton Truck 1 EA ¥ ¥ A022AD 12-Ton Truck 1 EA ¥ ¥

A023 Between and

(731 km)

A023AA 4-Ton Truck 7 EA ¥ ¥ A023AB 8-Ton Truck 5 EA ¥ ¥ A023AC 10-Ton Truck 1 EA ¥ ¥ A023AD 12-Ton Truck 1 EA ¥ ¥

A024 Between and (731 km/733 km)

A024AA 4-Ton Truck 6 EA ¥ ¥ A024AB 8-Ton Truck 8 EA ¥ ¥ A024AC 10-Ton Truck 1 EA ¥ ¥ A024AD 12-Ton Truck 1 EA ¥ ¥

A025 From to

(769 km/781 km)

A025AA 4-Ton Truck 10 EA ¥ ¥ A025AB 8-Ton Truck 7 EA ¥ ¥ A025AC 10-Ton Truck 1 EA ¥ ¥ A025AD 12-Ton Truck 1 EA ¥ ¥

A026 Between and

(702 km)

A026AA 4-Ton Truck 7 EA ¥ ¥ A026AB 8-Ton Truck 14 EA ¥ ¥ A026AC 10-Ton Truck 1 EA ¥ ¥ A026AD 12-Ton Truck 1 EA ¥ ¥

A027 thru A030 Reserved.

② ESTIMATED TOTAL AMOUNT FOR GROUP II: ¥

Misawa Air Base

③ ESTIMATED TOTAL AMOUNT FOR ①GROUP I and ②GROUP II:

Sagami General Depot or Camp Zama

Yokohama Kaiun KK, Mizuho Branch Office

US Fleet Activities, Yokosuka via USN Air Facility, Atsugi or Yokota Air Base

(706 km)

Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken US Fleet Activities, Yokosuka or Yokosuka or USN Ordnance Department, Hinata Futo

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

A031 Accessorial Services, Cancellation Charges and Table Items for Group I and Group II:

A031AA All rates shall be increased by the percentage (%) for transporting of 6.05% EA % ¥ dangerous freight.

(Refer to paragraph 1.2.2.of the PWS)

A031AB All rates shall be increased by the percentage (%) for transporting of 0.30% EA % ¥ hazardous freight.

(Refer to paragraph 1.2.3.of the PWS)

A031AC All rates shall be increased by the percentage (%) for transporting of 0.35% EA % ¥

A031AD 26.00% EA % ¥

A031AE 0.15% EA % ¥

A031AF 0.15% EA % ¥

A031AG 0.15% EA % ¥

A031AH 0.02% EA % ¥

A031AJ 0.02% EA % ¥

A031AK 1 Half Hour ¥ ¥

A031AL 1 Half Hour ¥ ¥

A031AM 1 Half Hour ¥ ¥

A031AN 1 Half Hour ¥ ¥

A031AP 1 Half Hour ¥ ¥

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AJ)

Demurrage charge for each 2-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 3-ton truck per half hour.

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AH)

Shipment for Non-Appropriated Funds Activity: For shipment of freight to be paid by non-appropriated funds, the rates shall be increased by by the percentage (%) .

(Refer to paragraph 1.6.11.(h) of the PWS.)

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 10-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 4-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 8-ton truck per half hour.

All rates shall be increased by the percentage (%) for transportation of

All rates shall be increased by the percentage (%) for transportation of freight to/from the points in Tohoku/Hokuriku-Shin'etsu Areas during the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 26.00% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AD)

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AG)

All rates shall be increased by the percentage (%) for Midnight and Early Morning Charges.

(Refer to paragraph 1.6.11.(e) of the PWS.)

of freight to/from the points in Hokkaido Area during the winter period.

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AF)

All rates shall be increased by the percentage (%) for transportation of of freight within Hokkaido Area during the winter period.

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.30% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AB) sensitive freight.

(Refer to paragraph 1.2.4.of the PWS) Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.35% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AC)

Formula: Offered " ③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 6.05% (Estimated Qty) x Offer Rate (%) = Est. Amount(A031AA) of freight within Tohoku/Hokuriku-Shin'etsu Areas during the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AE)

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

A031AQ 1 Half Hour ¥ ¥

A031AR 1 EA ¥ ¥

A031AS 1 EA ¥ ¥

A031AT 1 EA ¥ ¥

A031AU 1 EA ¥ ¥

A031AV 1 EA ¥ ¥

A031AW 1 EA ¥ ¥

A031AX 1 EA ¥ ¥

A031AY 1.80% EA % ¥

A031AZ 1 EA ¥ ¥

A031BA

A031BB 11.00% EA ¥ ¥

④

④ Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1.

Formula: ④Offered ESTIMATED TOTAL AMOUNT of Table 1 x 11.00% (Estimated Qty) = Est. Amount (A031BB)

A031BC Distance Rate Table for transportation service of general in the areas 8.00% EA ¥ ¥ ⑤

⑤ Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2.

Formula: ⑤Offered ESTIMATED TOTAL AMOUNT of Table 2 x 8.00% (Estimated Qty) = Est. Amount (A031BC)

A031BD 0.80% EA ¥ ¥

⑥

⑥ Remarks: Fill in Table 3 first, then insert the estimated total amount for Table 3.

Formula: ⑥Offered ESTIMATED TOTAL AMOUNT of Table 3 x 0.80% (Estimated Qty) = Est. Amount (A031BD)

Hokkaido under Group II specified in paragraph 1.1.2 of the PWS.

See Table 3.

(Refer to paragraph 1.6.11.(g) of the PWS.)

⑦ ESTIMATED TOTAL AMOUNT FOR A031, Accessorial Services, Cancellation Charges and Table Items for Group I and Group II:

(Refer to paragraph 1.6.3/1.6.10.(c) of the PWS.)

defined in paragraph 1.1.2 (Group II) of the PWS NOT specified in Item A021 through A026. See Table 2.

(Refer to paragraph 1.6.3/1.6.10.(c) of the PWS.)

Ferry Route/Round Trip Ferry Charge for use in shipments to/from

ESTIMATED GRAND TOTAL AMOUNT FOR APENDIX A (③ + ⑦)

All rates shall be increased by the percentage (%) for Same Day

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 10-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 12-ton truck.

(Refer to paragraph 1.6.11.(b) of the PWS.)

Use of Pay Parking Lots and toll roads as directed by the TO. (Refer to paragraph 1.6.11.(d) of the PWS.)

Distance Rate Table for transportation service of general freight in the areas defined in paragraph 1.1.1 (Group I) of the PWS NOT specified in Item A001 through A016. See Table 1.

Ordering Service.

(Refer to paragraph 1.6.11.(a) of the PWS.)

Formula: Offered "① ESTIMATED TOTAL AMOUNT FOR (GROUP I)" x 1.80% (Estimated Qty) x Offer Rate (%) = Est. Amount (A031AY)

Retention of loaded truck per truck per night when specifically scheduled by the Transportation Officer.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 4-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 8-ton truck.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Cancellation charge for each 2-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 3-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation Charge for transportation of hazardous freight per certificate which the Contractor has obtained from GOJ authority.

(Refer to paragraph 1.6.12.(b) of the PWS.)

Demurrage charge for each 12-ton truck per half hour.

2-ton 3-ton 4-ton 8-ton *6-ton

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Note: * Refer to paragraph 1.6.3/1.6.10.(c) of the PWS.

④ Estimated Total Amount by 1 each for all items under Table 1, A031BB:

Every 20 km Over 200 km Up to 500 km

Every 50 km Over 500 km

Up through 10

Distance 10-ton 12-ton in Km (¥) (¥)

Table 1 (Price List for Item A031BB)

Distance Rate Table

One-Way Truck Size

4-ton 8-ton 10-ton

Every 50 km Over 500 km

Note: * Refer to paragraph 1.6.3./1.6.10. (c) of the PWS.

⑤ Estimated Total Amount by 1 each for all items under Table 2, A031BC:

Every 20 km Over 200 km Up to 500 km

One-Way Truck Size Distance 12-ton *6-ton

Table 2 (Price List for Item A031BC)

Distance Rate Table in Km (¥) (¥)

Up through 10

Between Aomori-ko and Hakodate-ko

Between Hachinohe-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Aomori-ko and Hakodate-ko

Between Aomori-ko and Hakodate-ko

¥⑥ Estimated Total Amount by 1 each for all items under Table 3, A031BD:

Ferry Route for Dangerous Freight Truck Size

4-ton 8-ton 10-ton 12-ton

Ferry Route for Hazardous/Sensitive Freight with Explosives

Truck Size 4-ton 8-ton 10-ton 12-ton

Note: * Refer to paragraph 1.6.11. of the PWS.

Ferry Route for Sensitive Freight without Explosives

Truck Size 4-ton 8-ton 10-ton 12-ton

Table 3 (Price List for Item A031BD)

Ferry Route/Round Trip Ferry Charge per Truck

Ferry Route for General Freight Truck Size

4-ton 8-ton 10-ton 12-ton

Item No.

Estimated (Est.) Qty

Unit Unit Price

(U/P) Est. Amount

GROUP I:

All listed unit prices shall be per truck of general freight per one way.

B001 Between and

(52 km)

B001AA 2-Ton Truck 1 EA ¥ ¥ B001AB 3-Ton Truck 1 EA ¥ ¥ B001AC 4-Ton Truck 5 EA ¥ ¥ B001AD 8-Ton Truck 90 EA ¥ ¥ B001AE 10-Ton Truck 480 EA ¥ ¥ B001AF 12-Ton Truck 1 EA ¥ ¥

B002 Between and

(24 km)

B002AA 2-Ton Truck 1 EA ¥ ¥ B002AB 3-Ton Truck 1 EA ¥ ¥ B002AC 4-Ton Truck 1 EA ¥ ¥ B002AD 8-Ton Truck 270 EA ¥ ¥ B002AE 10-Ton Truck 300 EA ¥ ¥ B002AF 12-Ton Truck 1 EA ¥ ¥

B003 Between and

(20 km)

B003AA 2-Ton Truck 1 EA ¥ ¥ B003AB 3-Ton Truck 1 EA ¥ ¥ B003AC 4-Ton Truck 1 EA ¥ ¥ B003AD 8-Ton Truck 250 EA ¥ ¥ B003AE 10-Ton Truck 150 EA ¥ ¥ B003AF 12-Ton Truck 1 EA ¥ ¥

B004 From to

(12 km)

B004AA 2-Ton Truck 1 EA ¥ ¥ B004AB 3-Ton Truck 1 EA ¥ ¥ B004AC 4-Ton Truck 1 EA ¥ ¥ B004AD 8-Ton Truck 170 EA ¥ ¥ B004AE 10-Ton Truck 10 EA ¥ ¥ B004AF 12-Ton Truck 1 EA ¥ ¥

B005 From to

(10 km)

B005AA 2-Ton Truck 1 EA ¥ ¥ B005AB 3-Ton Truck 1 EA ¥ ¥ B005AC 4-Ton Truck 1 EA ¥ ¥ B005AD 8-Ton Truck 140 EA ¥ ¥ B005AE 10-Ton Truck 20 EA ¥ ¥ B005AF 12-Ton Truck 1 EA ¥ ¥

EXHIBIT B : PRICING SCHEDULE

(Distances are estimates only)

Option One: 12 months

Description

The Contractor shall perform the services in the areas defined under paragraph (para.) 1.1.1 of the Performance Work Statement (PWS).

Item No.

Est.

Qty

Unit U/P Est. Amount

B006 From to

(33 km)

B006AA 2-Ton Truck 1 EA ¥ ¥ B006AB 3-Ton Truck 1 EA ¥ ¥ B006AC 4-Ton Truck 95 EA ¥ ¥ B006AD 8-Ton Truck 7 EA ¥ ¥ B006AE 10-Ton Truck 1 EA ¥ ¥ B006AF 12-Ton Truck 1 EA ¥ ¥

B007 Between and

(32 km/35 km/38 km)

B007AA 2-Ton Truck 1 EA ¥ ¥ B007AB 3-Ton Truck 1 EA ¥ ¥ B007AC 4-Ton Truck 2 EA ¥ ¥ B007AD 8-Ton Truck 24 EA ¥ ¥ B007AE 10-Ton Truck 48 EA ¥ ¥ B007AF 12-Ton Truck 1 EA ¥ ¥

B008 Between USN Air Facility, Atsugi and

(38 km)

B008AA 2-Ton Truck 24 EA ¥ ¥ B008AB 3-Ton Truck 11 EA ¥ ¥ B008AC 4-Ton Truck 10 EA ¥ ¥ B008AD 8-Ton Truck 80 EA ¥ ¥ B008AE 10-Ton Truck 336 EA ¥ ¥ B008AF 12-Ton Truck 1 EA ¥ ¥

B009 Between and

(41 km)

B009AA 2-Ton Truck 35 EA ¥ ¥ B009AB 3-Ton Truck 7 EA ¥ ¥ B009AC 4-Ton Truck 7 EA ¥ ¥ B009AD 8-Ton Truck 60 EA ¥ ¥ B009AE 10-Ton Truck 5 EA ¥ ¥ B009AF 12-Ton Truck 4 EA ¥ ¥

B010 Between and

(75 km/71 km)

B010AA 2-Ton Truck 15 EA ¥ ¥ B010AB 3-Ton Truck 40 EA ¥ ¥ B010AC 4-Ton Truck 310 EA ¥ ¥ B010AD 8-Ton Truck 200 EA ¥ ¥ B010AE 10-Ton Truck 15 EA ¥ ¥ B010AF 12-Ton Truck 3 EA ¥ ¥ ken or Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken

Item No.

Est.

Qty

Unit U/P Est. Amount

B011 Between and

(29 km)

B011AA 2-Ton Truck 1 EA ¥ ¥ B011AB 3-Ton Truck 1 EA ¥ ¥ B011AC 4-Ton Truck 1 EA ¥ ¥ B011AD 8-Ton Truck 12 EA ¥ ¥ B011AE 10-Ton Truck 160 EA ¥ ¥ B011AF 12-Ton Truck 1 EA ¥ ¥

B012 Between and

(55 km)

B012AA 2-Ton Truck 1 EA ¥ ¥ B012AB 3-Ton Truck 1 EA ¥ ¥ B012AC 4-Ton Truck 2 EA ¥ ¥ B012AD 8-Ton Truck 9 EA ¥ ¥ B012AE 10-Ton Truck 140 EA ¥ ¥ B012AF 12-Ton Truck 2 EA ¥ ¥

B013 Between and

(25 km)

B013AA 2-Ton Truck 1 EA ¥ ¥ B013AB 3-Ton Truck 1 EA ¥ ¥ B013AC 4-Ton Truck 3 EA ¥ ¥ B013AD 8-Ton Truck 40 EA ¥ ¥ B013AE 10-Ton Truck 80 EA ¥ ¥ B013AF 12-Ton Truck 1 EA ¥ ¥

B014 Between and

(25 km/27 km/30 km)

B014AA 2-Ton Truck 1 EA ¥ ¥ B014AB 3-Ton Truck 1 EA ¥ ¥ B014AC 4-Ton Truck 3 EA ¥ ¥ B014AD 8-Ton Truck 60 EA ¥ ¥ B014AE 10-Ton Truck 90 EA ¥ ¥ B014AF 12-Ton Truck 1 EA ¥ ¥

B015 Between and

(89 km)

B015AA 2-Ton Truck 1 EA ¥ ¥ B015AB 3-Ton Truck 1 EA ¥ ¥ B015AC 4-Ton Truck 4 EA ¥ ¥ B015AD 8-Ton Truck 15 EA ¥ ¥ B015AE 10-Ton Truck 5 EA ¥ ¥ B015AF 12-Ton Truck 5 EA ¥ ¥

Item No.

Est.

Qty

Unit U/P Est. Amount

B016 Between and

(79 km)

B016AA 2-Ton Truck 10 EA ¥ ¥ B016AB 3-Ton Truck 10 EA ¥ ¥ B016AC 4-Ton Truck 30 EA ¥ ¥ B016AD 8-Ton Truck 50 EA ¥ ¥ B016AE 10-Ton Truck 5 EA ¥ ¥ B016AF 12-Ton Truck 1 EA ¥ ¥

B017 thru B020 Reserved.

① ESTIMATED TOTAL AMOUNT FOR GROUP I: ¥

Description

US Fleet Activities, Yokosuka

Item No.

Est.

Qty

Unit U/P Est. Amount

GROUP II: The Contractor shall perform the services in the area defined under paragraph 1.1.2 of the PWS.

All listed unit prices shall be per truck of general freight per one way.

B021 Between and

(740 km/738 km)

B021AA 4-Ton Truck 34 EA ¥ ¥ B021AB 8-Ton Truck 130 EA ¥ ¥ B021AC 10-Ton Truck 150 EA ¥ ¥ B021AD 12-Ton Truck 5 EA ¥ ¥

B022 Between and

B022AA 4-Ton Truck 15 EA ¥ ¥ B022AB 8-Ton Truck 70 EA ¥ ¥ B022AC 10-Ton Truck 1 EA ¥ ¥ B022AD 12-Ton Truck 1 EA ¥ ¥

B023 Between and

(731 km)

B023AA 4-Ton Truck 7 EA ¥ ¥ B023AB 8-Ton Truck 5 EA ¥ ¥ B023AC 10-Ton Truck 1 EA ¥ ¥ B023AD 12-Ton Truck 1 EA ¥ ¥

B024 Between

(731 km/733 km)

B024AA 4-Ton Truck 6 EA ¥ ¥ B024AB 8-Ton Truck 8 EA ¥ ¥ B024AC 10-Ton Truck 1 EA ¥ ¥ B024AD 12-Ton Truck 1 EA ¥ ¥

B025 From to

(769 km/781 km)

B025AA 4-Ton Truck 10 EA ¥ ¥ B025AB 8-Ton Truck 7 EA ¥ ¥ B025AC 10-Ton Truck 1 EA ¥ ¥ B025AD 12-Ton Truck 1 EA ¥ ¥

B026 Between and

(702 km)

B026AA 4-Ton Truck 7 EA ¥ ¥ B026AB 8-Ton Truck 14 EA ¥ ¥ B026AC 10-Ton Truck 1 EA ¥ ¥ B026AD 12-Ton Truck 1 EA ¥ ¥

B027 thru B030 Reserved.

② ESTIMATED TOTAL AMOUNT FOR GROUP II: ¥

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

B031 Accessorial Services, Cancellation Charges and Table Items for Group I and Group II:

B031AA All rates shall be increased by the percentage (%) for transporting of 6.05% EA % ¥ dangerous freight.

(Refer to paragraph 1.2.2.of the PWS)

B031AB All rates shall be increased by the percentage (%) for transporting of 0.30% EA % ¥ hazardous freight.

(Refer to paragraph 1.2.3.of the PWS)

B031AC All rates shall be increased by the percentage (%) for transporting of 0.35% EA % ¥

B031AD 26.00% EA % ¥

B031AE 0.15% EA % ¥

B031AF 0.15% EA % ¥

B031AG 0.15% EA % ¥

B031AH 0.02% EA % ¥

B031AJ 0.02% EA % ¥

B031AK 1 Half Hour ¥ ¥

B031AL 1 Half Hour ¥ ¥

B031AM 1 Half Hour ¥ ¥

B031AN 1 Half Hour ¥ ¥

B031AP 1 Half Hour ¥ ¥

Formula: Offered " ③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 6.05% (Estimated Qty) x Offer Rate (%) = Est. Amount(B031AA)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.30% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AB) of freight within Tohoku/Hokuriku-Shin'etsu Areas during the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AE)

All rates shall be increased by the percentage (%) for transportation of of freight to/from the points in Hokkaido Area during the winter period.

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

sensitive freight.

(Refer to paragraph 1.2.4.of the PWS) Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.35% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AC)

All rates shall be increased by the percentage (%) for transportation of freight to/from the points in Tohoku/Hokuriku-Shin'etsu Areas during the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "②ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 26.00% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AD)

(Refer to paragraph 1.6.11.(e) of the PWS.)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AH)

Shipment for Non-Appropriated Funds Activity: For shipment of freight to be paid by non-appropriated funds, the rates shall be increased by by the percentage (%) .

(Refer to paragraph 1.6.11.(h) of the PWS.)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AJ)

Demurrage charge for each 2-ton truck per half hour.

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AF)

All rates shall be increased by the percentage (%) for transportation of of freight within Hokkaido Area during the winter period.

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

Formula: Offered "②ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AG)

All rates shall be increased by the percentage (%) for Midnight and Early Morning Charges.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 10-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 3-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 4-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 8-ton truck per half hour.

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

B031AQ 1 Half Hour ¥ ¥

B031AR 1 EA ¥ ¥

B031AS 1 EA ¥ ¥

B031AT 1 EA ¥ ¥

B031AU 1 EA ¥ ¥

B031AV 1 EA ¥ ¥

B031AW 1 EA ¥ ¥

B031AX 1 EA ¥ ¥

B031AY 1.80% EA % ¥

B031AZ 1 EA ¥ ¥

B031BA

B031BB 11.00% EA ¥ ¥

④

④ Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1.

Formula: ④Offered ESTIMATED TOTAL AMOUNT of Table 1 x 11.00% (Estimated Qty) = Est. Amount (B031BB)

B031BC Distance Rate Table for transportation service of general in the areas 8.00% EA ¥ ¥ ⑤

⑤ Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2.

Formula: ⑤Offered ESTIMATED TOTAL AMOUNT of Table 2 x 8.00% (Estimated Qty) = Est. Amount (B031BC)

B031BD 0.80% EA ¥ ¥

⑥

⑥ Remarks: Fill in Table 3 first, then insert the estimated total amount for Table 3.

Formula: ⑥Offered ESTIMATED TOTAL AMOUNT of Table 3 x 0.80% (Estimated Qty) = Est. Amount (B031BD)

Description

Demurrage charge for each 12-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Cancellation charge for each 2-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 10-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 12-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation Charge for transportation of hazardous freight per certificate

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 3-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 4-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 8-ton truck.

by the Transportation Officer.

(Refer to paragraph 1.6.11.(b) of the PWS.)

Use of Pay Parking Lots and toll roads as directed by the TO. (Refer to paragraph 1.6.11.(d) of the PWS.)

Distance Rate Table for transportation service of general freight in the areas defined in paragraph 1.1.1 (Group I) of the PWS NOT specified in Item B001 through B016. See Table 1.

which the Contractor has obtained from GOJ authority.

(Refer to paragraph 1.6.12.(b) of the PWS.)

All rates shall be increased by the percentage (%) for Same Day Ordering Service.

(Refer to paragraph 1.6.11.(a) of the PWS.)

Formula: Offered "① ESTIMATED TOTAL AMOUNT FOR (GROUP I)" x 1.80% (Estimated Qty) x Offer Rate (%) = Est. Amount (B031AY)

Retention of loaded truck per truck per night when specifically scheduled

ESTIMATED GRAND TOTAL AMOUNT FOR APPENDIX B (③ + ⑦):

B021 through B026. See Table 2.

(Refer to paragraph 1.6.3/1.6.10.(c) of the PWS.)

Ferry Route/Round Trip Ferry Charge for use in shipments to/from Hokkaido under Group II specified in paragraph 1.1.2 of the PWS.

See Table 3.

(Refer to paragraph 1.6.11.(g) of the PWS.)

⑦ ESTIMATED TOTAL AMOUNT FOR B031, Accessorial Services, 2-ton 3-ton 4-ton 8-ton *6-ton

Not Applicable

Not Applicable

Not Applicable

Table 1 (Price List for Item B031BB)

Distance Rate Table

One-Way Truck Size Distance 10-ton 12-ton in Km (¥) (¥)

Up through 10

Every 20 km Over 200 km Up to 500 km

Every 50 km Over 500 km

Note: * Refer to paragraph 1.6.3./1.6.10.(c) of the PWS.

④ Estimated Total Amount by 1 each for all items under Table 1, B031BB

4-ton 8-ton 10-ton in Km (¥) (¥)

Up through 10

Table 2 (Price List for Item B031BC)

Distance Rate Table

One-Way Truck Size Distance 12-ton *6-ton

Every 20 km Over 200 km Up to 500 km

Every 50 km Over 500 km

Note: * Refer to paragraph 1.6.3./1.6.10. (c) of the PWS.

⑤ Estimated Total Amount by 1 each for all items under Table 2, B031BC

Between Aomori-ko and Hakodate-ko

Between Hachinohe-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Aomori-ko and Hakodate-ko

Between Aomori-ko and Hakodate-ko

Table 3 (Price List for Item B031BD)

Ferry Route/Round Trip Ferry Charge per Truck

Ferry Route for General Freight Truck Size

4-ton 8-ton 10-ton 12-ton

Ferry Route for Sensitive Freight without Explosives

Truck Size 4-ton 8-ton 10-ton 12-ton

Ferry Route for Hazardous/Sensitive Freight with Explosives

Truck Size 4-ton 8-ton 10-ton 12-ton

Ferry Route for Dangerous Freight Truck Size

4-ton 8-ton 10-ton 12-ton

⑥ Estimated Total Amount by 1 each for all items under Table 3, B031BD Note: * Refer to paragraph 1.6.11. of the PWS.

Item No.

Estimated (Est.) Qty

Unit Unit Price

(U/P) Est. Amount

GROUP I:

All listed unit prices shall be per truck of general freight per one way.

C001 Between and

(52 km)

C001AA 2-Ton Truck 1 EA ¥ ¥ C001AB 3-Ton Truck 1 EA ¥ ¥ C001AC 4-Ton Truck 5 EA ¥ ¥ C001AD 8-Ton Truck 90 EA ¥ ¥ C001AE 10-Ton Truck 480 EA ¥ ¥ C001AF 12-Ton Truck 1 EA ¥ ¥

C002 Between and

(24 km)

C002AA 2-Ton Truck 1 EA ¥ ¥ C002AB 3-Ton Truck 1 EA ¥ ¥ C002AC 4-Ton Truck 1 EA ¥ ¥ C002AD 8-Ton Truck 270 EA ¥ ¥ C002AE 10-Ton Truck 300 EA ¥ ¥ C002AF 12-Ton Truck 1 EA ¥ ¥

C003 Between and

(20 km)

C003AA 2-Ton Truck 1 EA ¥ ¥ C003AB 3-Ton Truck 1 EA ¥ ¥ C003AC 4-Ton Truck 1 EA ¥ ¥ C003AD 8-Ton Truck 250 EA ¥ ¥ C003AE 10-Ton Truck 150 EA ¥ ¥ C003AF 12-Ton Truck 1 EA ¥ ¥

C004 From to

(12 km)

C004AA 2-Ton Truck 1 EA ¥ ¥ C004AB 3-Ton Truck 1 EA ¥ ¥ C004AC 4-Ton Truck 1 EA ¥ ¥ C004AD 8-Ton Truck 170 EA ¥ ¥ C004AE 10-Ton Truck 10 EA ¥ ¥ C004AF 12-Ton Truck 1 EA ¥ ¥

C005 From to

(10 km)

C005AA 2-Ton Truck 1 EA ¥ ¥ C005AB 3-Ton Truck 1 EA ¥ ¥ C005AC 4-Ton Truck 1 EA ¥ ¥ C005AD 8-Ton Truck 140 EA ¥ ¥ C005AE 10-Ton Truck 20 EA ¥ ¥ C005AF 12-Ton Truck 1 EA ¥ ¥

The Contractor shall perform the services in the areas defined under paragraph (para.) 1.1.1 of the Performance Work Statement (PWS).

EXHIBIT C : PRICING SCHEDULE

Option Two: 12 months

Description

Item No.

Est.

Qty

Unit U/P Est. Amount

C006 From to

(33 km)

C006AA 2-Ton Truck 1 EA ¥ ¥ C006AB 3-Ton Truck 1 EA ¥ ¥ C006AC 4-Ton Truck 95 EA ¥ ¥ C006AD 8-Ton Truck 7 EA ¥ ¥ C006AE 10-Ton Truck 1 EA ¥ ¥ C006AF 12-Ton Truck 1 EA ¥ ¥

CA007 Between and

(32 km/35 km/38 km)

C007AA 2-Ton Truck 1 EA ¥ ¥ C007AB 3-Ton Truck 1 EA ¥ ¥ C007AC 4-Ton Truck 2 EA ¥ ¥ C007AD 8-Ton Truck 24 EA ¥ ¥ C007AE 10-Ton Truck 48 EA ¥ ¥ C007AF 12-Ton Truck 1 EA ¥ ¥

C008 Between USN Air Facility, Atsugi and

(38 km)

C008AA 2-Ton Truck 24 EA ¥ ¥ C008AB 3-Ton Truck 11 EA ¥ ¥ C008AC 4-Ton Truck 10 EA ¥ ¥ C008AD 8-Ton Truck 80 EA ¥ ¥ C008AE 10-Ton Truck 336 EA ¥ ¥ C008AF 12-Ton Truck 1 EA ¥ ¥

C009 Between and

(41 km)

C009AA 2-Ton Truck 35 EA ¥ ¥ C009AB 3-Ton Truck 7 EA ¥ ¥ C009AC 4-Ton Truck 7 EA ¥ ¥ C009AD 8-Ton Truck 60 EA ¥ ¥ C009AE 10-Ton Truck 5 EA ¥ ¥ C009AF 12-Ton Truck 4 EA ¥ ¥

C010 Between and

(75 km/71 km)

C010AA 2-Ton Truck 15 EA ¥ ¥ C010AB 3-Ton Truck 40 EA ¥ ¥ C010AC 4-Ton Truck 310 EA ¥ ¥ C010AD 8-Ton Truck 200 EA ¥ ¥ C010AE 10-Ton Truck 15 EA ¥ ¥ C010AF 12-Ton Truck 3 EA ¥ ¥ ken or Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken

Item No.

Est.

Qty

Unit U/P Est. Amount

CA011 Between and

(29 km)

C011AA 2-Ton Truck 1 EA ¥ ¥ C011AB 3-Ton Truck 1 EA ¥ ¥ C011AC 4-Ton Truck 1 EA ¥ ¥ C011AD 8-Ton Truck 12 EA ¥ ¥ C011AE 10-Ton Truck 160 EA ¥ ¥ C011AF 12-Ton Truck 1 EA ¥ ¥

C012 Between and

(55 km)

C012AA 2-Ton Truck 1 EA ¥ ¥ C012AB 3-Ton Truck 1 EA ¥ ¥ C012AC 4-Ton Truck 2 EA ¥ ¥ C012AD 8-Ton Truck 9 EA ¥ ¥ C012AE 10-Ton Truck 140 EA ¥ ¥ C012AF 12-Ton Truck 2 EA ¥ ¥

C013 Between and

(25 km)

C013AA 2-Ton Truck 1 EA ¥ ¥ C013AB 3-Ton Truck 1 EA ¥ ¥ C013AC 4-Ton Truck 3 EA ¥ ¥ C013AD 8-Ton Truck 40 EA ¥ ¥ C013AE 10-Ton Truck 80 EA ¥ ¥ C013AF 12-Ton Truck 1 EA ¥ ¥

C014 Between and

(25 km/27 km/30 km)

C014AA 2-Ton Truck 1 EA ¥ ¥ C014AB 3-Ton Truck 1 EA ¥ ¥ C014AC 4-Ton Truck 3 EA ¥ ¥ C014AD 8-Ton Truck 60 EA ¥ ¥ C014AE 10-Ton Truck 90 EA ¥ ¥ C014AF 12-Ton Truck 1 EA ¥ ¥

C015 Between and

(89 km)

C015AA 2-Ton Truck 1 EA ¥ ¥ C015AB 3-Ton Truck 1 EA ¥ ¥ C015AC 4-Ton Truck 4 EA ¥ ¥ C015AD 8-Ton Truck 15 EA ¥ ¥ C015AE 10-Ton Truck 5 EA ¥ ¥ C015AF 12-Ton Truck 5 EA ¥ ¥

Item No.

Est.

Qty

Unit U/P Est. Amount

C016 Between and

(79 km)

C016AA 2-Ton Truck 10 EA ¥ ¥ C016AB 3-Ton Truck 10 EA ¥ ¥ C016AC 4-Ton Truck 30 EA ¥ ¥ C016AD 8-Ton Truck 50 EA ¥ ¥ C016AE 10-Ton Truck 5 EA ¥ ¥ C016AF 12-Ton Truck 1 EA ¥ ¥

C017 thru C020 Reserved.

① ESTIMATED TOTAL AMOUNT FOR GROUP I: ¥

Item No.

Est.

Qty

Unit U/P Est. Amount

GROUP II: The Contractor shall perform the services in the area defined under paragraph 1.1.2 of the PWS.

All listed unit prices shall be per truck of general freight per one way.

C021 Between and

(740 km/738 km)

C021AA 4-Ton Truck 34 EA ¥ ¥ C021AB 8-Ton Truck 130 EA ¥ ¥ C021AC 10-Ton Truck 150 EA ¥ ¥ C021AD 12-Ton Truck 5 EA ¥ ¥

C022 Between and

C022AA 4-Ton Truck 15 EA ¥ ¥ C022AB 8-Ton Truck 70 EA ¥ ¥ C022AC 10-Ton Truck 1 EA ¥ ¥ C022AD 12-Ton Truck 1 EA ¥ ¥

C023 Between and

(731 km)

C023AA 4-Ton Truck 7 EA ¥ ¥ C023AB 8-Ton Truck 5 EA ¥ ¥ C023AC 10-Ton Truck 1 EA ¥ ¥ C023AD 12-Ton Truck 1 EA ¥ ¥

C024 Between

(731 km/733 km)

C024AA 4-Ton Truck 6 EA ¥ ¥ C024AB 8-Ton Truck 8 EA ¥ ¥ C024AC 10-Ton Truck 1 EA ¥ ¥ C024AD 12-Ton Truck 1 EA ¥ ¥

C025 From to

(769 km/781 km)

C025AA 4-Ton Truck 10 EA ¥ ¥ C025AB 8-Ton Truck 7 EA ¥ ¥ C025AC 10-Ton Truck 1 EA ¥ ¥ C025AD 12-Ton Truck 1 EA ¥ ¥

C026 Between and

(702 km)

C026AA 4-Ton Truck 7 EA ¥ ¥ C026AB 8-Ton Truck 14 EA ¥ ¥ C026AC 10-Ton Truck 1 EA ¥ ¥ C026AD 12-Ton Truck 1 EA ¥ ¥

C027 thru C030 Reserved.

② ESTIMATED TOTAL AMOUNT FOR GROUP II: ¥

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

C031 Accessorial Services, Cancellation Charges and Table Items for Group I and Group II:

C031AA All rates shall be increased by the percentage (%) for transporting of 6.05% EA % ¥ dangerous freight.

(Refer to paragraph 1.2.2.of the PWS)

C031AB All rates shall be increased by the percentage (%) for transporting of 0.30% EA % ¥ hazardous freight.

(Refer to paragraph 1.2.3.of the PWS)

C031AC All rates shall be increased by the percentage (%) for transporting of 0.35% EA % ¥

C031AD 26.00% EA % ¥

C031AE 0.15% EA % ¥

C031AF 0.15% EA % ¥

C031AG 0.15% EA % ¥

C031AH 0.02% EA % ¥

C031AJ 0.02% EA % ¥

C031AK 1 Half Hour ¥ ¥

C031AL 1 Half Hour ¥ ¥

C031AM 1 Half Hour ¥ ¥

C031AN 1 Half Hour ¥ ¥

C031AP 1 Half Hour ¥ ¥

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.30% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AB)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.35% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AC)

All rates shall be increased by the percentage (%) for transportation of freight to/from the points in Tohoku/Hokuriku-Shin'etsu Areas during

Formula: Offered " ③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 6.05% (Estimated Qty) x Offer Rate (%) = Est. Amount(C031AA) of freight to/from the points in Hokkaido Area during the winter period.

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AF)

All rates shall be increased by the percentage (%) for transportation of of freight within Hokkaido Area during the winter period.

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AG)

All rates shall be increased by the percentage (%) for Midnight and the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 26.00% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AD)

All rates shall be increased by the percentage (%) for transportation of of freight within Tohoku/Hokuriku-Shin'etsu Areas during the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AE)

All rates shall be increased by the percentage (%) for transportation of

Demurrage charge for each 2-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 3-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 4-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Early Morning Charges.

(Refer to paragraph 1.6.11.(e) of the PWS.)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AH)

Shipment for Non-Appropriated Funds Activity: For shipment of freight to be paid by non-appropriated funds, the rates shall be increased by by the percentage (%) .

(Refer to paragraph 1.6.11.(h) of the PWS.)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AJ)

Demurrage charge for each 8-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 10-ton truck per half hour.

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

C031AQ 1 Half Hour ¥ ¥

C031AR 1 EA ¥ ¥

C031AS 1 EA ¥ ¥

C031AT 1 EA ¥ ¥

C031AU 1 EA ¥ ¥

C031AV 1 EA ¥ ¥

C031AW 1 EA ¥ ¥

C031AX 1 EA ¥ ¥

C031AY 1.80% EA % ¥

C031AZ 1 EA ¥ ¥

C031BA

C031BB 11.00% EA ¥ ¥

④

④Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1.

Formula: ④Offered ESTIMATED TOTAL AMOUNT of Table 1 x 11.00% (Estimated Qty) = Est. Amount (C031BB)

C031BC Distance Rate Table for transportation service of general in the areas 8.00% EA ¥ ¥ ⑤

⑤Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2.

Formula: ⑤Offered ESTIMATED TOTAL AMOUNT of Table 2 x 8.00% (Estimated Qty) = Est. Amount (C031BC)

C031BD 0.80% EA ¥ ¥

⑥

⑥Remarks: Fill in Table 3 first, then insert the estimated total amount for Table 3.

Formula: ⑥Offered ESTIMATED TOTAL AMOUNT of Table 3 x 0.80% (Estimated Qty) = Est. Amount (C031BD)

(Refer to paragraph 1.6.11.(c) of the PWS.)

Cancellation charge for each 2-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 3-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 4-ton truck.

Description

Demurrage charge for each 12-ton truck per half hour.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation Charge for transportation of hazardous freight per certificate which the Contractor has obtained from GOJ authority.

(Refer to paragraph 1.6.12.(b) of the PWS.)

All rates shall be increased by the percentage (%) for Same Day Ordering Service.

(Refer to paragraph 1.6.11.(a) of the PWS.)

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 8-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 10-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 12-ton truck.

C001 through C016. See Table 1.

C021 through C026. See Table 2.

(Refer to paragraph 1.6.3/1.6.10.(c) of the PWS.)

Ferry Route/Round Trip Ferry Charge for use in shipments to/from Hokkaido under Group II specified in paragraph 1.1.2 of the PWS.

Formula: Offered "① ESTIMATED TOTAL AMOUNT FOR (GROUP I)" x 1.80% (Estimated Qty) x Offer Rate (%) = Est. Amount (C031AY)

Retention of loaded truck per truck per night when specifically scheduled by the Transportation Officer.

(Refer to paragraph 1.6.11.(b) of the PWS.)

Use of Pay Parking Lots and toll roads as directed by the TO. (Refer to paragraph 1.6.11.(d) of the PWS.)

Distance Rate Table for transportation service of general freight in the areas defined in paragraph 1.1.1 (Group I) of the PWS NOT specified in Item

See Table 3.

(Refer to paragraph 1.6.11.(g) of the PWS.)

⑦ ESTIMATED TOTAL AMOUNT FOR C031, Accessorial Services, ESTIMATED GRAND TOTAL AMOUNT FOR APPENDIX C (③ + ⑦)

2-ton 3-ton 4-ton 8-ton *6-ton

Not Applicable

Not Applicable

Not Applicable

(Price List for Item C031BB)

Distance Rate Table

One-Way Truck Size Distance 10-ton 12-ton in Km (¥) (¥)

Up through 10

Every 20 km Over 200 km Up to 500 km

Every 50 km Over 500 km

Note: * Refer to paragraph 1.6.3./1.6.10.(c) of the PWS.

④ Estimated Total Amount by 1 each for all items under Table 1, C031BB

4-ton 8-ton 10-ton

Up through 10

Table 2 (Price List for Item C031BC)

Distance Rate Table

One-Way Truck Size Distance 12-ton *6-ton in Km (¥) (¥)

Every 20 km Over 200 km Up to 500 km

Every 50 km Over 500 km

⑤ Estimated Total Amount by 1 each for all items under Table 2, C031BC

Between Aomori-ko and Hakodate-ko

Between Hachinohe-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Aomori-ko and Hakodate-ko

Between Aomori-ko and Hakodate-ko

Ferry Route for General Freight Truck Size

4-ton 8-ton 10-ton 12-ton

Table 3 (Price List for Item C031BD)

Ferry Route/Round Trip Ferry Charge per Truck

Ferry Route for Sensitive Freight without Explosives

Truck Size 4-ton 8-ton 10-ton 12-ton

Ferry Route for Hazardous/Sensitive Freight with Explosives

Truck Size 4-ton 8-ton 10-ton 12-ton

Ferry Route for Dangerous Freight Truck Size

4-ton 8-ton 10-ton 12-ton

⑥ Estimated Total Amount by 1 each for all items under Table 3, C031BD

Item No.

Estimated (Est.) Qty

Unit Unit Price

(U/P) Est. Amount

GROUP I:

All listed unit prices shall be per truck of general freight per one way.

D001 Between and

(52 km)

D001AA 2-Ton Truck 1 EA ¥ ¥ D001AB 3-Ton Truck 1 EA ¥ ¥ D001AC 4-Ton Truck 5 EA ¥ ¥ D001AD 8-Ton Truck 90 EA ¥ ¥ D001AE 10-Ton Truck 480 EA ¥ ¥ D001AF 12-Ton Truck 1 EA ¥ ¥

D002 Between and

(24 km)

D002AA 2-Ton Truck 1 EA ¥ ¥ D002AB 3-Ton Truck 1 EA ¥ ¥ D002AC 4-Ton Truck 1 EA ¥ ¥ D002AD 8-Ton Truck 270 EA ¥ ¥ D002AE 10-Ton Truck 300 EA ¥ ¥ D002AF 12-Ton Truck 1 EA ¥ ¥

D003 Between and

(20 km)

D003AA 2-Ton Truck 1 EA ¥ ¥ D003AB 3-Ton Truck 1 EA ¥ ¥ D003AC 4-Ton Truck 1 EA ¥ ¥ D003AD 8-Ton Truck 250 EA ¥ ¥ D003AE 10-Ton Truck 150 EA ¥ ¥ D003AF 12-Ton Truck 1 EA ¥ ¥

D004 From to

(12 km)

D004AA 2-Ton Truck 1 EA ¥ ¥ D004AB 3-Ton Truck 1 EA ¥ ¥ D004AC 4-Ton Truck 1 EA ¥ ¥ D004AD 8-Ton Truck 170 EA ¥ ¥ D004AE 10-Ton Truck 10 EA ¥ ¥ D004AF 12-Ton Truck 1 EA ¥ ¥

D005 From to

(10 km)

D005AA 2-Ton Truck 1 EA ¥ ¥ D005AB 3-Ton Truck 1 EA ¥ ¥ D005AC 4-Ton Truck 1 EA ¥ ¥ D005AD 8-Ton Truck 140 EA ¥ ¥ D005AE 10-Ton Truck 20 EA ¥ ¥ D005AF 12-Ton Truck 1 EA ¥ ¥

The Contractor shall perform the services in the areas defined under paragraph (para.) 1.1.1 of the Performance Work Statement (PWS).

EXHIBIT D : PRICING SCHEDULE

Option Three: 12 months

Description

Item No.

Est.

Qty

Unit U/P Est. Amount

D006 From to

(33 km)

D006AA 2-Ton Truck 1 EA ¥ ¥ D006AB 3-Ton Truck 1 EA ¥ ¥ D006AC 4-Ton Truck 95 EA ¥ ¥ D006AD 8-Ton Truck 7 EA ¥ ¥ D006AE 10-Ton Truck 1 EA ¥ ¥ D006AF 12-Ton Truck 1 EA ¥ ¥

D007 Between and

(32 km/35 km/38 km)

D007AA 2-Ton Truck 1 EA ¥ ¥ D007AB 3-Ton Truck 1 EA ¥ ¥ D007AC 4-Ton Truck 2 EA ¥ ¥ D007AD 8-Ton Truck 24 EA ¥ ¥ D007AE 10-Ton Truck 48 EA ¥ ¥ D007AF 12-Ton Truck 1 EA ¥ ¥

D008 Between USN Air Facility, Atsugi and

(38 km)

D008AA 2-Ton Truck 24 EA ¥ ¥ D008AB 3-Ton Truck 11 EA ¥ ¥ D008AC 4-Ton Truck 10 EA ¥ ¥ D008AD 8-Ton Truck 80 EA ¥ ¥ D008AE 10-Ton Truck 336 EA ¥ ¥ D008AF 12-Ton Truck 1 EA ¥ ¥

D009 Between and

(41 km)

D009AA 2-Ton Truck 35 EA ¥ ¥ D009AB 3-Ton Truck 7 EA ¥ ¥ D009AC 4-Ton Truck 7 EA ¥ ¥ D009AD 8-Ton Truck 60 EA ¥ ¥ D009AE 10-Ton Truck 5 EA ¥ ¥ D009AF 12-Ton Truck 4 EA ¥ ¥

D010 Between and

(75 km/71 km)

D010AA 2-Ton Truck 15 EA ¥ ¥ D010AB 3-Ton Truck 40 EA ¥ ¥ D010AC 4-Ton Truck 310 EA ¥ ¥ D010AD 8-Ton Truck 200 EA ¥ ¥ D010AE 10-Ton Truck 15 EA ¥ ¥ D010AF 12-Ton Truck 3 EA ¥ ¥ ken or Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken

Item No.

Est.

Qty

Unit U/P Est. Amount

D011 Between and

(29 km)

D011AA 2-Ton Truck 1 EA ¥ ¥ D011AB 3-Ton Truck 1 EA ¥ ¥ D011AC 4-Ton Truck 1 EA ¥ ¥ D011AD 8-Ton Truck 12 EA ¥ ¥ D011AE 10-Ton Truck 160 EA ¥ ¥ D011AF 12-Ton Truck 1 EA ¥ ¥

D012 Between and

(55 km)

D012AA 2-Ton Truck 1 EA ¥ ¥ D012AB 3-Ton Truck 1 EA ¥ ¥ D012AC 4-Ton Truck 2 EA ¥ ¥ D012AD 8-Ton Truck 9 EA ¥ ¥ D012AE 10-Ton Truck 140 EA ¥ ¥ D012AF 12-Ton Truck 2 EA ¥ ¥

D013 Between and

(25 km)

D013AA 2-Ton Truck 1 EA ¥ ¥ D013AB 3-Ton Truck 1 EA ¥ ¥ D013AC 4-Ton Truck 3 EA ¥ ¥ D013AD 8-Ton Truck 40 EA ¥ ¥ D013AE 10-Ton Truck 80 EA ¥ ¥ D013AF 12-Ton Truck 1 EA ¥ ¥

D014 Between and

(25 km/27 km/30 km)

D014AA 2-Ton Truck 1 EA ¥ ¥ D014AB 3-Ton Truck 1 EA ¥ ¥ D014AC 4-Ton Truck 3 EA ¥ ¥ D014AD 8-Ton Truck 60 EA ¥ ¥ D014AE 10-Ton Truck 90 EA ¥ ¥ D014AF 12-Ton Truck 1 EA ¥ ¥

D015 Between and

(89 km)

D015AA 2-Ton Truck 1 EA ¥ ¥ D015AB 3-Ton Truck 1 EA ¥ ¥ D015AC 4-Ton Truck 4 EA ¥ ¥ D015AD 8-Ton Truck 15 EA ¥ ¥ D015AE 10-Ton Truck 5 EA ¥ ¥ D015AF 12-Ton Truck 5 EA ¥ ¥

Item No.

Est.

Qty

Unit U/P Est. Amount

D016 Between and

(79 km)

D016AA 2-Ton Truck 10 EA ¥ ¥ D016AB 3-Ton Truck 10 EA ¥ ¥ D016AC 4-Ton Truck 30 EA ¥ ¥ D016AD 8-Ton Truck 50 EA ¥ ¥ D016AE 10-Ton Truck 5 EA ¥ ¥ D016AF 12-Ton Truck 1 EA ¥ ¥

D017 thru D020 Reserved.

① ESTIMATED TOTAL AMOUNT FOR GROUP I: ¥

Item No.

Est.

Qty

Unit U/P Est. Amount

GROUP II: The Contractor shall perform the services in the area defined under paragraph 1.1.2 of the PWS.

All listed unit prices shall be per truck of general freight per one way.

D021 Between and

(740 km/738 km)

D021AA 4-Ton Truck 34 EA ¥ ¥ D021AB 8-Ton Truck 130 EA ¥ ¥ D021AC 10-Ton Truck 150 EA ¥ ¥ D021AD 12-Ton Truck 5 EA ¥ ¥

D022 Between and

D022AA 4-Ton Truck 15 EA ¥ ¥ D022AB 8-Ton Truck 70 EA ¥ ¥ D022AC 10-Ton Truck 1 EA ¥ ¥ D022AD 12-Ton Truck 1 EA ¥ ¥

D023 Between and

(731 km)

D023AA 4-Ton Truck 7 EA ¥ ¥ D023AB 8-Ton Truck 5 EA ¥ ¥ D023AC 10-Ton Truck 1 EA ¥ ¥ D023AD 12-Ton Truck 1 EA ¥ ¥

D024 Between

(731 km/733 km)

D024AA 4-Ton Truck 6 EA ¥ ¥ D024AB 8-Ton Truck 8 EA ¥ ¥ D024AC 10-Ton Truck 1 EA ¥ ¥ D024AD 12-Ton Truck 1 EA ¥ ¥

D025 From to

(769 km/781 km)

D025AA 4-Ton Truck 10 EA ¥ ¥ D025AB 8-Ton Truck 7 EA ¥ ¥ D025AC 10-Ton Truck 1 EA ¥ ¥ D025AD 12-Ton Truck 1 EA ¥ ¥

D026 Between and

(702 km)

D026AA 4-Ton Truck 7 EA ¥ ¥ D026AB 8-Ton Truck 14 EA ¥ ¥ D026AC 10-Ton Truck 1 EA ¥ ¥ D026AD 12-Ton Truck 1 EA ¥ ¥

D027 thru D030 Reserved.

② ESTIMATED TOTAL AMOUNT FOR GROUP II: ¥

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

D031 Accessorial Services, Cancellation Charges and Table Items for Group I and Group II:

D031AA All rates shall be increased by the percentage (%) for transporting of 6.05% EA % ¥ dangerous freight.

(Refer to paragraph 1.2.2.of the PWS)

D031AB All rates shall be increased by the percentage (%) for transporting of 0.30% EA % ¥ hazardous freight.

(Refer to paragraph 1.2.3.of the PWS)

D031AC All rates shall be increased by the percentage (%) for transporting of 0.35% EA % ¥

D031AD 26.00% EA % ¥

D031AE 0.15% EA % ¥

D031AF 0.15% EA % ¥

D031AG 0.15% EA % ¥

D031AH 0.02% EA % ¥

D031AJ 0.02% EA % ¥

D031AK 1 Half Hour ¥ ¥

D031AL 1 Half Hour ¥ ¥

D031AM 1 Half Hour ¥ ¥

D031AN 1 Half Hour ¥ ¥

D031AP 1 Half Hour ¥ ¥

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.30% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AB)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.35% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AC)

All rates shall be increased by the percentage (%) for transportation of

Formula: Offered " ③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 6.05% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AA)

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AF)

All rates shall be increased by the percentage (%) for transportation of of freight within Hokkaido Area during the winter period.

(Refer to paragraph 1.6.11.(f)(2) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AG)

All rates shall be increased by the percentage (%) for Midnight and the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 26.00% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AD)

All rates shall be increased by the percentage (%) for transportation of of freight within Tohoku/Hokuriku-Shin'etsu Areas during the winter period.

(Refer to paragraph 1.6.11.(f)(1) of the PWS.)

Formula: Offered "② ESTIMATED TOTAL AMOUNT FOR (GROUP II)" x 0.15% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AE)

All rates shall be increased by the percentage (%) for transportation of

Demurrage charge for each 2-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 3-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Demurrage charge for each 4-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Early Morning Charges.

(Refer to paragraph 1.6.11.(e) of the PWS.)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AH)

Shipment for Non-Appropriated Funds Activity: For shipment of freight to be paid by non-appropriated funds, the rates shall be increased by by the percentage (%) .

(Refer to paragraph 1.6.11.(h) of the PWS.)

Formula: Offered "③ ESTIMATED TOTAL AMOUNT FOR (GROUP I + II)" x 0.02% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AJ)

Demurrage charge for each 8-ton truck per half hour.

(Refer to paragraph 1.6.11.(c) of the PWS.)

Item No.

Est.

Qty

Unit U/P or

Percentage Est. Amount

D031AQ 1 Half Hour ¥ ¥

D031AR 1 EA ¥ ¥

D031AS 1 EA ¥ ¥

D031AT 1 EA ¥ ¥

D031AU 1 EA ¥ ¥

D031AV 1 EA ¥ ¥

D031AW 1 EA ¥ ¥

D031AX 1 EA ¥ ¥

D031AY 1.80% EA ¥

D031AZ 1 EA ¥ ¥

D031BA

D031BB 11.00% EA ¥ ¥

④

④ Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1.

Formula: ④Offered ESTIMATED TOTAL AMOUNT of Table 1 x 11.00% (Estimated Qty) = Est. Amount (D031BB)

D031BC Distance Rate Table for transportation service of general in the areas 8.00% EA ¥ ¥ ⑤

⑤ Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2.

Formula: ⑤Offered ESTIMATED TOTAL AMOUNT of Table 2 x 8.00% (Estimated Qty) = Est. Amount (D031BC)

D031BD 0.80% EA ¥ ¥

⑥

⑥ Remarks: Fill in Table 3 first, then insert the estimated total amount for Table 3.

Formula: ⑥Offered ESTIMATED TOTAL AMOUNT of Table 3 x 0.80% (Estimated Qty) = Est. Amount (D031BD)

(Refer to paragraph 1.6.11.(c) of the PWS.)

Cancellation charge for each 2-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 3-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 4-ton truck.

Description

Demurrage charge for each 12-ton truck per half hour.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation Charge for transportation of hazardous freight per certificate which the Contractor has obtained from GOJ authority.

(Refer to paragraph 1.6.12.(b) of the PWS.)

All rates shall be increased by the percentage (%) for Same Day Ordering Service.

(Refer to paragraph 1.6.11.(a) of the PWS.)

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 8-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 10-ton truck.

(Refer to paragraph 1.6.12.(a) of the PWS.)

Cancellation charge for each 12-ton truck.

D001 through D016. See Table 1.

D021 throughD026. See Table 2.

(Refer to paragraph 1.6.3/1.6.10.(c) of the PWS.)

Ferry Route/Round Trip Ferry Charge for use in shipments to/from Hokkaido under Group II specified in paragraph 1.1.2 of the PWS.

Formula: Offered "① ESTIMATED TOTAL AMOUNT FOR (GROUP I)" x 1.80% (Estimated Qty) x Offer Rate (%) = Est. Amount (D031AY)

Retention of loaded truck per truck per night when specifically scheduled by the Transportation Officer.

(Refer to paragraph 1.6.11.(b) of the PWS.)

Use of Pay Parking Lots and toll roads as directed by the TO. (Refer to paragraph 1.6.11.(d) of the PWS.)

Distance Rate Table for transportation service of general freight in the areas defined in paragraph 1.1.1 (Group I) of the PWS NOT specified in Item

See Table 3.

(Refer to paragraph 1.6.11.(g) of the PWS.)

⑦ ESTIMATED TOTAL AMOUNT FOR D031, Accessorial Services, ESTIMATED GRAND TOTAL AMOUNT FOR APPENDIX D (③ + ⑦)

2-ton 3-ton 4-ton 8-ton *6-ton

Not Applicable

Not Applicable

Not Applicable

(Price List for Item D031BB)

Distance Rate Table

One-Way Truck Size Distance 10-ton 12-ton in Km (¥) (¥)

Up through 10

Every 20 km Over 200 km Up to 500 km

Every…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .