Exhibits to Solicitation No. FA5209-09-R-0025

EXHIBITS

PRICING SCHEDULE FOR SCHEDULES I, II, AND III

I. ESTIMATED QUANTITIES

The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract.

The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; and U.S. legal holidays are listed below by area of performance within each schedule. Offerors must complete the “Offeror’s Guaranteed Daily

Capability”, which must equal to exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit proposals. Failure to do so will render the proposal non responsive.

Base

Government’s

Estimated Maximum

Daily Requirement

Government’s

Minimum Acceptable

Daily Capability

Offeror’s

Guaranteed Daily

Capability

ZAMA NCWT 260 NCWT 135 NCWT

YOKOSUKA NCWT 1200 NCWT 700 NCWT

(NCWT: Net hundredweight)

II. CONTRACTOR’S FACILITY

The Contractor’s facility to be used in the performance of this contract for Zama and Yokosuka (Primarily for

ATSUGI) and in accordance with paragraph 10, Facilities, Part I of PWS shall be as identified below. The Contractor’s facility shall have the size of storing a minimum of 50 containers specified at Item 0010 and the corresponding items for options.

Base Location of the warehouse(s)

Approximate square footage (sq-ft) in each warehouse available for assembling, packing, and storage under this contract

ZAMA

Sq-ft

YOKOSUKA

Primarily for ATSUGI

Sq-ft

III. CONTRACT AREAS OF PERFORMANCE

(a) The Government will consider all areas of performance described in paragraph (b) as including the Contractor's facility, regardless of geographical location.

(b) The Contractor shall perform services within the following defined areas of performance, which include terminals identified therein: Area within a radius of thirty (XX) kilometers from the main gate of the Government Installation (see the list below).

Base Area within a radius of

(XX) km From

Drayage Beyond the Contract Areas of Performance

ZAMA 35km Main gate Not-To-Exceed (NTE) 55km

YOKOSUKA

100km

(includes on-base ATSUGI) Main gate NTE 600km

IV. SUPPLIES OR SERVICES AND PRICES/COSTS

BASIC PERIOD (1 Jan 2010 through 31 Dec 2010)

SCHEDULE I

OUTBOUND SERVICES (Items A001 through A014)

Item A001. Complete Service - Outbound (HHG): Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in

Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC

Pamphlet 55-12) at owner’s residence, or at Government-furnished facility when ordered by the ordering officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on line-haul carrier’s equipment at the Government-furnished or contractor-furnished facility. When containers will not accommodate all articles of any one lot, loose articled must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize and other shipments must be paid for under Item A003.

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

AA.

At owner’s residence:

Container, Commercial Spec

ASTM-D4169-01, or

SDDC Pamphlet 55-12

1,800 20,000

AB.

At Government-furnished facility or Contractor’s facility:

Container, Commercial Spec

ASTM-D4169-01, or

SDDC Pamphlet 55-12

100 150

Item A002. Outbound (HHGs From Non-Temporary Storage): No requirement.

Item A003. Complete Service-Outbound (HHG-Overflow Articles and HHGs Shipments requiring other than

ASTM-D4169-01 or SDDC Pamphlet 55-12): Service must be the same as Item A001 or Item A002 except that the loose articles are drayed to Government-furnished or contractor-furnished facility when ordered by the ordering officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly.

Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12.

Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC

Pam 55-12. One or more of these containers may be required per shipment.

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

(Unit:NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: NCWT)

Unit

Price

Total

AA.

Government-Furnished Containers:

Overseas Pack: Overflow Articles

No requirement 30

AB.

Government-Furnished Containers:

Overseas Pack: Oversize Articles

No requirement 30

AC.

Government-Furnished Containers:

Overseas Pack: Other Shipments

No requirement 20

AD.

Government-Furnished Containers:

Domestic Pack: Overflow Articles

No requirement No requirement

AE.

Government-Furnished Containers:

Domestic Pack: Oversize Articles

No requirement No requirement

AF.

Government-Furnished Containers:

Domestic Pack: Other Shipments

No requirement No requirement

AG.

Contractor-Furnished Containers:

Overseas Pack: Overflow Articles

(to be drayed to DDYJ

Yokosuka)

(at owner’s residence)

(to be drayed to Camp

Zama warehouse)

(at Gov’t- or

Contractor-furnished facility)

AH.

Contractor-Furnished Containers:

Overseas Pack: Oversize Articles

(to DDYJ)

(at owner’s)

(to Zama)

(at Gov’t’s or

Contractor’s)

AJ.

Overseas Pack: Other Shipments

AK.

Domestic Pack: Overflow Articles

No requirement No requirement

AL.

Contractor-Furnished Containers:

Domestic Pack: Oversize Articles

No requirement No requirement

AM.

Contractor-Furnished Containers:

Domestic Pack: Other Shipments

No requirement No requirement

Item A004. Complete Service - Outbound (Unaccompanied Baggage (UB)): Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line-haul carrier’s equipment. Service must be performed at owner’s residence. (Service may be performed at Government-furnished facility or contractor-furnished facility when ordered by the Ordering

Officer.)

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AA.

Government-Furnished Containers:

Drayage Included

No requirement 500

AB.

Government-Furnished Containers:

Drayage Not Included

No requirement 200

AC.

Contractor-Furnished Containers:

Drayage Included

30 400

AD.

Contractor-Furnished Containers:

Drayage Not Included

No requirement 400

AE. Shipboard Pack outs: When outbound services under items A001, A003 and A004 are ordered for performance at the member’s/employee’s residence located on an ocean vessel, the contractor must pick up goods outside fence perimeter. (Due to contractor’s personnel liability and safety, and for security reasons.)

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

AE.

Shipboard Pack outs

No requirement 20

Item A005. Complete Service-Outbound (UB from Nontemporary Storage): No requirement.

Item A006. Outbound Service-UB Packed By Member/Employee: No requirement.

Item A007. Outbound Service-UB Packed By Member/Employee-Consolidated Shipments/Government Facility:

No requirement.

Item A008. Expensive and Valuable Items: No requirement.

Item A009. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer.

Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of completion of containerization service. For Item A009AA, Storage charges apply for 30-days period or fraction thereof. For Item A009AB and A009AC, Storage charges apply for each day. Item A009AB is for the first day

(= the sixth workday following date of transportation officer’s receipt or notification of completion of containerization) and warehouse handling charges, and item A009AC is for each additional day charge. Date of release from storage must not be considered in computation of storage charges. Charges for these services are based on actual net weight of shipment (HHG or UB).

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AA.

Storage 150 No requirement

AB.

st Day of Storage & Warehouse

Handling HHG or UB

No requirement 200

AC.

Each Additional day No requirement 8,000

Item A010. Containers: Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.

*When a specific container from the SDDC Pam. 55-12 is ordered, the order will indicate the appropriate SDDC approval number.

(ea: each / cu ft: cubic feet)

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AA.

Container

(ASTM-D4169-01)

(Unit: ea)

AB.

Container

(SDDC Pamphlet 55-12)*

AC.

Crate

(ASTM-D6039/D6039M-02)

(Unit: cu ft or fraction thereof)

(Unit: cu ft or fraction

1,300

Item A011. Remarking, Coopering and Assembly/Disassembly Service:

AA. Remarking of Shipments for Re-consignment: Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for re-consignment, and loading on the hauling carrier’s vehicle.

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AA.

Remarking

No requirement 30

AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail and bands shall be accomplished at no expense to the Government.

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AB.

Coopering No requirement 200

AC. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AC(1).

Assembly

No requirement 5

AC(2).

Disassembly No requirement 5

Item A012. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Contract Area of

Performance within a radius of 35km within a radius of 100km

Not-to-exceed~ a radius of 55km a radius of 600km

AA.

HHG

5 30

AB.

UB

5 50

Item A013. Attempted Pickup: When the initial attempt to pickup a shipment at the owner’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after

Contractor’s notification, the ordering officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the residence.

(shpmt = shipment)

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

(Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

ea shpmt)

Unit

Price

Total

AA.

HHG

3 5

AB.

3 5

Notes:

(1) All above items are included in total amount for price competition.

(2) All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

AREA TOTAL

SUB TOTAL WITHOUT ADDITIONAL SERVICES

Item A014. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.

AA. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for outbound services under Item A001, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item

A001.

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AA(1).

Grand Piano 3 3

AA(2).

Upright Piano or Organ

5 8

AA(3) When the piano or organ is to be moved from the second floor or above, the following rate shall be added to the rate under Item A014AA(1) or A014AA(2) for each floor covered. However, this additional rate does not apply when a building elevator is available.

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AA(3).

Second floor or above 2 2

AB. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

AB.

Third Party 2 Indefinite Indefinite 10 Indefinite Indefinite

AC. Additional Pickup: In conjunction with Item A001, A003, and A004, add a rate for one (1) additional pickup point for one (1) shipment within the performance area.

Estimated

Annual

Quantity (Unit: per pick-up)

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AC(1)

HHG

3 No requirement

AC(2)

3 No requirement

AD. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.

(TBD: To Be Determined)

ZAMA YOKOSUKA

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AD.

Crane 2 TBD TBD No requirement

AE. Overtime: Rates at Item A001, A002 and A003 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART, I para. A.3.b.)

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AE.

Overtime No requirement 20 % Indefinite

RECAPITULATION SCHEDULE I WITH ADDITIONAL SERVICES

SUB TOTAL OF SCHEDULE I (OUTBOUND) OF BASIC PERIOD

Note: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

SCHEDULE II

INBOUND SERVICES (Items A015 through A030)

Item A015. Complete Service - Inbound (HHGs): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to government-furnished or contractor-furnished facility and return, unloading from the delivering carrier’s vehicle, handling into

Government-furnished or contractor-furnished facility, drayage to owner’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by owner, un-servicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates and debris from owner’s residence and drayage of empty containers to Government facility or Contractor’s facility.

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

A015.

Complete Service – Inbound

(HHGs)

1,120 10,000

Item A016. Complete Service - Inbound (HHG): No requirement.

Item A017. Complete Service - Inbound (HHG): No requirement.

Item A018. Inbound Service-Contractor Facility (HHG): No requirement.

Item A019. Complete Service – Expensive and Valuable Items: No requirement.

Item A020. Complete Service - Inbound (UB): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage of UB containers to owner’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

A020.

Complete Service – Inbound

(UB)

62 1,420

Item A021. Complete Service - Inbound (Unaccompanied Baggage): No requirement.

Item A022. Inbound Service – Contractor Facility (Unaccompanied Baggage): No requirement.

Item A023. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer.

Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of arrival of shipment. For Item A023AA, Storage charges apply for 30-days period or fraction thereof.

For Item A023AB and A023AC, Storage charges apply for each day. Item A023AB is for the first day (= the sixth workday following date of transportation officer’s receipt or notification of completion of containerization) and warehouse handling charges, and item A023AC is for each additional day charge. Date of release from storage must not be considered in computation of storage charges. Charges for these services are based on actual net weight of shipment

(HHG or UB).

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AA.

Storage 50 No requirement

AB.

st Day of Storage & Warehouse

Handling HHG or UB

No requirement 600

AC.

No requirement 10,000

Item A024. Remarking, Coopering, and Assembly/Disassembly Service:

AA. Remarking of Shipment for Re-consignment: Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for re-consignment loading on the hauling carrier’s vehicle.

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea piece)

Unit

Price

Total

AA.

No requirement 15

AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

ea piece)

Unit

Price

Total

AB.

AC. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AC(1).

Assembly

No requirement 5

AC(2).

Item A025. Attempted Delivery: When the initial attempt to deliver a shipment at the owner’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after

Contractor’s notification, the ordering officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the residence.

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

AA.

HHG

3 4

AB.

3 4

Item A026. Reweighing: Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

AA.

HHG

2 13

AB.

5 6

Item A027. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Estimated

Annual

Quantity

(Unit: per loaded

10km)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: per loaded

10km)

Unit

Price

Total

Contract Area of

Performance within a radius of 35km within a radius of 100km

Not-to-exceed~ a radius of 55km a radius of 600km

AA.

HHG

5 30

AB.

Item A028. Partial Withdrawal: Service must be the same as Item A015 above, except a partial removal of the items from the outer container will be performed at the Government-furnished or contractor-furnished facility. Articles not removed from the shipment will remain at the Government-furnished or contractor-furnished facility.

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per container)

Unit

Price

Total

AA.

HHG

Drayage Included

No requirement 10

AB.

HHG

Drayage Not Included

No requirement 30

AC.

UB

Drayage Included

No requirement No requirement

AD.

UB

Item A029. Additional Services: The Contractor must provide additional services not included above, but required

AA. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for inbound services under Item A015, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item

A015.

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AA(1).

Grand Piano 2 2

AA(2).

2 6

AA(3) When the piano or organ is to be moved on the second floor or above, the following rate shall be added to the rate under Item A029AA(1) or A029AA(2) for each floor covered. However, this additional rate does not apply when a building elevator is available.

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AA(3).

2 1

AB. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

AB.

2 Indefinite Indefinite 5 Indefinite Indefinite

AC. Additional Delivery: In conjunction with Item A015, add a rate for one (1) additional delivery point for one (1) shipment within the performance area.

Estimated

Annual

Quantity

(Unit: per delivery)

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AC(1).

HHG

5 No requirement

AC(2).

AD. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AD.

1 TBD TBD No requirement

AE. Customs Clearance: The Contractor will clear customs when shipments become frustrated.

Estimated

Annual

Quantity

(Unit: ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea shpmt)

Unit

Price

Total

AE.

Customs

Clearance

5 1

AF. Overtime: Rates at Item A015 and A020 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

AF.

Item A030. Reserved.

RECAPITULATION SCHEDULE II WITH ADDITIONAL SERVICES

SUB TOTAL OF SCHEDULE II (INBOUND) OF BASIC PERIOD

SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES (Items A031 through A034)

Item A031. Complete Service for Intra-City and Intra-Area Moves: Service must include a premove survey, servicing of appliances, packaging and packing at owner’s residence to protect HHGs properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in owner’s new residence as directed by owner or owner’s designated representative and removal of all empty containers and materials from residence.

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

A031.

Complete Service – Intra-City and Intra-Area Moves

4,000 16,200

Item A032. Attempted Pickup or Delivery: When the initial attempt to pickup or deliver a shipment at the owner’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup or delivery at the residence.

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

AA.

Attempted Pickup

3 2

AB.

Attempted Delivery 3 2

Item A033. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Contract Area of

Performance within a radius of 35km within a radius of 100km

Not-to-exceed~ a radius of 55km a radius of 600km

A033.

Drayage Beyond the

Contract Area of

Performance

10 50

Notes:

Item A034. Additional Services: The Contractor must provide additional services not included above, but required

AA. Moving and Placing Pianos or Organs: When moving and placing pianos or organs between residences are involved for local moves under Item A031, the contractor shall be paid the unit price listed hereunder in addition to the rate of Item A031.

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AA(1).

Grand Piano

3 3

AA(2).

15 10

AA(3) When the piano or organ is to be moved to or moved from the second floor or above, the following rate shall be added to the rate under Item A034AA(1) or A034AA(2) for each floor covered. However, this additional rate does not apply when a building elevator is available.

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AA(3).

To/from second floor or above

10 3

AB. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph 6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on

Estimated

Annual

Quantity

(Unit: per service)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: per service)

Unit

Price

Total

AB.

AC. Additional Pickup and Delivery: In conjunction with Item A031, add a rate for one (1) additional pickup point or one (1) additional delivery point for one (1) shipment within the performance area.

Estimated

Annual

Quantity

(Unit: per pick-up or delivery)

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AC.

Pickup or Delivery 10 No requirement

AD. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is

Estimated

Annual

Quantity (Unit: ea)

Unit

Estimated

Annual

Quantity

Unit

Price

Total

AD.

AE. Overtime: Rates at Item A031 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AE.

No requirement 100 % Indefinite

RECAPITULATION SCHEDULE III WITH ADDITIONAL SERVICES

SUB TOTAL OF SCHEDULE III (INTRA-CITY AND INTRA-MOVES)

OF BASIC PERIOD

RECAPITULATION SCHEDULE I, II, AND III

WITHOUT ADDITIONAL SERVICES

TOTAL OF SCHEDULE I, II, AND III OF BASIC PERIOD

Note: This total amount is for price competition.

WITH ADDITIONAL SERVICES

CLIN AREA TOTAL

(Insert this amount at CLINs in SF1449)

TOTAL OF SCHEDULE I, II, AND III OF BASIC PERIOD

OPTION ONE (1 Jan 2011 through 31 Dec 2011)

OUTBOUND SERVICES (Items B001 through B014)

Item B001. Complete Service - Outbound (HHG): Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in

Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC

Pamphlet 55-12) at owner’s residence, or at Government-furnished facility when ordered by the ordering officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on line-haul carrier’s equipment at the Government-furnished or contractor-furnished facility. When containers will not accommodate all articles of any one lot, loose articled must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize and other shipments must be paid for under Item B003.

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

AA.

At owner’s residence:

Container, Commercial Spec

ASTM-D4169-01, or

SDDC Pamphlet 55-12

1,800 20,000

AB.

At Government-furnished facility or Contractor’s facility:

Container, Commercial Spec

ASTM-D4169-01, or

Item B002. Outbound (HHGs From Non-Temporary Storage): No requirement.

Item B003. Complete Service-Outbound (HHG-Overflow Articles and HHGs Shipments requiring other than

ASTM-D4169-01 or SDDC Pamphlet 55-12): Service must be the same as Item B001 or Item B002 except that the loose articles are drayed to Government-furnished or contractor-furnished facility when ordered by the ordering officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly.

Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12.

Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

(Unit:NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: NCWT)

Unit

Price

Total

AA.

Government-Furnished Containers:

Overseas Pack: Overflow Articles

No requirement 30

AB.

Government-Furnished Containers:

Overseas Pack: Oversize Articles

No requirement 30

AC.

Government-Furnished Containers:

Overseas Pack: Other Shipments

No requirement 20

AD.

Government-Furnished Containers:

Domestic Pack: Overflow Articles

No requirement No requirement

AE.

Government-Furnished Containers:

Domestic Pack: Oversize Articles

No requirement No requirement

AF.

Government-Furnished Containers:

Domestic Pack: Other Shipments

No requirement No requirement

AG.

Contractor-Furnished Containers:

Overseas Pack: Overflow Articles

(to be drayed to Camp

Contractor-

Overseas Pack: Oversize Articles

Overseas Pack: Other Shipments

Domestic Pack: Overflow Articles

No requirement No requirement

AL.

Contractor-Furnished Containers:

Domestic Pack: Oversize Articles

No requirement No requirement

AM.

Contractor-Furnished Containers:

Item B004. Complete Service - Outbound (Unaccompanied Baggage (UB)): Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line-haul carrier’s equipment. Service must be performed at owner’s residence. (Service may be performed at Government-furnished facility or contractor-furnished facility when ordered by the Ordering

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

AA.

Government-Furnished Containers:

Drayage Included

No requirement 500

AB.

Government-Furnished Containers:

Drayage Not Included

No requirement 200

AC.

Contractor-Furnished Containers:

Drayage Included

30 400

AD.

Contractor-Furnished Containers:

AE. Shipboard Pack outs: When outbound services under items B001, B003 and B004 are ordered for performance at the member’s/employee’s residence located on an ocean vessel, the contractor must pick up goods outside fence

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

AE.

Item B005. Complete Service-Outbound (UB from Nontemporary Storage): No requirement.

Item B006. Outbound Service-UB Packed By Member/Employee: No requirement.

Item B007. Outbound Service-UB Packed By Member/Employee-Consolidated Shipments/Government Facility:

Item B008. Expensive and Valuable Items: No requirement.

Item B009. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer.

Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of completion of containerization service. For Item B009AA, Storage charges apply for 30-days period or fraction thereof. For Item B009AB and B009AC, Storage charges apply for each day. Item B009AB is for the first day

(= the sixth workday following date of transportation officer’s receipt or notification of completion of containerization) and warehouse handling charges, and item B009AC is for each additional day charge. Date of release from storage must not be considered in computation of storage charges. Charges for these services are based on actual net weight of

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AA.

Storage 150 No requirement

AB.

st Day of Storage & Warehouse

Handling HHG or UB

No requirement 200

AC.

Item B010. Containers: Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.

*When a specific container from the SDDC Pam. 55-12 is ordered, the order will indicate the appropriate SDDC approval number.

(ea: each / cu ft: cubic feet)

Item

ZAMA YOKOSUKA

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AA.

Container

(ASTM-D4169-01)

(SDDC Pamphlet 55-12)*

(ASTM-D6039/D6039M-02)

(Unit: cu ft or fraction

Item B011. Remarking, Coopering and Assembly/Disassembly Service:

AA. Remarking of Shipments for Re-consignment: Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for re-consignment, and loading on the

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AA.

AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AB.

containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AC(1).

Assembly

No requirement 5

AC(2).

Item B012. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Contract Area of

Performance within a radius of 35km within a radius of 100km

Not-to-exceed~ a radius of 55km a radius of 600km

AA.

HHG

5 30

AB.

Item B013. Attempted Pickup: When the initial attempt to pickup a shipment at the owner’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after

Contractor’s notification, the ordering officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the

(shpmt = shipment)

ZAMA YOKOSUKA

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

AA.

HHG

3 5

AB.

Item B014. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.

AA. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for outbound services under Item B001, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item

B001.

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AA(1).

Grand Piano

3 3

AA(2).

AA(3) When the piano or organ is to be moved from the second floor or above, the following rate shall be added to the rate under Item B014AA(1) or B014AA(2) for each floor covered. However, this additional rate does not apply

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AA(3).

AB. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

AB.

AC. Additional Pickup: In conjunction with Item B001, B003, and B004, add a rate for one (1) additional pickup

Estimated

Annual

Quantity (Unit: per pick-up)

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AC(1)

HHG

3 No requirement

AC(2)

AD. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is

ZAMA YOKOSUKA

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AD.

AE. Overtime: Rates at Item B001, B002 and B003 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AE.

SUB TOTAL OF SCHEDULE I (OUTBOUND) OF OPTION ONE

INBOUND SERVICES (Items B015 through B030)

Item B015. Complete Service - Inbound (HHGs): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to government-furnished or contractor-furnished facility and return, unloading from the delivering carrier’s vehicle, handling into

Government-furnished or contractor-furnished facility, drayage to owner’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by owner, un-servicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates and debris from owner’s residence

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

B015.

Complete Service – Inbound

Item B016. Complete Service - Inbound (HHG): No requirement.

Item B017. Complete Service - Inbound (HHG): No requirement.

Item B018. Inbound Service-Contractor Facility (HHG): No requirement.

Item B019. Complete Service – Expensive and Valuable Items: No requirement.

Item B020. Complete Service - Inbound (UB): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage of UB containers to owner’s residence, unpacking of containers, Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

B020.

Complete Service – Inbound

Item B021. Complete Service - Inbound (Unaccompanied Baggage): No requirement.

Item B022. Inbound Service – Contractor Facility (Unaccompanied Baggage): No requirement.

Item B023. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer.

Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of arrival of shipment. For Item B023AA, Storage charges apply for 30-days period or fraction thereof.

For Item B023AB and B023AC, Storage charges apply for each day. Item B023AB is for the first day (= the sixth workday following date of transportation officer’s receipt or notification of completion of containerization) and warehouse handling charges, and item B023AC is for each additional day charge. Date of release from storage must not be considered in computation of storage charges. Charges for these services are based on actual net weight of shipment

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

NCWT)

Unit

Price

Total

AA.

Storage 50 No requirement

AB.

st Day of Storage & Warehouse

Handling HHG or UB

No requirement 600

AC.

Item B024. Remarking, Coopering, and Assembly/Disassembly Service:

AA. Remarking of Shipment for Re-consignment: Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, obliteration of all old markings, stenciling of necessary information on loaded

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea piece)

Unit

Price

Total

AA.

AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

ea piece)

Unit

Price

Total

AB.

containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

AC(1).

Assembly No requirement 5

AC(2).

Item B025. Attempted Delivery: When the initial attempt to deliver a shipment at the owner’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after

Contractor’s notification, the ordering officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the

Estimated

Annual

Quantity

(Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

ea shpmt)

Unit

Price

Total

AA.

HHG

3 4

AB.

Item B026. Reweighing: Service must consist of weighing the loaded containers prior to delivery and weighing the

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

AA.

HHG

2 13

AB.

Item B027. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Contract Area of

Performance within a radius of 35km within a radius of 100km

Not-to-exceed~ a radius of 55km a radius of 600km

AA.

HHG

5 30

AB.

Item B028. Partial Withdrawal: Service must be the same as Item B015 above, except a partial removal of the items from the outer container will be performed at the Government-furnished or contractor-furnished facility. Articles not

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: per container)

Unit

Price

Total

AA.

HHG

Drayage Included

No requirement 10

AB.

HHG

Drayage Not Included

No requirement 30

AC.

UB

Drayage Included

No requirement No requirement

AD.

UB

Item B029. Additional Services: The Contractor must provide additional services not included above, but required for

AA. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for inbound services under Item B015, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item

B015.

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: ea)

Unit

Price

Total

AA(1).

Grand Piano 2 2

AA(2).

2 6

AA(3) When the piano or organ is to be moved on the second floor or above, the following rate shall be added to the rate under Item B029AA(1) or B029AA(2) for each floor covered. However, this additional rate does not apply when a building elevator is available.

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea)

Unit

Price

Total

AA(3).

2 1

AB. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per service)

Unit

Price

Total

AB.

AC. Additional Delivery: In conjunction with Item B015, add a rate for one (1) additional delivery point for one (1) shipment within the performance area.

Estimated

Annual

Quantity (Unit: per delivery)

Unit

Price

Total

Estimated

Annual

Quantity

Unit

Price

Total

AC(1).

HHG

5 No requirement

AC(2).

AD. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is

Estimated

Annual

Quantity (Unit: ea)

Unit

Estimated

Annual

Quantity

Unit

Price

Total

AD.

1 TBD TBD No requirement

AE. Customs Clearance: The Contractor will clear customs when shipments become frustrated.

Estimated

Annual

Quantity

(Unit: ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit: ea shpmt)

Unit

Price

Total

AE.

Customs

Clearance

5 1

AF. Overtime: Rates at Item B015 and B020 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)

Estimated

Annual

Quantity

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

AF.

Item B030. Reserved.

RECAPITULATION SCHEDULE II WITH ADDITIONAL SERVICES

SUB TOTAL OF SCHEDULE II (INBOUND) OF OPTION ONE

SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES (Items B031 through B034)

Item B031. Complete Service for Intra-City and Intra-Area Moves: Service must include a premove survey, servicing of appliances, packaging and packing at owner’s residence to protect HHGs properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in owner’s new residence as directed by owner or owner’s designated representative and removal of all empty containers and materials from residence.

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

Estimated

Annual

Quantity

(Unit:

NCWT)

Unit

Price

Total

B031.

Complete Service – Intra-City and Intra-Area Moves

4,000 16,200

Item B032. Attempted Pickup or Delivery: When the initial attempt to pickup or deliver a shipment at the owner’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup or delivery at the residence.

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

Estimated

Annual

Quantity (Unit:

ea shpmt)

Unit

Price

Total

AA.

Attempted Pickup

3 2

AB.

Attempted Delivery 3 2

Item B033. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Estimated

Annual

Quantity (Unit: per loaded

10km)

Unit

Price

Total

Contract Area of

Performance within a radius of 35km within a radius of 100km

Not-to-exceed~ a radius of 55km a radius of 600km

B033.

Drayage Beyond the

Contract Area of

Performance

10 50

Notes:

Item B034. Additional Services: The Contractor must provide additional services not included above, but required for

AA. Moving and Placing Pianos or Organs: When moving and placing pianos or organs between…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .