Performance Plan.doc

DOC document 66 KB Posted

Attached to
Asbestos Surveys, Sampling and Abatement Services at Yokota Air Base and Remote Sites, Japan
Solicitation number
FA5209-10-R-0022
Issued by

About this file

Performance plan. Please replace the previous one. Contents is same except watermark.

View the file

Other files

File Type Posted
PWS amendment.doc DOC document
Exhibits —
Amendment 01.pdf PDF
Exhibits —
PWS.doc DOC document
Performance Plan.doc DOC document
Exhibits —
PP Questionnaire.doc DOC document
FA5209-10-R-0022.pdf PDF
PPI List.doc DOC document
PWS.doc DOC document
Notice to Offerors.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA5209-10-R-0022 Attachment 2

PERFORMANCE PLAN

FOR

ASBESTOS SURVEYS, SAMPLING AND ABATEMENT SERVICES AT YOKOTA AIR BASE AND REMOTE SITES, JAPAN Date: 1 JULY 2010 NOTE: THIS PERFORMANCE PLAN IS PROVIDED AS AN ATTACHMENT TO THE SOLICITATION FOR INFORMATIONAL PURPOSE ONLY. IT WILL NOT BECOME PART OF THE CONTRACT.

This Performance Plan (PP) has been developed as identified in Air Force Instruction (AFI) 63-124, Performance-based Services Acquisition (PBSA). The PP has been developed to evaluate contractor actions while implementing the Performance-based Work Statement (PWS). This plan will be used by the Quality Assurance Personnel (QAP) to ensure contractor compliance on Asbestos Abatement for Facilities on Yokota Air Base and Remote Sites Services contract. This plan prescribes the objective in having the services, the goals of the multi-functional team, team members and their roles and responsibilities, and how the multi-functional team will assess contractor performance and manage the contract to obtain efficiencies, improved performance, and cost savings throughout its life cycle.

1. OBJECTIVE.

The objective is that the contractor provides all management, tools, supplies, equipment, labor and transportation necessary to perform asbestos surveys, sampling, and abatement services at Yokota Air Base and Remote Sites, Tama Service Annex, Fuchu, Yuki, Tokorozawa, Owada and Momote, Japan in accordance with the PWS. In addition to the services described in the PWS, the contractor is expected to be a partner with the base community in continuously improving the quality of programs and services offered to customers. This PP is designed to provide the QAP with an effective and systematic method of monitoring contractor performance for each listed objective on the Services Summary (SS) in the PWS. This PP provides a systematic method to evaluate the services the contractor is required to furnish and not the details of how the contractor accomplishes the work. This PP is based on the premise that the contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government is quality assurance to ensure contract standards are achieved. The government will also rely on the contractor's existing or developed Quality Control System for ensuring contractual requirements are met. The contractor is required to develop and implement a comprehensive program of inspections and monitoring actions. The QAP is to be objective, fair, and consistent in evaluating the contractor’s performance against the standard.

2. GOALS OF THE MULTI-FUNCTIONAL TEAM

The government personnel listed in paragraph 3 below will participate in performance management of the contractor. The goals of this team are to manage this contract and to provide an avenue to collectively work together to create a strong working relationship between the using agency, contracting and the contractor and to provide the highest level of contract performance and customer service. Working together will reduce costs and improve contract performance. Contractor input shall be encouraged throughout the contract. Their roles and responsibilities are described in paragraph 3 below.

3. MULTI-FUNCTIONAL TEAM ROLES & RESPONSIBILITIES

The following government officials will participate in performance management of the contractor. Their roles and responsibilities are described as follows:

3.1. Quality Assurance Personnel (QAP):

3.1.1. Responsible for monitoring, assessing, recording and reporting on contractor compliance with the terms and conditions of the contract. A primary and alternate QAP will be appointed for this contract. The Functional Commander/Director (FC/FD) is the designating authority. QAP will have primary responsibility for completing quality assurance monitoring forms that will be used to document the inspection and evaluation of the contractor’s performance. The QAP will maintain surveillance documentation, notify the Contracting Officer of any significant performance deficiencies and recommend improvements to the PP and PWS throughout the life of the acquisition.

3.1.1.1. Assessment Schedule: The QAP will develop a surveillance schedule based on a schedule of asbestos abatement for each project. Computer generated or locally revised forms may be used based on the surveillance plan’s requirements. This schedule should indicate contract number, SS number (inspection items) and paragraph numbers of the PWS, and date of inspections. The checklist must be signed by the QAP and delegated authority. The surveillance schedule must be created upon the receipt of the performance schedule and shall be sent to the Contracting Officer. The schedule shall be marked “FOR OFFICIAL USE ONLY” and shall not be shown to the contractor.

3.1.1.2. Changes to the assessment schedule shall be posted promptly. Copies of the changed schedule shall be sent to the FD/FC and the Contracting Officer. The QAP shall document the reason(s) for changes of the assessment schedule, and maintain the documentation in the QAP files with the corresponding changed assessment schedule.

3.1.1.3. Surveillance: The QAP will conduct inspections of all SS items. The QAP may also receive feedback from customers and other government employees and pass them on to the Contractor’s Quality Control Inspection (QCI) for correction. Compilation of the surveillance for the month will be signed by the QAP. If discrepancies are found during surveillances, the Functional Commander/Director must sign surveillance documentation.

3.1.2. QAP is responsible for certifying receipt of the contractor’s services upon the completion of each work order project. The QAP must certify on each invoice, or may use a DD Form 250 or similar documents.

3.2. The Contracting Office: Overall responsibility for overseeing the contractor’s performance. The Contracting Officer will be responsible for monitoring of the contractor’s performance in the areas of contract compliance, contract administration, cost control, and property control; reviewing the QAP assessment of the contractor’s performance; and resolving all differences between the QAP and the Contractor’s disagreements. The Contracting Officer is the only person with the authority to direct the contractor in the performance of his duties under the contract and to make interpretations of and/or changes to the contract. The Contracting Officer will facilitate MFT meetings.

3.3. The Functional Commander/Director (FC/FD): Overall responsibility for developing the PWS and the PP to ensure mission requirements, are performance-based, foster innovation, and define metrics. The FC/FD will assign competent and capable functional experts and QAP(s) to the Multi-Functional Team. The FC/FD will also assign a primary and an alternate QAP and notify the Contracting Officer of any changes to this designation and any significant contractor deficiencies related to the performance of the contract. The FC/FD is responsible for identifying mission essential services and developing the necessary documents IAW DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crisis. The FC/FD is responsible for reviewing contractor’s performance documentation prepared by the QAP ensuring contract compliance.

3.4. The Contracting Squadron Commander: Serves as the business advisor to senior leadership i.e. wing commander and group commanders. Annually brief Senior Leadership on the health of Quality Assurance Program. Annually submits Management and Oversight of the Acquisition of Service Process (MOASP) reports to PACAF. Ensures that the MFT exercises acquisition authorities and responsibilities in accordance with the Federal Acquisition Regulation (FAR), Defense Federal Acquisition Regulation (DFARS), Air Force Federal Acquisition Regulation (AFFARS) and Air Force instructions. Responsible for developing and implementing acquisition strategies for services acquisitions; providing oversight of the MFT in planning, assessing contractor performance, and managing the acquisition throughout the life of the requirement; and ensuring personnel on the MFT receive the appropriate level of training to meet local needs.

3.5. The Quality Assurance Program Coordinator (QAPC): Develops, manages and implements the base Quality Assurance Program; supports the MFT in the development of contract requirements, ensuring requirements are clearly stated and enforceable; aids in development of the Service Summary (SS) and PP and provides training to all FC/FD, QAP(s) and others that interact with this contract as needed.

3.6. The Contract Administrator (CA): The focal point for issues regarding the contract; prepares and processes modifications to the contract; assists the Contracting Officer in ensuring contractor performance meets contract standards; records and transcribes minutes for meetings.

3.7. Others as needed: The MFT may include other organizations as deemed necessary.

4. PERFORMANCE ASSESSMENT.

4.1. The following Services Summary Guides reflect the performance evaluation required by the PWS.

SERVICES SUMMARY (SS) AND METHOD OF ASSESSMENT

Performance Objective
SOW Para
Performance Threshold
Methods
Contractor arrives to the job-site on time with all required equipment based on type of work (Emergency, Urgent or Routine)
1.2., 1.3., 1.4.
95% of the time of the time of the requirements or no more than 2 failures/deficiencies of the performance per month.
Periodic Inspections
Asbestos Abatement is completed in a timely manner consistent with the type of work (Emergency, Urgent, or Routine) and submittals
1.5
95% of the time of the time of the requirements or no more than 2 failures/deficiencies of the performance per month.
Periodic Inspections
All reports are accurate and forwarded on time
1.6.
100% of the time
100%

4.2. Assessment of SS Items: The QAP will perform inspections to ensure the Contractor compliance with the appropriate paragraphs of the PWS and will record the results of inspection, noting the date of inspection.

4.3. Assessment Documentation shall include as a minimum: the date, time, and location the assessment was conducted, results of the assessment (acceptable or unacceptable), PWS paragraph number referencing the requirement, a short description of the requirement being surveyed, applicable remarks, signature of QAP conducting the assessment. When QAP determine that contractor performance is unacceptable, the specific reason for the unacceptable performance shall be recorded on the QAP’s assessment documentation.

The methods of inspection are listed below.

4.4. Methods of Inspection: Periodic Inspection

4.4.1. Periodic Inspection:

Standard: Deficiencies shall not exceed the performance thresholds cited in the SS for each performance objective. The QAP shall notify the Contracting Officer for appropriate action in accordance with FAR 52.212-4, Contract Terms and Conditions - Commercial Items or the appropriate Inspection of Services clause, if any of the above service areas exceed the performance thresholds.

Procedures: The QAP shall inspect the performance objectives indicated in SS at least one time per month and indicate performance as acceptable or unacceptable. The surveillance documentation should outline the same items indicated on the QAP’s surveillance schedule. If during an inspection the QAP finds unacceptable service they will conduct an investigation to ascertain the validity and cause of the unacceptable service and notify the contractor’s contract manager of the findings. Based on the findings, the contract manager may be asked to re-perform. If the contract manager disagrees with the complaint and challenges the validity, the QAP will contact the Contracting Officer. The unacceptable condition will be recorded. Recurring deficiencies in excess of the performance thresholds listed in the SS are not permitted for any of the performance objectives listed in the SS. If a repeated unacceptable service is received indicating the same deficiency during the same service period, the QAP should contact the Contracting Officer for appropriate action.

4.4.2. 100% Inspection Standard: There are no deficiencies allowed for items requiring 100% inspection. The QAP shall notify the CO for appropriate action in accordance with FAR 52.212-4, Contract Terms and Conditions – Commercial Items or the appropriate Inspection of Services clause if there are any failures to perform.

Procedures: The QAP shall inspect each task immediately after completion of the task or by the due date, and record the results on his surveillance checklist as acceptable or unacceptable. The contract number, date, PWS paragraph and QAP’s signature will also be annotated on the form.

4.5. Assessment of Non-SS Items: All other tasks required under the PWS may be inspected on a random basis at a frequency determined by the FC/FD and the Contracting Officer.

4.6. Remedies for Non-Conformance: If inspections indicate unacceptable performance, the QAP will notify the contractor’s contract manager of the deficiencies for correction. The contractor shall be given 6 hours after notification to correct the unacceptable performance. If deficiencies are not corrected within the required time frame, the QAP should notify the Contracting Officer for action. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the Contracting Officer shall be notified for a final decision. When re-performance is not possible, contract price may be reduced to reflect the reduced value of the services performed.

5. PERFORMANCE MANAGEMENT.

5.1. Market Research: Market research will be used as a tool throughout the life of the contract to remain current with the most efficient and effective assessment methods and techniques of the commercial marketplace. As a minimum, market research will be conducted annually prior to exercising the option periods.

5.2. Multi-functional Team Meetings: The multi-functional team will manage the contract for the life of the contract. This team will form a partnership between the government and the contractor to ensure the best possible service is provided for the life of the contract. This team will meet upon exercising contract options.

5.2.1. All performance assessment documentation will be reviewed at these meetings. If performance improvement is necessary a plan of action will be created. The multi-functional team will continually review documentation and procedures to improve efficiency. If an MFT is required more often than annually, it will be scheduled by the Contracting Officer.

5.3. Quarterly QAP Performance Assessment: Contract Administrator (CA) will perform quarterly surveillances to ensure contract compliance and proper documentations of QAP files.

5.4. Contractor Performance Assessment Report System (CPARS): The QAP shall conduct, document, track, and analyze contractor performance via regularly scheduled assessments. The assessment results shall be maintained as Past Performance Information and utilized to prepare and support annual Contractor Performance Assessment Report System (CPARS) reporting. CPARS will be updated at least annually documenting contractor performance for this specific contract. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance. The Assessing Official Representative (AOR) will be the QAP, who will also prepare the CPAR document and obtain FC/FD signature as the Assessing Official (AO). The contractor will have input prior to this CPAR being finalized. The contractor will select their personnel to serve as Contractor Representatives (CR) to review and comment on the CPAR. The CPAR will be sent to the Reviewing Official (RO) if there is significant disagreement on the CPAR's ratings between the AO and the CR or if the AO chooses to revise the assessment as a result of the CR's comments. The AO is the Functional Commander/Director (FC/FD). The FC/FD’s signature shall not be delegated.

5.5. Quality Control (QC) Program: The contractor shall maintain and implement a Quality Control (QC) Program to ensure the contract services conform to the requirements of the PWS.

6. REVISIONS TO THIS PERFORMANCE PLAN (PP): Revisions to this PP are the joint responsibility of the FD/FC, Contracting Officer and QAP. The QAP reviews the PWS and PP annually and will provide proposed changes through the FC/FD to the MFT for review. This is a living document that can be changed at any time if the overall scope of the contract does not change.

File details come from the government source that posted it. Updated .