Amendment_No._0004_to_RFP_No._FA5205-13-R-0005.pdf
PDF 3 MB Posted
- Solicitation number
- FA5205-13-R-0005
About this file
Amendment No. 0004 to RFP No. FA5205-13-R-0005
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See schedule POC: Satoshi Nogaw a, Mr.
DSN#: 226-3496
Commercial#: 0176-77-3496 E-mail Address: satoshi.nogaw a.jp@us.af.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Apr-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5205-13-R-0005
X 9B. DATED (SEE ITEM 11)
01-Feb-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Apr-2013
CODE
35 CONS/LGC (JAPAN)
DODAAC: FA5205
BLDG. 656, MISAWA AIR BASE
MISAWA-SHI, AOMORI-KEN 033-0012
FA5205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5205-13-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
This amendment is issued to amend subject RFP with regard to Attachment 1, 2 and 5, and Section J for correction and addition of Contractor-Furnished U.S. Material (CFUSM) information, and extend the offer submission due date.
(A) The offer submission due date specified in block 13A of SF 1442 is extended to ″02:00PM″ on ″17 Apr 2013″ (Japan Standard Time).
(B) Attachment 1, Specifications and Attachment 2, Drawings. By incorporating attached Addendum No. 4 dated 5 Apr 13 into Attachment 1 and 2 of the RFP, the following specifications and drawings are replaced with revised ones:
Attachment 1, Specifications Attachment 2, Drawings 1-1 Area-1 Section 01 11 00 2-1 Area-1 No. G-003, G-004 and E-502 1-2 Area-2 Section 01 11 00 2-2 Area-2 No. G-003, G-004 and E-502 1-4 Area-4 Section 01 11 00 2-3 Area-3 No. G-003, G-004 and E-502 2-4 Area-4 No. G-003, G-004 and E-502
(C) Attachment 5, List of CFUSM. By replacing List of CFUSM, CFUSM information and remark are changed and reference only quantities are added.
(D) Section J. By replacing page 24 of the RFP with the revised one, the Exhibit/ Attachment Table specified in Section J is updated to reflect incorporation of Addendum No. 4, as shown in "From" and "To" below:
From:
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 1-1 Area 1 323 02-MAY-2011 1-2 Area 2 324 02-MAY-2011 1-3 Area 3 601 14-FEB-2013 1-4 Area 4 324 02-MAY-2011 Attachment 2 Drawings 2-1 Area 1 119 27-FEB-2013 2-2 Area 2 119 27-FEB-2013 2-3 Area 3 119 27-FEB-2013 2-4 Area 4 119 27-FEB-2013 Attachment 3 Addendum No. 1 thru 3 4 27-FEB-2013 Attachment 4 Schedule of Contractor’s
Submittals
18 18-DEC-2012
Attachment 5 List of Contractor-Furnished U.S. Material (CFUSM)
4 28-FEB-2013
Attachment 6 Section Details of Existing Asphalt Pavement Shoulders at Taxiways
2 14-FEB-2013
To:
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 1-1 Area 1 323 04-APR-2013
1-2 Area 2 324 04-APR-2013 1-3 Area 3 601 14-FEB-2013 1-4 Area 4 324 04-APR-2013 Attachment 2 Drawings 2-1 Area 1 119 04-APR-2013 2-2 Area 2 119 04-APR-2013 2-3 Area 3 119 04-APR-2013 2-4 Area 4 119 04-APR-2013 Attachment 3 Addendum No. 1 thru 4 6 04-APR-2013 Attachment 4 Schedule of Contractor’s
Submittals
18 18-DEC-2012
Attachment 5 List of Contractor-Furnished U.S. Material (CFUSM)
4 08-APR-2013
Attachment 6 Section Details of Existing Asphalt Pavement Shoulders at
(E) No other change is made under this amendment.
2 Attachments:
1. Revised pages 1 and 24 of 42 of the RFP numbered with FA5205-13-R-0005-0004, 2 pages, w/Revised List of CFUSM, 4 pages.
2. Addendum No. 4 dtd 4 Apr 13, 2 pages, w/Revised Specifications, 33 pages, Revised Drawings, 12 sheets.
Attachment 1
FA5205-13-R-0005-0004
See Schedule.
Additional Information to Offerors:
1. Decription of Work/Estimate Cost: This project is Repair Airf iled Lighting Sytem, Misaw a Air Base, Japan. Refer to Sec. B for "Project description", Sec. L, para. L-123H for "Description of the Magnitude of Construction Projects".
2. Pre-proposal conference/job site visit w ill be held on 7 Feb 13 at 1300 hours in the 35th Contracting Squadron conference room. See AFFARS 5352.215-9001, "Notice of Pre-Bid/Pre-Proposal Conference", and FAR 52.236-27, "Site Visit (Construction) - Alternate I", for more detail information.
3. Performance Bond: Refer to Sec. H, para. H-902, "Performance Bond", and Sec. I, FAR 52.228-15, "Performance and Payment Bonds - Construction".
4. This solicitation is issued under the authority to advertise (ATA) approved by HQ USAF/A7CR for Fiscal Year 13 Sustainment, Restoration and Modernization, and Demolition Projects. ATA has been granted for this project.
This acquisition is unrestricted; no small business setaside.
KAZUHIRO NAKAMURA DSN:226-3496 / COM:(81)0176-77
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Feb-2013
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________*FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Apr 2013 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______220 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
35 CONS/LGC (JAPAN)
DODAAC: FA5205
BLDG. 656, MISAWA AIR BASE
MISAWA-SHI, AOMORI-KEN 033-0012
FA5205
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
Section J - List of Documents, Exhibits and Other Attachments
EXHIBIT/ATTACHMENT TABLE
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 1-1 Area 1 323 04-APR-2013 1-2 Area 2 324 04-APR-2013 1-3 Area 3 601 14-FEB-2013 1-4 Area 4 324 04-APR-2013 Attachment 2 Drawings 2-1 Area 1 119 04-APR-2013 2-2 Area 2 119 04-APR-2013 2-3 Area 3 119 04-APR-2013 2-4 Area 4 119 04-APR-2013 Attachment 3 Addendum No. 1 thru 4 6 04-APR-2013 Attachment 4 Schedule of Contractor’s
Submittals
18 18-DEC-2012
Attachment 5 List of Contractor-Furnished U.S. Material (CFUSM)
4 08-APR-2013
Attachment 6 Section Details of Existing Asphalt Pavement Shoulders at
Attachment 5 to RFP No. FA5205-13-R-0015
Revised 8 Apr 13 per Amendment No. FA5205-13-R-0005-0004
LIST OF CONTRACTOR – FURNISHED U.S. MATERIAL (CFUSM)
8 Apr 2013
Project: QKKA 11-1200P2, REPR Airfield Lighting System, Misawa AB, Japan
Area 1:
Item No. Nomenclature QTY (reference only) U/I
0001 Cable 1/C #8 AWG 5KV Type C 24,713 M
0002 Cable 1/C #6 AWG 5KV Type C 253 M
0003 LED L-861T Elevated Taxi Light Fixture & 8 EA Transformer w/Base Plate & Can
0004 L-867 Size D Junction Can w Plate 3 EA
0005 L-858 Taxiway Sign w/L-867 Base Transformer 2 EA
0006 L-858 Taxiway Sign w L-867 Base Transformer 2 EA w/4 Modules
0007 Isolation Transformer for LED Taxiway Edge Light 361 EA
Area 2:
0001 Cable 1/C #8 AWG 5KV Type C 19,246 M
0002 Cable 1/C #6 AWG 5KV Type C 13,513 M
*0003 LED L-861T Elevated Taxi Light Fixture & *55 EA Transformer w/Base Plate (See Remark for *.)
0004 LED L-861T Elevated Taxi Edge Light Fixture & 43 EA
Transformer w/Base Plate & Can
0005 L-867 Size D Junction Can w Plate 30 EA
0006 L-858 Taxiway Sign w/L867 Base Transformer 2 EA w/2 Modules
0007 LED L-852T Semi Flush Taxiway Edge Light 7 EA w/Transformer
0008 Wind Indicator Lighting 2 EA
0009 Isolation Transformer for LED Taxiway Edge Light 209 EA
Revised 8 Apr 13 per Amendment No. FA5205-13-R-0005-0004
Area 3:
0001 Cable 1/C #8 AWG 5KV Type C 32,438 M
0002 Cable 1/C #6 AWG 5KV Type C 7,212 M
0003 Ventilation 6 EA
0004 L-828 4KW 50Hz Switchgear Type CCR 1 EA
0005 L-828 7.5KW 50Hz Switchgear Type CCR 9 EA
0006 L-828 10KW 50Hz Switchgear Type CCR 2 EA
0007 L-828 15KW 50Hz Switchgear Type CCR 1 EA
0008 L-828 30KW 50Hz Switchgear Type CCR 6 EA
0009 L-828 4KW 50Hz Switchgear Type CCR Ferroresonant 1 EA w/Series Circuits & Cabinet
0010 L-828 7.5KW 50Hz Switchgear Type CCR Ferroresonant 11 EA w/Series Circuit Cutouts & Cabinet
0011 300KW 380/220V 3Ph 4Wire 50Hz Standby Gen Set 1 EA w/Tank
0012 Movable 208/120V 300KW 3Ph 4Wire 50Hz Generator 1 EA
0013 800A 4Pole Auto Transformer Switch w/Isolation By-pass 1 EA
0014 3.3KV med voltage load break switch 3 EA
0015 Unit Substation Nema 3R Enclosure 500A KVA Transformer 1 EA 6.6KV 50Hz 125E Fuse 800A CB 1200A Switchboard
0016 75KVA 380-120/280V 3P 4W 50Hz Transformer NEMA 2 EA 1 Enclosure
0017 800A 3 Pole Enclosed Circuit Breaker 1 EA
0018 1200A 380/220 3P 4W 50Hz Switchboard 1 EA
0019 125A 120/208V 3-pole 4-wire 50Hz Panel Board 1 EA
0020 L-847 2 Circuit Selector Switch 1 EA
0021 Airfield Control Equipment ACE2 ALCMS interface 15 EA
Revised 8 Apr 13 per Amendment No. FA5205-13-R-0005-0004
0022 37.5KVA 380-2400V 1P 3W 50Hz Transformer NEMA 1 EA 1 Enclosure
0023 5KVA 208-480V 1P 3W 50Hz Transformer NEMA 1 EA 1 Enclosure
0024 25KVA 380-3.3/5.715KV 120V 50Hz 1P 3W Transformer 1 EA NEMA 1 Enclosure
0025 225KVA 380-3.3KV 3P 4W120V 50Hz 1P 3W Transformer 1 EA NEMA 1 Enclosure
0026 Magnetic Contactor 20A 2Pole 210V 1 LS
Area 4:
0001 Cable 1/C #8 AWG 5KV Type C 37,890 M
0002 LED L-861T Elevated Taxi Light Fixture & 8 EA Transformer w/Base Plate & Can
0003 L-867 Size D Junction Can w Plate 15 EA
0004 L-858 Taxiway Sign w/L867 Base Transformer 1 EA w/3 Modules
0005 LED L-852T Semi Flush Taxiway Edge Light 142 EA w/Transformer
0006 LED L-852T Semi Flush Taxiway Edge Light 8 EA w/Transformer & Can
0007 Isolation Transformer for LED Taxiway Edge Light 1,588 EA
REMARK: Quantities of CFUSMs are provided for the purpose of reference only, except for *Item No.
0003 for Area 2 of which quantity shall be estimated as 55 each. For all other items, offerors shall count and identify the CFUSM quantities from the project drawings, Attachment 2, and all CFUSM costs including Item No. 0003 for Area 2 shall be included in the offers.
NOTE:
a. Transportation of these items shall be in accordance with Section I, Contract Clause DFARS
252.247-7023, Transportation of Supplies by Sea (MAY 2002).
b. Disposition of Surplus U.S. Materials, Supplies or Equipment:
In the event the U.S. Government and contractor agree that title to any surplus contractor-furnished U.S. Materials, supplies or equipments which have been exempted from Japanese Custom Duties or Taxes pursuant to Article XI of the Status of Forces Agreement will remain with
Revised 8 Apr 13 per Amendment No. FA5205-13-R-0005-0004 the contractor, the disposition of such property accruing from the performance of this contract shall be the responsibility of the contractor. The contractor further agrees to make a full disclosure of such settlement to the local Government customs authorities for the payment of applicable duties and taxes.
REFERENCE PUBLICATIONS
• AFI32-1043MANAGING, OPERATING, AND MAINTAINING AIRCRAFT ARRESTING
SYSTEMS
• UFC 3-535-01 DESIGN STANDARDS FOR VISUAL AIR NAVIGATION FACILITIES
Attachment 2
RFP No. FA5205-13-R-0015
ADDENDUM NO. 4
FOR
PROJECT No. QKKA 11-1200P2, REPAIR AIRFIELD LIGHTING SYSTEM, MISAWA AB, JAPAN
04 Apr 2013
Project drawings and specifications are amended to provide the following changes, and the Drawing No.
G-003, G-004, and E-502 for all areas and Specification 01 11 00 for Area 1 and 4 are replaced with Revised 04 Apr 13, as attached.
Drawings for All Areas:
1) △4 a DWG #G-003:
The description in the construction note ③ is modified, and the following is added: “INSTALL
NEW LED IF EXISTING LIGHTS IS QUARTZ. REUSE EXISTING IF LIGHT IS LED. (SEE
NOTES 1-3, G-004)”
2) △4 g DWG #G-003:
The description in the general note No. 29 is deleted in its entirely, and the following is added:
“REPLACE ALL EXISTING ISOLATION TRANSFORMERS FOR THE EXISTING LED
TAXIWAY EDGE LIGHTS WITH NEW. TRANSFORMER COMPATIBLE WITH LED
TAXIWAY EDGE LIGHTS. REPLACE ALL CABLES FOR AIRFIELD LIGHTING
CIRCUITS.”
3) △4 b DWG #G-004:
The symbols of the legend are changed from solid line to dotted line.
4) △4 c DWG #G-004:
The description note No.1 is deleted partially, and the following is added: “SEE DETAIL 3/E- 502”.
5) △4 d DWG #G-004:
The description note No. 3 is added in note, and the following is added: “3. CONTRACTOR
SHALL CONDUCT FIELD SURVEY FOR ACTUAL LOCATION OF EXISTING QUARTZ
TAXIWAY EDGE LIGHT BEFORE START CONSTRUCTION (SEE DETAIL 3/E-502)”.
6) △4 k DWG #G-004:
The words “(NO BASE PLATE)” are deleted in the symbol descriptions.
7) △4 e DWG #E-502:
The description note No. 2 a is modified, and the following is added:
“(QUANTITY: BASE ON DRAWINGS)”.
8) △4 f DWG #E-502:
The description note No. 2 b is deleted partially, and the following is added:
“QUANTITY: NO MORE THAN 55 IN AREA 2, NOT REQUIRED AT AREA 1, 3 & 4)”.
RFP No. FA5205-13-R-0015
9) △4 h DWG #E-502:
The description note No.2 is deleted partially.
Drawing for Area 2:
10) △4 j DWG #E-502:
The description note No.4 is added, and the following is added:
“4. CONTRACTOR SHALL USE QUANTITY OF 55 FOR EXISTING QUORTZ TAXIWAY
EDGE LIGHTS. REMAINING NEW LED TAXIWAY EDGE LIGHTS NOT INSTALLED
WILL BE TURNED OVER TO THE GOVERNMENT”.
Specs for Areas 1 & 4:
11) Spec. Sec 01 11 00 para. 1.4.3.a.i.:
The description is changed from “i. Replace existing taxiway edge lights with LED type lights with isolation transformers” to “Remove existing taxiway edge lights”.
Specs for Areas 2:
12) Spec. Sec 01 11 00 para. 1.4.3.a.viii.:
An additional sub-paragraph is added, and the following is added:
“xiii. Remove existing taxiway edge lights.”
Specs for Areas 4:
13) Spec. Sec 01 11 00 para. 1.4.3.a.v.:
The description is changed from “v. Install new taxiway edge lights at Taxiway Bravo and Charlie.” to “v. Install new taxiway edge lights.”
(End of Addendum)
15 Attachments:
1. Area-1 DWG No. G-003 Revised 4 Apr 13, 1 sheet.
2. Area-1 DWG No. G-004 Revised 4 Apr 13, 1 sheet.
3. Area-1 DWG No. E-502 Revised 4 Apr 13, 1 sheet.
4. Area-2 DWG No. G-003 Revised 4 Apr 13, 1 sheet.
5. Area-2 DWG No. G-004 Revised 4 Apr 13, 1 sheet.
6. Area-2 DWG No. E-502 Revised 4 Apr 13, 1 sheet.
7. Area-3 DWG No. G-003 Revised 4 Apr 13, 1 sheet.
8. Area-3 DWG No. G-004 Revised 4 Apr 13, 1 sheet.
9. Area-3 DWG No. E-502 Revised 4 Apr 13, 1 sheet.
10. Area-4 DWG No. G-003 Revised 4 Apr 13, 1 sheet.
11. Area-4 DWG No. G-004 Revised 4 Apr 13, 1 sheet.
12. Area-4 DWG No. E-502 Revised 4 Apr 13, 1 sheet.
13. Area-1 Specification 01 11 00 Revised 4 Apr 13, 11 pages.
14. Area-2 Specification 01 11 00 Revised 4 Apr 13, 11 pages.
15. Area-4 Specification 01 11 00 Revised 4 Apr 13, 11 pages.
AECOM
999 TOWN & COUNTRY ROAD
ORANGE, CALIFORNIA 92868
T: 714.567.2400
F: 714.567.2441 www.aecom.com
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
ORANGE, CALIFORNIA 92868
T: 714.567.2400
REPR Airfield Lighting Systems MISAWA AIR BASE
Section 01 11 00 Page 1 4 Apr 13 Revised
SECTION 01 11 00
SUMMARY OF WORK
01/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E 2114 (2008) Standard Terminology for
Sustainability Relative to the Performance of
Buildings
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E
2114, Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.
Submit the following items to the Contracting Officer:
file:///D:/01%2057%2020.00%2010.doc file:///D:/01%2033%2000.doc
Section 01 11 00 Page 2 4 Apr 13 Revised
Utility Outage Requests
Utility Connection Requests
Borrow Permits
Excavation Permits
Welding Permits
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Scope
The work covered by these construction documents consists of furnishing all supervision, labor, equipment, and materials necessary to perform all operations required to complete ready for use, all in accordance with these specifications and the applicable drawings, for the Project QKKA 11-1200P2
(Area 1) Repair Airfield Lighting System, Misawa Air Base, Japan.
1.4.2 Location
The project is located within airfield area including Taxiways Charlie and
Bravo areas at Misawa Air Base, Japan.
1.4.3 Project Description
The work to be performed in connection with the project includes, but is not limited to the following:
a. Existing Airfield Lighting System
i. Remove existing taxiway edge lights.
ii. Replace existing 5kV circuits.
iii. Replace existing isolation transformers for existing LED type taxiway lights.
iv. Install new taxiway end lights.
v. Install new taxiway edge lights at Taxiways Bravo and Charlie.
vi. Trenching and backfill for installation of new conduits.
vii. Install new electrical conduit and junction boxes.
viii. Replace and install new taxiway signs.
ix. Replace existing pull box covers
1.4.4 Phasing Of Work
a. The work is divided into two distinct phases (east and west sides of
Airfield) and sub-phases.
b. The construction phasing requires night time work (except as noted on the phasing drawings).
c. Each phase of the work requires additional construction sequencing and coordination with the Base Airfield Management.
1.4.5 Airfield Lighting Expert
Section 01 11 00 Page 3 4 Apr 13 Revised
The contractor shall appoint an Airfield Lighting Expert to ensure compliance with UFC 3-535-01 & UFC 3-535-02. The Airfield Lighting Expert must have a minimum 5 year’s experience as an Airfield Lighting manufacturer’s Engineer or a minimum 5 year’s experience with US Air Force
Runway Lighting projects for material, shop drawing approvals and construction advice. Material and shop drawing submittals are required for
Airfield Lighting Expert’s approval signature.
1.5 WORK RESCHEDULING
1.5.1 Exterior construction work during Winter Period
Period from 15 December through 15 March in the following year, dates specified inclusive, is defined as "Winter Period" for the purpose of construction contracts to be performed in Misawa Air Base, Japan. During such period, the contractor shall obtain approval from Contracting Officer prior to performing exterior construction work such as excavation, backfill, asphalt/concrete placement, paint, etc.
1.5.1.1 Work Permitted during winter period
Replacement of existing taxiway edge lights, isolation transformers, box covers and cables with new.
1.5.2 Availability of Work Site and Working Hours
a. The contractor shall provide a notice to the Contracting Officer at least fourteen (14) days prior to commencement of the on-site work in order for coordination with the using activity. The work site will be made available to the Contractor as follows:
(1) Five days a week, Monday through Friday except U.S. legal holidays
(2) Working Hours: 2200 hours to 0600 hours
The above working days and hours may be extended by the Contracting Officer upon the Contractor's request, on the stipulation that work requiring inspection by the Government or work unable to be inspected by the
Government on the following day shall not be performed during the extended days and hours.
b. U.S. Legal Holidays. If a U.S. holiday falls on Saturday, the preceding Friday will be observed as a U.S. holiday; and if a U.S.
holiday falls on Sunday, the following Monday will be observed as a
U.S. holiday. The following is a list of U.S. holidays:
New Year's Day
1st of January
Birthday of Martin Luther King Jr. 3rd Monday of January
President's Day 3rd Monday of February
Memorial Day Last Monday of May
Section 01 11 00 Page 4 4 Apr 13 Revised
Independence Day 4th of July
Labor Day 1st Monday of September
Columbus Day 2nd Monday of October
Veteran's Day 11th November
Thanksgiving Day 4th Thursday of November
Christmas Day 25th December
c. Should Misawa AFB be put under security alert or exercise, and the contractor is restricted from accessing the work site. The Construction contract period will be adjusted accordingly by the Contracting Officer.
Contracting Officer shall notify the contractor of unavailability of the work site.
1.6 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability.
Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.7 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Occupancy notifications will be posted in a prominent location in the work area.
Section 01 11 00 Page 5 4 Apr 13 Revised
Before work is started, the Contractor shall arrange with the Contracting
Officer’s representative (COR) a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.8 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.9 ON-SITE PERMITS
1.9.1 Work Clearance Permit (AF Form 103)
Coordination with the Contracting Officer's Representative (COR) 30 days in advance is required for the issuance of work-clearance permit (AF Form 103) along with requests for the establishment of a field office, erection of portable toilet facilities, excavations, parking blocks, etc. prior to commencement of work.
1.9.2 Utility Outage Requests and Utility Connection Requests
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the
Government.
Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.
along with requests for utility outages and connections. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.9.3 Base Civil Engineering Work and Welding Permits
Base Civil Engineering Work Permits - The contractor is responsible for obtaining a coordinated and approved Base Civil Engineering Work Clearance
Section 01 11 00 Page 6 4 Apr 13 Revised
Request (AF IMT 103) before any site work begins. Coordination with the
Contracting Officer's Representative (COR) 30 days in advance is required for open flam work or welding.
Welding Permit - The Contractor shall submit a request for open flame work
("Hot Work Permit) to the Base Fire Department for approval prior to commencing any open flame or welding operations. A Base Fire Department representative will visit the work site prior to commencement of the work and the Contractor shall demonstrate the work to be performed and precautions to be taken to prevent a fire. Open flame work will not begin without approval of the Contracting Officer's Representative (open flame and welding permit) or until the Fire Department arrives at work site if required.
1.10 LOCATION OF UNDERGROUND FACILITIES
Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.11 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.
Scrap metal shall be turned over to DRMO by contractor at no cost to
The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area located within 10 kilometers of the construction site.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
1.12 REQUIREMENTS AT AIRFIELD
1.12.1 Construction Waiver
The contractor shall be prepared waiver document package (UFC 3-260-01, Section 14) 3 months prior to US government, project engineer, 35CES/CEPM to obtain a construction waiver for men and equipment.
Obtain a construction waiver 3 months minimum prior to the construction start date with map of hauling route, working hours and places.
1.12.2 Entry Authorization
Section 01 11 00 Page 7 4 Apr 13 Revised
Obtain 35OSS/CC approval of Entry Authorization List in the controlled area during construction period. It takes about 3 weeks for approval process of
EAL.
1.12.3 Communication/Radio Requirements
The contractor needs radios for communication with the Air Control Tower
(ATC) during the performance of contract on the airfield. The contractor propose 35CES/CECP Engineering LMR Manager's to use government's radio transceivers battery powered portable radios within 30 calendar days after receipt of Notice to Proceed (NTP).
Access to the airfield worksite shall be accomplished through coordination with airfield management. Contractor is required to remain in voice contact with the airfield traffic controller (control tower) at all times.
Permission must be granted, by the control tower, prior to movement of any kind across airfield runways, taxiways, and clear zones. Transceivers shall remain accountable, on-base in locked storage, when not being used.
1.12.4 Airfield Driving Training
All workers operating a vehicle on the Airfield will receive Flight line
Drivers Training in English/Japanese and be certified by Airfield Management prior to operating vehicles on the Airfield. All workers/sub-contractors must comply with 36 FWI 13-202. Contractor must obtain POV passes from
Airfield (AFLD) management prior to driving a vehicle onto the AFLD.
The contractor can conduct survey and construction occurring within
Controlled Movement Area (CMA) after completion of Airfield Driver’s
Briefing conducted by 35OSS/OSAM (one hour briefing for all workers) for each project or be escorted. Minimum three foremen should acquire the
Airfield Driver’s License for one project site if it required. The three day’s Airfield Driving Training is required to get Airfield Driving certification.
1.12.5 Daily Site Clean-up
The contractor shall inspect the worksite and perform any necessary clean-up prior to departure at the end of the work day. Clean-up shall also be performed periodically throughout the work day to allow for expedient evacuation of the runway. No equipment will be allowed to remain on the airfield without prior coordination and approval of the Airfield Manager, 35
OSS/OGSAM, 226-4430/2833.
Prior to opening the runway and taxiway the Contractor shall conduct a safety inspection of the work area to determine that all personnel and equipment have been removed from the runway, that all potential Foreign
Object Debris (FOD) have been removed, and that the runway and taxiway are ready for air operations. The Contractor shall cooperate with the Base
Operations staff at all times, and shall correct any deficiencies prior to opening the runway and taxiway.
1.12.6 Equipment
All machines, tools, and equipment used in the performance of the work shall be approved, maintained in satisfactory operating condition, and no taller than fifteen (15) feet in height. All heavy equipment shall be able to meet runway evacuation requirements.
Section 01 11 00 Page 8 4 Apr 13 Revised
1.12.7 Night Operations
Normal aircraft flight operations hours are from 0600 to 2200 hours, 7 days per week. The Contractor may request working hour changes through the
Contracting Officer or his/her authorized representative. Requests shall be made 7 days in advance of the desired change. When night operations are to be conducted by the Contractor, all necessary lighting will be furnished by the contractor at no cost to the Government. Lighting will be shaded or directed so as not to interfere with aircraft or control tower operations.
1.12.8 Workday Notification
The contractor shall notify Base Airfield Management, 35OSS/OSA, 226-3180 of the location and duration of work prior to work each day. The contractor shall notify Base Airfield Management when departing airfield at the end of the working day.
1.12.9 Runway Evacuation Requirement
a. Alert Aircraft Launches: Runway must be cleared within five (5) minutes of notification. Equipment/personnel must be positioned on the shoulder of the runway, outside the runway lights.
b. Aircraft Approach/Landing/Departure: The contractor's equipment and personnel must be cleared off the runway and at the hold short line of the adjoining taxiway within ten (10) minutes of notification.
c. In-flight Emergency: Immediate equipment/personnel evacuation is required. This will not be an "Exercise" situation.
d. Personnel must park equipment with a height of 3 meter or higher 50 meter away from taxiway or runway then leave the work site immediately upon advice from Control Tower.
e. Prior to opening the runway the Contractor shall conduct a safety inspection of the work area to determine that all personnel and equipment have been removed from the runway, that all potential Foreign Object Debris
(FOD) have been removed, and that the runway is ready for air operations.
The Contractor shall cooperate with the Base Operations staff at all times, and shall correct any deficiencies prior to opening the runway.
1.12.10 Airfield Work Requirement
a. Taxiways can be used to access and to leave work site after obtaining permission from the Control Tower through radio communication.
b. Runway is off limits at all times.
c. The workers will not be able to work closer than 100ft of the runway unless specified in the temporary construction waiver. Coordination will need to be accomplished at least two days in advance to ensure proper coordination with the control tower.
d. Work will be authorized to be accomplished on both ends of the runway at the same time.
Section 01 11 00 Page 9 4 Apr 13 Revised
e. Personnel Protection: All personnel at site are required to wear ear protection from aircraft noise.
f. Marked and/or flagged for high daytime visibility and, if appropriate, lighted for nighttime operations.
1.12.11 Haul Routes
The Contractor will be required to use the haul routes identified by the
Contracting Officer’s representative(COR). The Contractor shall maintain the haul routes and shall keep the dust under control by wetting the surface as required. Sweeping and cleaning of pavements will be done as necessary to remove spillage resulting from hauling operations. After all hauling and construction has been completed, the Contractor will restore the earth areas used for haul routes and construction activities to original condition by fine grading, shaping, compacting and sodding and shall clean and sweep all paved areas as required. Any pavement damage as a result of hauling operations under this contract shall be promptly repaired by the Contractor, as approved by the Contracting Officer. The cost of maintenance and repair of the haul routes shall be considered as a subsidiary obligation of the
Contractor.
Prior to entering an active taxiway the Contractor shall conduct a thorough
FOD check as required and remove all potential Foreign Object Debris (FOD) from vehicle tires.
1.12.12 Verification of Dimensions
The contract drawings show the extent and general arrangement of work to be done. The contractor must visit the site and become thoroughly familiar with all details of the work and working conditions and verify all dimensions in the field. Advise the Contracting Officer of any discrepancies before performing work.
1.12.13 Suspension of Power
The contractor shall request approval from the Contracting Officer or his authorized representative 14 days prior to the suspension of electrical power in coordination with all relative activities through AF Form 103.
The electrical power outage of the existing Airfield Lighting System will be permitted between 2200 and 0600 hours, non-operational hours.
1.12.14 Availability and Use of Utility Services
a. Water and Electricity will be available at the work site or in the vicinity of the work site. All reasonably required amounts of such utility services will be furnished to the Contractor without charge.
b. Water and Electricity is/are not available at work site. There is no source for such utility services in the vicinity of the work site. Therefore, the Contractor shall provide all required utility services using the most suitable and safety equipment furnished by the Contractor.
1.12.15 Availability of Sanitary Facilities
Section 01 11 00 Page 10 4 Apr 13 Revised
Toilet facilities are: * available * not available for Contractor's use.
1.13 Material Approval Submittals
The material approval submittals listed in Schedule of Contractor's
Submittals shall be submitted to the Contracting Officer for approval in accordance with the Contract Clause of this contract and instructions indicated in AF Form 3000 within 30 calendar days after the date of award of the contract after receipt of Notice to Proceed (NTP) of the individual
TOs, but before starting installation of any materials. Items listed in the schedule are principal materials only. This listing does not in any way limit the responsibility of the contractor to submit any materials specified in the technical provision of this contract when called for by the Contracting Officer.
1.14 Temporary facilities
The contractor shall provide temporary office/storage as required for his/her operations. Work clearance permit shall be obtained by coordinating
AF Form 103 with the relative activities for location of temporary facilities prior to erection. Paints, solvents and other flammable materials shall not be stored in the project building. The contractor may have telephone installed in his field office for his use in connection with this project Subject to approval of the Contracting Officer or his designated representative. All expenses related to the installation and use of such telephone will be borne by the contractor.
1.15 Final/BOD Inspection
Final/BOD inspection will be performed Monday through Friday excluding holidays, between 0800 through 1600 hours, subject to the flight operation at the airfield. The contractor shall submit a request for Final/BOD inspection in writing, at least 48 hours prior to his desired day and time.
After considering flight operation and other factors involved in the operation of airfield, the day and time of Final/BOD inspection will be determined by the Government and notified the contractor at least eight (8) hours prior to such determined day and time.
1.16 Confined Spaces
The Contractor shall coordinate entries into permit-required confined spaces with 35 CES/CEF (Fire Department). Contractor will provide time/date, location, duration of work, and type of work to be performed to
Fire Department. Contractor will notify Fire Department at completion of the entry.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.*
Section 01 11 00 Page 11 4 Apr 13 Revised
-- End of Section --
Section 01 11 00 Page 1 Revised 4 Apr 13 per Addendum No. 4
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the services. This comparison may consider raw materials acquisition, submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that
Section 01 11 00 Page 2
Borrow Permits
The work covered by these construction documents consists of furnishing all supervision, labor, equipment, and materials necessary to perform all operations required to complete ready for use, all in accordance with these specifications and the applicable drawings, for the Project QKKA 11-1200P3 (Area 2) Repair Airfield Lighting System, Misawa Air Base, Japan.
The project is located within airfield area including Taxiways Alpha area at the Misawa Air Base, Japan.
i. Replace existing taxiway edge lights with LED type lights with isolation transformers.
ii. Replace existing 5kV circuits.
iii. Replace existing isolation transformers for existing LED type taxiway lights.
iv. Install new taxiway end lights.
v. Install new taxiway edge lights
vi. Trenching and backfill for installation of new conduits.
vii. Install new electrical conduit and junction boxes.
viii. Install new airfield signs.
ix. Replace existing pull box covers.
xi. Modify existing windcones.
xii. Modify existing handholes.
xiii. Remove existing taxiway edge lights.
a. The work is divided into two distinct phases (east and west sides of Airfield) and sub-phases.
b. The construction phasing requires night time work (except as noted on the phasing drawings).
Section 01 11 00 Page 3 compliance with UFC 3-535-01 & UFC 3-535-02. The Airfield Lighting Expert must have a minimum 5 year’s experience as an Airfield Lighting manufacturer’s Engineer or a minimum 5 year’s experience with US Air Force Runway Lighting projects for material, shop drawing approvals and
Period from 15 December through 15 March in the following year, dates specified inclusive, is defined as "Winter Period" for the purpose of construction contracts to be performed in Misawa Air Base, Japan. During such period, the contractor shall obtain approval from Contracting Officer covers and cables with new, and modification of windcones.
inspection by the Government or work unable to be inspected by the
Birthday of Martin Luther King Jr. 3rd Monday of January
Section 01 11 00 Page 4
President's Day 3rd Monday of February
Memorial Day Last Monday of May
Independence Day 4th of July
Labor Day 1st Monday of September
Columbus Day 2nd Monday of October
Veteran's Day 11th November contract period will be adjusted accordingly by the Contracting Officer.
Contracting Officer shall notify the contractor of unavailability of the work site.
1.6 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the
Section 01 11 00 Page 5
1.7 OCCUPANCY OF PREMISES
as approved by the Contracting Officer. At the completion of along with requests for the establishment of a field office, erection of and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work along with requests for utility outages and connections. Each request shall
Section 01 11 00 Page 6
Request (AF IMT 103) before any site work begins. Coordination with the commencing any open flame or welding operations. A Base Fire Department representative will visit the work site prior to commencement of the work and the Contractor shall demonstrate the work to be performed and precautions to be taken to prevent a fire. Open flame work will not begin without approval of the Contracting Officer's Representative (open flame and underground obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify
The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area located within 10 kilometers of the construction site.
if approved by the Contracting Officer. Contractor shall be responsible for
The contractor shall be prepared waiver document package (UFC 3-260-01, Section 01 11 00 Page 7
(ATC) during the performance of contract on the airfield. The contractor propose 35CES/CECP Engineering LMR Manager's to use government's radio with the airfield traffic controller (control tower) at all times.
Permission must be granted, by the control tower, prior to movement of any
Drivers Training in English/Japanese and be certified by Airfield Management prior to operating vehicles on the Airfield. All workers/sub-contractors must comply with 36 FWI 13-202. Contractor must obtain POV passes from Airfield (AFLD) management prior to driving a vehicle onto the AFLD.
The contractor can conduct survey and construction occurring within Controlled Movement Area (CMA) after completion of Airfield Driver’s Briefing conducted by 35OSS/OSAM (one hour briefing for all workers) for each project or be escorted. Minimum three foremen should acquire the Airfield Driver’s License for one project site if it required. The three prior to departure at the end of the work day. Clean-up shall also be performed periodically throughout the work day to allow for expedient evacuation of the runway. No equipment will be allowed to remain on the equipment have been removed from the runway, that all potential Foreign Object Debris (FOD) have been removed, and that the runway and taxiway are ready for air operations. The Contractor shall cooperate with the Base
Section 01 11 00 Page 8
1.12.6 Equipment
All machines, tools, and equipment used in the performance of the work shall be approved, maintained in satisfactory operating condition, and no taller per week. The Contractor may request working hour changes through the Contracting Officer or his/her authorized representative. Requests shall be made 7 days in advance of the desired change. When night operations are to be conducted by the Contractor, all necessary lighting will be furnished by the location and duration of work prior to work each day. The contractor have been removed from the runway, that all potential Foreign Object Debris (FOD) have been removed, and that the runway is ready for air operations.
Section 01 11 00 Page 9
Contracting Officer’s representative (COR). The Contractor shall maintain the haul routes and shall keep the dust under control by wetting the surface as required. Sweeping and cleaning of pavements will be done as necessary to remove spillage resulting from hauling operations. After all hauling and construction has been completed, the Contractor will restore the earth areas used for haul routes and construction activities to original condition by fine grading, shaping, compacting and sodding and shall clean and sweep all paved areas as required. Any pavement damage as a result of hauling operations under this contract shall be promptly repaired by the Contractor, as approved by the Contracting Officer. The cost of maintenance and repair done. The contractor must visit the site and become thoroughly familiar with all details of the work and working conditions and verify all power in coordination with all relative activities through AF Form 103.
Section 01 11 00 Page 10 work site. Therefore, the Contractor shall provide all required accordance with the Contract Clause of this contract and instructions indicated in AF Form 3000 within 30 calendar days after the date of award of the contract after receipt of Notice to Proceed (NTP) of the individual TOs, but before starting installation of any materials. Items listed in the schedule are principal materials only. This listing does not in any way limit the responsibility of the contractor to submit any materials
1.14 Temporary Facilities
AF Form 103 with the relative activities for location…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .