Exhibits
168 KB Posted
- Attached to
- Asbestos Surveys, Sampling and Abatement Services at Yokota Air Base and Remote Sites, Japan
- Solicitation number
- FA5209-10-R-0022
About this file
EXHIBIT A-E
Text of this file
Basic Period
| PRICE LIST | |||||
| Basic Period (1 Oct 10 thru 30 Sep 11) | |||||
| CLIN | DECSCRPTION | UNIT | QTY | UNIT PRICE | TOTAL |
| A001AA | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 320 | ||
| A001AB | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 50 | ||
| A001AC | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 15 | ||
| A001AD | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 15 | ||
| A001AE | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 150 | ||
| A001AF | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 125 | ||
| A001AG | SHEET PROTECTION (WEATHER) | SM | 275 | ||
| A001AH | CLEAN, HEPA VAC & WET WIPE | SM | 1,500 | ||
| A001AJ | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 60 | ||
| A001AK | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 40 | ||
| A001AL | INST/DEMO DECON CHAMBER | SM | 50 | ||
| A001AM | PROTECT, FLOORS, 6 MIL POLY | SM | 1,000 | ||
| A001AN | PROTECT, WALLS, 6 MIL POLY | SM | 1,000 | ||
| A001AP | PROTECT, CEILINGS, 6 MIL POLY | SM | 750 | ||
| A001AQ | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 400 | ||
| A001AR | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 400 | ||
| A001AS | DEMO, NON-ACM GWB | SM | 15 | ||
| A001AT | DEMO, NON-ACM SUSPENDED CEILING | SM | 15 | ||
| A001AU | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 15 | ||
| A001AV | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 15 | ||
| A001AW | DEMO, NON-ACM PARTITION, PLASTER | SM | 15 | ||
| A001AX | DEMO, NON-ACM PARTITION, GWB | SM | 10 | ||
| A001AY | DEMO, NON-ACM CARPET | SM | 100 | ||
| A001AZ | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| A001BA | DEMO, ACM BOILER/HEATER INSULATION | SM | 50 | ||
| A001BB | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 10 | ||
| A001BC | DEMO, ACM DUCT OR AHU INSULATION | SM | 10 | ||
| A001BD | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 10 | ||
| A001BE | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 10 | ||
| A001BF | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 10 | ||
| A001BG | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 10 | ||
| A001BH | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 15 | ||
| A001BJ | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 20 | ||
| A001BK | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 10 | ||
| A001BL | DEMO, ACM PIPE INSULATION, >400 mm | SM | 10 | ||
| A001BM | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 10 | ||
| A001BN | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 10 | ||
| A001BP | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 10 | ||
| A001BQ | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 10 | ||
| A001BR | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | SM | 10 | ||
| A001BS | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| A001BT | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 40 | ||
| A001BU | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| A001BV | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 15 | ||
| A001BW | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 10 | ||
| A001BX | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| A001BY | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 15 | ||
| A001BZ | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 20 | ||
| A001CA | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| A001CB | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| A001CC | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 30 | ||
| A001CD | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 35 | ||
| A001CE | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 35 | ||
| A001CF | DEMO, ACM CEILING SYSTEM, SOLID | SM | 90 | ||
| A001CG | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 60 | ||
| A001CH | DEMO, ACM FLOOR TILE/MASTIC | SM | 90 | ||
| A001CJ | DEMO, ACM CARPET/MASTIC | SM | 90 | ||
| A001CK | DEMO, ACM COVE BASE/MASTIC | LM | 90 | ||
| A001CL | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 15 | ||
| A001CM | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 15 | ||
| A001CN | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 80 | ||
| A001CP | DEMO, ACM SOIL | CM | 5 | ||
| A001CQ | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 30 | ||
| A001CR | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 30 | ||
| A001CS | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 20 | ||
| A001CT | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 20 | ||
| A001CU | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 100 | ||
| A001CV | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 40 | ||
| A001CW | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 80 | ||
| A001CX | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 10 | ||
| A001CY | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 10 | ||
| A001CZ | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 25 | ||
| A001DA | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 25 | ||
| A001DB | Demo, ACM Mortar (up to 30mm thickness) | EA | 25 | ||
| A001DC | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 30 | ||
| A001DD | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 30 | ||
| A001DE | Generator for electric hot water heater 3KVA 100/200V | EA | 30 | ||
| A001DF-A | Trip Charge--EMERGENCY UNDER ¥600,000 | EA | 10 | ||
| A001DF-B | Trip Charge--EMERGENCY ¥600,000-¥2,100,000 | EA | 3 | ||
| A001DF-C | Trip Charge--EMERGENCY ¥2,100,000 or MORE | EA | 1 | ||
| A001DG-A | Trip Charge--Urgent UNDER ¥600,000 | EA | 10 | ||
| A001DG-B | Trip Charge--Urgent ¥600,000-¥2,100,000 | EA | 3 | ||
| A001DG-C | Trip Charge--Urgent ¥2,100,000 or MORE | EA | 1 | ||
| A001DH | Assessment Fee | EA | 20 | ||
| Total Amount for Basic Period: | ¥0 | ||||
| Abbreviations: | |||||
| MH - Man Hour LF - Linear Foot | |||||
| SY - Square Yard EA - Each |
&C&"-,Bold"&16
EXHIBIT A
Option One
| PRICE LIST | |||||
| Option One (1 Oct 11 thru 30 Sep 12) | |||||
| CLIN | DECSCRPTION | UNIT | QTY | UNIT PRICE | TOTAL |
| B001AA | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 320 | ||
| B001AB | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 50 | ||
| B001AC | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 15 | ||
| B001AD | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 15 | ||
| B001AE | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 150 | ||
| B001AF | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 125 | ||
| B001AG | SHEET PROTECTION (WEATHER) | SM | 275 | ||
| B001AH | CLEAN, HEPA VAC & WET WIPE | SM | 1,500 | ||
| B001AJ | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 60 | ||
| B001AK | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 40 | ||
| B001AL | INST/DEMO DECON CHAMBER | SM | 50 | ||
| B001AM | PROTECT, FLOORS, 6 MIL POLY | SM | 1,000 | ||
| B001AN | PROTECT, WALLS, 6 MIL POLY | SM | 1,000 | ||
| B001AP | PROTECT, CEILINGS, 6 MIL POLY | SM | 750 | ||
| B001AQ | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 400 | ||
| B001AR | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 400 | ||
| B001AS | DEMO, NON-ACM GWB | SM | 15 | ||
| B001AT | DEMO, NON-ACM SUSPENDED CEILING | SM | 15 | ||
| B001AU | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 15 | ||
| B001AV | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 15 | ||
| B001AW | DEMO, NON-ACM PARTITION, PLASTER | SM | 15 | ||
| B001AX | DEMO, NON-ACM PARTITION, GWB | SM | 10 | ||
| B001AY | DEMO, NON-ACM CARPET | SM | 100 | ||
| B001AZ | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| B001BA | DEMO, ACM BOILER/HEATER INSULATION | SM | 50 | ||
| B001BB | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 10 | ||
| B001BC | DEMO, ACM DUCT OR AHU INSULATION | SM | 10 | ||
| B001BD | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 10 | ||
| B001BE | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 10 | ||
| B001BF | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 10 | ||
| B001BG | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 10 | ||
| B001BH | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 15 | ||
| B001BJ | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 20 | ||
| B001BK | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 10 | ||
| B001BL | DEMO, ACM PIPE INSULATION, >400 mm | SM | 10 | ||
| B001BM | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 10 | ||
| B001BN | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 10 | ||
| B001BP | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 10 | ||
| B001BQ | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 10 | ||
| B001BR | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | SM | 10 | ||
| B001BS | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| B001BT | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 40 | ||
| B001BU | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| B001BV | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 15 | ||
| B001BW | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 10 | ||
| B001BX | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| B001BY | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 15 | ||
| B001BZ | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 20 | ||
| B001CA | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| B001CB | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| B001CC | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 30 | ||
| B001CD | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 35 | ||
| B001CE | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 35 | ||
| B001CF | DEMO, ACM CEILING SYSTEM, SOLID | SM | 90 | ||
| B001CG | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 60 | ||
| B001CH | DEMO, ACM FLOOR TILE/MASTIC | SM | 90 | ||
| B001CJ | DEMO, ACM CARPET/MASTIC | SM | 90 | ||
| B001CK | DEMO, ACM COVE BASE/MASTIC | LM | 90 | ||
| B001CL | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 15 | ||
| B001CM | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 15 | ||
| B001CN | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 80 | ||
| B001CP | DEMO, ACM SOIL | CM | 5 | ||
| B001CQ | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 30 | ||
| B001CR | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 30 | ||
| B001CS | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 20 | ||
| B001CT | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 20 | ||
| B001CU | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 100 | ||
| B001CV | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 40 | ||
| B001CW | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 80 | ||
| B001CX | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 10 | ||
| B001CY | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 10 | ||
| B001CZ | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 25 | ||
| B001DA | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 25 | ||
| B001DB | Demo, ACM Mortar (up to 30mm thickness) | EA | 25 | ||
| B001DC | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 30 | ||
| B001DD | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 30 | ||
| B001DE | Generator for electric hot water heater 3KVA 100/200V | EA | 30 | ||
| B001DF-A | Trip Charge--EMERGENCY UNDER ¥600,000 | EA | 10 | ||
| B001DF-B | Trip Charge--EMERGENCY ¥600,000-¥2,100,000 | EA | 3 | ||
| B001DF-C | Trip Charge--EMERGENCY ¥2,100,000 or MORE | EA | 1 | ||
| B001DG-A | Trip Charge--Urgent UNDER ¥600,000 | EA | 10 | ||
| B001DG-B | Trip Charge--Urgent ¥600,000-¥2,100,000 | EA | 3 | ||
| B001DG-C | Trip Charge--Urgent ¥2,100,000 or MORE | EA | 1 | ||
| B001DH | Assessment Fee | EA | 20 | ||
| MH - Man Hour LF - Linear Foot | |||||
| SY - Square Yard EA - Each |
&C&"-,Bold"&16EXHIBIT B
Option Two
| PRICE LIST | |||||
| Option Two (1 Oct 12 thru 30 Sep 13) | |||||
| CLIN | DECSCRPTION | UNIT | QTY | UNIT PRICE | TOTAL |
| C001AA | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 320 | ||
| C001AB | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 50 | ||
| C001AC | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 15 | ||
| C001AD | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 15 | ||
| C001AE | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 150 | ||
| C001AF | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 125 | ||
| C001AG | SHEET PROTECTION (WEATHER) | SM | 275 | ||
| C001AH | CLEAN, HEPA VAC & WET WIPE | SM | 1,500 | ||
| C001AJ | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 60 | ||
| C001AK | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 40 | ||
| C001AL | INST/DEMO DECON CHAMBER | SM | 50 | ||
| C001AM | PROTECT, FLOORS, 6 MIL POLY | SM | 1,000 | ||
| C001AN | PROTECT, WALLS, 6 MIL POLY | SM | 1,000 | ||
| C001AP | PROTECT, CEILINGS, 6 MIL POLY | SM | 750 | ||
| C001AQ | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 400 | ||
| C001AR | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 400 | ||
| C001AS | DEMO, NON-ACM GWB | SM | 15 | ||
| C001AT | DEMO, NON-ACM SUSPENDED CEILING | SM | 15 | ||
| C001AU | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 15 | ||
| C001AV | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 15 | ||
| C001AW | DEMO, NON-ACM PARTITION, PLASTER | SM | 15 | ||
| C001AX | DEMO, NON-ACM PARTITION, GWB | SM | 10 | ||
| C001AY | DEMO, NON-ACM CARPET | SM | 100 | ||
| C001AZ | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| C001BA | DEMO, ACM BOILER/HEATER INSULATION | SM | 50 | ||
| C001BB | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 10 | ||
| C001BC | DEMO, ACM DUCT OR AHU INSULATION | SM | 10 | ||
| C001BD | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 10 | ||
| C001BE | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 10 | ||
| C001BF | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 10 | ||
| C001BG | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 10 | ||
| C001BH | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 15 | ||
| C001BJ | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 20 | ||
| C001BK | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 10 | ||
| C001BL | DEMO, ACM PIPE INSULATION, >400 mm | SM | 10 | ||
| C001BM | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 10 | ||
| C001BN | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 10 | ||
| C001BP | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 10 | ||
| C001BQ | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 10 | ||
| C001BR | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | SM | 10 | ||
| C001BS | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| C001BT | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 40 | ||
| C001BU | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| C001BV | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 15 | ||
| C001BW | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 10 | ||
| C001BX | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| C001BY | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 15 | ||
| C001BZ | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 20 | ||
| C001CA | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| C001CB | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| C001CC | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 30 | ||
| C001CD | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 35 | ||
| C001CE | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 35 | ||
| C001CF | DEMO, ACM CEILING SYSTEM, SOLID | SM | 90 | ||
| C001CG | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 60 | ||
| C001CH | DEMO, ACM FLOOR TILE/MASTIC | SM | 90 | ||
| C001CJ | DEMO, ACM CARPET/MASTIC | SM | 90 | ||
| C001CK | DEMO, ACM COVE BASE/MASTIC | LM | 90 | ||
| C001CL | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 15 | ||
| C001CM | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 15 | ||
| C001CN | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 80 | ||
| C001CP | DEMO, ACM SOIL | CM | 5 | ||
| C001CQ | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 30 | ||
| C001CR | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 30 | ||
| C001CS | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 20 | ||
| C001CT | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 20 | ||
| C001CU | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 100 | ||
| C001CV | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 40 | ||
| C001CW | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 80 | ||
| C001CX | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 10 | ||
| C001CYC | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 10 | ||
| C001CZ | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 25 | ||
| C001DA | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 25 | ||
| C001DB | Demo, ACM Mortar (up to 30mm thickness) | EA | 25 | ||
| C001DC | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 30 | ||
| C001DD | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 30 | ||
| C001DE | Generator for electric hot water heater 3KVA 100/200V | EA | 30 | ||
| C001DF-A | Trip Charge--EMERGENCY UNDER ¥600,000 | EA | 10 | ||
| C001DF-B | Trip Charge--EMERGENCY ¥600,000-¥2,100,000 | EA | 3 | ||
| C001DF-C | Trip Charge--EMERGENCY ¥2,100,000 or MORE | EA | 1 | ||
| C001DG-A | Trip Charge--Urgent UNDER ¥600,000 | EA | 10 | ||
| C001DG-B | Trip Charge--Urgent ¥600,000-¥2,100,000 | EA | 3 | ||
| C001DG-C | Trip Charge--Urgent ¥2,100,000 or MORE | EA | 1 | ||
| C001DH | Assessment Fee | EA | 20 | ||
| MH - Man Hour LF - Linear Foot | |||||
| SY - Square Yard EA - Each |
&C &"-,Bold"&16EXHIBIT C
Option Three
| PRICE LIST | |||||
| Option Three (1 Oct 13 thru 30 Sep 14) | |||||
| CLIN | DECSCRPTION | UNIT | QTY | UNIT PRICE | TOTAL |
| D001AA | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 320 | ||
| D001AB | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 50 | ||
| D001AC | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 15 | ||
| D001AD | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 15 | ||
| D001AE | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 150 | ||
| D001AF | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 125 | ||
| D001AG | SHEET PROTECTION (WEATHER) | SM | 275 | ||
| D001AH | CLEAN, HEPA VAC & WET WIPE | SM | 1,500 | ||
| D001AJ | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 60 | ||
| D001AK | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 40 | ||
| D001AL | INST/DEMO DECON CHAMBER | SM | 50 | ||
| D001AM | PROTECT, FLOORS, 6 MIL POLY | SM | 1,000 | ||
| D001AN | PROTECT, WALLS, 6 MIL POLY | SM | 1,000 | ||
| D001AP | PROTECT, CEILINGS, 6 MIL POLY | SM | 750 | ||
| D001AQ | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 400 | ||
| D001AR | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 400 | ||
| D001AS | DEMO, NON-ACM GWB | SM | 15 | ||
| D001AT | DEMO, NON-ACM SUSPENDED CEILING | SM | 15 | ||
| D001AU | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 15 | ||
| D001AV | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 15 | ||
| D001AW | DEMO, NON-ACM PARTITION, PLASTER | SM | 15 | ||
| D001AX | DEMO, NON-ACM PARTITION, GWB | SM | 10 | ||
| D001AY | DEMO, NON-ACM CARPET | SM | 100 | ||
| D001AZ | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| D001BA | DEMO, ACM BOILER/HEATER INSULATION | SM | 50 | ||
| D001BB | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 10 | ||
| D001BC | DEMO, ACM DUCT OR AHU INSULATION | SM | 10 | ||
| D001BD | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 10 | ||
| D001BE | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 10 | ||
| D001BF | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 10 | ||
| D001BG | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 10 | ||
| D001BH | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 15 | ||
| D001BJ | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 20 | ||
| D001BK | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 10 | ||
| D001BL | DEMO, ACM PIPE INSULATION, >400 mm | SM | 10 | ||
| D001BM | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 10 | ||
| D001BN | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 10 | ||
| D001BP | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 10 | ||
| D001BQ | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 10 | ||
| D001BR | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | SM | 10 | ||
| D001BS | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| D001BT | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 40 | ||
| D001BU | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| D001BV | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 15 | ||
| D001BW | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 10 | ||
| D001BX | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| D001BY | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 15 | ||
| D001BZ | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 20 | ||
| D001CA | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| D001CB | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| D001CC | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 30 | ||
| D001CD | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 35 | ||
| D001CE | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 35 | ||
| D001CF | DEMO, ACM CEILING SYSTEM, SOLID | SM | 90 | ||
| D001CG | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 60 | ||
| D001CH | DEMO, ACM FLOOR TILE/MASTIC | SM | 90 | ||
| D001CJ | DEMO, ACM CARPET/MASTIC | SM | 90 | ||
| D001CK | DEMO, ACM COVE BASE/MASTIC | LM | 90 | ||
| D001CL | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 15 | ||
| D001CM | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 15 | ||
| D001CN | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 80 | ||
| D001CP | DEMO, ACM SOIL | CM | 5 | ||
| D001CQ | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 30 | ||
| D001CR | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 30 | ||
| D001CS | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 20 | ||
| D001CT | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 20 | ||
| D001CU | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 100 | ||
| D001CV | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 40 | ||
| D001CW | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 80 | ||
| D001CX | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 10 | ||
| D001CYC | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 10 | ||
| D001CZ | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 25 | ||
| D001DA | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 25 | ||
| D001DB | Demo, ACM Mortar (up to 30mm thickness) | EA | 25 | ||
| D001DC | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 30 | ||
| D001DD | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 30 | ||
| D001DE | Generator for electric hot water heater 3KVA 100/200V | EA | 30 | ||
| D001DF-A | Trip Charge--EMERGENCY UNDER ¥600,000 | EA | 10 | ||
| D001DF-B | Trip Charge--EMERGENCY ¥600,000-¥2,100,000 | EA | 3 | ||
| D001DF-C | Trip Charge--EMERGENCY ¥2,100,000 or MORE | EA | 1 | ||
| D001DG-A | Trip Charge--Urgent UNDER ¥600,000 | EA | 10 | ||
| D001DG-B | Trip Charge--Urgent ¥600,000-¥2,100,000 | EA | 3 | ||
| D001DG-C | Trip Charge--Urgent ¥2,100,000 or MORE | EA | 1 | ||
| D001DH | Assessment Fee | EA | 20 | ||
| MH - Man Hour LF - Linear Foot | |||||
| SY - Square Yard EA - Each |
&C &"-,Bold"&16EXHIBIT D
Option Four
| PRICE LIST | |||||
| Option Four (1 Oct 14 thru 30 Sep 15) | |||||
| CLIN | DECSCRPTION | UNIT | QTY | UNIT PRICE | TOTAL |
| E001AA | SCAFFOLDING: TUBULAR METAL, Top<10m HIGH | SM | 320 | ||
| E001AB | SCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGH | SM | 50 | ||
| E001AC | SCAFFOLDING: TUBULAR METAL, Top>25m HIGH | SM | 15 | ||
| E001AD | SCAFFOLDING: INTERIOR HUNG INCL. SAFETY NET | SM | 15 | ||
| E001AE | SCAFFOLDING: PORTABLE TRESTLE PLATFORM | SM | 150 | ||
| E001AF | SCAFFOLDING: MOBILE SCAFFOLDING | SM | 125 | ||
| E001AG | SHEET PROTECTION (WEATHER) | SM | 275 | ||
| E001AH | CLEAN, HEPA VAC & WET WIPE | SM | 1,500 | ||
| E001AJ | PROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PW | SM | 60 | ||
| E001AK | PROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PW | SM | 40 | ||
| E001AL | INST/DEMO DECON CHAMBER | SM | 50 | ||
| E001AM | PROTECT, FLOORS, 6 MIL POLY | SM | 1,000 | ||
| E001AN | PROTECT, WALLS, 6 MIL POLY | SM | 1,000 | ||
| E001AP | PROTECT, CEILINGS, 6 MIL POLY | SM | 750 | ||
| E001AQ | PROTECT, EQUIPMENT, 6 MIL POLY | SM | 400 | ||
| E001AR | PROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLY | SM | 400 | ||
| E001AS | DEMO, NON-ACM GWB | SM | 15 | ||
| E001AT | DEMO, NON-ACM SUSPENDED CEILING | SM | 15 | ||
| E001AU | DEMO, NON-ACM SUSPENDED CEILING, 2X GRID | SM | 15 | ||
| E001AV | DEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4 | EA | 15 | ||
| E001AW | DEMO, NON-ACM PARTITION, PLASTER | SM | 15 | ||
| E001AX | DEMO, NON-ACM PARTITION, GWB | SM | 10 | ||
| E001AY | DEMO, NON-ACM CARPET | SM | 100 | ||
| E001AZ | DEMO, ACM INSULATION, SPRAY-ON | SM | 100 | ||
| E001BA | DEMO, ACM BOILER/HEATER INSULATION | SM | 50 | ||
| E001BB | DEMO, ACM BOILER BREECHING/FLUE INSULATION | SM | 10 | ||
| E001BC | DEMO, ACM DUCT OR AHU INSULATION | SM | 10 | ||
| E001BD | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2 | EA | 10 | ||
| E001BE | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2 | EA | 10 | ||
| E001BF | DEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2 | EA | 10 | ||
| E001BG | DEMO, ACM PIPE INSULATION, UP TO 100mm | LM | 10 | ||
| E001BH | DEMO, ACM PIPE INSULATION, 101 TO 200 mm | LM | 15 | ||
| E001BJ | DEMO, ACM PIPE INSULATION, 201 TO 300 mm | LM | 20 | ||
| E001BK | DEMO, ACM PIPE INSULATION, 301 TO 400 mm | LM | 10 | ||
| E001BL | DEMO, ACM PIPE INSULATION, >400 mm | SM | 10 | ||
| E001BM | DEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mm | LM | 10 | ||
| E001BN | DEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mm | LM | 10 | ||
| E001BP | DEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mm | LM | 10 | ||
| E001BQ | DEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mm | LM | 10 | ||
| E001BR | DEMO, ACM PIPE INSULATION W/ PIPE, >400 mm | SM | 10 | ||
| E001BS | DEMO, ACM PIPE FITTING INSULATION, UP TO 100 mm | EA | 20 | ||
| E001BT | DEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mm | EA | 40 | ||
| E001BU | DEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mm | EA | 20 | ||
| E001BV | DEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mm | EA | 15 | ||
| E001BW | DEMO, ACM PIPE FITTING INSULATION, >400 mm | EA | 10 | ||
| E001BX | DEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mm | EA | 10 | ||
| E001BY | DEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mm | EA | 15 | ||
| E001BZ | DEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mm | EA | 20 | ||
| E001CA | DEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mm | EA | 10 | ||
| E001CB | DEMO, ACM PIPE FITTING W/ INSULATION, >400 mm | EA | 10 | ||
| E001CC | DEMO, ACM PIPE/FITTING INSULATION, GLOVE BAG | EA | 30 | ||
| E001CD | DEMO, ACM CEMENTITIOUS MATL, FLAT SURFACE | SM | 35 | ||
| E001CE | DEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACE | SM | 35 | ||
| E001CF | DEMO, ACM CEILING SYSTEM, SOLID | SM | 90 | ||
| E001CG | DEMO, ACM CEILING SYSTEM, LAY-IN | SM | 60 | ||
| E001CH | DEMO, ACM FLOOR TILE/MASTIC | SM | 90 | ||
| E001CJ | DEMO, ACM CARPET/MASTIC | SM | 90 | ||
| E001CK | DEMO, ACM COVE BASE/MASTIC | LM | 90 | ||
| E001CL | DEMO, ACM BASE BOARD & MASTIC, GLOVE BAG | EA | 15 | ||
| E001CM | DEMO, ACM FLOOR TILE & MASTIC, GLOVE BAG | EA | 15 | ||
| E001CN | DEMO, ACM WALL BOARD/TRANSITE/FINISH | SM | 80 | ||
| E001CP | DEMO, ACM SOIL | CM | 5 | ||
| E001CQ | DISPOSAL, ACM COLLECT/BAG/TRANSPORT | CM | 30 | ||
| E001CR | DISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREA | CM | 30 | ||
| E001CS | DISPOSAL, NON-ACM COLLECT/TRANSPORT | CM | 20 | ||
| E001CT | DISPOSAL, NON-ACM GWB COLLECT/TRANSPORT | CM | 20 | ||
| E001CU | ENCAPSULATE, WALLS/CEILINGS/FLOOR | SM | 100 | ||
| E001CV | ENCAPSULATE, BEAMS/COLUMNS/STRUCTURE | SM | 40 | ||
| E001CW | ENCAPSULATE, PIPES, UP TO 300 mm | LM | 80 | ||
| E001CX | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM, | EA | 10 | ||
| E001CY | Sample/Analyze, Clearance Sample, Aggressive, TEM, | EA | 10 | ||
| E001CZ | Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | EA | 25 | ||
| E001DA | Sample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCM | EA | 25 | ||
| E001DB | Demo, ACM Mortar (up to 30mm thickness) | EA | 25 | ||
| E001DC | Electric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 days | EA | 30 | ||
| E001DD | Electric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14days | EA | 30 | ||
| E001DE | Generator for electric hot water heater 3KVA 100/200V | EA | 30 | ||
| E001DF-A | Trip Charge--EMERGENCY UNDER ¥600,000 | EA | 10 | ||
| E001DF-B | Trip Charge--EMERGENCY ¥600,000-¥2,100,000 | EA | 3 | ||
| E001DF-C | Trip Charge--EMERGENCY ¥2,100,000 or MORE | EA | 1 | ||
| E001DG-A | Trip Charge--Urgent UNDER ¥600,000 | EA | 10 | ||
| E001DG-B | Trip Charge--Urgent ¥600,000-¥2,100,000 | EA | 3 | ||
| E001DG-C | Trip Charge--Urgent ¥2,100,000 or MORE | EA | 1 | ||
| E001DH | Assessment Fee | EA | 20 | ||
| MH - Man Hour LF - Linear Foot | |||||
| SY - Square Yard EA - Each |
&C&"-,Bold"&16
EXHIBIT E
Total Amount
| CLIN | BASIC | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | TOTAL |
| A001AA | ¥0 | ¥0 | ||||
| A001AB | ¥0 | ¥0 | ||||
| A001AC | ¥0 | ¥0 | ||||
| A001AD | ¥0 | ¥0 | ||||
| A001AE | ¥0 | ¥0 | ||||
| A001AF | ¥0 | ¥0 | ||||
| A001AG | ¥0 | ¥0 | ||||
| A001AH | ¥0 | ¥0 | ||||
| A001AJ | ¥0 | ¥0 | ||||
| A001AK | ¥0 | ¥0 | ||||
| A001AL | ¥0 | ¥0 | ||||
| A001AM | ¥0 | ¥0 | ||||
| A001AN | ¥0 | ¥0 | ||||
| A001AP | ¥0 | ¥0 | ||||
| A001AQ | ¥0 | ¥0 | ||||
| A001AR | ¥0 | ¥0 | ||||
| A001AS | ¥0 | ¥0 | ||||
| A001AT | ¥0 | ¥0 | ||||
| A001AU | ¥0 | ¥0 | ||||
| A001AV | ¥0 | ¥0 | ||||
| A001AW | ¥0 | ¥0 | ||||
| A001AX | ¥0 | ¥0 | ||||
| A001AY | ¥0 | ¥0 | ||||
| A001AZ | ¥0 | ¥0 | ||||
| A001BA | ¥0 | ¥0 | ||||
| A001BB | ¥0 | ¥0 | ||||
| A001BC | ¥0 | ¥0 | ||||
| A001BD | ¥0 | ¥0 | ||||
| A001BE | ¥0 | ¥0 | ||||
| A001BF | ¥0 | ¥0 | ||||
| A001BG | ¥0 | ¥0 | ||||
| A001BH | ¥0 | ¥0 | ||||
| A001BJ | ¥0 | ¥0 | ||||
| A001BK | ¥0 | ¥0 | ||||
| A001BL | ¥0 | ¥0 | ||||
| A001BM | ¥0 | ¥0 | ||||
| A001BN | ¥0 | ¥0 | ||||
| A001BP | ¥0 | ¥0 | ||||
| A001BQ | ¥0 | ¥0 | ||||
| A001BR | ¥0 | ¥0 | ||||
| A001BS | ¥0 | ¥0 | ||||
| A001BT | ¥0 | ¥0 | ||||
| A001BU | ¥0 | ¥0 | ||||
| A001BV | ¥0 | ¥0 | ||||
| A001BW | ¥0 | ¥0 | ||||
| A001BX | ¥0 | ¥0 | ||||
| A001BY | ¥0 | ¥0 | ||||
| A001BZ | ¥0 | ¥0 | ||||
| A001CA | ¥0 | ¥0 | ||||
| A001CB | ¥0 | ¥0 | ||||
| A001CC | ¥0 | ¥0 | ||||
| A001CD | ¥0 | ¥0 | ||||
| A001CE | ¥0 | ¥0 | ||||
| A001CF | ¥0 | ¥0 | ||||
| A001CG | ¥0 | ¥0 | ||||
| A001CH | ¥0 | ¥0 | ||||
| A001CJ | ¥0 | ¥0 | ||||
| A001CK | ¥0 | ¥0 | ||||
| A001CL | ¥0 | ¥0 | ||||
| A001CM | ¥0 | ¥0 | ||||
| A001CN | ¥0 | ¥0 | ||||
| A001CP | ¥0 | ¥0 | ||||
| A001CQ | ¥0 | ¥0 | ||||
| A001CR | ¥0 | ¥0 | ||||
| A001CS | ¥0 | ¥0 | ||||
| A001CT | ¥0 | ¥0 | ||||
| A001CU | ¥0 | ¥0 | ||||
| A001CV | ¥0 | ¥0 | ||||
| A001CW | ¥0 | ¥0 | ||||
| A001CX | ¥0 | ¥0 | ||||
| A001CY | ¥0 | ¥0 | ||||
| A001CZ | ¥0 | ¥0 | ||||
| A001DA | ¥0 | ¥0 | ||||
| A001DB | ¥0 | ¥0 | ||||
| A001DC | ¥0 | ¥0 | ||||
| A001DD | ¥0 | ¥0 | ||||
| A001DE | ¥0 | ¥0 | ||||
| A001DF | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 |
| A001DG | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 |
| A001DH | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 |
&C&"-,Bold"&14SUMMARY
OF
Asbestos Surveys, Sampling and Abatement
YOKOTA AIR BASE&16
Other files
| File | Type | Posted |
|---|---|---|
| PWS amendment.doc | DOC document | |
| Amendment 01.pdf | ||
| Exhibits | — | |
| PWS.doc | DOC document | |
| Performance Plan.doc | DOC document | |
| Performance Plan.doc | DOC document | |
| Exhibits | — | |
| PP Questionnaire.doc | DOC document | |
| FA5209-10-R-0022.pdf | ||
| PPI List.doc | DOC document | |
| PWS.doc | DOC document | |
| Notice to Offerors.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .