Exhibit A thru C RFP No. FA5205-10-R-0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5205-10-R-0007-0001.pdf | ||
| Q A_FA5205-10-R-0007.pdf | ||
| Pre-proposal_Conference_Minutes_10R0007.pdf | ||
| FA520510R0007__SF1442.pdf | ||
| FA520510R0007_Attachment_2_Drawings.pdf | ||
| No_Bid_Form.xls | XLS spreadsheet | |
| FA520510R0007_Attachment_3_Schedule_of_Contractors_Submittal.pdf | ||
| FA520510R0007_Attachment_4_Historical_Data.pdf | ||
| FA520510R0007_Attachment_1_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A (R)
| EXHIBIT A | 18 Jun 10 | ||||||||||||||
| ROADS AND PAVEMENTS IDIQ CONTRACT | |||||||||||||||
| MISAWA AB, JAPAN | |||||||||||||||
| REQUEST FOR PROPOSAL No. FA5205-10-R-0007 | |||||||||||||||
| CONTRACT No. | |||||||||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||||||||
| Company Name and Address | |||||||||||||||
| * | |||||||||||||||
| Estimated | Unit of | Estimated | |||||||||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||||||||
| ELIN | |||||||||||||||
| A | 001 | Basic Year (One year from the date of contract award). | 1 | LS | Y | 0 | |||||||||
| Sub ELIN | Sub ELINs for ELIN A001 are listed hereunder. | ||||||||||||||
| Fill-in Left | SubELIN | # Filled | |||||||||||||
| SURVEY AND TEST | |||||||||||||||
| 6 | 175 | ||||||||||||||
| A | 001 | AA | Quantity Survey and Report, 2,000 SM Area | 50 | LOT | Y | Y | 0 | 1 | ||||||
| A | 001 | AB | Topographic Survey including Road Profile & Sections at 20 m intervals, and Provide Survey Map, 2,000 SM Area | 50 | LOT | Y | Y | 0 | 1 | ||||||
| A | 001 | AC | Quantity Survey and Report, Underground Utility Lines and Manholes | 1,000 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | AD | Quantity Survey and Report, Pavement Cracks or Curbs or Markings | 5,000 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | AE | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 20 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | AF | Core Drilling and Sampling of AC or PCC Pavement of Roads, Parking Lots, and Other Surfaces | 80 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | AG | Test Digging of AC Pavement, not exceed 1m x 1m x 1m including temporary pavement restoration | 10 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| ASPHALT CONCRETE SURFACES | 0 | ||||||||||||||
| A | 001 | AH | Remove & Reconstruct 50 mm Thick AC Surface, including Fine Grade and Compaction | 1,500 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | AJ | 30 mm Thick AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | AK | 50 mm Thick AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | AL | 50 mm Thick AC Surface, including Fine Grade and Compaction | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | AM | Place AC Intermediate Leveling Course | 200 | MTON | Y | Y | 0 | 1 | ||||||
| A | 001 | AN | Construct Base Course (Mixtured Stone M30-0) | 2,200 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | AP | Construct Subbase Course (Crushed Stone C40-0) | 1,400 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | AQ | Construct Granular Material (Mountain Sand) | 800 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | AR | Apply Soil-Cement Stabilization of Existing or New Subbase (200mm Thick) | 200 | SM | Y | Y | 0 | 13 | 1 | |||||
| A | 001 | AS | Remix and Repave with Heating Stabilization of Existing AC Pavement, Cement and Asphalt Mixtures In-place (100mm Thick) | 200 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| ADDITIONAL MINOR PAVEMENT WORK | 0 | ||||||||||||||
| 0 | |||||||||||||||
| A | 001 | AT | Furnish & Apply Asphalt Prime Coat | 12,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | AU | Furnish & Apply Asphalt Tack Coat | 12,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | AV | Repair Cracks of existing AC or PCC Pavement with Routing and Crack-cutting and Hot Apply Sealing, 1-20 mm in width and depth | 4,000 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | AW | Sealing Cracks or Joints in between new and existing of AC or PCC with Saw-cutting and Routing, approx. 20 mm in width and depth | 1,000 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | AX | Place Expansion Joint Filler and Sealant | 300 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | AY | Surface Treatment on existing AC Pavement (Cold-Application Mixture, not less than 1.26 kg per square meter) | 2,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | AZ | Place Portland cement concrete | 100 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | BA | Install Concrete Formwork | 200 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | BB | Install Concrete Reinforcement Bars | 2,000 | KG | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| RECYCLED AC PAVEMENT | 0 | ||||||||||||||
| 0 | 2 | ||||||||||||||
| A | 001 | BC | 50 mm Thick Recycled AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | BD | 50 mm Thick Recycled AC Pavement over Base Course, including Fine Grade and Compaction | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| PAVEMENT MARKINGS | 0 | ||||||||||||||
| 0 | 4 | ||||||||||||||
| A | 001 | BE | Removal of Pavement Marking | 80 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | BF | Pavement Marking Stripes, Reflective, 150mm Wide, White | 15,000 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | BG | Alphanumeric Concrete Curb Marking | 100 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | BH | White, Handicap Symbol Parking Stall Pavement Marking | 10 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| SIDEWALK/STAIRS/SIGN POSTS/BARRICADES | 0 | ||||||||||||||
| 0 | 10 | ||||||||||||||
| A | 001 | BJ | Construct New Concrete Sidewalk, Complete in Place | 100 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | BK | Remove and Replace existing Concrete Sidewalk, Complete in Place | 400 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | BL | Construct New Accessible Sidewalk Ramp, Type A, B, or C, Complete in Place | 10 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | BM | Place Inter-Locking Concrete Tiles (300x300x60 mm) | 20 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | BN | Construct New Concrete Stairs, Complete in Place | 2 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | BP | Install New Stair Handrails | 7 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | BQ | Install Traffic Sign & Post | 10 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | BR | Install Traffic Sign | 5 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | BS | Install Guard Rail with Reflector, (Brown Color, 700 mm high, R-GR.C-2B or R-GR.B-2B) | 10 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | BT | Install Removable Steel Bollard with concrete footing, Steel Tube w/ Cover & Lock (165 mm diameter, 90 cm high) | 10 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | BU | Install Guard Pipe 0.8 m high Steel Post with Beam Pipes and continuous concrete footing | 10 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| CURB, CURB AND GUTTER | 0 | ||||||||||||||
| 0 | 7 | ||||||||||||||
| A | 001 | BV | Remove and Replace existing Concrete Curbs, Cast-in-Place, 150mm Standard Barrier Type | 300 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | BW | Remove and Replace existing Concrete Curbs and Gutters, Cast-in-Place, 150mm Standard Barrier Type | 700 | LM | Y | Y | 0 | 6 | 1 | |||||
| A | 001 | BX | Construct Cast-in-Place Concrete Curbs and Gutters, 150mm Standard Barrier Type | 100 | LM | Y | Y | 0 | 3 | 1 | |||||
| A | 001 | BY | Construct Cast-in-Place Concrete Curbs and Gutters, 150mm Standard Mountable Type | 20 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | BZ | Construct Cast-in-Place Concrete High Curbs, 460mm Barrier Type | 50 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| SURFACE INLETS/STORM DRAIN LINES | 0 | ||||||||||||||
| 0 | |||||||||||||||
| A | 001 | CA | Raise/Lower existing Gutter Inlet, Concrete Frame and Grating Cover | 20 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CB | Remove and Replace Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-14) | 3 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CC | Remove and Replace Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-25) | 5 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CD | Install New Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-25) | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CE | Install New Concrete "U" Ditches with Steel Grating Cover (W300mm x D300mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CF | Install New Concrete "U" Ditches with Steel Grating Cover (W450mm x D450mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CG | Install New Heavy Duty Concrete "U" Ditches with Steel Grating Cover (W450mm x D900mm, Load ClassT-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CH | Install Free Gradient Concrete "U" Ditches and Steel Grating Cover (W400mm x D1100mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CJ | Install V-Type Concrete Ditch (W700mm x 85mm Thick) | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CK | Install 200 mm Diameter Concrete Drain Pipe | 30 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CL | Install 300 mm Diameter Concrete Drain Pipe | 10 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CM | Install 400 mm Diameter Concrete Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CN | Install 600 mm Diameter Concrete Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CP | Install 50 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CQ | Install 100 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | CR | Install 200 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| MANHOLES/HANDHOLE/CATCH BASIN | 0 | ||||||||||||||
| 0 | |||||||||||||||
| A | 001 | CS | Raise/Lower existing Manhole Frame and Cover | 5 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CT | Raise/Lower existing Handhole Frame and Cover | 5 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CU | Raise/Lower existing Gate Valve Box | 3 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CV | Replace existing Manhole with precast Concrete Structures and Ductile Cover, 600 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CW | Replace existing Manhole with precast Concrete Structures and Ductile Cover, 900 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CX | Replace existing Catch Basin with precast Concrete Structures and Grating Cover, 900 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CY | Install Precast Concrete Manhole, 600 mm round or square, 1.2 m depth (Ductile Cover φ600 mm round or square, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | CZ | Install Precast Concrete Manhole, 600 mm round or square, 1.2 m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DA | Install Precast Concrete Manhole, 900 mm round or square, 1.5 m depth (Ductile Cover φ600 mm round or square, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DB | Install Precast Concrete Manhole, 900 mm round or square 1.5 m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DC | Install Precast Concrete Manhole, 1.2m round or square 2.0m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DD | Install Precast Handhole, φ=0.9m, D=1.5m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DE | Install Pre-Cast Handhole H1.5m x W1.5m xD2m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DF | Install Pre-Cast Handhole H2m x W2m xD2m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DG | Install New Manhole Locking Device (Set of 4 each per manhole) | 50 | SET | Y | Y | 0 | 1 | ||||||
| WATER SUPPLY PIPE AND GATE VALVE | 0 | ||||||||||||||
| 0 | 9 | ||||||||||||||
| A | 001 | DH | Install new 50 mm Poly Vinyl Chloride Pipe and Fittings | 10 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | DJ | Install new 100 mm Poly Vinyl Chloride Pipe and Fittings | 10 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | DK | Install new 100 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | DL | Install new 150 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | DM | Install new 200 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | DN | Install Water Gate Valve 100 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DP | Install Water Gate Valve 150 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DQ | Install Water Gate Valve 200 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | DR | Install Air Release Valve | 1 | EA | Y | Y | 0 | 7 | 1 | |||||
| A | 001 | DS | Construct Concrete Thrust Blocking | 1 | CM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| EARTH WORK/SODDING/PLANTING | 0 | ||||||||||||||
| 0 | 5 | ||||||||||||||
| A | 001 | DT | Construct Embankment | 1,000 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | DU | Removal and Restoration of Sod | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | DV | Place Sod (Noshiba) | 4,600 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | DW | Apply Hydroseeding | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | DX | Place Topsoil, 100 mm thick | 800 | CM | Y | Y | 0 | 1 | 1 | |||||
| A | 001 | DY | Plant Cherry Tree (Sakura), 3"/75mm Caliper (diameter) at Breast Height (DBH) with Guy or Pole Supports | 5 | EA | Y | Y | 0 | 1 | 1 | |||||
| A | 001 | DZ | Plant Pinus Densiflore (Akamatsu) Tree, 3"/75mm Caliper (diameter) at Breast Height (DBH) with Guy or Pole Supports | 2 | EA | Y | Y | 0 | 1 | 1 | |||||
| A | 001 | EA | Apply Emulsion Coat to Tree Branches and Stumps Cut | 100 | SM | Y | Y | 0 | 1 | 1 | |||||
| A | 001 | EB | Place Polyester Fabric Multi Sheet for Erosion Control & Protection, 0.5 mm thk | 50 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| FENCING AND GATES | 0 | ||||||||||||||
| 0 | 11 | ||||||||||||||
| A | 001 | EC | Install Fence 2.4 m high, Chain-link w/Single Arm Extension w/barbed wire with Concrete Foundation | 40 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | ED | Install Fence 2.4 m high, Chain-link w/Double Arm Extension w/barbed wire with Concrete Foundation | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | EE | Install Pedestrian Gate H2.4 m x W2.1 m Chain-link w/Vertical Arm Extension w/barbed wire with Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | EF | Install Double Swing Gate H2.4 m x W7.3 m Chain-link w/Single Arm Extension w/barbed wire with Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | EG | Install 1.8 m High Decorative CMU Reinforced Wall Fence with Resin Emulsion Paint | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | EH | Install 2.2 m High Decorative CMU Reinforced Wall Fence with Resin Emulsion Paint | 20 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | EJ | Install Pedestrian Gate H2.2 m x W2.1 m for Decorative CMU Reinforced Wall Fence | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | EK | Install Double Swing Gate H2.2 m x W7.1 m for Decorative CMU Reinforced Wall Fence | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | EL | Install Fence 2.4 m high, Lattice-frame w/Vertical Steel Pipe Extension and Concrete Foundation | 10 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | EM | Install Personnel Gate H2.4 m x W2.0 m Lattice-frame w/Vertical Steel Pipe Extension and Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | EN | Install Single Swing Gate H2.4 m x W5.0 m Lattice-frame w/Vertical Steel Pipe Extension and Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | EP | Install Outrigger Post @ 3.55m on CMU Wall with 3 Stranded Barbed Wires | 20 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | EQ | Install Guard Wire and Fixed Steel Bollard | 10 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | ER | Relocate existing Chain-link Fence with dis-assembling of post, frames, fabric net, barbed wires and concrete footing | 20 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | ES | Remove and Salvage existing Chain-link Fence, Post, Wires, and Dispose concrete footing | 10 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | ET | Remove and Salvage existing Personnel Chain-link Gate, Post, Frames, Wires, and Dispose concrete footing | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | EU | Remove and dispose existing Double Swing Chain-link Gate, Post, Frames, Wires, and dispose concrete footing | 1 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| REMOVAL AND DISPOSAL WORK | 0 | ||||||||||||||
| 0 | 27 | ||||||||||||||
| A | 001 | EV | Saw Cutting Existing AC Pavement, 50mm in Depth | 5,400 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | EW | Saw Cutting Existing Concrete Pavement, 100mm in Depth | 100 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | EX | 30 mm Thick Cold Planing of AC Pavement | 300 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | EY | 50 mm Thick Cold Planing of AC Pavement | 5,000 | SM | Y | Y | 0 | 1 | ||||||
| A | 001 | EZ | Removal and Disposal of Asphalt Concrete Pavement | 1,700 | MTON | Y | Y | 0 | 1 | ||||||
| A | 001 | FA | Removal and Disposal of Subbase/Base Course | 2,000 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | FB | Unclassified Excavation and Disposal | 1,200 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | FC | Removal and Disposal of Reinforced Concrete | 50 | MTON | Y | Y | 0 | 1 | ||||||
| A | 001 | FD | Removal and Disposal of Plain Concrete | 50 | MTON | Y | Y | 0 | 1 | ||||||
| A | 001 | FE | Removal and Disposal of Concrete Curbs | 100 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | FF | Removal and Disposal of Concrete Curbs and Gutters | 350 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | FG | Removal and Disposal of Street Light and Foundation | 3 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FH | Removal and Disposal of Cable with Conduit | 40 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | FJ | Removal and Disposal of Water Pipe | 30 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | FK | Removal and Disposal of Steel, Plastic and Wood Structure | 10 | MTON | Y | Y | 0 | 1 | ||||||
| A | 001 | FL | Removal and Disposal of Metal Structure & Railings | 10 | MTON | Y | Y | 0 | 1 | ||||||
| A | 001 | FM | Removal and Disposal of Shrub, Bush, or Tree, less than 6"/15cm Caliper (Diameter) at Breast High (DBH) and Stump | 10 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FN | Removal and Disposal of Tree, 6"/15cm or more, and less than 14"/35cm Caliper (Diameter) at Breast High (DBH) and Stump | 10 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FP | Removal and Disposal of Tree, 14"/35cm or more, and less than 30"/76cm Caliper (Diameter) at Breast High (DBH) and Stump | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FQ | Removal and Disposal of Tree, 30"/76cm or more Caliper (Diameter) at Breast High (DBH) and Stump | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FR | Cut Flush and Remove Shrub, Bush, or Tree, less than 6"/15cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FS | Cut Flush and Remove Tree, 6"/15cm or more, and less than 10"/25cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FT | Cut Flush and Remove Tree, 10"/25cm or more, and less than 14"/35cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FU | Cut Flush and Remove Tree, 14"/35cm or more, and less than 18"/45cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FV | Cut Flush and Remove Tree, 18"/45cm or more, and less than 24"/60cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FW | Cut Flush and Remove Tree, 24"/60cm or more, and less than 30"/76cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | FX | Cut Flush and Remove Tree, 30"/76cm or more Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| MISCELLANEOUS UTILITY WORK | 0 | ||||||||||||||
| 0 | 27 | ||||||||||||||
| A | 001 | FY | Construct Concrete Encasement | 30 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | FZ | Install 28 mm Diameter Polyethylene Coated Rigid Steel Conduit | 100 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GA | Install 36 mm Diameter Polyethylene Coated Rigid Steel Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GB | Install 82 mm Diameter Polyethylene Coated Rigid Steel Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GC | Install 30 mm Diameter Polyethylene Flexible Conduit | 180 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GD | Install 50 mm Diameter Polyethylene Flexible Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GE | Install 80 mm Diameter Polyethylene Flexible Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GF | Install Wall Mounted Light | 5 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GG | Install 3.5 m High Walkway Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GH | Install 4.5 m High Walkway Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GJ | Install 4.5 m High Walkway Light - Globe Shape w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GK | Install 6.6 m High Street Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GL | Install 8.0 m High Street Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GM | Install 6.6 m High Street Light w/ High Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GN | Install 8.0 m High Street Light w/ High Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GP | Install 10 m High Utility Concrete Pole | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GQ | Relocate existing Fire Hydrant within 15 m distance | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GR | Relocate Street Light w/Foundation | 2 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GS | Relocate Utility Pole | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GT | Install Cubicle Transformer Station w/Foundation, 3φ4W, 6.6KV/208-120V, 30KVA/50Hz, approx.W2,500mm x D2,000mm x H2,350mm | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GU | Relocate Cubicle Transformer Station w/Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | GV | Install New Cable CV 3.5mm2-2C | 300 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GW | Install New Cable CV 5.5mm2-2C | 110 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GX | Install New Cable CV 8.0mm2-2C | 140 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GY | Install New 6KV Cable CVT22SQ | 5 | LM | Y | Y | 0 | 1 | ||||||
| A | 001 | GZ | Install New 6KV CVT22SQ Cable Terminal Kits, Indoor Type | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | HA | Install New 6KV CVT22SQ Cable Terminal Kits, Outdoor Type | 1 | EA | Y | Y | 0 | 1 | ||||||
| A | 001 | HB | (Not Used) | Y | N/A | Y | - | ||||||||
| DESIGNATED TEMPORARY CONSTRUCTION WORK | 0 | ||||||||||||||
| 0 | 1 | ||||||||||||||
| A | 001 | HC | Placing and Removing Metal Sheet for Access Road, Size 1.5m x 6.0m x 25mm thk | 2,000 | SM | Y | Y | 0 | 1 | 1 | |||||
| A | 001 | HD | Placing and Removing Foamed Plastic Mat for Access Road, Size 1.2m x 2.4m x 13mm thk | 200 | SM | Y | Y | 0 | 1 | 1 | |||||
| A | 001 | HE | Temporary Construction Fence, 2.2m High, include all required components | 2,000 | LM | Y | Y | 0 | 1 | 1 | |||||
| A | 001 | HF | Temporary Construction Gate, 2.2m High, include all required components | 3 | EA | Y | Y | 0 | 9 | 1 | |||||
| A | 001 | HG | Transportation of Soils/Gravels from Storage Yard on Base to Construction Site, including Rehandling within 100m | 6,000 | CM | Y | Y | 0 | 1 | ||||||
| A | 001 | HH | Transportation of Heavy Vehicle Equipment with Trailer/Truck less than 25km, (Asphalt Finisher, Steel or Tire Roller, etc.) | 100 | WAY | Y | Y | 0 | 1 | ||||||
| Grand Total | Y | 0 | |||||||||||||
| 0 |
&L&10Exhibit A RFP No. FA5205-10-R-0007&C&10Page &P of &N
Exhibit B (R)
| EXHIBIT B | 18 Jun 10 | ||||||||||||||
| ROADS AND PAVEMENTS IDIQ CONTRACT | |||||||||||||||
| MISAWA AB, JAPAN | |||||||||||||||
| REQUEST FOR PROPOSAL No. FA5205-10-R-0007 | |||||||||||||||
| CONTRACT No. | |||||||||||||||
| 0 | |||||||||||||||
| 0 | |||||||||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||||||||
| 0 | |||||||||||||||
| 0 | |||||||||||||||
| Company Name and Address | |||||||||||||||
| * | |||||||||||||||
| Estimated | Unit of | Estimated | |||||||||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||||||||
| ELIN | |||||||||||||||
| B | 001 | Option Year One (One year from the end date of basic year). | 1 | LS | Y | 0 | |||||||||
| Sub ELIN | Sub ELINs for ELIN B001 are listed hereunder. | ||||||||||||||
| Fill-in Left | SubELIN | # Filled | |||||||||||||
| SURVEY AND TEST | |||||||||||||||
| 6 | 175 | ||||||||||||||
| B | 001 | AA | Quantity Survey and Report, 2,000 SM Area | 50 | LOT | Y | Y | 0 | 1 | ||||||
| B | 001 | AB | Topographic Survey including Road Profile & Sections at 20 m intervals, and Provide Survey Map, 2,000 SM Area | 50 | LOT | Y | Y | 0 | 1 | ||||||
| B | 001 | AC | Quantity Survey and Report, Underground Utility Lines and Manholes | 1,000 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | AD | Quantity Survey and Report, Pavement Cracks or Curbs or Markings | 5,000 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | AE | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 20 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | AF | Core Drilling and Sampling of AC or PCC Pavement of Roads, Parking Lots, and Other Surfaces | 80 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | AG | Test Digging of AC Pavement, not exceed 1m x 1m x 1m including temporary pavement restoration | 10 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| ASPHALT CONCRETE SURFACES | 0 | ||||||||||||||
| B | 001 | AH | Remove & Reconstruct 50 mm Thick AC Surface, including Fine Grade and Compaction | 1,500 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | AJ | 30 mm Thick AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | AK | 50 mm Thick AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | AL | 50 mm Thick AC Surface, including Fine Grade and Compaction | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | AM | Place AC Intermediate Leveling Course | 200 | MTON | Y | Y | 0 | 1 | ||||||
| B | 001 | AN | Construct Base Course (Mixtured Stone M30-0) | 2,200 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | AP | Construct Subbase Course (Crushed Stone C40-0) | 1,400 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | AQ | Construct Granular Material (Mountain Sand) | 800 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | AR | Apply Soil-Cement Stabilization of Existing or New Subbase (200mm Thick) | 200 | SM | Y | Y | 0 | 13 | 1 | |||||
| B | 001 | AS | Remix and Repave with Heating Stabilization of Existing AC Pavement, Cement and Asphalt Mixtures In-place (100mm Thick) | 200 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| ADDITIONAL MINOR PAVEMENT WORK | 0 | ||||||||||||||
| 0 | |||||||||||||||
| B | 001 | AT | Furnish & Apply Asphalt Prime Coat | 12,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | AU | Furnish & Apply Asphalt Tack Coat | 12,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | AV | Repair Cracks of existing AC or PCC Pavement with Routing and Crack-cutting and Hot Apply Sealing, 1-20 mm in width and depth | 4,000 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | AW | Sealing Cracks or Joints in between new and existing of AC or PCC with Saw-cutting and Routing, approx. 20 mm in width and depth | 1,000 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | AX | Place Expansion Joint Filler and Sealant | 300 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | AY | Surface Treatment on existing AC Pavement (Cold-Application Mixture, not less than 1.26 kg per square meter) | 2,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | AZ | Place Portland cement concrete | 100 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | BA | Install Concrete Formwork | 200 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | BB | Install Concrete Reinforcement Bars | 2,000 | KG | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| RECYCLED AC PAVEMENT | 0 | ||||||||||||||
| 0 | 2 | ||||||||||||||
| B | 001 | BC | 50 mm Thick Recycled AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | BD | 50 mm Thick Recycled AC Pavement over Base Course, including Fine Grade and Compaction | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| PAVEMENT MARKINGS | 0 | ||||||||||||||
| 0 | 4 | ||||||||||||||
| B | 001 | BE | Removal of Pavement Marking | 80 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | BF | Pavement Marking Stripes, Reflective, 150mm Wide, White | 15,000 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | BG | Alphanumeric Concrete Curb Marking | 100 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | BH | White, Handicap Symbol Parking Stall Pavement Marking | 10 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| SIDEWALK/STAIRS/SIGN POSTS/BARRICADES | 0 | ||||||||||||||
| 0 | 10 | ||||||||||||||
| B | 001 | BJ | Construct New Concrete Sidewalk, Complete in Place | 100 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | BK | Remove and Replace existing Concrete Sidewalk, Complete in Place | 400 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | BL | Construct New Accessible Sidewalk Ramp, Type A, B, or C, Complete in Place | 10 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | BM | Place Inter-Locking Concrete Tiles (300x300x60 mm) | 20 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | BN | Construct New Concrete Stairs, Complete in Place | 2 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | BP | Install New Stair Handrails | 7 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | BQ | Install Traffic Sign & Post | 10 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | BR | Install Traffic Sign | 5 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | BS | Install Guard Rail with Reflector, (Brown Color, 700 mm high, R-GR.C-2B or R-GR.B-2B) | 10 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | BT | Install Removable Steel Bollard with concrete footing, Steel Tube w/ Cover & Lock (165 mm diameter, 90 cm high) | 10 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | BU | Install Guard Pipe 0.8 m high Steel Post with Beam Pipes and continuous concrete footing | 10 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| CURB, CURB AND GUTTER | 0 | ||||||||||||||
| 0 | 7 | ||||||||||||||
| B | 001 | BV | Remove and Replace existing Concrete Curbs, Cast-in-Place, 150mm Standard Barrier Type | 300 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | BW | Remove and Replace existing Concrete Curbs and Gutters, Cast-in-Place, 150mm Standard Barrier Type | 700 | LM | Y | Y | 0 | 6 | 1 | |||||
| B | 001 | BX | Construct Cast-in-Place Concrete Curbs and Gutters, 150mm Standard Barrier Type | 100 | LM | Y | Y | 0 | 3 | 1 | |||||
| B | 001 | BY | Construct Cast-in-Place Concrete Curbs and Gutters, 150mm Standard Mountable Type | 20 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | BZ | Construct Cast-in-Place Concrete High Curbs, 460mm Barrier Type | 50 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| SURFACE INLETS/STORM DRAIN LINES | 0 | ||||||||||||||
| 0 | |||||||||||||||
| B | 001 | CA | Raise/Lower existing Gutter Inlet, Concrete Frame and Grating Cover | 20 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CB | Remove and Replace Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-14) | 3 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CC | Remove and Replace Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-25) | 5 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CD | Install New Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-25) | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CE | Install New Concrete "U" Ditches with Steel Grating Cover (W300mm x D300mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CF | Install New Concrete "U" Ditches with Steel Grating Cover (W450mm x D450mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CG | Install New Heavy Duty Concrete "U" Ditches with Steel Grating Cover (W450mm x D900mm, Load ClassT-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CH | Install Free Gradient Concrete "U" Ditches and Steel Grating Cover (W400mm x D1100mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CJ | Install V-Type Concrete Ditch (W700mm x 85mm Thick) | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CK | Install 200 mm Diameter Concrete Drain Pipe | 30 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CL | Install 300 mm Diameter Concrete Drain Pipe | 10 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CM | Install 400 mm Diameter Concrete Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CN | Install 600 mm Diameter Concrete Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CP | Install 50 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CQ | Install 100 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | CR | Install 200 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| MANHOLES/HANDHOLE/CATCH BASIN | 0 | ||||||||||||||
| 0 | |||||||||||||||
| B | 001 | CS | Raise/Lower existing Manhole Frame and Cover | 5 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CT | Raise/Lower existing Handhole Frame and Cover | 5 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CU | Raise/Lower existing Gate Valve Box | 3 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CV | Replace existing Manhole with precast Concrete Structures and Ductile Cover, 600 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CW | Replace existing Manhole with precast Concrete Structures and Ductile Cover, 900 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CX | Replace existing Catch Basin with precast Concrete Structures and Grating Cover, 900 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CY | Install Precast Concrete Manhole, 600 mm round or square, 1.2 m depth (Ductile Cover φ600 mm round or square, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | CZ | Install Precast Concrete Manhole, 600 mm round or square, 1.2 m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DA | Install Precast Concrete Manhole, 900 mm round or square, 1.5 m depth (Ductile Cover φ600 mm round or square, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DB | Install Precast Concrete Manhole, 900 mm round or square 1.5 m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DC | Install Precast Concrete Manhole, 1.2m round or square 2.0m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DD | Install Precast Handhole, φ=0.9m, D=1.5m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DE | Install Pre-Cast Handhole H1.5m x W1.5m xD2m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DF | Install Pre-Cast Handhole H2m x W2m xD2m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DG | Install New Manhole Locking Device (Set of 4 each per manhole) | 50 | SET | Y | Y | 0 | 1 | ||||||
| WATER SUPPLY PIPE AND GATE VALVE | 0 | ||||||||||||||
| 0 | 9 | ||||||||||||||
| B | 001 | DH | Install new 50 mm Poly Vinyl Chloride Pipe and Fittings | 10 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | DJ | Install new 100 mm Poly Vinyl Chloride Pipe and Fittings | 10 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | DK | Install new 100 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | DL | Install new 150 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | DM | Install new 200 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | DN | Install Water Gate Valve 100 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DP | Install Water Gate Valve 150 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DQ | Install Water Gate Valve 200 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | DR | Install Air Release Valve | 1 | EA | Y | Y | 0 | 7 | 1 | |||||
| B | 001 | DS | Construct Concrete Thrust Blocking | 1 | CM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| EARTH WORK/SODDING/PLANTING | 0 | ||||||||||||||
| 0 | 5 | ||||||||||||||
| B | 001 | DT | Construct Embankment | 1,000 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | DU | Removal and Restoration of Sod | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | DV | Place Sod (Noshiba) | 4,600 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | DW | Apply Hydroseeding | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | DX | Place Topsoil, 100 mm thick | 800 | CM | Y | Y | 0 | 1 | 1 | |||||
| B | 001 | DY | Plant Cherry Tree (Sakura), 3"/75mm Caliper (diameter) at Breast Height (DBH) with Guy or Pole Supports | 5 | EA | Y | Y | 0 | 1 | 1 | |||||
| B | 001 | DZ | Plant Pinus Densiflore (Akamatsu) Tree, 3"/75mm Caliper (diameter) at Breast Height (DBH) with Guy or Pole Supports | 2 | EA | Y | Y | 0 | 1 | 1 | |||||
| B | 001 | EA | Apply Emulsion Coat to Tree Branches and Stumps Cut | 100 | SM | Y | Y | 0 | 1 | 1 | |||||
| B | 001 | EB | Place Polyester Fabric Multi Sheet for Erosion Control & Protection, 0.5 mm thk | 50 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| FENCING AND GATES | 0 | ||||||||||||||
| 0 | 11 | ||||||||||||||
| B | 001 | EC | Install Fence 2.4 m high, Chain-link w/Single Arm Extension w/barbed wire with Concrete Foundation | 40 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | ED | Install Fence 2.4 m high, Chain-link w/Double Arm Extension w/barbed wire with Concrete Foundation | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | EE | Install Pedestrian Gate H2.4 m x W2.1 m Chain-link w/Vertical Arm Extension w/barbed wire with Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | EF | Install Double Swing Gate H2.4 m x W7.3 m Chain-link w/Single Arm Extension w/barbed wire with Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | EG | Install 1.8 m High Decorative CMU Reinforced Wall Fence with Resin Emulsion Paint | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | EH | Install 2.2 m High Decorative CMU Reinforced Wall Fence with Resin Emulsion Paint | 20 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | EJ | Install Pedestrian Gate H2.2 m x W2.1 m for Decorative CMU Reinforced Wall Fence | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | EK | Install Double Swing Gate H2.2 m x W7.1 m for Decorative CMU Reinforced Wall Fence | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | EL | Install Fence 2.4 m high, Lattice-frame w/Vertical Steel Pipe Extension and Concrete Foundation | 10 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | EM | Install Personnel Gate H2.4 m x W2.0 m Lattice-frame w/Vertical Steel Pipe Extension and Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | EN | Install Single Swing Gate H2.4 m x W5.0 m Lattice-frame w/Vertical Steel Pipe Extension and Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | EP | Install Outrigger Post @ 3.55m on CMU Wall with 3 Stranded Barbed Wires | 20 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | EQ | Install Guard Wire and Fixed Steel Bollard | 10 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | ER | Relocate existing Chain-link Fence with dis-assembling of post, frames, fabric net, barbed wires and concrete footing | 20 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | ES | Remove and Salvage existing Chain-link Fence, Post, Wires, and Dispose concrete footing | 10 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | ET | Remove and Salvage existing Personnel Chain-link Gate, Post, Frames, Wires, and Dispose concrete footing | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | EU | Remove and dispose existing Double Swing Chain-link Gate, Post, Frames, Wires, and dispose concrete footing | 1 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| REMOVAL AND DISPOSAL WORK | 0 | ||||||||||||||
| 0 | 27 | ||||||||||||||
| B | 001 | EV | Saw Cutting Existing AC Pavement, 50mm in Depth | 5,400 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | EW | Saw Cutting Existing Concrete Pavement, 100mm in Depth | 100 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | EX | 30 mm Thick Cold Planing of AC Pavement | 300 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | EY | 50 mm Thick Cold Planing of AC Pavement | 5,000 | SM | Y | Y | 0 | 1 | ||||||
| B | 001 | EZ | Removal and Disposal of Asphalt Concrete Pavement | 1,700 | MTON | Y | Y | 0 | 1 | ||||||
| B | 001 | FA | Removal and Disposal of Subbase/Base Course | 2,000 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | FB | Unclassified Excavation and Disposal | 1,200 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | FC | Removal and Disposal of Reinforced Concrete | 50 | MTON | Y | Y | 0 | 1 | ||||||
| B | 001 | FD | Removal and Disposal of Plain Concrete | 50 | MTON | Y | Y | 0 | 1 | ||||||
| B | 001 | FE | Removal and Disposal of Concrete Curbs | 100 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | FF | Removal and Disposal of Concrete Curbs and Gutters | 350 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | FG | Removal and Disposal of Street Light and Foundation | 3 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FH | Removal and Disposal of Cable with Conduit | 40 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | FJ | Removal and Disposal of Water Pipe | 30 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | FK | Removal and Disposal of Steel, Plastic and Wood Structure | 10 | MTON | Y | Y | 0 | 1 | ||||||
| B | 001 | FL | Removal and Disposal of Metal Structure & Railings | 10 | MTON | Y | Y | 0 | 1 | ||||||
| B | 001 | FM | Removal and Disposal of Shrub, Bush, or Tree, less than 6"/15cm Caliper (Diameter) at Breast High (DBH) and Stump | 10 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FN | Removal and Disposal of Tree, 6"/15cm or more, and less than 14"/35cm Caliper (Diameter) at Breast High (DBH) and Stump | 10 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FP | Removal and Disposal of Tree, 14"/35cm or more, and less than 30"/76cm Caliper (Diameter) at Breast High (DBH) and Stump | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FQ | Removal and Disposal of Tree, 30"/76cm or more Caliper (Diameter) at Breast High (DBH) and Stump | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FR | Cut Flush and Remove Shrub, Bush, or Tree, less than 6"/15cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FS | Cut Flush and Remove Tree, 6"/15cm or more, and less than 10"/25cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FT | Cut Flush and Remove Tree, 10"/25cm or more, and less than 14"/35cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FU | Cut Flush and Remove Tree, 14"/35cm or more, and less than 18"/45cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FV | Cut Flush and Remove Tree, 18"/45cm or more, and less than 24"/60cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FW | Cut Flush and Remove Tree, 24"/60cm or more, and less than 30"/76cm Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | FX | Cut Flush and Remove Tree, 30"/76cm or more Caliper (Diameter) at Breast High (DBH), on Base Disposal | 2 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| MISCELLANEOUS UTILITY WORK | 0 | ||||||||||||||
| 0 | 27 | ||||||||||||||
| B | 001 | FY | Construct Concrete Encasement | 30 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | FZ | Install 28 mm Diameter Polyethylene Coated Rigid Steel Conduit | 100 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GA | Install 36 mm Diameter Polyethylene Coated Rigid Steel Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GB | Install 82 mm Diameter Polyethylene Coated Rigid Steel Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GC | Install 30 mm Diameter Polyethylene Flexible Conduit | 180 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GD | Install 50 mm Diameter Polyethylene Flexible Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GE | Install 80 mm Diameter Polyethylene Flexible Conduit | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GF | Install Wall Mounted Light | 5 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GG | Install 3.5 m High Walkway Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GH | Install 4.5 m High Walkway Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GJ | Install 4.5 m High Walkway Light - Globe Shape w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GK | Install 6.6 m High Street Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GL | Install 8.0 m High Street Light w/ Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GM | Install 6.6 m High Street Light w/ High Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GN | Install 8.0 m High Street Light w/ High Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GP | Install 10 m High Utility Concrete Pole | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GQ | Relocate existing Fire Hydrant within 15 m distance | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GR | Relocate Street Light w/Foundation | 2 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GS | Relocate Utility Pole | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GT | Install Cubicle Transformer Station w/Foundation, 3φ4W, 6.6KV/208-120V, 30KVA/50Hz, approx.W2,500mm x D2,000mm x H2,350mm | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GU | Relocate Cubicle Transformer Station w/Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | GV | Install New Cable CV 3.5mm2-2C | 300 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GW | Install New Cable CV 5.5mm2-2C | 110 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GX | Install New Cable CV 8.0mm2-2C | 140 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GY | Install New 6KV Cable CVT22SQ | 5 | LM | Y | Y | 0 | 1 | ||||||
| B | 001 | GZ | Install New 6KV CVT22SQ Cable Terminal Kits, Indoor Type | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | HA | Install New 6KV CVT22SQ Cable Terminal Kits, Outdoor Type | 1 | EA | Y | Y | 0 | 1 | ||||||
| B | 001 | HB | (Not Used) | Y | N/A | Y | - | ||||||||
| DESIGNATED TEMPORARY CONSTRUCTION WORK | 0 | ||||||||||||||
| 0 | 1 | ||||||||||||||
| B | 001 | HC | Placing and Removing Metal Sheet for Access Road, Size 1.5m x 6.0m x 25mm thk | 2,000 | SM | Y | Y | 0 | 1 | 1 | |||||
| B | 001 | HD | Placing and Removing Foamed Plastic Mat for Access Road, Size 1.2m x 2.4m x 13mm thk | 200 | SM | Y | Y | 0 | 1 | 1 | |||||
| B | 001 | HE | Temporary Construction Fence, 2.2m High, include all required components | 2,000 | LM | Y | Y | 0 | 1 | 1 | |||||
| B | 001 | HF | Temporary Construction Gate, 2.2m High, include all required components | 3 | EA | Y | Y | 0 | 9 | 1 | |||||
| B | 001 | HG | Transportation of Soils/Gravels from Storage Yard on Base to Construction Site, including Rehandling within 100m | 6,000 | CM | Y | Y | 0 | 1 | ||||||
| B | 001 | HH | Transportation of Heavy Vehicle Equipment with Trailer/Truck less than 25km, (Asphalt Finisher, Steel or Tire Roller, etc.) | 100 | WAY | Y | Y | 0 | 1 | ||||||
| Grand Total | Y | 0 | |||||||||||||
| 0 |
&L&10Exhibit B RFP No. FA5205-10-R-0007&C&10Page &P of &N
Exhibit C (R)
| EXHIBIT C | 18 Jun 10 | ||||||||||||||
| ROADS AND PAVEMENTS IDIQ CONTRACT | |||||||||||||||
| MISAWA AB, JAPAN | |||||||||||||||
| REQUEST FOR PROPOSAL No. FA5205-10-R-0007 | |||||||||||||||
| CONTRACT No. | |||||||||||||||
| 0 | |||||||||||||||
| 0 | |||||||||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||||||||
| 0 | |||||||||||||||
| 0 | |||||||||||||||
| Company Name and Address | |||||||||||||||
| * | |||||||||||||||
| Estimated | Unit of | Estimated | |||||||||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||||||||
| ELIN | |||||||||||||||
| C | 001 | Option Year Two (One year from the end date of option year one). | 1 | LS | Y | 0 | |||||||||
| Sub ELIN | Sub ELINs for ELIN C001 are listed hereunder. | ||||||||||||||
| Fill-in Left | SubELIN | # Filled | |||||||||||||
| SURVEY AND TEST | |||||||||||||||
| 6 | 175 | ||||||||||||||
| C | 001 | AA | Quantity Survey and Report, 2,000 SM Area | 50 | LOT | Y | Y | 0 | 1 | ||||||
| C | 001 | AB | Topographic Survey including Road Profile & Sections at 20 m intervals, and Provide Survey Map, 2,000 SM Area | 50 | LOT | Y | Y | 0 | 1 | ||||||
| C | 001 | AC | Quantity Survey and Report, Underground Utility Lines and Manholes | 1,000 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | AD | Quantity Survey and Report, Pavement Cracks or Curbs or Markings | 5,000 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | AE | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 20 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | AF | Core Drilling and Sampling of AC or PCC Pavement of Roads, Parking Lots, and Other Surfaces | 80 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | AG | Test Digging of AC Pavement, not exceed 1m x 1m x 1m including temporary pavement restoration | 10 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| ASPHALT CONCRETE SURFACES | 0 | ||||||||||||||
| C | 001 | AH | Remove & Reconstruct 50 mm Thick AC Surface, including Fine Grade and Compaction | 1,500 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | AJ | 30 mm Thick AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | AK | 50 mm Thick AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | AL | 50 mm Thick AC Surface, including Fine Grade and Compaction | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | AM | Place AC Intermediate Leveling Course | 200 | MTON | Y | Y | 0 | 1 | ||||||
| C | 001 | AN | Construct Base Course (Mixtured Stone M30-0) | 2,200 | CM | Y | Y | 0 | 1 | ||||||
| C | 001 | AP | Construct Subbase Course (Crushed Stone C40-0) | 1,400 | CM | Y | Y | 0 | 1 | ||||||
| C | 001 | AQ | Construct Granular Material (Mountain Sand) | 800 | CM | Y | Y | 0 | 1 | ||||||
| C | 001 | AR | Apply Soil-Cement Stabilization of Existing or New Subbase (200mm Thick) | 200 | SM | Y | Y | 0 | 13 | 1 | |||||
| C | 001 | AS | Remix and Repave with Heating Stabilization of Existing AC Pavement, Cement and Asphalt Mixtures In-place (100mm Thick) | 200 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| ADDITIONAL MINOR PAVEMENT WORK | 0 | ||||||||||||||
| 0 | |||||||||||||||
| C | 001 | AT | Furnish & Apply Asphalt Prime Coat | 12,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | AU | Furnish & Apply Asphalt Tack Coat | 12,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | AV | Repair Cracks of existing AC or PCC Pavement with Routing and Crack-cutting and Hot Apply Sealing, 1-20 mm in width and depth | 4,000 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | AW | Sealing Cracks or Joints in between new and existing of AC or PCC with Saw-cutting and Routing, approx. 20 mm in width and depth | 1,000 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | AX | Place Expansion Joint Filler and Sealant | 300 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | AY | Surface Treatment on existing AC Pavement (Cold-Application Mixture, not less than 1.26 kg per square meter) | 2,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | AZ | Place Portland cement concrete | 100 | CM | Y | Y | 0 | 1 | ||||||
| C | 001 | BA | Install Concrete Formwork | 200 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | BB | Install Concrete Reinforcement Bars | 2,000 | KG | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| RECYCLED AC PAVEMENT | 0 | ||||||||||||||
| 0 | 2 | ||||||||||||||
| C | 001 | BC | 50 mm Thick Recycled AC Overlay of Paved Surfaces, including Edge Preparation & Restoration | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | BD | 50 mm Thick Recycled AC Pavement over Base Course, including Fine Grade and Compaction | 6,000 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| PAVEMENT MARKINGS | 0 | ||||||||||||||
| 0 | 4 | ||||||||||||||
| C | 001 | BE | Removal of Pavement Marking | 80 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | BF | Pavement Marking Stripes, Reflective, 150mm Wide, White | 15,000 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | BG | Alphanumeric Concrete Curb Marking | 100 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | BH | White, Handicap Symbol Parking Stall Pavement Marking | 10 | EA | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| SIDEWALK/STAIRS/SIGN POSTS/BARRICADES | 0 | ||||||||||||||
| 0 | 10 | ||||||||||||||
| C | 001 | BJ | Construct New Concrete Sidewalk, Complete in Place | 100 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | BK | Remove and Replace existing Concrete Sidewalk, Complete in Place | 400 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | BL | Construct New Accessible Sidewalk Ramp, Type A, B, or C, Complete in Place | 10 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | BM | Place Inter-Locking Concrete Tiles (300x300x60 mm) | 20 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | BN | Construct New Concrete Stairs, Complete in Place | 2 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | BP | Install New Stair Handrails | 7 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | BQ | Install Traffic Sign & Post | 10 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | BR | Install Traffic Sign | 5 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | BS | Install Guard Rail with Reflector, (Brown Color, 700 mm high, R-GR.C-2B or R-GR.B-2B) | 10 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | BT | Install Removable Steel Bollard with concrete footing, Steel Tube w/ Cover & Lock (165 mm diameter, 90 cm high) | 10 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | BU | Install Guard Pipe 0.8 m high Steel Post with Beam Pipes and continuous concrete footing | 10 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| CURB, CURB AND GUTTER | 0 | ||||||||||||||
| 0 | 7 | ||||||||||||||
| C | 001 | BV | Remove and Replace existing Concrete Curbs, Cast-in-Place, 150mm Standard Barrier Type | 300 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | BW | Remove and Replace existing Concrete Curbs and Gutters, Cast-in-Place, 150mm Standard Barrier Type | 700 | LM | Y | Y | 0 | 6 | 1 | |||||
| C | 001 | BX | Construct Cast-in-Place Concrete Curbs and Gutters, 150mm Standard Barrier Type | 100 | LM | Y | Y | 0 | 3 | 1 | |||||
| C | 001 | BY | Construct Cast-in-Place Concrete Curbs and Gutters, 150mm Standard Mountable Type | 20 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | BZ | Construct Cast-in-Place Concrete High Curbs, 460mm Barrier Type | 50 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| SURFACE INLETS/STORM DRAIN LINES | 0 | ||||||||||||||
| 0 | |||||||||||||||
| C | 001 | CA | Raise/Lower existing Gutter Inlet, Concrete Frame and Grating Cover | 20 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CB | Remove and Replace Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-14) | 3 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CC | Remove and Replace Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-25) | 5 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CD | Install New Gutter Inlet with Pre-cast Concrete Structures & Grating Cover (Load Class T-25) | 2 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CE | Install New Concrete "U" Ditches with Steel Grating Cover (W300mm x D300mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CF | Install New Concrete "U" Ditches with Steel Grating Cover (W450mm x D450mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CG | Install New Heavy Duty Concrete "U" Ditches with Steel Grating Cover (W450mm x D900mm, Load ClassT-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CH | Install Free Gradient Concrete "U" Ditches and Steel Grating Cover (W400mm x D1100mm, Load Class T-25) | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CJ | Install V-Type Concrete Ditch (W700mm x 85mm Thick) | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CK | Install 200 mm Diameter Concrete Drain Pipe | 30 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CL | Install 300 mm Diameter Concrete Drain Pipe | 10 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CM | Install 400 mm Diameter Concrete Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CN | Install 600 mm Diameter Concrete Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CP | Install 50 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CQ | Install 100 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | CR | Install 200 mm Diameter Sub Drain Pipe | 5 | LM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| MANHOLES/HANDHOLE/CATCH BASIN | 0 | ||||||||||||||
| 0 | |||||||||||||||
| C | 001 | CS | Raise/Lower existing Manhole Frame and Cover | 5 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CT | Raise/Lower existing Handhole Frame and Cover | 5 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CU | Raise/Lower existing Gate Valve Box | 3 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CV | Replace existing Manhole with precast Concrete Structures and Ductile Cover, 600 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CW | Replace existing Manhole with precast Concrete Structures and Ductile Cover, 900 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CX | Replace existing Catch Basin with precast Concrete Structures and Grating Cover, 900 mm round or square (Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CY | Install Precast Concrete Manhole, 600 mm round or square, 1.2 m depth (Ductile Cover φ600 mm round or square, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | CZ | Install Precast Concrete Manhole, 600 mm round or square, 1.2 m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DA | Install Precast Concrete Manhole, 900 mm round or square, 1.5 m depth (Ductile Cover φ600 mm round or square, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DB | Install Precast Concrete Manhole, 900 mm round or square 1.5 m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DC | Install Precast Concrete Manhole, 1.2m round or square 2.0m depth (Ductile Cover φ600 mm round or square, Load Class T-25) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DD | Install Precast Handhole, φ=0.9m, D=1.5m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DE | Install Pre-Cast Handhole H1.5m x W1.5m xD2m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DF | Install Pre-Cast Handhole H2m x W2m xD2m w/accessory, Support Arms and Pin Insulator (Cover φ600 mm, Load Class T-6) | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DG | Install New Manhole Locking Device (Set of 4 each per manhole) | 50 | SET | Y | Y | 0 | 1 | ||||||
| WATER SUPPLY PIPE AND GATE VALVE | 0 | ||||||||||||||
| 0 | 9 | ||||||||||||||
| C | 001 | DH | Install new 50 mm Poly Vinyl Chloride Pipe and Fittings | 10 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | DJ | Install new 100 mm Poly Vinyl Chloride Pipe and Fittings | 10 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | DK | Install new 100 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | DL | Install new 150 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | DM | Install new 200 mm Diameter Ductile Iron Pipe and Fittings | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | DN | Install Water Gate Valve 100 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DP | Install Water Gate Valve 150 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DQ | Install Water Gate Valve 200 mm Diameter | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | DR | Install Air Release Valve | 1 | EA | Y | Y | 0 | 7 | 1 | |||||
| C | 001 | DS | Construct Concrete Thrust Blocking | 1 | CM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| EARTH WORK/SODDING/PLANTING | 0 | ||||||||||||||
| 0 | 5 | ||||||||||||||
| C | 001 | DT | Construct Embankment | 1,000 | CM | Y | Y | 0 | 1 | ||||||
| C | 001 | DU | Removal and Restoration of Sod | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | DV | Place Sod (Noshiba) | 4,600 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | DW | Apply Hydroseeding | 1,000 | SM | Y | Y | 0 | 1 | ||||||
| C | 001 | DX | Place Topsoil, 100 mm thick | 800 | CM | Y | Y | 0 | 1 | 1 | |||||
| C | 001 | DY | Plant Cherry Tree (Sakura), 3"/75mm Caliper (diameter) at Breast Height (DBH) with Guy or Pole Supports | 5 | EA | Y | Y | 0 | 1 | 1 | |||||
| C | 001 | DZ | Plant Pinus Densiflore (Akamatsu) Tree, 3"/75mm Caliper (diameter) at Breast Height (DBH) with Guy or Pole Supports | 2 | EA | Y | Y | 0 | 1 | 1 | |||||
| C | 001 | EA | Apply Emulsion Coat to Tree Branches and Stumps Cut | 100 | SM | Y | Y | 0 | 1 | 1 | |||||
| C | 001 | EB | Place Polyester Fabric Multi Sheet for Erosion Control & Protection, 0.5 mm thk | 50 | SM | Y | Y | 0 | 1 | ||||||
| 0 | |||||||||||||||
| FENCING AND GATES | 0 | ||||||||||||||
| 0 | 11 | ||||||||||||||
| C | 001 | EC | Install Fence 2.4 m high, Chain-link w/Single Arm Extension w/barbed wire with Concrete Foundation | 40 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | ED | Install Fence 2.4 m high, Chain-link w/Double Arm Extension w/barbed wire with Concrete Foundation | 5 | LM | Y | Y | 0 | 1 | ||||||
| C | 001 | EE | Install Pedestrian Gate H2.4 m x W2.1 m Chain-link w/Vertical Arm Extension w/barbed wire with Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | EF | Install Double Swing Gate H2.4 m x W7.3 m Chain-link w/Single Arm Extension w/barbed wire with Concrete Foundation | 1 | EA | Y | Y | 0 | 1 | ||||||
| C | 001 | EG | Install 1.8 m High Decorative CMU Reinforced Wall Fence with Resin Emulsion Paint | 5 | LM | Y | Y | 0 | 1 |
This is the start of the file's text. The full file is on GovTribe.