Basic Period

PRICE LIST
Basic Period (1 Oct 10 thru 30 Sep 11)
CLINDECSCRPTIONUNITQTYUNIT PRICETOTAL
A001AASCAFFOLDING: TUBULAR METAL, Top<10m HIGHSM320
A001ABSCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGHSM50
A001ACSCAFFOLDING: TUBULAR METAL, Top>25m HIGHSM15
A001ADSCAFFOLDING: INTERIOR HUNG INCL. SAFETY NETSM15
A001AESCAFFOLDING: PORTABLE TRESTLE PLATFORMSM150
A001AFSCAFFOLDING: MOBILE SCAFFOLDINGSM125
A001AGSHEET PROTECTION (WEATHER)SM275
A001AHCLEAN, HEPA VAC & WET WIPESM1,500
A001AJPROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PWSM60
A001AKPROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PWSM40
A001ALINST/DEMO DECON CHAMBERSM50
A001AMPROTECT, FLOORS, 6 MIL POLYSM1,000
A001ANPROTECT, WALLS, 6 MIL POLYSM1,000
A001APPROTECT, CEILINGS, 6 MIL POLYSM750
A001AQPROTECT, EQUIPMENT, 6 MIL POLYSM400
A001ARPROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLYSM400
A001ASDEMO, NON-ACM GWBSM15
A001ATDEMO, NON-ACM SUSPENDED CEILINGSM15
A001AUDEMO, NON-ACM SUSPENDED CEILING, 2X GRIDSM15
A001AVDEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4EA15
A001AWDEMO, NON-ACM PARTITION, PLASTERSM15
A001AXDEMO, NON-ACM PARTITION, GWBSM10
A001AYDEMO, NON-ACM CARPETSM100
A001AZDEMO, ACM INSULATION, SPRAY-ONSM100
A001BADEMO, ACM BOILER/HEATER INSULATIONSM50
A001BBDEMO, ACM BOILER BREECHING/FLUE INSULATIONSM10
A001BCDEMO, ACM DUCT OR AHU INSULATIONSM10
A001BDDEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2EA10
A001BEDEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2EA10
A001BFDEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2EA10
A001BGDEMO, ACM PIPE INSULATION, UP TO 100mmLM10
A001BHDEMO, ACM PIPE INSULATION, 101 TO 200 mmLM15
A001BJDEMO, ACM PIPE INSULATION, 201 TO 300 mmLM20
A001BKDEMO, ACM PIPE INSULATION, 301 TO 400 mmLM10
A001BLDEMO, ACM PIPE INSULATION, >400 mmSM10
A001BMDEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mmLM10
A001BNDEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mmLM10
A001BPDEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mmLM10
A001BQDEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mmLM10
A001BRDEMO, ACM PIPE INSULATION W/ PIPE, >400 mmSM10
A001BSDEMO, ACM PIPE FITTING INSULATION, UP TO 100 mmEA20
A001BTDEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mmEA40
A001BUDEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mmEA20
A001BVDEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mmEA15
A001BWDEMO, ACM PIPE FITTING INSULATION, >400 mmEA10
A001BXDEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mmEA10
A001BYDEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mmEA15
A001BZDEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mmEA20
A001CADEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mmEA10
A001CBDEMO, ACM PIPE FITTING W/ INSULATION, >400 mmEA10
A001CCDEMO, ACM PIPE/FITTING INSULATION, GLOVE BAGEA30
A001CDDEMO, ACM CEMENTITIOUS MATL, FLAT SURFACESM35
A001CEDEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACESM35
A001CFDEMO, ACM CEILING SYSTEM, SOLIDSM90
A001CGDEMO, ACM CEILING SYSTEM, LAY-INSM60
A001CHDEMO, ACM FLOOR TILE/MASTICSM90
A001CJDEMO, ACM CARPET/MASTICSM90
A001CKDEMO, ACM COVE BASE/MASTICLM90
A001CLDEMO, ACM BASE BOARD & MASTIC, GLOVE BAGEA15
A001CMDEMO, ACM FLOOR TILE & MASTIC, GLOVE BAGEA15
A001CNDEMO, ACM WALL BOARD/TRANSITE/FINISHSM80
A001CPDEMO, ACM SOILCM5
A001CQDISPOSAL, ACM COLLECT/BAG/TRANSPORTCM30
A001CRDISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREACM30
A001CSDISPOSAL, NON-ACM COLLECT/TRANSPORTCM20
A001CTDISPOSAL, NON-ACM GWB COLLECT/TRANSPORTCM20
A001CUENCAPSULATE, WALLS/CEILINGS/FLOORSM100
A001CVENCAPSULATE, BEAMS/COLUMNS/STRUCTURESM40
A001CWENCAPSULATE, PIPES, UP TO 300 mmLM80
A001CXSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM,EA10
A001CYSample/Analyze, Clearance Sample, Aggressive, TEM,EA10
A001CZSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCMEA25
A001DASample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCMEA25
A001DBDemo, ACM Mortar (up to 30mm thickness)EA25
A001DCElectric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 daysEA30
A001DDElectric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14daysEA30
A001DEGenerator for electric hot water heater 3KVA 100/200VEA30
A001DFTrip Charge--EMERGENCYEA10
A001DGTrip Charge--UrgentEA10
A001DHAssessment FeeEA20
Total Amount for Basic Period:¥0
Abbreviations:
MH - Man Hour LF - Linear Foot
SY - Square Yard EA - Each

&C&"-,Bold"&16

EXHIBIT A

Option One

PRICE LIST
Option One (1 Oct 11 thru 30 Sep 12)
CLINDECSCRPTIONUNITQTYUNIT PRICETOTAL
B001AASCAFFOLDING: TUBULAR METAL, Top<10m HIGHSM320
B001ABSCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGHSM50
B001ACSCAFFOLDING: TUBULAR METAL, Top>25m HIGHSM15
B001ADSCAFFOLDING: INTERIOR HUNG INCL. SAFETY NETSM15
B001AESCAFFOLDING: PORTABLE TRESTLE PLATFORMSM150
B001AFSCAFFOLDING: MOBILE SCAFFOLDINGSM125
B001AGSHEET PROTECTION (WEATHER)SM275
B001AHCLEAN, HEPA VAC & WET WIPESM1,500
B001AJPROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PWSM60
B001AKPROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PWSM40
B001ALINST/DEMO DECON CHAMBERSM50
B001AMPROTECT, FLOORS, 6 MIL POLYSM1,000
B001ANPROTECT, WALLS, 6 MIL POLYSM1,000
B001APPROTECT, CEILINGS, 6 MIL POLYSM750
B001AQPROTECT, EQUIPMENT, 6 MIL POLYSM400
B001ARPROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLYSM400
B001ASDEMO, NON-ACM GWBSM15
B001ATDEMO, NON-ACM SUSPENDED CEILINGSM15
B001AUDEMO, NON-ACM SUSPENDED CEILING, 2X GRIDSM15
B001AVDEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4EA15
B001AWDEMO, NON-ACM PARTITION, PLASTERSM15
B001AXDEMO, NON-ACM PARTITION, GWBSM10
B001AYDEMO, NON-ACM CARPETSM100
B001AZDEMO, ACM INSULATION, SPRAY-ONSM100
B001BADEMO, ACM BOILER/HEATER INSULATIONSM50
B001BBDEMO, ACM BOILER BREECHING/FLUE INSULATIONSM10
B001BCDEMO, ACM DUCT OR AHU INSULATIONSM10
B001BDDEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2EA10
B001BEDEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2EA10
B001BFDEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2EA10
B001BGDEMO, ACM PIPE INSULATION, UP TO 100mmLM10
B001BHDEMO, ACM PIPE INSULATION, 101 TO 200 mmLM15
B001BJDEMO, ACM PIPE INSULATION, 201 TO 300 mmLM20
B001BKDEMO, ACM PIPE INSULATION, 301 TO 400 mmLM10
B001BLDEMO, ACM PIPE INSULATION, >400 mmSM10
B001BMDEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mmLM10
B001BNDEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mmLM10
B001BPDEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mmLM10
B001BQDEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mmLM10
B001BRDEMO, ACM PIPE INSULATION W/ PIPE, >400 mmSM10
B001BSDEMO, ACM PIPE FITTING INSULATION, UP TO 100 mmEA20
B001BTDEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mmEA40
B001BUDEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mmEA20
B001BVDEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mmEA15
B001BWDEMO, ACM PIPE FITTING INSULATION, >400 mmEA10
B001BXDEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mmEA10
B001BYDEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mmEA15
B001BZDEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mmEA20
B001CADEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mmEA10
B001CBDEMO, ACM PIPE FITTING W/ INSULATION, >400 mmEA10
B001CCDEMO, ACM PIPE/FITTING INSULATION, GLOVE BAGEA30
B001CDDEMO, ACM CEMENTITIOUS MATL, FLAT SURFACESM35
B001CEDEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACESM35
B001CFDEMO, ACM CEILING SYSTEM, SOLIDSM90
B001CGDEMO, ACM CEILING SYSTEM, LAY-INSM60
B001CHDEMO, ACM FLOOR TILE/MASTICSM90
B001CJDEMO, ACM CARPET/MASTICSM90
B001CKDEMO, ACM COVE BASE/MASTICLM90
B001CLDEMO, ACM BASE BOARD & MASTIC, GLOVE BAGEA15
B001CMDEMO, ACM FLOOR TILE & MASTIC, GLOVE BAGEA15
B001CNDEMO, ACM WALL BOARD/TRANSITE/FINISHSM80
B001CPDEMO, ACM SOILCM5
B001CQDISPOSAL, ACM COLLECT/BAG/TRANSPORTCM30
B001CRDISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREACM30
B001CSDISPOSAL, NON-ACM COLLECT/TRANSPORTCM20
B001CTDISPOSAL, NON-ACM GWB COLLECT/TRANSPORTCM20
B001CUENCAPSULATE, WALLS/CEILINGS/FLOORSM100
B001CVENCAPSULATE, BEAMS/COLUMNS/STRUCTURESM40
B001CWENCAPSULATE, PIPES, UP TO 300 mmLM80
B001CXSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM,EA10
B001CYSample/Analyze, Clearance Sample, Aggressive, TEM,EA10
B001CZSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCMEA25
B001DASample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCMEA25
B001DBDemo, ACM Mortar (up to 30mm thickness)EA25
B001DCElectric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 daysEA30
B001DDElectric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14daysEA30
B001DEGenerator for electric hot water heater 3KVA 100/200VEA30
B001DFTrip Charge--EMERGENCYEA10
B001DGTrip Charge--UrgentEA10
B001DHAssessment FeeEA20
Total Amount for Option One:¥0
Abbreviations:
MH - Man Hour LF - Linear Foot
SY - Square Yard EA - Each

&C&"-,Bold"&16EXHIBIT B

Option Two

PRICE LIST
Option Two (1 Oct 12 thru 30 Sep 13)
CLINDECSCRPTIONUNITQTYUNIT PRICETOTAL
C001AASCAFFOLDING: TUBULAR METAL, Top<10m HIGHSM320
C001ABSCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGHSM50
C001ACSCAFFOLDING: TUBULAR METAL, Top>25m HIGHSM15
C001ADSCAFFOLDING: INTERIOR HUNG INCL. SAFETY NETSM15
C001AESCAFFOLDING: PORTABLE TRESTLE PLATFORMSM150
C001AFSCAFFOLDING: MOBILE SCAFFOLDINGSM125
C001AGSHEET PROTECTION (WEATHER)SM275
C001AHCLEAN, HEPA VAC & WET WIPESM1,500
C001AJPROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PWSM60
C001AKPROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PWSM40
C001ALINST/DEMO DECON CHAMBERSM50
C001AMPROTECT, FLOORS, 6 MIL POLYSM1,000
C001ANPROTECT, WALLS, 6 MIL POLYSM1,000
C001APPROTECT, CEILINGS, 6 MIL POLYSM750
C001AQPROTECT, EQUIPMENT, 6 MIL POLYSM400
C001ARPROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLYSM400
C001ASDEMO, NON-ACM GWBSM15
C001ATDEMO, NON-ACM SUSPENDED CEILINGSM15
C001AUDEMO, NON-ACM SUSPENDED CEILING, 2X GRIDSM15
C001AVDEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4EA15
C001AWDEMO, NON-ACM PARTITION, PLASTERSM15
C001AXDEMO, NON-ACM PARTITION, GWBSM10
C001AYDEMO, NON-ACM CARPETSM100
C001AZDEMO, ACM INSULATION, SPRAY-ONSM100
C001BADEMO, ACM BOILER/HEATER INSULATIONSM50
C001BBDEMO, ACM BOILER BREECHING/FLUE INSULATIONSM10
C001BCDEMO, ACM DUCT OR AHU INSULATIONSM10
C001BDDEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2EA10
C001BEDEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2EA10
C001BFDEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2EA10
C001BGDEMO, ACM PIPE INSULATION, UP TO 100mmLM10
C001BHDEMO, ACM PIPE INSULATION, 101 TO 200 mmLM15
C001BJDEMO, ACM PIPE INSULATION, 201 TO 300 mmLM20
C001BKDEMO, ACM PIPE INSULATION, 301 TO 400 mmLM10
C001BLDEMO, ACM PIPE INSULATION, >400 mmSM10
C001BMDEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mmLM10
C001BNDEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mmLM10
C001BPDEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mmLM10
C001BQDEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mmLM10
C001BRDEMO, ACM PIPE INSULATION W/ PIPE, >400 mmSM10
C001BSDEMO, ACM PIPE FITTING INSULATION, UP TO 100 mmEA20
C001BTDEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mmEA40
C001BUDEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mmEA20
C001BVDEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mmEA15
C001BWDEMO, ACM PIPE FITTING INSULATION, >400 mmEA10
C001BXDEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mmEA10
C001BYDEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mmEA15
C001BZDEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mmEA20
C001CADEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mmEA10
C001CBDEMO, ACM PIPE FITTING W/ INSULATION, >400 mmEA10
C001CCDEMO, ACM PIPE/FITTING INSULATION, GLOVE BAGEA30
C001CDDEMO, ACM CEMENTITIOUS MATL, FLAT SURFACESM35
C001CEDEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACESM35
C001CFDEMO, ACM CEILING SYSTEM, SOLIDSM90
C001CGDEMO, ACM CEILING SYSTEM, LAY-INSM60
C001CHDEMO, ACM FLOOR TILE/MASTICSM90
C001CJDEMO, ACM CARPET/MASTICSM90
C001CKDEMO, ACM COVE BASE/MASTICLM90
C001CLDEMO, ACM BASE BOARD & MASTIC, GLOVE BAGEA15
C001CMDEMO, ACM FLOOR TILE & MASTIC, GLOVE BAGEA15
C001CNDEMO, ACM WALL BOARD/TRANSITE/FINISHSM80
C001CPDEMO, ACM SOILCM5
C001CQDISPOSAL, ACM COLLECT/BAG/TRANSPORTCM30
C001CRDISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREACM30
C001CSDISPOSAL, NON-ACM COLLECT/TRANSPORTCM20
C001CTDISPOSAL, NON-ACM GWB COLLECT/TRANSPORTCM20
C001CUENCAPSULATE, WALLS/CEILINGS/FLOORSM100
C001CVENCAPSULATE, BEAMS/COLUMNS/STRUCTURESM40
C001CWENCAPSULATE, PIPES, UP TO 300 mmLM80
C001CXSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM,EA10
C001CYCSample/Analyze, Clearance Sample, Aggressive, TEM,EA10
C001CZSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCMEA25
C001DASample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCMEA25
C001DBDemo, ACM Mortar (up to 30mm thickness)EA25
C001DCElectric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 daysEA30
C001DDElectric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14daysEA30
C001DEGenerator for electric hot water heater 3KVA 100/200VEA30
C001DFTrip Charge--EMERGENCYEA10
C001DGTrip Charge--UrgentEA10
C001DHAssessment FeeEA20
Total Amount for Option Two:¥0
Abbreviations:
MH - Man Hour LF - Linear Foot
SY - Square Yard EA - Each

&C &"-,Bold"&16EXHIBIT C

Option Three

PRICE LIST
Option Three (1 Oct 13 thru 30 Sep 14)
CLINDECSCRPTIONUNITQTYUNIT PRICETOTAL
D001AASCAFFOLDING: TUBULAR METAL, Top<10m HIGHSM320
D001ABSCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGHSM50
D001ACSCAFFOLDING: TUBULAR METAL, Top>25m HIGHSM15
D001ADSCAFFOLDING: INTERIOR HUNG INCL. SAFETY NETSM15
D001AESCAFFOLDING: PORTABLE TRESTLE PLATFORMSM150
D001AFSCAFFOLDING: MOBILE SCAFFOLDINGSM125
D001AGSHEET PROTECTION (WEATHER)SM275
D001AHCLEAN, HEPA VAC & WET WIPESM1,500
D001AJPROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PWSM60
D001AKPROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PWSM40
D001ALINST/DEMO DECON CHAMBERSM50
D001AMPROTECT, FLOORS, 6 MIL POLYSM1,000
D001ANPROTECT, WALLS, 6 MIL POLYSM1,000
D001APPROTECT, CEILINGS, 6 MIL POLYSM750
D001AQPROTECT, EQUIPMENT, 6 MIL POLYSM400
D001ARPROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLYSM400
D001ASDEMO, NON-ACM GWBSM15
D001ATDEMO, NON-ACM SUSPENDED CEILINGSM15
D001AUDEMO, NON-ACM SUSPENDED CEILING, 2X GRIDSM15
D001AVDEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4EA15
D001AWDEMO, NON-ACM PARTITION, PLASTERSM15
D001AXDEMO, NON-ACM PARTITION, GWBSM10
D001AYDEMO, NON-ACM CARPETSM100
D001AZDEMO, ACM INSULATION, SPRAY-ONSM100
D001BADEMO, ACM BOILER/HEATER INSULATIONSM50
D001BBDEMO, ACM BOILER BREECHING/FLUE INSULATIONSM10
D001BCDEMO, ACM DUCT OR AHU INSULATIONSM10
D001BDDEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2EA10
D001BEDEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2EA10
D001BFDEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2EA10
D001BGDEMO, ACM PIPE INSULATION, UP TO 100mmLM10
D001BHDEMO, ACM PIPE INSULATION, 101 TO 200 mmLM15
D001BJDEMO, ACM PIPE INSULATION, 201 TO 300 mmLM20
D001BKDEMO, ACM PIPE INSULATION, 301 TO 400 mmLM10
D001BLDEMO, ACM PIPE INSULATION, >400 mmSM10
D001BMDEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mmLM10
D001BNDEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mmLM10
D001BPDEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mmLM10
D001BQDEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mmLM10
D001BRDEMO, ACM PIPE INSULATION W/ PIPE, >400 mmSM10
D001BSDEMO, ACM PIPE FITTING INSULATION, UP TO 100 mmEA20
D001BTDEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mmEA40
D001BUDEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mmEA20
D001BVDEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mmEA15
D001BWDEMO, ACM PIPE FITTING INSULATION, >400 mmEA10
D001BXDEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mmEA10
D001BYDEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mmEA15
D001BZDEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mmEA20
D001CADEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mmEA10
D001CBDEMO, ACM PIPE FITTING W/ INSULATION, >400 mmEA10
D001CCDEMO, ACM PIPE/FITTING INSULATION, GLOVE BAGEA30
D001CDDEMO, ACM CEMENTITIOUS MATL, FLAT SURFACESM35
D001CEDEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACESM35
D001CFDEMO, ACM CEILING SYSTEM, SOLIDSM90
D001CGDEMO, ACM CEILING SYSTEM, LAY-INSM60
D001CHDEMO, ACM FLOOR TILE/MASTICSM90
D001CJDEMO, ACM CARPET/MASTICSM90
D001CKDEMO, ACM COVE BASE/MASTICLM90
D001CLDEMO, ACM BASE BOARD & MASTIC, GLOVE BAGEA15
D001CMDEMO, ACM FLOOR TILE & MASTIC, GLOVE BAGEA15
D001CNDEMO, ACM WALL BOARD/TRANSITE/FINISHSM80
D001CPDEMO, ACM SOILCM5
D001CQDISPOSAL, ACM COLLECT/BAG/TRANSPORTCM30
D001CRDISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREACM30
D001CSDISPOSAL, NON-ACM COLLECT/TRANSPORTCM20
D001CTDISPOSAL, NON-ACM GWB COLLECT/TRANSPORTCM20
D001CUENCAPSULATE, WALLS/CEILINGS/FLOORSM100
D001CVENCAPSULATE, BEAMS/COLUMNS/STRUCTURESM40
D001CWENCAPSULATE, PIPES, UP TO 300 mmLM80
D001CXSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM,EA10
D001CYCSample/Analyze, Clearance Sample, Aggressive, TEM,EA10
D001CZSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCMEA25
D001DASample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCMEA25
D001DBDemo, ACM Mortar (up to 30mm thickness)EA25
D001DCElectric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 daysEA30
D001DDElectric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14daysEA30
D001DEGenerator for electric hot water heater 3KVA 100/200VEA30
D001DFTrip Charge--EMERGENCYEA10
D001DGTrip Charge--UrgentEA10
D001DHAssessment FeeEA20
Total Amount for Option Three:¥0
Abbreviations:
MH - Man Hour LF - Linear Foot
SY - Square Yard EA - Each

&C &"-,Bold"&16EXHIBIT D

Option Four

PRICE LIST
Option Four (1 Oct 14 thru 30 Sep 15)
CLINDECSCRPTIONUNITQTYUNIT PRICETOTAL
E001AASCAFFOLDING: TUBULAR METAL, Top<10m HIGHSM320
E001ABSCAFFOLDING: TUBULAR METAL, Top: 10-25m HIGHSM50
E001ACSCAFFOLDING: TUBULAR METAL, Top>25m HIGHSM15
E001ADSCAFFOLDING: INTERIOR HUNG INCL. SAFETY NETSM15
E001AESCAFFOLDING: PORTABLE TRESTLE PLATFORMSM150
E001AFSCAFFOLDING: MOBILE SCAFFOLDINGSM125
E001AGSHEET PROTECTION (WEATHER)SM275
E001AHCLEAN, HEPA VAC & WET WIPESM1,500
E001AJPROTECT, INST/DEMO CARPET, 2-6 MIL POLY, 19mm PWSM60
E001AKPROTECT, INST/DEMO SEPARATION BARRIER, STUDS, 12mm PWSM40
E001ALINST/DEMO DECON CHAMBERSM50
E001AMPROTECT, FLOORS, 6 MIL POLYSM1,000
E001ANPROTECT, WALLS, 6 MIL POLYSM1,000
E001APPROTECT, CEILINGS, 6 MIL POLYSM750
E001AQPROTECT, EQUIPMENT, 6 MIL POLYSM400
E001ARPROTECT, OPENINGS/CRITICAL BARRIERS, 6 MIL POLYSM400
E001ASDEMO, NON-ACM GWBSM15
E001ATDEMO, NON-ACM SUSPENDED CEILINGSM15
E001AUDEMO, NON-ACM SUSPENDED CEILING, 2X GRIDSM15
E001AVDEMO, NON-ACM LIGHT FIXTURE, UP TO 2X4EA15
E001AWDEMO, NON-ACM PARTITION, PLASTERSM15
E001AXDEMO, NON-ACM PARTITION, GWBSM10
E001AYDEMO, NON-ACM CARPETSM100
E001AZDEMO, ACM INSULATION, SPRAY-ONSM100
E001BADEMO, ACM BOILER/HEATER INSULATIONSM50
E001BBDEMO, ACM BOILER BREECHING/FLUE INSULATIONSM10
E001BCDEMO, ACM DUCT OR AHU INSULATIONSM10
E001BDDEMO, ACM DUCT JOINTS/GASKETS/FLEX, UP TO 0.1 M2EA10
E001BEDEMO, ACM DUCT JOINTS/GASKETS/FLEX, 0.1 TO 0.25 M2EA10
E001BFDEMO, ACM DUCT JOINTS/GASKETS/FLEX, >0.25 M2EA10
E001BGDEMO, ACM PIPE INSULATION, UP TO 100mmLM10
E001BHDEMO, ACM PIPE INSULATION, 101 TO 200 mmLM15
E001BJDEMO, ACM PIPE INSULATION, 201 TO 300 mmLM20
E001BKDEMO, ACM PIPE INSULATION, 301 TO 400 mmLM10
E001BLDEMO, ACM PIPE INSULATION, >400 mmSM10
E001BMDEMO, ACM PIPE INSULATION W/ PIPE, UP TO 100 mmLM10
E001BNDEMO, ACM PIPE INSULATION W/ PIPE, 101 TO 200 mmLM10
E001BPDEMO, ACM PIPE INSULATION W/ PIPE, 201 TO 300 mmLM10
E001BQDEMO, ACM PIPE INSULATION W/ PIPE, 301 TO 400 mmLM10
E001BRDEMO, ACM PIPE INSULATION W/ PIPE, >400 mmSM10
E001BSDEMO, ACM PIPE FITTING INSULATION, UP TO 100 mmEA20
E001BTDEMO, ACM PIPE FITTING INSULATION, 101 TO 200 mmEA40
E001BUDEMO, ACM PIPE FITTING INSULATION, 201 TO 300 mmEA20
E001BVDEMO, ACM PIPE FITTING INSULATON, 301 TO 400 mmEA15
E001BWDEMO, ACM PIPE FITTING INSULATION, >400 mmEA10
E001BXDEMO, ACM PIPE FITTING W/ INSULATION, UP TO 100 mmEA10
E001BYDEMO, ACM PIPE FITTING W/ INSULATION, 101 TO 200 mmEA15
E001BZDEMO, ACM PIPE FITTING W/ INSULAITON, 201 TO 300 mmEA20
E001CADEMO, ACM PIPE FITTING W/ INSULATION, 301 TO 400 mmEA10
E001CBDEMO, ACM PIPE FITTING W/ INSULATION, >400 mmEA10
E001CCDEMO, ACM PIPE/FITTING INSULATION, GLOVE BAGEA30
E001CDDEMO, ACM CEMENTITIOUS MATL, FLAT SURFACESM35
E001CEDEMO, ACM CEMENTITIOUS MATL, IRREGULAR SURFACESM35
E001CFDEMO, ACM CEILING SYSTEM, SOLIDSM90
E001CGDEMO, ACM CEILING SYSTEM, LAY-INSM60
E001CHDEMO, ACM FLOOR TILE/MASTICSM90
E001CJDEMO, ACM CARPET/MASTICSM90
E001CKDEMO, ACM COVE BASE/MASTICLM90
E001CLDEMO, ACM BASE BOARD & MASTIC, GLOVE BAGEA15
E001CMDEMO, ACM FLOOR TILE & MASTIC, GLOVE BAGEA15
E001CNDEMO, ACM WALL BOARD/TRANSITE/FINISHSM80
E001CPDEMO, ACM SOILCM5
E001CQDISPOSAL, ACM COLLECT/BAG/TRANSPORTCM30
E001CRDISPOSAL, ACM COLLECT/BAG/TRANSPORT TO OUTSIDE KANTO AREACM30
E001CSDISPOSAL, NON-ACM COLLECT/TRANSPORTCM20
E001CTDISPOSAL, NON-ACM GWB COLLECT/TRANSPORTCM20
E001CUENCAPSULATE, WALLS/CEILINGS/FLOORSM100
E001CVENCAPSULATE, BEAMS/COLUMNS/STRUCTURESM40
E001CWENCAPSULATE, PIPES, UP TO 300 mmLM80
E001CXSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, TEM,EA10
E001CYSample/Analyze, Clearance Sample, Aggressive, TEM,EA10
E001CZSample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCMEA25
E001DASample/Analyze/Use NVLAP or AIHA approved lab,Clearance Sample, Aggressive, PCMEA25
E001DBDemo, ACM Mortar (up to 30mm thickness)EA25
E001DCElectric hot water heater for hot shower at 3-chamber decontamination unit (200L) within 14 daysEA30
E001DDElectric hot water heater for hot shower of 3-chamber decontamination unit (200L) Over 14daysEA30
E001DEGenerator for electric hot water heater 3KVA 100/200VEA30
E001DFTrip Charge--EMERGENCYEA10
E001DGTrip Charge--UrgentEA10
E001DHAssessment FeeEA20
Total Amount for Option Two:¥0
Abbreviations:
MH - Man Hour LF - Linear Foot
SY - Square Yard EA - Each

&C&"-,Bold"&16

EXHIBIT E

Total Amount

CLINBASICOPTION 1OPTION 2OPTION 3OPTION 4TOTAL
A001AA¥0¥0
A001AB¥0¥0
A001AC¥0¥0
A001AD¥0¥0
A001AE¥0¥0
A001AF¥0¥0
A001AG¥0¥0
A001AH¥0¥0
A001AJ¥0¥0
A001AK¥0¥0
A001AL¥0¥0
A001AM¥0¥0
A001AN¥0¥0
A001AP¥0¥0
A001AQ¥0¥0
A001AR¥0¥0
A001AS¥0¥0
Total¥0¥0¥0¥0¥0¥0
¥0

&C&"-,Bold"&14SUMMARY

OF

CARPET INSTALLATION

YOKOTA AIR BASE&16

Other files

File Type Posted
PWS amendment.doc DOC document
Exhibits —
Amendment 01.pdf PDF
Exhibits —
PWS.doc DOC document
Performance Plan.doc DOC document
Performance Plan.doc DOC document
PP Questionnaire.doc DOC document
FA5209-10-R-0022.pdf PDF
PPI List.doc DOC document
PWS.doc DOC document
Notice to Offerors.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .