JA-2_Drawings_22x34.pdf
PDF 21 MB Posted
- Attached to
- CH&PP Fire Alarm System Repair Federal contract opportunity
- Solicitation number
- FA5004-15-R-C006
About this file
JA-2 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0001.pdf | ||
| JA-1_Specifications_(9_July_2015).pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| CHPP_Fire_Alarm_JA_Signed.pdf | ||
| JA-9_AF_Form_3065 _Contract_Progress_Report.pdf | ||
| JA-5_Past_Performance_Worksheet.pdf | ||
| JA-7_AF_Form_3000 _Material_Approval_Submittal.pdf | ||
| JA-8_AF_Form_3064 _Contract_Progress_Schedule.pdf | ||
| JA-3_Wage_Determination_Building_and_Heavy_AK1.pdf | ||
| FA5004-15-R-C006.pdf | ||
| JA-6_AF_Form_66_-_10_Apr_'15.pdf | ||
| JA-4_Past_Performance_Questionnaire.pdf | ||
| JA-1_Specifications.pdf | ||
| JA-10_Financial_Reference_Sheet.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG
DRAWING TITLE
SCALE
GOVERNING CODES:
2012 INTERNATIONAL BUILDING CODE - IBC
2012 INTERNATIONAL FIRE CODE - IFC
2014 NFPA 70 - NATIONAL ELECTRICAL CODE - NEC
2013 NPFA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE
AUTHORITY HAVING JURISDICTION
PACAF FIRE PROTECTION DESIGN ENGINEER
FA5004-15-R-C006
JA-2 Page 1 of 50
B O
TT
O
M A
S H
S
IL
O
TO
P A
S H
S
IL
O
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 575'-6"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
WEST
FILTRATION
BUILDING
ELEV. 578'-3"
ELEV. 543'-9"
ELEV. 636'-0"
B
TRIPPER
ROOM
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 575'-6"
ELEV. 556'-2"
ELEV. 545'-6"
ELEV. 531'-0"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
WEST
FILTRATION
BUILDING
ELEV. 571'-3"
ELEV. 575'-6" ELEV. 578'-3"ELEV. 578'-3"
CRANE
ELEV. 543'-9" ELEV. 543'-9"
ELEV. 556'-2"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
TRIPPER
ROOM
TURBINE
GENERATOR
ROOM
FREIGHT
ELEVATOR
PRIMARY
COAL
ELEVATOR
SECONDARY
COAL
ELEVATOR
E A
S T
FI
LT
R A
TI
O
N B
U
IL
D
IN
G
W E
S T
FI
LT
R A
TI
O
N B
U
IL
D
IN
G
POWER PLANT
COAL HANDLING
& UNLOADING AREA
F100
EIELSON CH&PP GENERAL FLOOR & ELEVATION PLAN
NO SCALE
XP
ELECTRICAL SYMBOL LEGEND
NOTE KEY - INDICATES NOTES APPLICABLE ON EACH SHEET
JUNCTION BOX
FIRE ALARM CONTROL PANEL: SURFACE MOUNTED; MONACO BT2 TRANSMITTER (EXISTING)
FIRE ALARM COMBINATION HORN/STROBE
SUBSCRIPTS: WP = WEATHERPROOF, XX = CANDELLA SETTING
STROBE ONLY
MANUAL PULL STATION, +4'-6" AFF U.O.N.
PHOTOELECTRIC SMOKE DETECTOR - CEILING MOUNTED U.O.N.
HEAT DETECTOR - CEILING MOUNTED U.O.N.,
TEMPERATURE IN SUBSCRIPT IF DIFFERS FROM 135 DEGREES F
XP - RATED FOR CLASS I DIV. 1/2 AREAS
SPRINKLER SYSTEM FLOW & TAMPER SWITCH
D
FIRE ALARM BELL / STROBE FOR CLASS II DIV 1 OR 2 AREAS
DELUGE SYSTEM WATER FLOW & TAMPER SWITCH CONNECTIONS
DELUGE SOLENOID VALVE
DEVICE RATED FOR CLASSIFIED (CLASS II DIV 1 OR 2) AREAS
TEMP
DUAL ADDRESSABLE MONITOR MODULE (ALARM/TROUBLE)
LHC LINEAR HEAT DETECTOR CABLE
FIRE ALARM REMOTE ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL WITH INTEGRAL TRANSMITTER
DELUGE RELEASING CONTROL PANEL
SWITCHED CIRCUIT
PUMP START SWITCH
SUPERVISED CONTROL RELAY
TICK MARKS ON DEMO PLANS INDICATE NUMBER OF CONDUCTORS IN CONDUIT
(FOUR SHOWN IN EXAMPLE)
CENTRAL DELUGE CONTROL PANEL (EXISTING)
ADDRESSABLE MONITOR MODULE
60 INPUT (30 CLASS A) - OR - 20 INPUT (10 CLASS A)
FIRE ALARM BELL
FLOOR ELEVATION FLOOR NAME(S)
531'-0" BASEMENT LEVEL
545'-6" TURBINE/FIRE FLOOR LEVEL
560'-6" WATER TREATMENT/PLC LEVEL
570'-6" ROOTS BLOWER LEVEL
571'-3" COAL SCALE DECK LEVEL
575'-6" EAST/WEST CONTACTOR DECKS
581'-2" DRUM LEVEL
600'-0" FAN DECK LEVEL
616-0" TRIPPER/BUNKER LEVEL
636'-0" PENTHOUSE LEVEL
F100 NO SCALE
FLOOR ID
B
P
F100
DEVICE IDENTIFICATION NUMBERING CONVENTION
NO SCALE
FLOOR ID (SEE ABOVE) FIRST POSITION; 1 DIGIT/CHARACTER
GRID LINE ID (NUMBERED GRIDS) STARTING AT RIGHT SIDE; 1 OR 2 DIGITS (W/O SUBSCRIPTS)
GRID LINE ID (ALPHABETIC GRIDS) STARTING AT TOP OF GRID; 1 CHARACTER
NUMBER OF SPECIFIC DEVICE IN THIS GRID; 1 DIGIT
(WHERE DEVICE IS ADDRESSABLE MONITOR MODULE (AMM), ID = 'A')
DEVICE
(TYP)
531'-0" BASEMENT LEVEL - COAL HANDLING
545'-6" FIRE FLOOR LEVEL - COAL HANDLING
560'-0" RECLAIM #2 UPPER - COAL HANDLING
A C D
543'-9" & 578' EAST BAGHOUSEE
WEST BAGHOUSEW 543'-9" & 578'
SORBENT FACILITIESS N/A
LOW TEMPERATURE SWITCH SET TO ACTIVATE AT 40 DEGREES F
(SUPERVISORY SIGNAL TO FACP WHERE POTENTIAL FREEZING CONDITIONS EXIST)
MONITORING OF ALARM CONTACT CLOSURE OF CO2 SUPPRESSION PANEL
MONITORING OF TROUBLE CONTACT CLOSURE OF CO2 SUPPRESSION PANEL
630-?" BACKUP COAL CONVEYOR9
MONITOR WATERFLOW OF SPRINKLER SYSTEM
MONITOR TAMPER SWITCH CONTACT OF SPRINKLER SYSTEM
ADDRESSABLE OUTPUT MODULE
INSTALL INSULATED GROUNDING CONDUCTOR, SIZED IN ACCORDANCE WITH NEC
REQUIREMENTS, IN ALL FEEDER AND BRANCH CIRCUIT CONDUITS. ADDITIONAL GROUNDING
CONDUCTORS NOT REQUIRED FOR FIRE ALARM LOW VOLTAGE POWER LIMITED SIGNAL LINE
OR NOTIFICATION CIRCUITS.
NOTIFICATION DEVICES MOUNTING HEIGHT - 80" MINIMUM TO 96" MAXIMUM,
MEASURED TO THE BOTTOM OF APPLIANCE.
WP INSTALL DEVICE OR EQUIPMENT IN AN ENCLOSURE RATED TO BE DUST-TIGHT,
WHICH COULD ENTAIL A SECONDARY ENCLOSURE TO PROTECT THE EQUIPMENT
PANELBOARD SURFACE MOUNTED
JA-2 Page 2 of 50
XP
XP XP
XP
XP
XP
XP
XP
XPXPXPXP
XP XP XP
UP TO FACP
ZONE 9
XP
M
AT
C H
LI
N
E F
M
AT
C H
LI
N
E F
XP
XP
XP
XP
J
J
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
J
J
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
J
LH
C
LH
C
LH
C
LH
C
LH
C
J
EOL
EOL
TO CDCP, ZONE 3
TO CDCP,
ZONE 1
EOL
TO CDCP, ZONE 2
D D D
TO CDCP
DEMO EXISTING THERMAL CABLES
(LHC) OVER CONVEYORS (TYP-3)
DELUGE SOLENOID VALVE FOR CONVEYOR
TO BUCKET ELEVATOR #1 ZONE #13
WATER FLOW & TAMPER SWITCH FOR
CONVEYOR TO BUCKET ELEVATOR #1 ZONE #8
DELUGE SOLENOID VALVE FOR RECLAIM
CONVEYOR #1 ZONE #12
WATER FLOW & TAMPER SWITCH FOR RECLAIM
CONVEYOR #1 ZONE #7
DELUGE SOLENOID VALVE FOR
PECK CARRIER ZONE #11
WATER FLOW & TAMPER SWITCH FOR
PECK CARRIER ZONE #6
M
AT
C H
LI
N
E F
M
AT
C H
LI
N
E F
DELUGE SOLENOIDS TO BE REPLACED WITH
UNITS WHICH ARE COMPATIBLE AND LISTED
COMBINATIONS FOR CONNECTION TO THE NEW
SUPPRESSION SYSTEM RELEASING PANEL(S)
DELUGE SYSTEM FOR RECLAIM CONVEYOR #1
TO BE DISABLED TO PREVENT ACTIVATION OF
THE SPRINKLER SYSTEM IN THIS AREA AS THIS
CONVEYOR IS NO LONGER IN SERVICE.
F101
F/A DEMO PLAN, BASEMENT LEVEL AREA 1 - 531'-0"
3/32" = 1-0"
F101
F/A DEMO PLAN, SUPPRESSION SYSTEMS - 531'-0"
3/32" = 1-0"
GENERAL DEMOLITION SHEETS F101 - F110 NOTES
1. EXISTING FIRE ALARM AND DELUGE SUPPRESSION SYSTEMS TO REMAIN IN-TACT AND IN SERVICE THROUGHOUT THE CONSTRUCTION PROCESS EXCEPT FOR PERIODS WHERE THE SYSTEMS ARE TRANSITIONING FROM EXISTING SYSTEMS TO NEW AT TIME OF FINAL CUT-OVER OF THESE SYSTEMS. ONCE NEW FIRE ALARM AND/OR DELUGE SUPPRESSION SYSTEMS HAVE BEEN TRANSITIONED OVER TO THE NEW FIRE ALARM AND/OR RELEASING PANEL CONTROLLERS AND THEY ARE FULLY COMMISSIONED, THE CONTRACTOR SHALL DEMOLISH IN THEIR ENTIRETY THESE EXISTING SYSTEMS. THE CONTRACTOR SHALL NOT LEAVE LARGE AREAS OF THE FACILITY WITHOUT
DETECTION AND/OR NOTIFICATION THROUGHOUT THE CONSTRUCTION EFFORT.
2. INFORMATION INCLUDED ON THE DEMO DRAWINGS WAS DERIVED FROM EXISTING AS-BUILT DRAWINGS AND FIELD INVESTIGATIONS, HOWEVER THERE MAY BE DIFFERENCES BETWEEN THE ACTUAL FIELD CONDITIONS AND THE DRAWINGS, WHERE ADDITIONAL ITEMS MAY BE SHOWN ON THE DRAWINGS OR EXISTING SYSTEM COMPONENTS MAY NOT BE SHOWN. THE CONTRACTOR SHALL REMOVE ALL FIRE ALARM COMPONENTS INCLUDING BUT NOT LIMITED TO CONTROL PANELS, INITIATION DEVICES, JUNCTION BOXES, CONDUITS, CONDUCTORS, RELAYS AND NOTIFICATION DEVICES. DEMOLITION WILL INCLUDE COMPONENTS ASSOCIATED WITH THE EXISTING FIRE ALARM AND DELUGE SUPPRESSION SYSTEMS REPLACED WITH NEW SYSTEMS, WHETHER THEY ARE SPECIFICALLY SHOWN OR NOTED ON THE CONTRACT DRAWINGS OR NOT SHOWN ON THE CONTRACT DRAWINGS BUT ARE PART OF THESE
EXISTING SYSTEMS.
3. CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER REGARDING ANY UNFORESEEN ITEMS WHICH ARE ENCOUNTERED DURING THE DEMOLITION WORK. CONTRACTING OFFICER TO HAVE THE FINAL JUDGEMENT WHETHER THE EQUIPMENT INCLUDED IN THIS DEMOLITION WORK IS ADEQUATELY DEFINED IN THE OVERALL SCOPE OF WORK IN THE CONTRACT DOCUMENTS AND WHETHER THESE ITEMS DISCOVERED DURING THE DEMOLITION
EFFORT WARRANT ADDITIONAL COST TO THE GOVERNMENT.
4. FIRE ALARM WIRING AND CONDUITS WITHIN THE EXISTING FILTRATION BUILDINGS/BAGHOUSES TO BE RE-UTILIZED FOR CONNECTION TO THE NEW FIRE ALARM SYSTEM SLC AND NAC CIRCUITS. INITIATION DEVICES TO BE REPLACED WITH COMPONENTS COMPATIBLE WITH THE NEW FIRE ALARM CONTROL PANEL. THE NOTIFICATION DEVICES WILL REMAIN FOR RE-CONNECTION TO A NEW NAC PANEL CONNECTED TO AND CONTROLLED FROM THE
MAIN FACP WHERE THERE WILL BE ONE NEW NAC PANEL PER BUILDING.
5. MANY OF THE AREAS WITHIN THE FACILITY WILL REQUIRE LIFTS, TALL LADDERS OR SCAFFOLDING TO ACCESS THE EXISTING INFRASTRUCTURE FOR DEMOLITION. CONTRACTOR IS STRONGLY ENCOURAGED FOR THE CONTRACTOR AND/OR SUBCONTRACTORS TO CONDUCT A SITE VISIT TO INVESTIGATE THE SITE CONDITIONS AND WORKING
ENVIRONMENT PRIOR TO BID SO THEY ARE AWARE OF THESE CONDITIONS.
6. CONTRACTOR SHALL TAKE CARE IN PRESERVING THE EXISTING FIRE ALARM CONTROL PANELS FOR TURNOVER TO THE GOVERNMENT AT THE END OF THE DEMOLITION WORK AS MANY OF THESE COMPONENTS MAY BE RE-USABLE
FOR OTHER SYSTEMS OF SIMILAR TYPES AT THE BASE.
7. THIS IS AN OPERATIONAL POWER PLANT FACILITY, WHERE AREAS ARE HEATED BUT NOT UNDER CLIMATE CONTROLS, AND TEMPERATURES AS HIGH AS 112 DEGREES FAHRENHEIT HAVE BEEN MONITORED. SCHEDULING FOR THIS WORK SHOULD BE ANTICIPATED TO BE COMPLETED FOR THE MOST PART DURING FALL/WINTER/SPRING MONTHS AS THE INTERIOR PLANT CONDITIONS ARE MORE FAVORABLE. THE CONTRACTOR'S PROJECT SPECIFIC WORK PLAN DEVELOPED IN ACCORDANCE WITH PROJECT DOCUMENTS AND SUBMITTED FOR APPROVAL SHALL
ADDRESS THE CONTRACTOR'S METHODS AND MEANS TO ADDRESS INTERIOR TEMPERATURES.
JA-2 Page 3 of 50
PUMP START - IN METRON PANEL
DIESEL FIRE PUMP ACTUATION - UP TO FPCAP ZN. 13
ELECTRIC FIRE PUMP ACTUATION - UP TO FPCAP ZN. 11
ELECTRIC FIRE PUMP TROUBLE - UP TO FPCAP ZN. 12
WET SPRINKLER TAMPER SWITCH-3 - UP TO FPCAP ZN. 6
WET SPRINKLER TAMPER SWITCH-4 - UP TO FPCAP ZN. 7
UP TO FACP
ZONE 11
UP TO FACP
ZONE 13
UP TO FACP
ZONE 10
M
AT
C H
LI
N
E F
M
AT
C H
LI
N
E F
DIESEL FIRE PUMP TROUBLE - UP TO FPCAP ZN. 14
WET SPRINKLER WATER FLOW
UP TO FPCAP ZONE 3
(TURBINE GENERATOR BASEMENT)
WET SPRINKLER
TAMPER SWITCH-1
UP TO FPCAP ZONE 4
WET SPRINKLER
TAMPER SWITCH-2
UP TO FPCAP ZONE 5
WET SPRINKLER WATER FLOW
& TAMPER SWITCH
UP TO FPCAP ZONE 1
LP1 POWER PANEL
(FEED UP TO CDCP)
WET SPRINKLER
TAMPER SWITCH-7
UP TO FPCAP ZONE 10
WET SPRINKLER
TAMPER SWITCH-6
UP TO FPCAP ZONE 9
WET SPRINKLER
TAMPER SWITCH-5
UP TO FPCAP ZONE 8
WET SPRINKLER
WATER FLOW & TAMPER SWITCH
RECLAIM CONVEYOR #2
UP TO FPCAP ZONE 2
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
EAST
FILTRATION
BUILDING
ELEV. 531'-0"
WEST
FILTRATION
BUILDING
A
I CG E
J
FIRE PUMP ROOM
FDC
F102
F/A DEMO PLAN, BASEMENT LEVEL AREA 2 - 531'-0"
3/32" = 1-0"
JA-2 Page 4 of 50
M
AT
C H
LI
N
E F
M
AT
C H
LI
N
E F
XP
XP
XP
XP
XP
XP
XP
TO FACP
ZONE 7
F/A CONTROL PANEL (FACP)
F/A CODE TRANSMITTER
XP
N
AC
XP
UP
DOWN
ZONE 9
ZONE 9
ZONE 8
CENTRAL DELUGE CONTROL PANEL (CDCP)
D
DELUGE SOLENOID VALVE FOR RECLAIM
CONVEYOR #2 ZONE #14
WATER FLOW & TAMPER SWITCH FOR
RECLAIM CONVEYOR #2 ZONE #9
TO CDCP
DELUGE SOLENOIDS TO BE REPLACED WITH
UNITS WHICH ARE COMPATIBLE AND LISTED
COMBINATIONS FOR CONNECTION TO THE NEW
SUPPRESSION SYSTEM RELEASING PANEL(S)
F103
F/A DEMO PLAN, FIRE FLOOR AREA 1 (COAL HANDLING) - 545'-6"
3/32" = 1-0"
F103
F/A DEMO PLAN GROUND LEVEL 543'-9", EAST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
F103
F/A DEMO PLAN CEILING LEVEL 578'/601', WEST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
FC
P
X M
T
RETURN TO FCP
NAC A
FC
P
X M
T
P
RETURN TO
FCP
NAC A
155 155 155 155 155 155 155 155
P
RETURN TO
FCP
NAC B
FROM FCP
NAC B
CEILING ELEVATION
DETECTION DEVICES
F103
F/A DEMO PLAN GROUND LEVEL 543'-9", WEST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
F103
F/A DEMO PLAN CEILING LEVEL 578'/601', EAST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
UP TO CEILING
HEAT DETECTOR
UP TO CEILING
HEAT DETECTOR
155 155 155 155 155 155 155 155 155
RETURN TO FCP
NAC B
FROM FCP
NAC B
DOWN TO PULL STATION
DOWN TO PULL
STATION
UP TO CEILING
HEAT DETECTOR
UP TO CEILING
HEAT DETECTOR
DOWN TO PULL
STATION
DOWN TO PULL STATION
UPPER CATWALK
ENTRY POINT
UPPER
STAIRWELL
ENTRY POINT
JA-2 Page 5 of 50
A
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
190 190 190 190 190
190 190 190 190
190190
190 190 190 190
XP
XP
XP
XPXPXPXPXPXPXPXPXP
XP
TO FACP
ZONE 6
TO FACP
ZONE 5
F/A CONTROL PANEL (FACP)
XP
ON SUSPENDED CEILING
BELOW
N
AC
J
U
XP
XP
ZONE 8
J
LP3
POWER
PANEL
2 #12
120 VAC
CIRCUIT 1928 CONDUCTORS
24 TO CDCP
4 TO FAP
8 CONDUCTORS TO
METRON PANEL
LOWER LEVEL
CENTRAL DELUGE CONTROL PANEL (CDCP)
XP
J
DEVICE CONNECTIONS TO NEW SORBENT
BUILDING MODULES SCHEMATIC ONLY
CONTRACTOR TO VERIFY AS REQUIRED
2 #12
120 VAC
CIRCUIT 21
(F/A BELLS)
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
CRANE
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 545'-6"
WEST
FILTRATION
BUILDING
A
I CG E
J
FIRE PROTECTION CONTROL
AND ALARM PANELS
EXISTING DEVICES TO BE REPLACED WITH
NEW DEVICES CONNECTED TO CLASS A
CIRCUITS PER DEVICE. EXISTING CIRCUIT
CONDUCTORS NOT RE-USED (TYP)
DEMO EXISTING NAC AND
NOTIFICATION DEVICES
F104
F/A DEMO PLAN, TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"
3/32" = 1-0"
EAST FILTRATION BUILDING SHOWN ON SHEET F103
WEST FILTRATION BUILDING SHOWN ON SHEET F103
JA-2 Page 6 of 50
C H
LI
N
E F
M
AT
C H
LI
N
E F
XP
XP
XP
XP
DN
DOWN TO ZONE 8
DEVICES
J
WN TO
ACP
EL
J
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
EOL
J
DEMO THERMAL CABLES (LHC)
OVER CONVEYOR (TYP)
TO CDCP ZONE #5
D
DELUGE SOLENOID VALVE FOR
CONVEYOR TO STORAGE ZONE #10
WATER FLOW & TAMPER SWITCH FOR
CONVEYOR TO STORAGE ZONE #15
TO CDCP
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
J
J
J
DEMO THERMAL CABLES (LHC)
OVER CONVEYOR (TYP)
D
DELUGE SOLENOID VALVE FOR
RECLAIM CONVEYOR #2 ZONE #14
WATER FLOW & TAMPER SWITCH FOR
RECLAIM CONVEYOR #2 ZONE #9
HORN, MANUAL PULL STATION
& BEACON ELEVATION 543'-6"
(ACTUAL LOCATION NOT DEPICTED)
CONVEYOR TO STORAGE ROUTED UPHILL
FROM BUILDING TO DROP COAL TO PILE ON
GROUND ABOVE RECLAIM CONVEYOR #2
COLLECTION BUCKET BELOW GRADE
CONVEYOR TO STORAGE ROUTED
DOWNHILL FROM BUILDING TO COLLECT
COAL FROM PILE ON GROUND,
COLLECTION BUCKET BELOW GRADE
DELUGE SOLENOIDS TO BE REPLACED WITH
UNITS WHICH ARE COMPATIBLE AND LISTED
COMBINATIONS FOR CONNECTION TO THE NEW
SUPPRESSION SYSTEM RELEASING PANEL(S)
J
J
J
J
ROOF
FIFTH LEVEL
FOURTH LEVEL
THIRD LEVEL
SECOND FLOOR
FIRST FLOOR
BASEMENT
PENTHOUSE ZONE 1
ZONE 1
ZONE 2
ZONE 3
ZONE 4
F/A CONTROL PANEL
OPERATING LEVEL
WATER TREATMENT
DRUM/PLC LEVEL
FAN DECK
BUCKET ELEVATION
CATWALK
LEVEL
DEVICES
F105
F/A DEMO PLAN, WATER TREATMENT/PLC LEVEL AREA 1 COAL HANDLING - 560'-6"
3/32" = 1-0"
F105 NO SCALE
CONVEYOR TO
STORAGE STARTS
AT CATWALK LEVEL
TICK MARKS REPRESENT
# OF CONDUCTORS (TYP)
GENERAL SHEET F105 NOTES
1. EXISTING THERMAL CABLES ASSOCIATED WITH AND CONNECTED TO THE EXISTING FIRE SUPPRESSION
SYSTEMS IN HIGH ANGLE CONVEYOR, RECLAIM CONVEYOR #2 AND CONVEYOR TO STORAGE TO REMAIN IN-PLACE UNTIL NEW OPERATIONAL SYSTEMS INCLUDING NEW DETECTION CABLES ARE INSTALLED AND READY FOR CUT-OVER TO CONNECT INITIATION SYSTEMS OVER TO THE NEW RELEASING PANEL.
JA-2 Page 7 of 50
C H
LI
N
E F
M
AT
C H
LI
N
E F
D
190190190190190
190190190
J JJ
JJJ
J
J
DOWN TO
FACP
ZONE 4
DEVICES
UP TO
NEXT LEVEL
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
I G E
C
J
F106
F/A DEMO PLAN, WATER TREATMENT/PLC LEVEL AREA 2 - 560'-6"
3/32" = 1-0"
JA-2 Page 8 of 50
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
ELEV. 571'-3"
A
I CG E
F107
F/A DEMO PLAN, COAL SCALE DECK AREA 2 - 571'-3"
3/32" = 1-0"
DEMO EXISTING FIRE PANEL
CONNECTIONS TO EXISTING
CO2 SUPPRESSION SYSTEM
AFTER NEW SYSTEMS ARE
CONNECTED TO AND
MONITORING THIS SYSTEM
JA-2 Page 9 of 50
190 190 190 190
190190190190
190 190 190 190
190190
J J
J
J JJ
N
AC
J
J
ZONE 3
DEVICES
DOWN
UP
EAST
FILTRATION
BUILDING
ELEV. 575'-6"WEST
FILTRATION
BUILDING
B
A
I G E
C
J
ELEV. 575'-6"
ELEV. 581'-2"
EAST
FILTRATION
BUILDING
ELEV. 575'-6"
ELEV. 581'-2"
WEST
FILTRATION
BUILDING
A
I CG E
J
F108
F/A DEMO PLAN - ROOTS BLOWER, CONTACTOR DECK, & DRUM LEVELS - 570'-6", 575'-6" & 581'-2" 3/32" = 1-0"
JA-2 Page 10 of 50
190190190190190
J
J
DOWN
UP
ZONE 2
DEVICES
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
ELEV. 600'-0" EAST
FILTRATION
BUILDING
ELEV. 600'-0"WEST
FILTRATION
BUILDING
A
I CG E
J
DETECTORS AT ROOF LEVEL (TYP)
DETECTORS AT ROOF LEVEL (TYP)
F109
F/A DEMO PLAN, FAN DECK LEVEL - 600'-0"
3/32" = 1-0"
JA-2 Page 11 of 50
190190190190 190 190 190 190
190190190190
XP XPXPXP
XP
J
DOWN
UP
J
ZONE 1
DEVICES
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
ELEV. 600'-0" EAST
FILTRATION
BUILDING
ELEV. 600'-0"WEST
FILTRATION
BUILDING
A
I CG E
J
DOWN
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
I G E
C
J
F110
F/A DEMO PLAN, TRIPPER/BUNKER LEVEL - 616'-0"
3/32" = 1-0"
F110
F/A DEMO PLAN, PENTHOUSE LEVEL - 636'-0"
3/32" = 1-0"
JA-2 Page 12 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
XP
UP TO AMM CABINET
COAL HANDLING OFFICE
XP
A0G-1
A0H-1
XP
A0H-2
A0F-1
XP
A0G-1
TO AMM MODULE IN
BASEMENT LEVEL (GRIDS 1E)
XP
A0F-1
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
4WP
M A
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
J
J
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
J
LH
C
LH
C
LH
C
LH
C
LH
C
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
S
LC
D D
WATER FLOW & TAMPER SWITCH FOR HIGH ANGLE CONVEYOR
PROVIDE COMPATIBLE DELUGE SOLENOID VALVE FOR HIGH ANGLE CONVEYOR
WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #1 (NO WORK FOR THIS ITEM)
DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #1 (NO WORK FOR THIS ITEM)
WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO BUCKET ELEVATOR #1
PROVIDE COMPATIBLE DELUGE SOLENOID VALVE FOR CONVEYOR TO BUCKET ELEVATOR #1
J
UP TO FIRE SUPPRESSION RELEASING PANEL
D
PROVIDE LONG LINE THERMAL DETECTION CABLES (TYP-2)
F201
F/A INITIATION PLAN, BASEMENT LEVEL AREA 1 - 531'-0"
3/32" = 1-0"
F201
F/A INITIATION PLAN, SUPPRESSION SYSTEMS - 531'-0"
3/32" = 1-0"
D
JA-2 Page 13 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
PUMP START - IN METRON PANEL
DIESEL FIRE PUMP ACTUATION
DIESEL FIRE PUMP TROUBLE
ELECTRIC FIRE PUMP ACTUATION
ELECTRIC FIRE PUMP TROUBLE
WET SPRINKLER TAMPER SWITCH-3
WET SPRINKLER TAMPER SWITCH-4
AREA HAS SPRINKLERS
NO ADDITIONAL DETECTION
ONE DETECTOR IN ROOM THE
OTHER ON CEILING ABOVE ROOM
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
EAST
FILTRATION
BUILDING
ELEV. 531'-0"
WEST
FILTRATION
BUILDING
A
I CG E
J
B1A-1 B2A-1
B2A-2
B4A-1B5A-1B6A-1B9A-1B10A-1B13A-1 B14A-1
B15A-1
B14φ -1
B15φ -2
B16A-1
B16B-1 B14B-2
B14B-1
B13B-1
B12C-1
B11B-1 B9B-1
B6B-2
B6B-1
B5B-1 B4B-1 B2B-1
B1B-1
B1B-2
B1C-1
B3C-1
B3C-2
B4C-1B5C-1B8C-1
B9C-1
B15C-1 B16C-1
B9E-1
B10E-1
B8E-1
B9G-1
B9H-1
B7C-1
B6D-1 B5D-1
B6E-1 B3E-1 B2E-1
B2D-1
B2G-1B5G-1B6G-1
B6H-1 B5H-1 B3H-1
B1H-1
B2G-1
B1E-2
B1E-1
TO LOW TEMPERATURE ALARMS IN
BUCKET ELEVATOR AREAS (2),
DRAWINGS 1/F201 & 1/F203
B15φ -1
AMM
AMM
B8D-1
AMM
B5D-2
B3D-2
AMM
B1C-2
WET SPRINKLER
WATER FLOW/TAMPER
(TURBINE GENERATOR BASEMENT)
WET SPRINKLER
TAMPER SWITCH-1
WET SPRINKLER
TAMPER SWITCH-7
WET SPRINKLER
TAMPER SWITCH-6
WET SPRINKLER
TAMPER SWITCH-5
AMM
B9A-2
AMM
AMM
TO WET SPRINKLER
WATER FLOW & TAMPER SWITCH
RECLAIM CONVEYOR #2, 1/F204
WET SPRINKLER
TAMPER SWITCH-2
AMM
B1F-2
B1F-1
WET SPRINKLER
WATER FLOW
& TAMPER SWITCH
BOILER BASEMENT
FLOOR ID - B
AMM
AMM
F202
F/A INITIATION PLAN, BASEMENT LEVEL AREA 2 - 531'-0"
3/32" = 1-0"
JA-2 Page 14 of 50
XP
TO SLC LOOP DEVICES
IN MAIN PLANT F204
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
WEST
FILTRATION
BUILDING
B
TO SLC LOOP DEVICES
IN MAIN PLANT F204
XPXP
XP
UP TO HAZARDOUS AREA INITIATION DEVICES
LOCATED IN COAL HANDLING AREA
M A
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
D
WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #2
DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #2
C0D-1
C0D-2
C0H-3
C 0H
-1
C0G-2
C0G-1
C0H-2
C0I-1 C0I-2
C0I-3
C0G-1
10A-1
10A-2
10A-5
10A-410A-3
C0H-A
C0G-A
C0D-3
TO AMM MODULE IN BASEMENT LEVEL (GRIDS 1E)
WP FLOOR ID - 1
1 12
TO PANEL 'BREAK'
THERE IS AN AREA HEATING UNIT AND STEAM PIPING
IN THIS AREA WHICH MAY HAVE ADVERSE EFFECT
ON HEAT DETECTORS AND TRIGGER FALSE ALARMS.
COORDINATE LOCATION WITH OPERATIONS AND
LOCATE NEW DETECTOR TO MITIGATE FALSE
ALARMS DUE TO EXISTING HEAT SOURCES.
F203
F/A INITIATION PLAN, FIRE FLOOR AREA 1 (COAL HANDLING) - 545'-6"
3/32" = 1-0"
HEAT DETECTION ABOVE CATWALK.
SEE DRAWING 1/F205
F203
F/A INITIATION PLAN GROUND LEVEL 543'-9", EAST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
F203
F/A INITIATION PLAN CEILING LEVEL 578'/601', WEST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
F203
F/A INITIATION PLAN GROUND LEVEL 543'-9", WEST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
F203
F/A INITIATION PLAN CEILING LEVEL 578'/601', EAST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
UPPER CATWALK
ENTRY POINT
UPPER
STAIRWELL
ENTRY POINT
UP TO CEILING
HEAT DETECTOR
UP TO CEILING
HEAT DETECTOR
155 155 155 155 155 155 155 155 155
DOWN TO PULL STATION
DOWN TO PULL
STATION
P
UP TO CEILING
HEAT DETECTOR
UP TO CEILING
HEAT DETECTOR
155 155 155 155 155 155 155 155 155
P
CEILING ELEVATION
DETECTION DEVICES
DOWN TO PULL
STATION
DOWN TO PULL STATION
CONNECT LOOP TOGETHER WHEN
EXISTING INITIATION DEVICES
REPLACED AND EXISTING FACP
REMOVED FROM SERVICE
CONNECT REVISED CIRCUIT TO
NEW FACP SLC CIRCUIT, 1/F208
CONNECT REVISED CIRCUIT TO
NEW FACP SLC CIRCUIT, 1/F208
CONNECT LOOP TOGETHER WHEN
EXISTING INITIATION DEVICES
REPLACED AND EXISTING FACP
REMOVED FROM SERVICE
EXISTING DETECTORS MANUAL STATIONS
REPLACED WITH NEW AND CONNECTED
TO EXISTING SLC CIRCUIT (TYP)
EXISTING MANUAL STATIONS REPLACED
WITH NEW AND CONNECTED TO NEW SLC
CIRCUIT IN MAIN FACILITY(TYP)
EXISTING DETECTORS MANUAL STATIONS
REPLACED WITH NEW AND CONNECTED TO
NEW SLC CIRCUIT IN MAIN FACILITY (TYP)
EXISTING DETECTORS MANUAL STATIONS
REPLACED WITH NEW AND CONNECTED
TO EXISTING SLC CIRCUIT (TYP 2)
E9B-1 E8B-1 E7B-1 E6B-1 E5B-1 E4B-1
E4B-2
E3B-1 E2B-1 E1B-2
W9A-4
W9A-2
W9A-3
E9B-4
E9B-3
E9B-2
W9A-1 W8A-1 W7A-1 W6A-1 W5A-1 W4A-1
W4A-2
W3A-1 W2A-1 W1A-1
W1A-2
E1B-1FLOOR ID - E
FLOOR ID - E
FLOOR ID - W
FLOOR ID - W
AOM
AOM
AOM
AOM
GENERAL SHEET F203 NOTES
1. WIRING TO EXISTING INITIATION DEVICES IN THE EAST AND WEST BAG HOUSES TO REMAIN FOR RECONNECTION TO
NEW ADDRESSABLE FIRE ALARM INITIATION DEVICES IN EXISTING LOCATIONS TO BE COMPATIBLE WITH NEW FIRE ALARM CONTROL PANELS. PROVIDE INTELLIGENT INTERFACE RELAYS AS REQUIRED TO CONNECT TO FAN SHUT-DOWN SYSTEMS CURRENTLY IN SERVICE FOR THESE FACILITIES. COMPLETED SYSTEM WILL PROVIDE FOR A COMPREHENSIVE FIRE ALARM SYSTEM WITHIN THE CH&PP INCLUDING THE EAST AND WEST BAG HOUSES.
2. TRANSITION FROM EXISTING FIRE ALARM SYSTEM IN THE EAST AND WEST BAG HOUSES TO THE NEW FIRE ALARM SYSTEM SHALL OCCUR ONLY AFTER THE MAJORITY OF THE NEW SYSTEM IS INSTALLED AND FUNCTIONAL SO THESE AREAS ARE NOT WITHOUT FIRE DETECTION FOR SUBSTANTIAL PERIODS DURING THIS TRANSITION.
SPECIFIC NOTES
COORDINATE FINAL LOCATION OF NAC PANELS, AMM MODULES, DELUGE RELEASING CONTROL PANELS AND OTHER INSTALLED EQUIPMENT WITH POWER PLANT OPERATIONS PRIOR TO FINAL INSTALLATION. NOTE FINAL INSTALLED LOCATION MAY DIFFER FROM WHAT IS SHOWN ON THIS DRAWING.
TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR RECLAIM CONVEYOR #2. SEE DRAWING SHEETS F201 & F205.
TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR CONVEYOR TO STORAGE. SEE DRAWING SHEET F205.
TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR HIGH ANGLE CONVEYOR. SEE DRAWING SHEETS F201 & F205.
TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR BUCKET ELEVATOR #1. SEE DRAWING SHEET F201.
JA-2 Page 15 of 50
XP XP
XP XP
XPXPXPXPXPXPXPXPXPXPXP
XP
XP
190 190 190 190
190 190 190 190
190 190 190 190
190 190
190 190 190
LOCATED ABOVE PLATFORM
OVER OFFICES ON
STRUCTURAL CEILING
XP
RAP
CONTINUATION OF SLC CIRCUIT
ON SHEET F203
LOCATED ON
STRUCTURAL CEILING
ADDRESSABLE MONITOR MODULE
(AAM) WITH 30 CLASS A INPUTS
INSIDE CONTROL ROOM
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
CRANE
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 545'-6"
WEST
FILTRATION
BUILDING
A
I CG E
J
SLC LOOP TO AMM IN
COAL LOADING OFFICE
INITIATION DEVICES IN SORBENT FACILITY AND
COAL THAWING AREA TO BE CONNECTED TO AAM
MODULE WITH NEW CONDUCTORS & CONDUIT
SO EACH DEVICE HAS A UNIQUE ADDRESS (TYP)
M A
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
FLOOR ID - 1
113φ-1
114φ-2
114φ-1
114φ-3
114φ-4
114φ-5
115φ-2115φ-3
115φ-1 115φ-4
115φ-5
12A-1
13A-1
13A-2 11A-114A-116A-118A-1110A-1111A-1113A-1115A-1
116A-2
116A-1
116B-1 113B-1 111B-1
110B-2
110B-1 18B-1 16B-1 14B-1 13B-2
13B-1
12B-2
12B-1
11B-2
11B-1
11C-1
12C-1
16C-1 14C-119C-1
110D-1
19E-1
17E-1
16E-1 14E-1 13E-1
13F-115F-116F-119F-1
110G-1
110H-2 16H-1 14H1 13H-1
11F-2 11F-1
11D-1
12G-1
12H-1
S10G-1
S11H-1S12H-1
S12G-1
S14G-1S15G-1
S16G-1
S16G-2
S16H-1
116I-1 115I-1
116I-2
114I-1 112I-1 111I-1 110I-1 18I-1 16I-1 14I-1 13I-1 11I-1
LOCATED ON CEILING ABOVE
FIRE PANEL LOCATION
110H-A
XP
XP
DETECTORS MOUNTED TO
BOTTOM OF BEAMS ON
EITHER SIDE OF AREA (TYP)
190 DEGREE HEAT DETECTORS
MOUNTED IN TURBINE BAY AREA
ON STRUCTURAL MEMBERS (TYP)
DETECTOR
INSIDE ROOM
ON CEILING
DETECTORS
INSIDE ROOMS
ON CEILING (TYP)
110H-1
LOCATE DETECTOR
FOR PROTECTION
OF NAC PANEL
DETECTORS LOCATED ON
ROOF OF BUILDING UP 3
LEVELS FROM FLOOR (TYP)
DETECTORS LOCATED
ON ROOF OF SILOS (TYP)
WET SPRINKLER
WATER FLOW &
TAMPER SWITCH
RECLAIM CONVEYOR #2
AMM
11D-2
TO SLC LOOP
BASEMENT LEVEL
ELECTRICAL PANEL FOR
FEEDING FACP - THIS LEVEL
NAC5 - BASEMENT LEVEL
TO SPARE
BREAKER
THERE IS AN AREA HEATING UNIT AND STEAM PIPING IN THIS
AREA WHICH MAY HAVE ADVERSE EFFECT ON HEAT
DETECTORS AND TRIGGER FALSE ALARMS. COORDINATE
LOCATION WITH OPERATIONS AND LOCATE NEW DETECTOR TO
MITIGATE FALSE ALARMS DUE TO EXISTING HEAT SOURCES.
F204
F/A INITIATION PLAN, TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"
3/32" = 1-0"
EAST FILTRATION BUILDING SHOWN ON SHEET F203
WEST FILTRATION BUILDING SHOWN ON SHEET F203
JA-2 Page 16 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
XP
J
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LH
C
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
J
J
J
J
XP
XP
XP
XP
XP
XP
XP
XP
XP
DOWN TO ADDRESSABLE MONITOR MODULE
(AAM) WITH 30 CLASS A INPUTS LOCATED IN
COAL HANDLING OFFICE
DOWN TO DELUGE RELEASING CONTROL PANEL
LOCATED IN COAL HANDLING OFFICE BREAK ROOM
PROVIDE LONG LINE LINEAR HEAT DETECTOR CABLES (TYP)
D
PROVIDE DELUGE SOLENOID VALVE FOR CONVEYOR TO STORAGE
WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO STORAGE
20G-1
20H-1 20H-2
20I-1
20I-2
20I-4
20I-5
20I-6
20I-3
20D-1
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
LHC
F205
F/A INITIATION PLAN, WATER TREATMENT/PLC LEVEL COAL HANDLING - 560'-6"
3/32" = 1-0"
SPECIFIC NOTES
NEW LINEAR HEAT DETECTION CABLES TO BE INSTALLED IN MOUNTING CLIPS, MESSENGER WIRE, TENSIONING TURNBUCKLES AND SUPPORTING SYSTEMS IN SIMILAR CONFIGURATIONS AND LOCATIONS TO EXISTING SYSTEMS INSTALLED AT THE SITE AND PER THE MANUFACTURERS RECOMMENDATIONS. PHOTO BELOW SHOWS A REPRESENTATIVE SUPPORT EYELET AND INSULATOR AFFIXED TO A SPRINKLER PIPE IN THE CONVEYOR TO STORAGE AREA WITHOUT A CABLE IN THE SUPPORT. DISTANCE BETWEEN SUPPORT TYPICALLY RANGE FROM 15 FEET TO 20 FEET.
SUPPORTING EYELET
F205
PHOTO OF TYPICAL LINEAR HEAT DETECTION CABLE SUPPORT
NO SCALE
JA-2 Page 17 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
DOWN TO FACP
UP TO SLC CIRCUIT
ON LEVEL 571'-3"
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
I G E
C
J
21A-1
FLOOR ID - 2
22A-1
21B-1
21B-2
22B-1
21C-221C-1
22C-1
22E-1
22F-1
22H-1
F206
F/A INITIATION PLAN, WATER TREATMENT/PLC LEVEL AREA 2 - 560'-6"
3/32" = 1-0"
JA-2 Page 18 of 50
DOWN TO SLC CIRCUIT
ON LEVEL 560'-6"
MONITOR MODULE FOR CO2
SUPPRESSION SYSTEM
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
ELEV. 571'-3"
A
I CG E
FLOOR ID - 4
43G-1
45G-1
45F-1
47G-1
49G-1
410E-1
49D-1 47D1 45D-1 43D-1
43F-1
44F-1
F207
F/A INITIATION PLAN, COAL SCALE DECK - 571'-3"
3/32" = 1-0"
JA-2 Page 19 of 50
190 190 190 190 190 190 190
190 190 190 190 190 190 190
190 190 190 190 190 190 190
190 190 190 190 190 190 190
190 190 190 190
190 190 190
DOWN TO FACP
TRANSITION UP TO
BOTTOM OF ROOF LEVEL
TRANSITION UP TO
BOTTOM OF ROOF LEVEL
TRANSITION UP
TO BOTTOM OF
ROOF LEVEL
EAST
FILTRATION
BUILDING
ELEV. 575'-6"WEST
FILTRATION
BUILDING
B
A
I G E
C
J
ELEV. 575'-6"
ELEV. 581'-2"
EAST
FILTRATION
BUILDING
ELEV. 575'-6"
ELEV. 581'-2"
WEST
FILTRATION
BUILDING
A
I CG E
J
UP TO PULL
STATION ON
LEVEL 600'-0"
UP TO PULL
STATION &
DETECTOR ON
LEVEL 600'-0"
CONNECT CIRCUIT TO
REVISED SLC CIRCUIT IN
EAST FILTRATION
BUILDING, SEE 3/F203
CONNECT CIRCUIT TO REVISED
SLC CIRCUIT IN WEST FILTRATION
BUILDING, SEE 5/F203
UP TO HEAT
DETECTOR ON
LEVEL 600'-0"
51A-1
FLOOR ID'S - 3, 5 & 6
53A-154A-155A-156A-158A-159A-1
59B-1 58B-1 56B-1 55B-1 54B-1 53B-1 51B-1
31I-153I-154I-155I-156I-158I-159I-1
59I-2 58I-2 56I-2 55I-2 54I-2 53I-2 31I-2
61H-1
63G-165G-167G-169G-1
63D-165D-167D-169D-1
610D-1
62E-1 63E-1
62F-1
61C-1
F208
F/A INITIATION PLAN - ROOTS BLOWER, CONTACTOR DECK, & DRUM LEVELS - 570'-6", 575'-6" & 581'-2" 3/32" = 1-0"
JA-2 Page 20 of 50
UP TO PULL
STATION ON
LEVEL ABOVE
71F-1
72G-1
FLOOR ID - 7
79F-1
710C-1
81E-1
DETECTORS LOCATED ON ROOF
ABOVE OPEN SPACE (TYP)
DETECTORS LOCATED ON ROOF
ABOVE OPEN SPACE (TYP)
DOWN TO FACP
82H-183H-185H-1
86H-1
89H-1
89G-1 86G-1
85G-1 83G-1 82G-1
82D-183D-185D-186D-189D-1
89C-1 86C-1 85C-1 83C-1 82C-1
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
ELEV. 600'-0" EAST
FILTRATION
BUILDING
ELEV. 600'-0"WEST
FILTRATION
BUILDING
A
I CG E
J
DOWN TO
LEVEL 581'-6"
DETECTORS FLOOR ID '8'
ARE LOCATED ON ROOF
ABOVE OPEN SPACE (TYP)
DOWN TO
LEVEL 581'-6"
ELEVATOR MACHINE ROOM IS AT
LEVEL ABOVE BUT SHOWN ON THIS
LEVEL FOR CLARITY AS OTHER
EQUIPMENT IS IN THIS SAME SPACE
ON THE TRIPPER/BUNKER LEVEL
UP TO NEXT LEVEL
F209
F/A INITIATION PLAN, FAN DECK LEVEL - 600'-0"
3/32" = 1-0"
JA-2 Page 21 of 50
XP-190 XP-190 XP-190XP-190XP-190 XP-190
XP-190
DOWN TO AAM MODULE IN
COAL HANDLING OFFICE
DETECTORS INSIDE TRIPPER ROOM
LOCATED ON CEILING (TYP)
DOWN SLC LOOP ON 600'-0"
89F-1 87F-1 86F-1 84F-1 83F1 82F-2
82F-1
81E-1
810C-1
TRIPPER
ROOM
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
A
I CG E
J
ELEV. 616'-0"
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
TRIPPER
ROOM
A
I G E
C
J
DOWN TO NEXT LEVEL
XP-190
XP-190
DOWN TO AAM MODULE IN
COAL HANDLING OFFICE
90D-1
90E-1
F
WEST
FILTRATION
BUILDING
B
I G E
C
J
F210
F/A INITIATION PLAN, TRIPPER/BUNKER LEVEL - 616'-0"
3/32" = 1-0"
F210
F/A INITIATION PLAN, PENTHOUSE LEVEL - 636'-0"
3/32" = 1-0"
JA-2 Page 22 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
XP-150
XP-150
XP-150
XP-150
TO NAC(1.1) ON 545'-6"
A0F-1
A0H-1
A0I-1 A0I-2
TO H/S D0H-1 545'-6"
TO RECLAIM CONVEYOR #2
TO NAC(1.2) ON 545'-6"
NAC(1.2)
F301
F/A NOTIFICATION PLAN, BASEMENT LEVEL AREA 1 COAL HANDLING - 531'-0"
3/32" = 1-0"
JA-2 Page 23 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
WP-75
WP-75 WP-75WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75 WP-75 WP-75
WP-75
WP-75 WP-75 WP-75
WP-75
WP-75
WP-75
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
EAST
FILTRATION
BUILDING
ELEV. 531'-0"
WEST
FILTRATION
BUILDING
A
I CG E
J
NAC5
SIGNAL
FROM
FACP
FLOOR ID - B
B3A-1
B15φ-1
B16φ-1
B15A-1
B15C-1
B13B-1 B10B-1
B9C-1
B6B-1
B5C-1
B5A-1
B3C-1
B1A-1
B1C-1
B1F-1
B2F-1
B2G-1
B4F-1
B4G-1
B5F-1
B5G-1B9G-1
B9F-1
B2A-1
WP-75
WP-75
WP-75
B6C-1
MOUNT ON
COLUMN
WP-75
B15B-1
NAC(5.3)
NAC(5.2)
NAC(5.1)
NAC(6.1)
EXISTING PANELBOARD 'K'
(ON TURBINE LEVEL ABOVE)
F302
F/A NOTIFICATION PLAN, BASEMENT LEVEL AREA 2 - 531'-0"
3/32" = 1-0"
SPECIFIC NOTES
UTILIZE EXISTING 20/1 SQUARE D QO TYPE BREAKER IN
EXISTING PANELBOARD 'K' ON TURBINE LEVEL TO POWER NEW
NAC5 PANEL BASEMENT LEVEL. SPARE BREAKERS ARE
AVAILABLE IN THIS PANEL. PROVIDE AN UPDATED
PANELBOARD SCHEDULE WITH INFORMATION AS TO WHICH
SPARE WAS UTILIZED FOR THIS WORK. FOR EXISTING
IDENTIFICATIONS USED ON THE PANEL SCHEDULE CONFIRM
WITH POWER PLANT OPERATIONS FOR ACCURACY OF THESE
EXISTING LABELS PRIOR TO CREATING THE NEW LEGEND.
FIELD ROUTE CONDUITS BETWEEN THESE TWO LOCATIONS.
JA-2 Page 24 of 50
WP-30
XP-150
XP-150
XP-150
M A
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
TO D0I-1 560'-6"
WP-30
SIGNAL
FROM
FACP
C0D-1
C0H-1 C0H-2
COH-3
C0G-1
C0I-1
10A-1 10A-2
LOOP CONTINUES
ON SHEET F304
TO BUCKET ELEVATOR PIT 531'-0"
NAC(1.2)
TO D0I-1
NAC(1.3)
TO 531'-0" NAC(1.1)
TO C0F-1 545'-6" NAC(1.2)
TO 560'-6" NAC(1.4)
NAC(1.3)
NAC(1.2)
N A
C
BREAK-1
NEW PANELBOARD 'BREAK',
SEE DRAWING E100
F303
F/A NOTIFICATION PLAN, FIRE FLOOR AREA 1 (COAL HANDLING) - 545'-6"
3/32" = 1-0"
HEAT DETECTION ABOVE CATWALK.
SEE DRAWING 1/F305
F303
F/A NOTIFICATION PLAN GROUND LEVEL 543'-9", EAST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
F303
F/A NOTIFICATION PLAN CEILING LEVEL 578'/601', WEST FILTRATION BUILDING (BAGHOUSE) 3/32" = 1-0"
F303
F/A NOTIFICATION PLAN GROUND LEVEL 543'-9", WEST FILTRATION BUILDING (BAGHOUSE)
3/32" = 1-0"
F303
F/A NOTIFICATION PLAN CEILING LEVEL 578'/601', EAST FILTRATION BUILDING (BAGHOUSE) 3/32" = 1-0"
UPPER CATWALK
ENTRY POINT
UPPER
STAIRWELL
ENTRY POINT
RETURN TO NAC6
RETURN TO NAC6
FROM NAC6
RETURN TO
NAC7
RETURN TO
NAC7
FROM NAC7
ELEV. 578'-3"
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
ELEV. 543'-9"
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
ELEV. 578'-3"
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
ELEV. 543'-9"
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
W9A-1
W7A-1
W6A-1
W4A-1
W1A-1
W1A-2
W4A-1
W6A-1W8A-1
E9B-2 E7B-1
E4B-1
E1B-2
E1B-1
E2B-1
E3B-1
E6B-1
E8B-1
E9B-1
N A
C
N A
C
GENERAL SHEET F303 NOTES
1. WIRING TO EXISTING NOTIFICATION DEVICES TO REMAIN FOR RECONNECTION TO NEW NAC PANELS WHICH ARE
COMPATIBLE WITH NEW FIRE ALARM CONTROL PANELS. COMPLETED SYSTEM WILL PROVIDE FOR A COMPREHENSIVE FIRE ALARM NOTIFICATION SYSTEM WITHIN THE CH&PP INCLUDING THE EAST AND WEST BAGHOUSES.
2. TRANSITION FROM EXISTING FIRE ALARM SYSTEM IN THE BAG HOUSES TO THE NEW FIRE ALARM SYSTEM SHALL OCCUR ONLY AFTER THE MAJORITY OF THE NEW SYSTEM IS INSTALLED AND FUNCTIONAL SO THESE AREAS ARE NOT WITHOUT
FIRE DETECTION FOR SUBSTANTIAL PERIODS DURING THIS TRANSITION.
3. CONNECT NEW NAC PANELS (NAC6 & NAC7) TO EXISTING NAC POWER CIRCUIT IN THE BAGHOUSE FACILITIES.
JA-2 Page 25 of 50
WP-75
75 75
XP-150
XP-150
XP-150
XP-150
XP-150
XP-150
XP-150
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75
WP-75 WP-75
WP-75
WP-75
WP-75
RAP
MOUNT NEAR CEILING ON
STRUT BRACKET OR
EXISTING COLUMN SO
NOT INTERFERING WITH
SLIDING DOORS
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
CRANE
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 545'-6"
WEST
FILTRATION
BUILDING
A
I CG E
J
M A
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
NAC2
SIGNAL
FROM
FACP
FLOOR ID - 1
114φ-1
115φ-1
112A-1
112A-1
19B-1
17C-1
16A-1
12A-1 11A-1
11B-1
13B-1
14B-1
14C-1
13C-1
11D-1
11F-1
14E-1
11G-1
12H-1
11I-1
14H-117H-1
18I-1
15I-1 111I-1116I-1
114I-1
110D-1
110G-1
WP-75
15E-1
WP-75
MOUNT ON BEAM
ABOVE FLOOR
16E-1
MOUNT ON COLUMN
WP-75
18H-1
WP-75
ADDITIONAL
H/S ON THIRD LEVEL
OF FACILITY TO
CONNECT TO NEW
NAC8 PANEL
NAC8
NAC(FACP 0.1)
NAC(FACP 0.2)
NAC(2.1)
NAC(2.2)
NAC(2.4)
NAC(2.3)
WP-75
110aG-1
111G-1
114G-1115G-1
115G-2
ELECTRICAL PANEL CP-K FOR
POTENTIAL POWER FOR NAC2
EXISTING
PANELBOARD 'K'
ELECTRICAL PANELS C-1 THROUGH C-4
POTENTIAL POWER FOR NAC2
F304
F/A NOTIFICATION PLAN, TURBINE LEVEL/FIRE FLOOR AREA 2 - 545'-6"
3/32" = 1-0"
EAST FILTRATION BUILDING SHOWN ON SHEET F303
WEST FILTRATION BUILDING SHOWN ON SHEET F303
SPECIFIC NOTES
UTILIZE EXISTING 20/1 SQUARE D QO TYPE
BREAKER IN EXISTING PANELBOARD 'K' TO
POWER NEW FACP THIS LEVEL AND NAC5
PANEL ON BASEMENT LEVEL. SPARE
BREAKERS ARE AVAILABLE IN THIS PANEL.
PROVIDE AN UPDATED PANELBOARD
SCHEDULE WITH INFORMATION AS TO
WHICH SPARES WERE UTILIZED FOR THIS
WORK. FOR EXISTING IDENTIFICATIONS
USED ON THE PANEL SCHEDULE CONFIRM
WITH POWERPLANT OPERATIONS FOR
ACCURACY OF THESE EXISTING LABELS
PRIOR TO CREATING THE NEW LEGEND.
FIELD ROUTE CONDUITS BETWEEN THESE
TWO LOCATIONS.
FOR POWERING NEW NAC2 PANEL, THERE
ARE EXISTING PANELS IDENTIFIED ON THE
DRAWING PANEL 'CP-K' AND PANELS 'C-1'
THROUGH 'C-4'. COORDINATE THE FINAL
CONNECTION POINT FOR THIS NAC PANEL
WITH THE POWER PLANT OPERATIONS TO
DETERMINE WHICH PANEL IS AVAILABLE
AND PREFERRED FOR CONNECTIONS OF
THIS NEW NAC POWER CIRCUIT. PROVIDE
AN UPDATED PANELBOARD SCHEDULE
WITH INFORMATION AS TO WHICH SPARES
WERE UTILIZED FOR THIS WORK. FOR
EXISTING IDENTIFICATIONS USED ON THE
PANEL SCHEDULE CONFIRM WITH
POWERPLANT OPERATIONS FOR
ACCURACY OF THESE EXISTING LABELS
PRIOR TO CREATING THE NEW LEGEND.
UTILIZE EXISTING CIRCUIT FOR POWERING
NAC PANEL CONNECTED TO EXISTING NAC
PANEL. PROVIDE AN UPDATED
PANELBOARD SCHEDULE WITH
INFORMATION AS TO WHICH SPARES /
NEW BREAKERS WERE UTILIZED FOR THIS
WORK. FOR EXISTING IDENTIFICATIONS
USED ON THE PANEL SCHEDULE CONFIRM
WITH POWERPLANT OPERATIONS FOR
ACCURACY OF THESE EXISTING LABELS
PRIOR TO CREATING THE NEW LEGEND.
JA-2 Page 26 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F
XP-150
XP-150
XP-150
XP-150
XP-150
XP-150
XP-150
D0D-1
D0C-1
D0B-1
D0B-2
D0E-1
D0G-1
D0I-1
TO NAC(4.1)
ON 600'-0"
TO NAC(1.4)
ON 545'-6"
TO C0I-1 545'-6"
TO NAC(1.3)
ON 545'-6"
F305
F/A NOTIFICATION PLAN, WATER TREATMENT, PLC LEVEL AREA 1 COAL HANDLING - 560'-6"
3/32" = 1-0"
JA-2 Page 27 of 50
TC
H
LI
N
E F
M A
TC
H
LI
N
E F3
WP-75
WP-75
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
I G E
C
J
TO NAC(3.2) ON 571'-3"
FLOOR ID - 2
23A-1 21A-1
22B-1
22C-1
22H-1
F306
F/A NOTIFICATION PLAN, WATER TREATMENT, PLC LEVEL AREA 2 - 560'-6"
3/32" = 1-0"
JA-2 Page 28 of 50
WP-75 WP-75
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
ELEV. 571'-3"
A
I CG E
N A
C
TO 575'-6" NAC(3.3)
TO 560'-6" NAC(3.1)
410E-1
FLOOR ID - 4
45E-2 45E-1
WP-75WP-75
WP-75WP-75
45D-147D-1
47G-1 45G-1
TO 581'-2" NAC(3.4)
NAC(3.2)
TO 560'-6" NAC(3.2)
PANEL 'LP-4'
F307
F/A NOTIFICATION PLAN, COAL SCALE DECK LEVEL - 571'-3"
3/32" = 1-0"
SPECIFIC NOTES
PROVIDE NEW 20/1 SQUARE D QO TYPE BREAKER IN EXISTING PANELBOARD LP-4
TO POWER NEW NAC PANEL. SPARE SLOTS ARE AVAILABLE IN THIS PANEL.
PROVIDE AN UPDATED PANELBOARD SCHEDULE WITH INFORMATION AS TO WHICH
SPACE WAS UTILIZED FOR THIS WORK. FOR EXISTING IDENTIFICATIONS USED ON
THE PANEL SCHEDULE CONFIRM WITH POWERPLANT OPERATIONS FOR
ACCURACY OF THESE EXISTING LABELS PRIOR TO CREATING THE NEW LEGEND.
JA-2 Page 29 of 50
WP-75
WP-75
EAST
FILTRATION
BUILDING
ELEV. 575'-6"WEST
FILTRATION
BUILDING
B
A
I G E
C
J
ELEV. 575'-6"
ELEV. 581'-2"
EAST
FILTRATION
BUILDING
ELEV. 575'-6"
ELEV. 581'-2"
WEST
FILTRATION
BUILDING
A
I CG E
J
WP-75
TO 571'-3" NAC(3.4)
FLOOR ID'S - 3, 5 & 6
610C-1
67E-1
61E-1
67F-1
610G-1
WP-75
WP-75WP-75
WP-75
WP-75
WP-75WP-75
TO 571'-3" NAC(3.3)
510I-1
56I-1 53I-1
51I-1
56H-1
53B-1
54A-156A-1
510B-1
WP-75
62H-1
WP-75
WP-75
WP-75
64E-1
64F-1
F308
F/A NOTIFICATION PLAN - ROOTS BLOWER, CONTACTOR DECK, & DRUM LEVELS - 570'-6", 575'-6" & 581'-2" 3/32" = 1-0"
JA-2 Page 30 of 50
WP-75
WP-75
WP-75 72G-1WP-75
WP-75WP-75
75G-177G-1
710G-1
710D-1 74D-1 75D-1 72D-1
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
A
I G E
C
J
ELEV. 600'-0" EAST
FILTRATION
BUILDING
ELEV. 600'-0"WEST
FILTRATION
BUILDING
A
I CG E
J
NAC(4.1)
NAC(4.2) ON 616'-0"
NAC(4.3) ON 616'-0"
WP-30
1578G-1
71G-1
ELEVATOR MACHINE ROOM IS AT
LEVEL ABOVE BUT SHOWN ON THIS
LEVEL FOR CLARITY AS OTHER
EQUIPMENT IS IN THIS SAME SPACE
ON THE TRIPPER/BUNKER LEVEL
N A
C
ELECTRICAL PANEL 'ROOF' FOR
POTENTIAL POWER FOR NAC4
ELECTRICAL PANEL ASSOCIATED WITH
BOILER 6 CONTROL ROOM FOR
POTENTIAL POWER FOR NAC4
F309
F/A NOTIFICATION PLAN, FAN DECK LEVEL - 600'-0"
3/32" = 1-0"
SPECIFIC NOTES
THERE IS NO CEILING FOR THIS LEVEL EXCEPT IN THE BOILER 6
CEMS/COMS MODULE AND ALL OPEN TO STRUCTURE ABOVE
WITH ONLY CATWALKS AND THE TRIPPER ROOM ON THE NEXT
UPPER LEVEL. THE ONLY OTHER ROOM WITH A CEILING IS THE
BLOWER ROOM ON THIS LEVEL.
UTILIZE EXISTING OR PROVIDE NEW 20/1 SQUARE D QO TYPE
BREAKERS IN EXISTING PANELBOARD 'ROOF' OR 'BOILER 6' TO
POWER NEW NAC4 PANEL ON THIS LEVEL. SPARE BREAKERS
MAY BE AVAILABLE IN ONE OF THESE PANELS. COORDINATE
WITH POWERPLANT OPERATORS TO DETERMINE WHICH
PANELBOARD IS AVAILABLE FOR CONNECTIONS OF THIS NEW
LOAD. PROVIDE AN UPDATED PANELBOARD SCHEDULE WITH
INFORMATION AS TO WHICH SPARES OR NEW BREAKERS
WERE UTILIZED FOR THIS WORK. FOR EXISTING
IDENTIFICATIONS USED ON THE PANEL SCHEDULE CONFIRM
WITH POWERPLANT OPERATIONS FOR ACCURACY OF THESE
EXISTING LABELS PRIOR TO CREATING THE NEW LEGEND.
FIELD ROUTE CONDUITS BETWEEN THESE TWO LOCATIONS.
JA-2 Page 31 of 50
WP-75
WP-75
TO NAC(4.2) ON 600'-0"
TO 600'-0" NAC(4.2)
COAL CONVEYOR IS ABOVE THIS
FLOOR LEVEL AND ACCESSED WITH
A VERTICAL LADDER AND PLATFORM
82F-1
XP-150
91E-1
83E-1
89F-1
810E-1
UP TO PENTHOUSE
XP-150
82E-1
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
TRIPPER
ROOM
A
I G E
C
JTRIPPER
ROOM
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
A
I CG E
J
ELEV. 616'-0"
COAL CONVEYOR
TO NAC(4.3) ON 600'-0"
TO P0E-1 ON 636'-0"
NAC(4.3)
XP-150
P0D-1
XP-150
P0E-1
EAST
FILTRATION
BUILDING
WEST
FILTRATION
BUILDING
B
I G E
C
J
TO NAC(4.3) ON 600'-0"
TO 91E-1 616'-0" NAC(4.3)
F310
F/A NOTIFICATION PLAN, TRIPPER/BUNKER LEVEL - 616'-0"
3/32" = 1-0"
F310
F/A NOTIFICATION PLAN, PENTHOUSE LEVEL - 636'-0"
3/32" = 1-0"
JA-2 Page 32 of 50
190190190190190190190190190190190190190190190190190190190 P
190 190
190 190 190 190 190 190 190
FAN DECK LEVEL - 600'-0"
P 190
190 190 190 190 190 190 190 190 190 P
P
TRIPPER/BUNKER LEVEL - 616'-8"
190190190190190190190190190190
190 190 190 190 190 190 190 190 190 190
BASEMENT LEVEL AREA 2 - 531'-0"
PP
P P P
P
P P P
TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"
190190190190190190 190190190190190
SIXTY INPUT
ADDRESSABLE
MONITOR MODULE
(30 CLASS A CIRCUITS)
190 190 190 190 190 190 190 190 190
BASEMENT LEVEL AREA 1 - 531'-0"XP
PENTHOUSE LEVEL 636'-0"
TRIPPER/BUNKER LEVEL 616'-0"
190190190190190190190190190190190190190
190 190 190
WATER TREATMENT/PLC LEVEL AREA 2 - 560'-6"
P
COAL SCALE DECK LEVEL - 571'-3"
AMM
P
BAGHOUSE LEVEL - 578'-3"
DRUM LEVEL - 581'-2"
155155 P155155155155155155
PP EAST BAGHOUSE LEVEL 543'-9"
155 155 155
P
155155 155 155 155 155
WEST BAGHOUSE LEVEL 543'-9"
SIXTY INPUT
ADDRESSABLE
MONITOR MODULE
(30 CLASS A CIRCUITS)
SLC CIRCUIT 1
MONACO M-2 WITH MAAP+
ADDRESSABLE FIRE ALARM
CONTROL PANEL (FACP) &
INTEGRAL RADIO TRANSCEIVER
SLC CIRCUIT 2
SLC CIRCUIT 3
SLC CIRCUIT 4
SLC CIRCUIT 5
SLC CIRCUIT 6
SLC CIRCUIT 7
MONACO TRANSMITTER
ABOVE ROOF OF TURBINE
GENERATOR BUILDING
SLC CIRCUIT 8
PP
PP
TWENTY INPUT
ADDRESSABLE
MONITOR MODULE
(10 CLASS A CIRCUITS)
OR
(20 CLASS B CIRCUITS)
B16A-1B15φ-2B14φ-1B14A-1B13A-1B10A-1B9A-1B6A-1B5A-1B4A-1B2A-1B2A-2B1A-1B1B-1
B2B-1B1B-2 B4B-1 B5B-1 B6B-1 B6B-2 B9B-1 B11B-1 B12C-1 B13B-1 B14B-1 B14B-2 B16B-1 B16C-1 B15C-1
B15A-1
B9C-1B9E-1B10E-1B8E-1B9G-1B9H-1B7C-1B6D-1B5D-1B6E-1B3E-1B2E-1B3C-1B2D-1B2G-1
B5G-1 B6G-1 B6H-1 B5H-1 B3H-1 B1H-1 B2G-1 B1F-1 B1E-1 B1C-1 B3C-1 B4C-1 B5C-1 B8C-1
E4B-2E4B-1E5B-1E6B-1E7B-1E8B-1E9B-1E3B-1E2B-1E1B-2
E1B-1 E9B-4 E9B-3 E9B-2
59A-158A-156A-155A-154A-153A-151A-151B-153B-154B-155B-156B-158B-159B-169D-167D-165D-163D-161C-162E-1 63E-162F-1
71F-1 72G-1
61H-1
31I-1 31I-2
53I-2 54I-2 55I-2
W3A-1 W2A-1 W1A-1
W1A-2
W9A-1 W8A-1 W7A-1 W6A-1 W5A-1
P W9A-2 W9A-3 W9A-4
W4A-1 P
W4A-2
56I-2 58I-2 59I-2 59I-1 58I-1 56I-1 55I-1 54I-1 53I-1 63G-1 65G-1 67G-1
79F-1
68G-1 61D-1
710C-1
115φ-5115φ-4115φ-3115φ-2114φ-5114φ-4114φ-3114φ-2113φ-1114φ-1115φ-1
115A-1113A-1111A-1110A-118A-116A-114A-113A-111A-110A-5
190190190
10A-4 10A-3 10A-2 10A-1 12A-1 13A-1 11B-1 11B-2 12B-1 12B-2 13B-1 13B-2 14B-1 16B-1 18B-1 110B-4 110B-2 111B-1 113B-1 116B-1
190 190 190 190 190
116A-2
116A-1
110D-119E-117E-116E-114E-113E-113F-115F-116F-119F-1110G-1
110H-A 110H-1 16H-1 14H-1 13H-1 C0H-1C0H-A C0H-2 C0G-1 C0G-2 C0H-3 11F-1 11F-2 11D-1 11C-1 12C-1 14C-1 16C-1 19C-1
22A-121A-121B-121B-221C-121C-222C-122E-122F-122H-1
43F-143G-145G-1
45F-1
47G-149G-1410G-149D-147D-145D-143D-1
22B-1
810C-189H-186H-185H-183H-182H-182G-182F-183G-185G-186G-189G-1
89D-1 86D-1 85D-1 83D-1 82D-1 82C-1 83C-1 85C-1 86C-1 89C-1
DELUGE PANEL OUTPUTS
DELUGE SYSTEM WATERFLOW / TAMPER
ZN-1ZN-2ZN-3ZN-4
ZN-1ZN-2ZN-3ZN-4
XP
XP XP XP
XP XP
XP XP XP
XP
XP XP
XP XP
XP XP XP
116I-1
116I-2
115I-1
114I-1
XP
112I-1
111I-1
110I-1
18I-1
16I-1
14I-1
13I-1
11I-1
S15G-1
S14G-1
S12G-1
S12H-1
S11H-1
12G-1
12H-1
S10G-1
XP
XP
XP
S16G-2
S16G-1
S16H-1
INDIVIDUAL CLASS A CIRCUIT
TO EACH DEVICE (TYP)
C0G-A
A0G-1
XP
A0H-1
XP
A0H-2
A0F-1
FIRE FLOOR AREA 1 - 545'-6"
C0D-1
XP
C0D-2
XP
C0D-3
C0I-1
XP
C0G-1
XP XP
C0I-2
20D-1
XP
20H-1 20I-1 20G-120I-2
XP XP
20I-3
20H-2
XP
20I-4
XP
20I-5 20I-6
XP XP XP
XP XP
WATER TREATMENT/PLC LEVEL AREA 1
COAL HANDLING - 560'-6"
89F-1
XP-190
87F-1
XP-190
86F-1 84F-1
XP-190 XP-190 XP-190
83F-1
XP-190
82F-2 81F-1
XP-190
90D-1
XP-190
90E-1
XP-190
DELUGE PANEL SUPERVISORY
SUPRTRBLALRM
INDIVIDUAL CLASS A CIRCUIT
TO EACH DEVICE (TYP)
INDIVIDUAL CLASS A CIRCUIT
TO EACH DEVICE (TYP)
INDIVIDUAL CLASS B CIRCUIT
TO DELUGE PANEL CONTACTS
USED FOR MONITORING (TYP)
XP
A0G-1
WPAMM
B1E-2
WP
B15φ-1
44F-1
CO2 SUPPRESSION PANEL
82F-1
XP
A0F-1
110H-2
ROOTS BLOWER LEVEL - 570'-6" CONTACTOR DECKS- 575'-6"
F401
F/A RISER DIAGRAM - SIGNAL LINE CIRCUITS & DEVICES
NO SCALE
B14φ -4 AMM
B14A -2
WET SPRINKLER
WATER FLOW/TAMPER
(TURBINE GENERATOR BASEMENT)
AMM
B9A -2 AMM
TAMPER SWITCHES IN
FIRE PUMP ROOM
WET SPRINKLER
TAMPER SWITCH-1
AMM WET SPRINKLER
TAMPER SWITCH-5
B8D-1
11D-2 AMM
B1C-1 WET SPRINKLER
TAMPER SWITCH-2
AMM
B3D -2 AMM
WET SPRINKLER
WATER FLOW & TAMPER SWITCH
RECLAIM CONVEYOR #2
WET SPRINKLER
TAMPER SWITCH-7
AMM WET SPRINKLER
TAMPER SWITCH-6
B5D-2
B1F-2 AMM
WET SPRINKLER
WATER FLOW & TAMPER SWITCH
BOILER BASEMENT
AOM AOMAOM AOM
B14φ -3 AMM
DIESEL FIRE PUMP
FIRE PUMP ROOM
B14φ -2 AMM
ELECTRIC FIRE PUMP
FIRE PUMP ROOM
JA-2 Page 33 of 50
FAN DECK LEVEL - 600'-0"
FAN DECK LEVEL - 616'-8"
BASEMENT LEVEL AREA 2 - 531'-0"
TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"
PLC LEVEL AREA 2 - 560'-6"
SCALE DECK LEVEL - 571'-3"
BAGHOUSE LEVEL - 578'-3"
DRUM LEVEL - 581'-2"
PENTHOUSE LEVEL - 636'-0"
1530WP-75WP-75WP-75WP-30WP-30
30WP-75WP-75
1.1
NAC1
1.2
XP-150 XP-150 XP-150
1.3
1.4
0.2
0.1
TO NAC6
TO NAC7
TO NAC8
(E)(E)(E)(E)
NAC7
7.2
7.1
BAGHOUSE LEVEL - 543'-9"
(E)(E)(E)(E)
(E)(E)(E)(E) (E)
NAC6
6.2
6.1
(E)(E)(E)(E) (E)
MONACO M-2 WITH MAAP+
ADDRESSABLE FIRE ALARM
CONTROL PANEL (FACP) &
INTEGRAL RADIO TRANSCEIVER
MONACO TRANSMITTER
NAC
ADDRESSABLE
MODULE
(E)
COAL SCALE DECK - 571'-3"
EAST/WEST CONTACTOR DECKS - 575'-6"
115Φ-1114Φ-1112A-116A-112A-110A-110A-2
11B-113B-114B-1119B-1112A-1
30WP-75
IN COAL HANDLING
A0I-1A0I-2A0H-1
XP-150 XP-150 XP-150
A0F-1C0D-1COH-1
XP-150 XP-150
C0I-1D0I-1COH-2
1530 15
COH-3COG-1
XP-150 XP-150 XP-150
D0G-1D0E-1D0B-2
2.1
NAC2
2.2
2.3
2.4
NEAR BOILER 6
XP-150 XP-150 XP-150
114I-1116I-1111I-1
XP-150 XP-150 XP-150
115I-111I-118I-1
WP-75WP-75WP-75WP-75
17H-114H-112H-111G-111F-1
XP-150
WP-75WP-75WP-75WP-75
16E-115E-114C-117C-1110G-1
WP-75 WP-75
14E-1
WP-75
11D-1
WP-75
13C-1
WP-75
110D-1
5.1
NAC5
5.2
5.3
5.4
NEAR FIRE PUMP ROOM
WP-75WP-75WP-75WP-75
B9F-1B9G-1B5G-1B2G-1B2F-1
WP-75WP-75WP-75
B9C-1B6C-1B1F-1B2F-1
WP-75 WP-75
B5C-1
WP-75
B3C-1
WP-75
B1C-1
WP-75
B2G-1
3.1
NAC3
3.2
3.3
3.4
NEAR CMADA
D0D-1 D0C-1 D0B-1
WP-75WP-75WP-75
53B-154A-156A-1510B-1
WP-75WP-75WP-75
61E-164E-167F-164F-1
WP-75 WP-75
64E-1
WP-75
610C-1
WP-75
610G-1
WP-75
62H-1
WP-75
WP-75
WP-75
45E-1
22H-1
410E-147G-1
WP-75 WP-75
45D-1
WP-75
45E-1
WP-75
47D-1
WP-75
45G-1
WP-75WP-75WP-75WP-75
B15B-1B15C-1B1A-1B2A-1B5A-1
WP-75
B13B-1
WP-75
B10B-1
WP-75
B6B-1B3A-1
3030WP-75
B15A-1
WP-75
B15Φ-1
WP-75
B16Φ-1
SPARE
WP-75 WP-75
B5F-1
WP-75
B4F-1
WP-75
B4G-1
WP-75
22C-1
WP-75
22B-1
WP-75
21A-1
WP-75
23A-1
WP-75WP-75WP-75WP-75
510I-156I-153I-151I-1
WP-75
4.1
NAC4
4.2
4.3
4.4
NEAR BLOWER ROOM
WP-75WP-75WP-75
72G-172D-177G-175G-1
WP-75 WP-75
75D-1
WP-75
77D-1
WP-75
710D-1
XP-150 XP-150 XP-150
89F-183E-182E-1
XP-150 XP-150
XP-150
91E-1
P0E-1P0D-1
SPARE
TO NAC3
TO NAC4
TO NAC5
TO NAC1
TO NAC2
NAC8
8.1
WESTEAST
E1B-1 E2B-1 E3B-1 E6B-1 E8B-1 E9B-1 W7A-1 W4A-1 W1A-1 W6A-1 W9A-1
W4A-1W1A-2W6A-2W8A-1E9B-2E7B-1E4B-1E1B-2
SORBENT BUILDING
F402
F/A RISER DIAGRAM - NOTIFICATION DEVICES & CIRCUITS
NO SCALE
WP-75
115G-2 115G-1
114G-1
75 WP-75
111G-1
WP-75
110aG-1
TO PANEL 'K'
TO EXISTING NAC
120V CIRCUIT
TO PANEL 'LP-4'
TO PANEL(S)
'CP-K', 'C-1':'C-4'
TO PANEL 'BREAK'
710G-1
WP-7515
78G-1
TO EXISTING NAC
120V CIRCUIT
TO PANEL 'ROOF'
(OR POSSIBLE 'B-6 CP')
TO EXISTING NAC
120V CIRCUIT
SPECIFIC NOTES
PROVIDE 120V 20A CIRCUIT TO POWER EQUIPMENT FROM PANEL(S) IDENTIFIED ON
DRAWING. COORDINATE WITH POWER PLANT PERSONNEL FOR FINAL CIRCUIT TO
BE UTILIZED FOR FEEDING POWER TO NEW FACP OR NAC PANELS.
TO PANEL 'K' 1
JA-2 Page 34 of 50
BASEMENT LEVEL AREA 1 - 531'-0"
D
PROVIDE DELUGE SOLENOID VALVE FOR HIGH ANGLE CONVEYOR
WATER FLOW & TAMPER SWITCH FOR HIGH ANGLE CONVEYOR
D D
PROVIDE DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #1
WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #1
PROVIDE DELUGE SOLENOID VALVE FOR CONVEYOR TO BUCKET ELEVATOR #1
WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO BUCKET ELEVATOR #1
J J
J J
HIGH ANGLE CONVEYOR
PLC LEVEL AREA 1 - 560'-6"
D
PROVIDE DELUGE SOLENOID VALVE FOR CONVEYOR TO STORAGE
WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO STORAGE
D
PROVIDE DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #2
WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #2
OPERATING LEVEL AREA 1 - 545'-6"
J LHC LHC LHC J
RECLAIM CONVEYOR #2
J J
CONVEYOR TO STORAGE
LHC LHC LHC
LHC LHC LHC
LHC LHC LHC
SLC SLC
SLC SLC SLC SLC SLC SLC SLC
SLC SLC
SLC SLC SLC SLC SLC SLC SLC
DELUGE RELEASING CONTROL PANEL #1 (DRCP1)
S
LC
S
LC
S
LC
SLC
SLC
S
LC
S
LC
S
LC
SLC SLC SLC SLC SLC SLC
SLC
S
LC
S
LC
S
LC
SLC SLC
S
LC
S
LC
S
LC
SLC SLC SLC SLC SLC
AUX RLY 1 - SUPERVISORY
AUX RLY 2 - TROUBLE
AUX RLY 3 - ALARM
AUX RLY 4 - ALARM (NOT ASSIGNED)
AUX RLY 1 - ZONE 1 OUTPUT
AUX RLY 1 - ZONE 2 OUTPUT
AUX RLY 1 - ZONE 3 OUTPUT
AUX RLY 1 - ZONE 4 OUTPUT
ZONE INPUTS
(SPARE)
(SPARE)
Z-1 OUTPUT - RECLAIM CONVEYOR #2
AUX RLY 1 - SUPERVISORY
AUX RLY 2 - TROUBLE
AUX RLY 3 - ALARM
AUX RLY 4 - ALARM (NOT ASSIGNED)
AUX RLY 1 - ZONE 1 OUTPUT
AUX RLY 1 - ZONE 2 OUTPUT
AUX RLY 1 - ZONE 3 OUTPUT
AUX RLY 1 - ZONE 4 OUTPUT
SPECIFIC NOTES
THIS CONVEYOR REMOVED FROM SERVICE PERMANENTLY AND NOT REQUIRE NEW
DELUGE PROTECTION, BUT EXISTING DELUGE SUPPRESSION TO REMAIN BUT BE
DISABLED SO NO ACTIVATION CONNECTED FROM NEW SUPPRESSION RELEASING PANEL.
SUPERVISORY
TROUBLE
ALARM
RECLAIM CONVEYOR #2
CONVEYOR TO STORAGE
COMMON ADDRESSED OUTPUTS TO
FIRE ALARM MONITORING MODULE
SPECIFIC ADDRESSED DELUGE OUTPUTS
TO FIRE ALARM MONITORING MODULE
CONVEYOR TO BUCKET ELEVATOR #1
HIGH ANGLE CONVEYOR
(SPARE)
(SPARE)
(SPARE)
(SPARE)
RECLAIM CONVEYOR #2
CONVEYOR TO STORAGE
Z-2 OUTPUT - CONVEYOR TO STORAGE
Z-3 OUTPUT - SPARE
Z-4 OUTPUT - SPARE
ZONE 1
ZONE 2
ZONE 3
ZONE 4
Z-1 OUTPUT - HIGH ANGLE CONVEYOR
Z-2 OUTPUT - CONVEYOR TO BUCKET ELEVATOR #1
Z-3 OUTPUT - SPARE
Z-4 OUTPUT - SPARE
ZONE INPUTS
(SPARE)
(SPARE)
CONVEYOR TO BUCKET ELEVATOR #1
HIGH ANGLE CONVEYOR
ZONE 1
ZONE 2
ZONE 3
ZONE 4
RECLAIM CONVEYOR #2
CONVEYOR TO STORAGE
SPECIFIC ADDRESSED WATERFLOW/TROUBLE
OUTPUTS TO FIRE ALARM MONITORING MODULE HIGH ANGLE CONVEYOR
CONVEYOR TO BUCKET ELEVATOR #1
CONVEYOR TO BUCKET ELEVATOR #1
F403
F/A RISER DIAGRAM - DELUGE SYSTEM CIRCUITS & DEVICES
NO SCALE
DELUGE RELEASING CONTROL PANEL #2 (DRCP2)
JA-2 Page 35 of 50
REFERENCED GRIDLINES
BAGHOUSE
BAGHOUSE
CHEMICAL STORAGE AREA TO
BE INCLUDED IN WP AREA
CLASSIFICATION HOWEVER
DETECTORS INSTALLED SHALL
BE THE SAME TYPE INSTALLED
IN THE CLASS II DIV 1 AREAS
OPEN TO BELOW
ROOF
BAGHOUSE
BAGHOUSE
OPEN TO BELOW
OPEN TO BELOW
BAGHOUSE BAGHOUSE
ROOF
ROOF
ROOF
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
CLASS II DIV 1 GROUP F AREA
UNCLASSIFIED AREA, BUT EQUIPMENT TO BE INSTALLED AS WEATHERPROOF TO
INCLUDE RACEWAYS, BACK BOXES, CONNECTIONS AND SHALL ALSO INCLUDE
SECONDARY ENCLOSURES FOR ANY PACKAGED EQUIPMENT WHICH IS PROVIDED IN
NEMA 1 TYPE ENCLOSURES TO PROVIDE ADDITIONAL PROTECTION FROM DUST
INFILTRATION INTO THESE COMPONENTS, DEVICES AND/OR ANCILLARY SYSTEMS
CLASS I DIV 2 GROUP D AREA
UNCLASSIFIED AREA
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 575'-6"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
WEST
FILTRATION
BUILDING
ELEV. 578'-3"
ELEV. 543'-9"
ELEV. 636'-0"
B
TRIPPER
ROOM
CRANE
ELEV. 543'-9" ELEV. 543'-9"
ELEV. 556'-2"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
TRIPPER
ROOM
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 575'-6"
ELEV. 556'-2"
ELEV. 545'-6"
ELEV. 531'-0"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
WEST
FILTRATION
BUILDING
ELEV. 571'-3"
ELEV. 575'-6" ELEV. 578'-3"ELEV. 578'-3"
TURBINE
GENERATOR
ROOM
AREA CLASSIFICATION: AREA CLASSIFICATION:
AREA CLASSIFICATION: AREA CLASSIFICATION: AREA CLASSIFICATION:
AREA CLASSIFICATION: AREA CLASSIFICATION:
GENERAL SHEET F500 NOTES
1. COAL HANDLING AREAS ARE AT VARIOUS ELEVATIONS WITH EXTERNAL CONVEYORS ARE NOT LEVEL.
2. AREA CLASSIFICATIONS BASED ON TYPES OF MATERIALS NORMALLY PRESENT AT THE LOCATIONS, i.e. PREDOMINANTLY COAL DUSTS. OTHER NON EXPLOSIVE BASED DUSTS AND DIRT ARE ALSO PRESENT WITHIN THE PLANT AREAS WHERE DEVICES ARE NOTED TO HAVE WEATHERPROOF ENCLOSURES TO PREVENT THIS DUST INFILTRATION INTO THESE SYSTEMS.
3. AREA CLASSIFICATIONS FOR THE SORBENT FACILITIES HAS NOT BEEN VERIFIED AS THESE LOCATIONS ARE STILL NOT COMPLETED AND TURNED OVER TO THE GOVERNMENT AND AS SUCH AS-BUILT INFORMATION IS NOT AVAILABLE.
JA-2 Page 36 of 50
FIRE ALARM SYSTEMS MATRIX
SY
ST
EM
O
U
TP
U T/
R
ES
PO
N
SE
TR
A
N S
M
IT
A
LA
R M
T O
S E
C U
R
IT
Y F
O R
C E
S
SYSTEM INPUT:
ALARM:
MANUAL PULL STATION O
SMOKE DETECTOR
HEAT DETECTOR
O
O
OFIRE SPRINKLER WATERFLOW (ANY ZONE)
ELECTRIC FIRE PUMP ACTUATION
DIESEL FIRE PUMP ACTUATION
O
O
O
TR
A
N S
M
IT
S U
P E
R V
IS
O
R Y
T O
S E
C U
R
IT
Y F
O R
C E
S
TR
A
N S
M
IT
T R
O U
B
LE
T O
S E
C U
R
IT
Y F
O R
C E
S
A C
TI
V
A
TE
A
LL
V
IS
U A
L A
N D
A U
D
IB
LE
A
LA
R
M S
A C
TI
V
A
TE
L O
C A
L S
U P
E R
V
IS
O R
Y A
N N
U N
C
IA
TO
R
A C
TI
V
A
TE
L O
C A
L
TR
O U
B
LE
A N
N U
N C
IA
TO
R
LO
C
A L
S P
R
IN
K
LE
R B
E
LL
A C
TI
VA
TE
D
W
AT
ER
F
LO
W
O
CMADA CO2 SYSTEM ACTUATION
SUPERVISORY:
LOW TEMPERATURE ALARM (ANY LOCATION) O
SPRINKLER TAMPER SWITCH (ANY LOCATION) O
TROUBLE:
FIRE ALARM PRIMARY POWER SOURCE FAILURE
FIRE ALARM PANEL BATTERY FAILURE
S…