FA520510R0007_Attachment_2_Drawings.pdf

PDF 5 MB Posted

Attached to
Roads and Pavements IDIQ Contract Federal contract opportunity
Solicitation number
FA5205-10-R-0007
Issued by
Department of the Air Force Pacific Air Forces

About this file

Attachment 2 Drawings RFP No. FA5205-10-R-0007

View the file

Other files for this federal contract opportunity

Other files attached to Roads and Pavements IDIQ Contract, newest first.
File Type Posted
FA5205-10-R-0007-0001.pdf PDF
Q A_FA5205-10-R-0007.pdf PDF
Pre-proposal_Conference_Minutes_10R0007.pdf PDF
FA520510R0007_Attachment_3_Schedule_of_Contractors_Submittal.pdf PDF
FA520510R0007_Attachment_4_Historical_Data.pdf PDF
FA520510R0007_Attachment_1_Specifications.pdf PDF
FA520510R0007__SF1442.pdf PDF
(Identifiable Offeror s Name)_10R0007_Exhibit A-C.xls XLS spreadsheet
No_Bid_Form.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREPARED BY:

35 CIVIL ENGINEERING SQUADRON

US AIR FORCE, MISAWA AB

APO AP 96319-5022

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TITLE SHEET 1 OF 76

DRAWING NUMBER

T-1 1

TITLE SHEET

MISAWA AIR BASE

JAPAN

IDIQ CONTRACT

ROADS/PAVEMENTS

Date: 21 Jun 10

Solicitation No. FA5205-10-R-0007

Contract No.

Attachment 2

DRAWING NO.

(SEQ. NO.) SHEET NO. REF.NO.

1 1 OF 76 T-1 TITLE SHEET 12/21/2009

2 2 OF 76 T-2 PROJECT COORDINATION / APPROVAL 12/21/2009

3 3 OF 76 T-3 SCHEDULE OF DRAWINGS-1 12/21/2009

4 4 OF 76 T-4 SCHEDULE OF DRAWINGS-2 12/21/2009

5 5 OF 76 T-5 REVISIONS 12/21/2009

6 6 OF 76 T-6 AREA COST ADJUSTMENT MAP 12/21/2009

7 7 OF 76 C-1 LOCATION MAP 12/21/2009

8 8 OF 76 C-2 TYPICAL AC PAVEMENT SECTION 12/21/2009

9 9 OF 76 C-3 TYPICAL AC SURFACE COURSE REPLACEMENT 12/21/2009

10 10 OF 76 C-4 TYPICAL AC OVERLAY SECTION 12/21/2009

11 11 OF 76 C-5 AC PAVEMENT OVERLAY AND TYPICAL SHOULDER DETAIL 12/21/2009

12 12 OF 76 C-6 LONGITUDINAL AND TRANSVERSE TRANSITION 12/21/2009

13 13 OF 76 C-7 TYPICAL INTER-ROCKING CONCRETE TILES 12/21/2009

14 14 OF 76 C-8 V-TYPE CONCRETE DITCH DETAIL 12/21/2009

15 15 OF 76 C-9 CAST-IN PLACE CONCRETE CURB 150 MM (BARRIER) 12/21/2009

16 16 OF 76 C-10 CAST-IN PLACE CURB & GUTTER 460 MM (BARRIER) 12/21/2009

17 17 OF 76 C-11 CONSTRUCT ACCESSIBLE SIDEWALK RAMP TYPE A, B, & C 12/21/2009

18 18 OF 76 C-12 SIDEWALK RAMP DETAIL 12/21/2009

19 19 OF 76 C-13 CAST-IN PLACE CONCRETE CURB AND GUTTER 12/21/2009

20 20 OF 76 C-14 CONCRETE SIDEWALK DETAIL 12/21/2009

21 21 OF 76 C-15 GUTTER INLET DETAIL 12/21/2009

22 22 OF 76 C-16 CONCRETE "U" DITCH W/GRATING 12/21/2009

23 23 OF 76 C-17 HEAVY DUTY CONC "U" DITCH W/GRATING 12/21/2009

24 24 OF 76 C-18 HEAVY DUTY SURFACE INLET DETAIL 12/21/2009

25 25 OF 76 C-19 RECEIVER INLET FRAME AND COVER ADJUSTMENT 12/21/2009

26 26 OF 76 C-20 L-TYPE GUTTER INLET DETAIL (500) 12/21/2009

27 27 OF 76 C-21 L-TYPE GUTTER INLET DETAIL (300) 12/21/2009

28 28 OF 76 C-22 REPAIR OF PCC & PAVEMENTS (UTILITY & TRENCH) 12/21/2009

29 29 OF 76 C-23 PIPE UNDER AC PAVEMENT DETAIL 12/21/2009

30 30 OF 76 C-24 TRENCH DETAIL 12/21/2009

31 31 OF 76 C-25 RAISE/LOWER GUTTER INLET FRAME & COVER 12/21/2009

32 32 OF 76 C-26 RAISE/LOWER CATCH BASIN FRAME & COVER 12/21/2009

33 33 OF 76 C-27 RAISE/LOWER MANHOLE FRAME & COVER 12/21/2009

34 34 OF 76 C-28 RAISE/LOWER HANDHOLE FRAME & COVER 12/21/2009

35 35 OF 76 C-29 RAISE/LOWER VALVE BOX DETAIL 12/21/2009

36 36 OF 76 C-30 PAVEMENT MARKING DETAILS 12/21/2009

37 37 OF 76 C-31 PRECAST FREE GRADIENT DITCH DETAIL 12/21/2009

38 38 OF 76 C-32 CRACK REPAIR DETAIL (GEOTEXTILE) 12/21/2009

39 39 OF 76 C-33 ALPHANUMERIC SYMBOL DETAIL 12/21/2009

40 40 OF 76 C-34 HANDICAP PAVEMENT MARKINGS 12/21/2009

41 41 OF 76 C-35 STAIR PLAN AND ELEVATION 12/21/2009

42 42 OF 76 C-36 STAIR SECTION 12/21/2009

43 43 OF 76 C-37 TYPICAL SIGN & POST DETAIL 12/21/2009

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY SCHEDULE OF DRAWINGS-1 3 OF 76

DRAWING NUMBER

T-3 3

LIST OF DRAWINGS-1

DESCRIPTION

DATE OF

DRAWING/REVISION

DRAWING NO.

(SEQ. NO.) SHEET NO. REF.NO.

44 44 OF 76 C-38 BOLLARD INSTALLATION & AC PAVEMENT RESTORATION 12/21/2009

45 45 OF 76 C-39 BOLLARD INSTALLATION (165MM) DETAIL 12/21/2009

46 46 OF 76 C-40 TWIN BOLLARD INSTALLATION DETAIL 12/21/2009

47 47 OF 76 C-41 TYPICAL DETAILS OF PERIMETER FENCING 12/21/2009

48 48 OF 76 C-42 PERIMETER FENCE POST DETAIL 12/21/2009

49 49 OF 76 C-43 BARBED WIRE INSTALLATION AND WIRE NET EDGE DETAILS 12/21/2009

50 50 OF 76 C-44 WIRE NET INSTALLATION DETAIL 12/21/2009

51 51 OF 76 C-45 DETAIL OF DOUBLE SWING GATE 12/21/2009

52 52 OF 76 C-46 GUARD RAIL AND GUARD WIRE DETAIL 12/21/2009

53 53 OF 76 C-47 STREET LIGHT 12/21/2009

54 54 OF 76 C-48 STREET LIGHT DETAIL 12/21/2009

55 55 OF 76 C-49 LIGHTED BOLLARD 12/21/2009

56 56 OF 76 C-50 WALL MOUNTED LIGHT 12/21/2009

57 57 OF 76 C-51 WALKWAY LIGHT (3.5M) 12/21/2009

58 58 OF 76 C-52 WALKWAY LIGHT (4.5M) 12/21/2009

59 59 OF 76 C-53 WALKWAY LIGHT - GLOBE SHAPE (4.5M) 12/21/2009

60 60 OF 76 C-54 UTILITY POLE (CONCRETE POLE) 12/21/2009

61 61 OF 76 C-55 PERSONNEL GATE DETAIL FOR CMU WALL 12/21/2009

62 62 OF 76 C-56 DOUBLE SWING GATE DETAIL FOR CMU WALL 12/21/2009

63 63 OF 76 C-57 DETAIL OF LATTICE-FRAME SECURITY FENCING 12/21/2009

64 64 OF 76 C-58 DETAIL OF LATTICE-FRAME PERSONNEL GATE 12/21/2009

65 65 OF 76 C-59 DETAIL OF LATTICE-FRAME SINGLE SWING GATE 12/21/2009

66 66 OF 76 C-60 GUARD PIPE DETAIL 12/21/2009

67 67 OF 76 C-61 CMU WALL ELEVATION 12/21/2009

68 68 OF 76 C-62 CMU WALL SECTION 12/21/2009

69 69 OF 76 C-63 CMU WALL DETAIL 12/21/2009

70 70 OF 76 C-64 DETAIL OF PRE-CAST CONCRETE MANHOLE (ELECT) 12/21/2009

71 71 OF 76 C-65 DETAIL OF PRE-CAST CONCRETE MANHOLE (ELECT) 12/21/2009

72 72 OF 76 C-66 DETAIL OF CABLE RACKS, HOOKS AND CONDUIT 12/21/2009

73 73 OF 76 C-67 CUBICLE TRANSFORMER STATION 12/21/2009

74 74 OF 76 C-68 CUBICLE TRANSFORMER STATION DIAGRAM 12/21/2009

75 75 OF 76 C-69 SUB DRAIN PIPE 12/21/2009

76 76 OF 76 C-70 CONSTRUCTION SIGN 12/21/2009

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY SCHEDULE OF DRAWINGS-2 4 OF 76

DRAWING NUMBER

T-4 4

SCHEDULE OF DRAWINGS-2

DESCRIPTION

DATE OF

DRAWING/REVISION

SHEET NO. REV. LTR SYMBOL DATE

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY REVISIONS 5 OF 76

DRAWING NUMBER

T-5 5

REVISIONS

APPROVALDESCRIPTION

AREA COST ADJUSTMENT MAP NOT TO SCALE

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY AREA COST ADJUSTMENT MAP 6 OF 76

DRAWING NUMBER

T-6 6

PROJECT LOCATION IS ENTIRE MISAWA AB, JAPAN, INCLUDING ALL OF FALCON ROAD/DRIVE, AND ITS REMOTE AREAS

(DRAUGHON RANGE IN AMAGAMORI), INCLUDING ANY OTHER U.S. GOVERNMENT FACILITY

WITHIN 150 KM OF MISAWA AB, EXCEPT FOR AIRFIELD AT MISAWA AB, AND HACHINOHE POL DEPOT AREAS.

LOCATION MAP OF MISAWA AB NOT TO SCALE

LOCATION MAP OF DRAUGHON RANGE NOT TO SCALE

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY LOCATION MAP 7 OF 76

DRAWING NUMBER

C-1 7

OGAWARA-KO

NOTE:

1. REMOVE EXISTING AC/BASE/SUBBASE COURSE AND SUBGRADE AS REQUIRED TO THE DEPTHS

SUCH THAT COMPACTED THICKNESS WILL BE AS SHOWN ABOVE.

2. FINISH GRADES SHALL MATCH SURROUNDING SURFACE AND SHALL HAVE

TRANSVERSE SLOPES OF 2%, OR A.O.B.E.

TYPICAL AC PAVEMENT SECTION

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TYPICAL AC PAVEMENT SECTION 8 OF 76

DRAWING NUMBER

C-2 8

T=30mm: T=50mm: T=100

EXISTING BASE COURSE FINE GRADE &

RECOMPACT TO 100% MAXIMUM DENSITY.

PROVIDE BASE COURSE AT DEPRESSED

AREAS AND AS REQUIRED TO PROVIDE

TRANSVERSE SLOPES AS SHOWN.

NOTE:

1. SLOPE AT PARKING LOT AREA MAY VARY.

2. BASE COURSE FINE GRADING & RECOMPACTION, WITHIN +/-50mm IS TO BE A COST INCLUDED

IN THE BID ITEM(S) FOR SURFACE COURSE REPLACEMENT.

* SLOPE VARIES AT SUPERELEVATED SECTIONS.

TYPICAL AC SURFACE COURSE REPLACEMENT

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TYPICAL AC SURFACE COURSE REPLACEMENT 9 OF 76

C-3 9

TYPICAL AC OVERLAY SECTION

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TYPICAL AC OVERLAY SECTION 10 OF 76

C-4 10

TYPICAL SECTION AT EXISTING CURB

N.T.S.

TYPICAL SHOULDER DETAIL

N.T.S.

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY AC PAVEMENT OVERLAY AND TYPICAL SHOULDER DETAIL 11 OF 76

C-5 11

ALTERNATE: EXISTING PAVEMENT COLD PLANE, (MILL), VARIABLE DEPTH (0mm-50mm)

EXISTING PAVEMENT; REMOVE DEBRIS AND CLEAN SURFACE; APPLY TACK COAT

& NEW AC OVERLAY

LONGITUDINAL AND TRANSVERSE TRANSITION

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY LONGITUDINAL AND TRANSVERSE TRANSITION 12 OF 76

C-6 12

INTER-ROCKING CONCRETE TILES

TYPICAL INTER-ROCKING INSTALLATION PLAN

TYPICAL INTER-ROCKING CONCRETE TILES

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TYPICAL INTER-ROCKING CONCRETE TILES 13 OF 76

C-7 13

V-TYPE CONCRETE DITCH DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY V-TYPE CONCRETE DITCH DETAIL 14 OF 76

C-8 14

CAST-IN PLACE CONCRETE CURB 150 MM (BARRIER)

JOINT & SNOW POLE SCHEMATIC PLAN

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CAST-IN PLACE CONCRETE CURB 150 MM (BARRIER) 15 OF 76

DRAWING NUMBER

C-9 15

Flexural and/or 4.5-6.5-20

NOTE: PROVIDE LEVELING MORTAR ON BASE COURSE.

CAST-IN PLACE CURB AND GUTTER 460 MM (BARRIER)

JOINT & SNOW POLE SCHEMATIC PLAN

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CAST-IN PLACE CURB AND GUTTER 460 MM (BARRIER) 16 OF 76

C-10 16

INTENTIONALLY BLANK

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CONSTRUCT ACCESSIBLE SIDEWALK RAMP TYPE A, B, & C 17 OF 76

DRAWING NUMBER

C-11 17

8.33% MAXIMUM SLOPE

(UNLESS OTHERWISE NOTED)

GROOVINGNON-BITUMINOUS EXPANSION

JOINT AND SEALER CURB RAMP SECTION

CLEAR SPACE

SIDEWALK

12 CURB FACE

GROOVING DETAIL

APPROXIMATELY 19

6 6

100 MINIMUM THICKNESS

1.22 M

SIDEWALK

2% M

AXIM

U M

CROSSWALK

1.22 M

1.

M1.52 M

1.52 M

8.

M

AXIM

U M

10%M A X

IM

U M

S

LO

P E

10%M

AXIM

U M

SLO

PE

GROOVING

8.33% MAXIMUM 8.33% MAXIMUM

FRONT EDGE

OF WALK

VARIES

SEE PLANS

SIDEWALK SIDEWALK

GROOVING

0 MM CURB FACE

TYPE A

TYPE C

TYPE B

.8

M

.3

M A

X

IM

U M

SIDEWALK

GROOVING

0.90 M 1.22 M 0.90 M

10% MAXIMUM SLOPE10% MAXIMUM

SLOPE

1.50 M

TYPICAL

150 MM WHITE STRIPING (TYPICAL)

CROSSWALK

1.50 M TYPICAL

150 MM WHITE STRIPING (TYPICAL)

1.82 M 1.82 M

DETECTABLE WARNING SYSTEM

(SEE DETAIL)

DETECTABLE WARNING SYSTEM

(SEE DETAIL)

DETECTABLE WARNING SYSTEM

(SEE DETAIL)

RAMP

DETECTABLE WARNING

SYSTEM DETAIL

1.22 M

1.

M

M A

X

IM

U M

M A

X

IM

U M

M A

X

IM

U M

SEE CURB RAMP SECTION

SEE CURB RAMP SECTION

SIDEWALK RAMP DETAIL

A-A' SECTION DETAIL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY SIDEWALK RAMP DETAIL 18 OF 76

C-12 18

CAST-IN PLACE STANDARD BARRIER CONCRETE CURB AND GUTTER

CAST-IN PLACE STANDARD MOUNTABLE CONCRETE CURB AND GUTTER

NOTE: ALL CURBING CONCRETE IS TO BE AIR ENTRAINED

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CAST-IN PLACE CONCRETE CURB AND GUTTER 19 OF 76

DRAWING NUMBER

C-13 19

Flexural and/or 4.5-6.5-20

Flexural and/or 4.5-6.5-20

CONCRETE SIDEWALK DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CONCRETE SIDEWALK DETAIL 20 OF 76

DRAWING NUMBER

C-14 20

NOTES:

1. TRANSVERSE CONTRACTION

JOINTS SHALL BE LOCATED

SUCH THAT THE LENGH

DIMENSION OF THE SLABS IS

NO GRATER THAN 1.25 TIMES

THE WIDTH AND NORMALLY

1.0 TIMES THE WIDTH.

2. EXPANSION JOINTS SHALL

BE CONSTRUCTED NOT MORE

THAN FIVE TIMES THE WIDE

"W" OF THE WALKWAY.

GUTTER INLET DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY GUTTER INLET DETAIL 21 OF 76

C-15 21

CONCRETE "U" DITCH W/ GRATING

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CONCRETE "U" DITCH W/GRATING 22 OF 76

C-16 22

HEAVY DUTY CONCRETE "U" DITCH W/GRATING

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY HEAVY DUTY CONCRETE "U" DITCH W/GRATING 23 OF 76

C-17 23

HEAVY DUTY SURFACE INLET DETAIL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY HEAVY DUTY SURFACE INLET DETAIL 24 OF 76

C-18 24

RECEIVER INLET FRAME AND COVER

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY RECEIVER INLET FRAME AND COVER ADJUSTMENT 25 OF 76

DRAWING NUMBER

C-19 25

T-25

L-TYPE GUTTER INLET DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY L-TYPE GUTTER INLET DETAIL (500) 26 OF 76

DRAWING NUMBER

C-20 26

GRATING COVER WITH

FRAME AND ANCHOR

(LOAD CLASS T-25)

L-TYPE GUTTER INLET DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY L-TYPE GUTTER INLET DETAIL (300) 27 OF 76

DRAWING NUMBER

C-21 27

GRATING COVER WITH

FRAME AND ANCHOR

(LOAD CLASS T-25)

REPAIR METHOD: EXCAVATE TRENCH AND INSTALL BEDDING UTILITY, COMPACTED BACKFILL, MARKING

BASIC TAPE AND SUBBASE/BASE COURSE TO GRADE AND MAINTAIN OPEN TO TRAFFIC AND

WEATHER FOR A MINIMUM OF 30 DAYS. THEN COMPLETE FINAL PAVEMENT REPAIR

1 OR 2 AS APPROPRIATE FOR AC OR PCC PAVEMENT.

REPAIR METHOD: REMOVE PAVEMENT 600mm MINIMUM FROM EDGES OF THE EXCAVATION. BACKFILL

1 THE CUT WITH WELL-COMPACTED LAYER MEETING SPECIFIED DENSITY, TO THE BOTTOM

OF PAVEMENT STRUCTURE. PLACE A BASE COURSE OF REQUIRED THICKNESS TO

AN ELEVATION APPROX 50mm BELOW PAVEMENT SURFACE, AND PLACE AN ASPHALT

SURFACE OVER THE COMPACTED BASE.

REPAIR METHOD: REMOVE PAVEMENT FROM EDGES OF THE CUT 1,200mm BACKFILL THE CUT WITH

2 WELL-COMPACTED LAYER MEETING SPECIFIED DENSITY, TO THE BOTTOM OF PAVEMENT

STRUCTURE, PLACE A CONCRETE SLAB OF REQUIRED THICKNESS; INSTALL SMOOTH

DOWELS AS REQUIRED BY DRILLING & EPOXYING INTO EXISTING PCC. PAINT AND OIL

OTHER ENDS OF DOWEL TIE BARS.

REPAIR OF PCC & PAVEMENTS (UTILITY & TRENCH)

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY REPAIR OF PCC & PAVEMENTS (UTILITY & TRENCH) 28 OF 76

C-22 28

"D"=PIPE DEPTH TO INVERT

PIPE UNDER AC PAVEMENT DETAIL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY PIPE UNDER AC PAVEMENT DETAIL 29 OF 76

C-23 29

OFF-ROAD TRENCH DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TRENCH DETAIL 30 OF 76

C-24 30

RAISE/LOWER GUTTER INLET FRAME & COVER

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY RAISE/LOWER GUTTER INLET FRAME & COVER 31 OF 76

C-25 31

RAISE/LOWER CATCH BASIN FRAME & COVER

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY RAISE/LOWER CATCH BASIN FRAME & COVER 32 OF 76

C-26 32

RAISE/LOWER MANHOLE FRAME & COVER

INSTALL LOCKING DEVICE, TOTAL

OF 4 EACH PER MANHOLE COVER.

LOCKING DEVICE FOR MANHOLE FRAME & COVER - NOT TO SCALE

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY RAISE/LOWER MANHOLE FRAME & COVER 33 OF 76

DRAWING NUMBER

C-27 33

INSTALL LOCKING

DEVICE (2 EACH TYP.)

90°

RAISE/LOWER HANDHOLE FRAME & COVER

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY RAISE/LOWER HANDHOLE FRAME & COVER 34 OF 76

C-28 34

RAISE/LOWER VALVE BOX DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY RAISE/LOWER VALVE BOX DETAIL 35 OF 76

C-29 35

PAVEMENT MARKING DETAILS

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY PAVEMENT MARKING DETAILS 36 OF 76

C-30 36

PRECAST FREE GRADIENT DITCH DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY PRECAST FREE GRADIENT DITCH DETAIL 37 OF 76

C-31 37

CRACK REPAIR DETAIL (GEOTEXTILE)

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CRACK REPAIR DETAIL (GEOTEXTILE) 38 OF 76

C-32 38

ALPHANUMERIC SYMBOL DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY ALPHANUMERIC SYMBOL DETAIL 39 OF 76

C-33 39

PLAN

HANDICAP PAVEMENT MARKINGS

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY HANDICAP PAVEMENT MARKINGS 40 OF 76

C-34 40

"W"=1,220 MINIMUM

"W"=1,830 STANDERD

NOTE: 1. SEE C-36 FOR ADDITIONAL DETAIL

2. PROVIDE LEVELING MORTAR ON BASE COURSE.

STAIR PLAN AND ELEVATION

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY STAIR PLAN AND ELEVATION 41 OF 76

DRAWING NUMBER

C-35 41

STAINLESS STEEL

HANDRAILS

SECTION A-A

40mm DIA. STENLESS STEEL

HANDRAIL, MITERED, WELDED

& JOINTS GROUND SMOOTH

NOTE:

1. CONCRETE IS TO BE

AIR-ENTRAINED.

2. PROVIDE ADDITIONAL

VERTICAL POST @ FOR

EACH 5 RISERS.

3. PROVIDE LEVELING MORTAR

ON BASE COURSE.

SECTION B-B

STAIR SECTION

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY STAIR SECTION 42 OF 76

C-36 42

TYPICAL SIGN & POST DETAIL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TYPICAL SIGN & POST DETAIL 43 OF 76

C-37 43

TYPICAL INSTALLATION PLAN OF BOLLARDS

TYPICAL SECTION AC PAVEMENT RESTORATION

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY BOLLARD INSTALLATION & AC PAVEMENT RESTORATION 44 OF 76

C-38 44

DETAIL SECTION-165mm BOLLARD INSTALLATION

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY BOLLARD INSTALLATION (165MM) DETAIL 45 OF 76

C-39 45

TWIN BOLLARD INSTALLATION DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TWIN BOLLARD INSTALLATION DETAIL 46 OF 76

C-40 46

NOTE: SEE RE.NO.C-45 TO C-48, INCLUSIVE, FOR ADDITIONAL DETAILS.

TYPICAL DETAILS OF PERIMETER FENCING

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY TYPICAL DETAILS OF PERIMETER FENCING 47 OF 76

C-41 47

NOTE: SINGLE, OR DOUBLE, BARBED WIRE ARMS MAY BE ORDERED.

PERIMETER FENCE POST DETAIL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY PERIMETER FENCE POST DETAIL 48 OF 76

C-42 48

BARBED WIRE INSTALLATION AND WIRE NET EDGE DETAILS

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY BARBED WIRE INSTALLATION AND WIRE NET EDGE DETAILS 49 OF 76

C-43 49

WIRE NET INSTALLATION DETAIL

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY WIRE NET INSTALLATION DETAIL 50 OF 76

C-44 50

NOTE: GATES MAY BE SINGLE (3500) OR DOUBLE (700) SWING.

DETAIL OF DOUBLE SWING GATE

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY DETAIL OF DOUBLE SWING GATE 51 OF 76

C-45 51

GUARD WIRE DETAIL

GUARD RAIL DETAIL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY GUARD RAIL AND GUARD WIRE DETAIL 52 OF 76

C-46 52

HIGH FOUNDATION

STREET LIGHT

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY STREET LIGHT 53 OF 76

DRAWING NUMBER

C-47 53

Provide caps on

REVISED SINGLE LINE DIAGRAM

WIRING DIAGRAM

STREET LIGHT DIAGRAM

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY STREET LIGHT DETAIL 54 OF 76

C-48 54

DRAWING BY: TY ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY FIRE HYDRANT ASSEMBLY DETAIL 55 OF 76

DRAWING NUMBER

C-49 55

Relocate existing fire hydrant within 15 meters distance shall be re-assembled.

DRAWING BY: NM ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY WALL MOUNTED LIGHT 56 OF 76

C-50 56

CHECKED BY: TY WALKWAY LIGHT (3.5M) 57 OF 76

C-51 57

CHECKED BY: TY WALKWAY LIGHT (4.5M) 58 OF 76

C-52 58

CHECKED BY: TY WALKWAY LIGHT - GLOBE SHAPE (4.5M) 59 OF 76

C-53 59

CONCRETE POLE

UTILITY POLE (CONCRETE POLE)

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY UTILITY POLE 60 OF 76

C-54 60

ELEVATION

DETAIL OF GATE-A DETAIL OF GATE-B

PLAN DETAIL OF GATE-C DETAIL OF GATE-D

PERSONNEL GATE DETAIL FOR CMU WALL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY PERSONNEL GATE DETAIL FOR CMU WALL 61 OF 76

C-55 61

NOTE: GATES MAY BE SINGLE (3550), OR DOUBLE (7100) SWING.

DOUBLE SWING GATE DETAIL FOR CMU WALL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY DOUBLE SWING GATE DETAIL FOR CMU WALL 62 OF 76

C-56 62

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY DETAIL OF LATTICE-FRAME SECURITY FENCING 63 OF 76

C-57 63

CHECKED BY: TY DETAIL OF LATTICE-FRAME PERSONNEL GATE 64 OF 76

C-58 64

CHECKED BY: TY DETAIL OF LATTICE-FRAME SINGLE SWING GATE 65 OF 76

C-59 65

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY GUARD PIPE DETAIL 66 OF 76

C-60 66

PLAN

CMU UNIT DETAIL

CMU UNIT DETAIL

CMU WALL ELEVATION

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CMU WALL ELAVATION 67 OF 76

C-61 67

TYPICAL SECTION POST SECTION

REMOVE/RESTORE SECTION

NOTE: PROVIDE LEVELING MORTAR ON BASE COURSE.

CMU WALL SECTION

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CMU WALL SECTION 68 OF 76

C-62 68

REINFORCING ELEVATION

REINFORCING PLAN

PRECAST CONCRETE HEAD BLOCK

CMU WALL DETAIL

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CMU WALL DETAIL 69 OF 76

C-63 69

SECTION

NOTE: PROVIDE LEVELING MORTAR ON BASE COURSE.

DETAILS OF PRE-CAST CONCRETE MANHOLE (ELECT)

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY DETAILS OF PRE-CAST CONCRETE MANHOLE (ELECT) 70 OF 76

C-64 70

SECTION

NOTE: PROVIDE LEVELING MORTAR ON BASE COURSE.

DETAILS OF PRE-CAST CONCRETE MANHOLE (ELECT)

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY DETAILS OF PRE-CAST CONCRETE MANHOLE (ELECT) 71 OF 76

C-65 71

CABLE RACKS AND HOOKS FOR PRE-CAST CONCRETE MANHOLE (ELEC)

UNDERGROUND CONDUIT INSTALLATION

& SURFACE RESTORATION DETAILS

DETAILS OF CABLE RACKS, HOOKS AND CONDUIT

DATE: 12/21/2009 PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY DETAILS OF CABLE RACKS, HOOKS AND CONDUIT 72 OF 76

C-66 72

CUBICLE TRANSFORMER STATION

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CUBICLE TRANSFORMER STATION 73 OF 76

DRAWING NUMBER

C-67 73

Approx. 2,500mm Approx. 2,000mm

A p p ro x.

,3 m m

CUBICLE TRANSFORMER STATION DIAGRAM

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CUBICLE TRANSFORMER STATION DIAGRAM 74 OF 76

DRAWING NUMBER

C-68 74

ELB P x 10

50AF / 20AT

FOR EXTERIOR LIGHTS

SUB DRAIN PIPE

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY SUB DRAIN PIPE 75 OF 76

C-69 75

CONSTRUCTION SIGN

DRAWING BY: YT ROADS/PAVEMENTS IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: TY CONSTRUCTION SIGN 76 OF 76

DRAWING NUMBER

C-70 76

DD/MM/YYYY

US AIR FORCE

PROJECT

QKKA XX-XXXX

RENOVATE B/XXXX

GENERAL CONTRACTOR

XXXXXX POC: XXX-XXXX

MANAGED BY 35CES/CEPM

POC: XXX-XXXX

ESTIMATED COMPLETION

DATE

AF SYMBOL: Silver ea ch