Q and A.pdf
PDF 83 KB Posted
- Attached to
- Gym Equipment
- Solicitation number
- FA520526QB111
About this file
This document is a Questions and Answers (Q&A) file for a Request for Quotation (RFQ) regarding gym equipment and facility modifications for Building 112.
The submission deadline has been extended to noon on August 20, 2026, via RFQ amendment. The project involves procurement and installation of three primary items: bleachers, a gym dividing net, and wall padding. The government does not provide existing drawings for the bleachers but specifies that new bleachers should match current dimensions—32 feet wide by 9 feet long on the left side and 25 feet 5 inches wide by 9 feet long on the right side. The gym dividing net must be 27 feet tall and 32 feet long, with specifications referenced in Appendix 4 of the Statement of Work (SOW). Wall padding specifications are detailed in Appendix 3 of the SOW; contractors requiring existing equipment dimensions should contact Mr. Turner to coordinate on-site measurements. The government prefers Japanese products due to repair and maintenance availability. Regarding asbestos-containing materials noted in Section 2.7.4 of the SOW for Building 112 walls, the government has provided attached test results indicating locations, affected areas, and concentration levels. Advance payment will not be authorized under the resulting contract, and contractors must arrange payment terms directly with suppliers such as Kotobuki Seating Co., Ltd., without government advance funding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01-1 SOW 4Aug2026.pdf | ||
| Asbestos Report for Bldg 112.pdf | ||
| 01 Combo 26QB111 Amend 0001.pdf | ||
| 01-2 SOW for CLIN1001 4Aug2026.pdf | ||
| 01 Combo 26QB111.pdf | ||
| 01-2 SOW for CLIN1001 Jun 2026.pdf | ||
| 01-1 SOW Jun2026.pdf | ||
| 01-3 RFO R-DFRAS Clause.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Answers 1 Is it possible to extend the due date of the bid from 6 Aug to 21 Aug
‘26?
RFQ amendment will be issued to extend the submission due date until noon on 20 Aug 26.
2 Dou you have plan and elevation drawing of the B112, and installation drawing of bleachers?
The government does not have any drawings of the bleachers.
3 Regarding Gym Dividing Net, could indicate manufacturer name or specification sheet, if any and is this flame-retardant sheet?
The spacification is in the Appendix 4 of SOW.
The requested divider net size is 27 feet tall and 32 feet long.
4 Regarding Wall Padding, could you indicate manufacturer name or specification sheet, if any?
The spacification is avaiavle in Appendix 3 of SOW.
If you wish to obtain the dimensions of the existing equipment, please contact Mr. Turner to coordinate a time to come and take measurements.
5 Regarding Bleachers, could you indicate manufacturer name or specification sheet?, if any.
The size of existing bleacher on left side of the gym is 32 Feet wide and 9 feet long and the size of bleacher on the right side is 25 Feet and 5 inches wide and 9 feet long. The sizes should be similar to what the government currently have.
6 Above 1~4 items should be US product, or Japanese products are approved?
The government prefer Japanese products due to the availability to have repairs made if needed
8 Section 2.7.4 of the SOW states that asbestos-containing materials were used in the walls of Building 112. To assist us in preparing our estimate and construction plan, could you please provide us with survey data indicating the locations where asbestos is present, the affected areas, and the concentration levels?
Please see attached the test result.
9 Regarding our business partner, Kotobuki Seating Co., Ltd., we are required to pay for materials before they are delivered. Therefore, would it be possible to submit the material approval documents, obtain government approval, and then issue an invoice for the material costs alone in advance of delivery?
No.
Adavance payment will not be authorized under the resultant contract.