JA-2_Drawings_22x34.pdf

PDF 21 MB Posted

Attached to
CH&PP Fire Alarm System Repair Federal contract opportunity
Solicitation number
FA5004-15-R-C006
Issued by
Department of the Air Force Pacific Air Forces

About this file

JA-2 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to CH&PP Fire Alarm System Repair, newest first.
File Type Posted
Questions_and_Answers_0001.pdf PDF
JA-1_Specifications_(9_July_2015).pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
CHPP_Fire_Alarm_JA_Signed.pdf PDF
JA-9_AF_Form_3065 _Contract_Progress_Report.pdf PDF
JA-5_Past_Performance_Worksheet.pdf PDF
JA-7_AF_Form_3000 _Material_Approval_Submittal.pdf PDF
JA-8_AF_Form_3064 _Contract_Progress_Schedule.pdf PDF
JA-3_Wage_Determination_Building_and_Heavy_AK1.pdf PDF
FA5004-15-R-C006.pdf PDF
JA-6_AF_Form_66_-_10_Apr_'15.pdf PDF
JA-4_Past_Performance_Questionnaire.pdf PDF
JA-1_Specifications.pdf PDF
JA-10_Financial_Reference_Sheet.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG

DRAWING TITLE

SCALE

GOVERNING CODES:

2012 INTERNATIONAL BUILDING CODE - IBC

2012 INTERNATIONAL FIRE CODE - IFC

2014 NFPA 70 - NATIONAL ELECTRICAL CODE - NEC

2013 NPFA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE

AUTHORITY HAVING JURISDICTION

PACAF FIRE PROTECTION DESIGN ENGINEER

FA5004-15-R-C006

JA-2 Page 1 of 50

B O

TT

O

M A

S H

S

IL

O

TO

P A

S H

S

IL

O

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

ELEV. 575'-6"

ELEV. 581'-2"

ELEV. 600'-0"

ELEV. 616'-0"

WEST

FILTRATION

BUILDING

ELEV. 578'-3"

ELEV. 543'-9"

ELEV. 636'-0"

B

TRIPPER

ROOM

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

ELEV. 575'-6"

ELEV. 556'-2"

ELEV. 545'-6"

ELEV. 531'-0"

ELEV. 581'-2"

ELEV. 600'-0"

ELEV. 616'-0"

WEST

FILTRATION

BUILDING

ELEV. 571'-3"

ELEV. 575'-6" ELEV. 578'-3"ELEV. 578'-3"

CRANE

ELEV. 543'-9" ELEV. 543'-9"

ELEV. 556'-2"

ELEV. 581'-2"

ELEV. 600'-0"

ELEV. 616'-0"

TRIPPER

ROOM

TURBINE

GENERATOR

ROOM

FREIGHT

ELEVATOR

PRIMARY

COAL

ELEVATOR

SECONDARY

COAL

ELEVATOR

E A

S T

FI

LT

R A

TI

O

N B

U

IL

D

IN

G

W E

S T

FI

LT

R A

TI

O

N B

U

IL

D

IN

G

POWER PLANT

COAL HANDLING

& UNLOADING AREA

F100

EIELSON CH&PP GENERAL FLOOR & ELEVATION PLAN

NO SCALE

XP

ELECTRICAL SYMBOL LEGEND

NOTE KEY - INDICATES NOTES APPLICABLE ON EACH SHEET

JUNCTION BOX

FIRE ALARM CONTROL PANEL: SURFACE MOUNTED; MONACO BT2 TRANSMITTER (EXISTING)

FIRE ALARM COMBINATION HORN/STROBE

SUBSCRIPTS: WP = WEATHERPROOF, XX = CANDELLA SETTING

STROBE ONLY

MANUAL PULL STATION, +4'-6" AFF U.O.N.

PHOTOELECTRIC SMOKE DETECTOR - CEILING MOUNTED U.O.N.

HEAT DETECTOR - CEILING MOUNTED U.O.N.,

TEMPERATURE IN SUBSCRIPT IF DIFFERS FROM 135 DEGREES F

XP - RATED FOR CLASS I DIV. 1/2 AREAS

SPRINKLER SYSTEM FLOW & TAMPER SWITCH

D

FIRE ALARM BELL / STROBE FOR CLASS II DIV 1 OR 2 AREAS

DELUGE SYSTEM WATER FLOW & TAMPER SWITCH CONNECTIONS

DELUGE SOLENOID VALVE

DEVICE RATED FOR CLASSIFIED (CLASS II DIV 1 OR 2) AREAS

TEMP

DUAL ADDRESSABLE MONITOR MODULE (ALARM/TROUBLE)

LHC LINEAR HEAT DETECTOR CABLE

FIRE ALARM REMOTE ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL WITH INTEGRAL TRANSMITTER

DELUGE RELEASING CONTROL PANEL

SWITCHED CIRCUIT

PUMP START SWITCH

SUPERVISED CONTROL RELAY

TICK MARKS ON DEMO PLANS INDICATE NUMBER OF CONDUCTORS IN CONDUIT

(FOUR SHOWN IN EXAMPLE)

CENTRAL DELUGE CONTROL PANEL (EXISTING)

ADDRESSABLE MONITOR MODULE

60 INPUT (30 CLASS A) - OR - 20 INPUT (10 CLASS A)

FIRE ALARM BELL

FLOOR ELEVATION FLOOR NAME(S)

531'-0" BASEMENT LEVEL

545'-6" TURBINE/FIRE FLOOR LEVEL

560'-6" WATER TREATMENT/PLC LEVEL

570'-6" ROOTS BLOWER LEVEL

571'-3" COAL SCALE DECK LEVEL

575'-6" EAST/WEST CONTACTOR DECKS

581'-2" DRUM LEVEL

600'-0" FAN DECK LEVEL

616-0" TRIPPER/BUNKER LEVEL

636'-0" PENTHOUSE LEVEL

F100 NO SCALE

FLOOR ID

B

P

F100

DEVICE IDENTIFICATION NUMBERING CONVENTION

NO SCALE

FLOOR ID (SEE ABOVE) FIRST POSITION; 1 DIGIT/CHARACTER

GRID LINE ID (NUMBERED GRIDS) STARTING AT RIGHT SIDE; 1 OR 2 DIGITS (W/O SUBSCRIPTS)

GRID LINE ID (ALPHABETIC GRIDS) STARTING AT TOP OF GRID; 1 CHARACTER

NUMBER OF SPECIFIC DEVICE IN THIS GRID; 1 DIGIT

(WHERE DEVICE IS ADDRESSABLE MONITOR MODULE (AMM), ID = 'A')

DEVICE

(TYP)

531'-0" BASEMENT LEVEL - COAL HANDLING

545'-6" FIRE FLOOR LEVEL - COAL HANDLING

560'-0" RECLAIM #2 UPPER - COAL HANDLING

A C D

543'-9" & 578' EAST BAGHOUSEE

WEST BAGHOUSEW 543'-9" & 578'

SORBENT FACILITIESS N/A

LOW TEMPERATURE SWITCH SET TO ACTIVATE AT 40 DEGREES F

(SUPERVISORY SIGNAL TO FACP WHERE POTENTIAL FREEZING CONDITIONS EXIST)

MONITORING OF ALARM CONTACT CLOSURE OF CO2 SUPPRESSION PANEL

MONITORING OF TROUBLE CONTACT CLOSURE OF CO2 SUPPRESSION PANEL

630-?" BACKUP COAL CONVEYOR9

MONITOR WATERFLOW OF SPRINKLER SYSTEM

MONITOR TAMPER SWITCH CONTACT OF SPRINKLER SYSTEM

ADDRESSABLE OUTPUT MODULE

INSTALL INSULATED GROUNDING CONDUCTOR, SIZED IN ACCORDANCE WITH NEC

REQUIREMENTS, IN ALL FEEDER AND BRANCH CIRCUIT CONDUITS. ADDITIONAL GROUNDING

CONDUCTORS NOT REQUIRED FOR FIRE ALARM LOW VOLTAGE POWER LIMITED SIGNAL LINE

OR NOTIFICATION CIRCUITS.

NOTIFICATION DEVICES MOUNTING HEIGHT - 80" MINIMUM TO 96" MAXIMUM,

MEASURED TO THE BOTTOM OF APPLIANCE.

WP INSTALL DEVICE OR EQUIPMENT IN AN ENCLOSURE RATED TO BE DUST-TIGHT,

WHICH COULD ENTAIL A SECONDARY ENCLOSURE TO PROTECT THE EQUIPMENT

PANELBOARD SURFACE MOUNTED

JA-2 Page 2 of 50

XP

XP XP

XP

XP

XP

XP

XP

XPXPXPXP

XP XP XP

UP TO FACP

ZONE 9

XP

M

AT

C H

LI

N

E F

M

AT

C H

LI

N

E F

XP

XP

XP

XP

J

J

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

J

J

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

J

LH

C

LH

C

LH

C

LH

C

LH

C

J

EOL

EOL

TO CDCP, ZONE 3

TO CDCP,

ZONE 1

EOL

TO CDCP, ZONE 2

D D D

TO CDCP

DEMO EXISTING THERMAL CABLES

(LHC) OVER CONVEYORS (TYP-3)

DELUGE SOLENOID VALVE FOR CONVEYOR

TO BUCKET ELEVATOR #1 ZONE #13

WATER FLOW & TAMPER SWITCH FOR

CONVEYOR TO BUCKET ELEVATOR #1 ZONE #8

DELUGE SOLENOID VALVE FOR RECLAIM

CONVEYOR #1 ZONE #12

WATER FLOW & TAMPER SWITCH FOR RECLAIM

CONVEYOR #1 ZONE #7

DELUGE SOLENOID VALVE FOR

PECK CARRIER ZONE #11

WATER FLOW & TAMPER SWITCH FOR

PECK CARRIER ZONE #6

M

AT

C H

LI

N

E F

M

AT

C H

LI

N

E F

DELUGE SOLENOIDS TO BE REPLACED WITH

UNITS WHICH ARE COMPATIBLE AND LISTED

COMBINATIONS FOR CONNECTION TO THE NEW

SUPPRESSION SYSTEM RELEASING PANEL(S)

DELUGE SYSTEM FOR RECLAIM CONVEYOR #1

TO BE DISABLED TO PREVENT ACTIVATION OF

THE SPRINKLER SYSTEM IN THIS AREA AS THIS

CONVEYOR IS NO LONGER IN SERVICE.

F101

F/A DEMO PLAN, BASEMENT LEVEL AREA 1 - 531'-0"

3/32" = 1-0"

F101

F/A DEMO PLAN, SUPPRESSION SYSTEMS - 531'-0"

3/32" = 1-0"

GENERAL DEMOLITION SHEETS F101 - F110 NOTES

1. EXISTING FIRE ALARM AND DELUGE SUPPRESSION SYSTEMS TO REMAIN IN-TACT AND IN SERVICE THROUGHOUT THE CONSTRUCTION PROCESS EXCEPT FOR PERIODS WHERE THE SYSTEMS ARE TRANSITIONING FROM EXISTING SYSTEMS TO NEW AT TIME OF FINAL CUT-OVER OF THESE SYSTEMS. ONCE NEW FIRE ALARM AND/OR DELUGE SUPPRESSION SYSTEMS HAVE BEEN TRANSITIONED OVER TO THE NEW FIRE ALARM AND/OR RELEASING PANEL CONTROLLERS AND THEY ARE FULLY COMMISSIONED, THE CONTRACTOR SHALL DEMOLISH IN THEIR ENTIRETY THESE EXISTING SYSTEMS. THE CONTRACTOR SHALL NOT LEAVE LARGE AREAS OF THE FACILITY WITHOUT

DETECTION AND/OR NOTIFICATION THROUGHOUT THE CONSTRUCTION EFFORT.

2. INFORMATION INCLUDED ON THE DEMO DRAWINGS WAS DERIVED FROM EXISTING AS-BUILT DRAWINGS AND FIELD INVESTIGATIONS, HOWEVER THERE MAY BE DIFFERENCES BETWEEN THE ACTUAL FIELD CONDITIONS AND THE DRAWINGS, WHERE ADDITIONAL ITEMS MAY BE SHOWN ON THE DRAWINGS OR EXISTING SYSTEM COMPONENTS MAY NOT BE SHOWN. THE CONTRACTOR SHALL REMOVE ALL FIRE ALARM COMPONENTS INCLUDING BUT NOT LIMITED TO CONTROL PANELS, INITIATION DEVICES, JUNCTION BOXES, CONDUITS, CONDUCTORS, RELAYS AND NOTIFICATION DEVICES. DEMOLITION WILL INCLUDE COMPONENTS ASSOCIATED WITH THE EXISTING FIRE ALARM AND DELUGE SUPPRESSION SYSTEMS REPLACED WITH NEW SYSTEMS, WHETHER THEY ARE SPECIFICALLY SHOWN OR NOTED ON THE CONTRACT DRAWINGS OR NOT SHOWN ON THE CONTRACT DRAWINGS BUT ARE PART OF THESE

EXISTING SYSTEMS.

3. CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER REGARDING ANY UNFORESEEN ITEMS WHICH ARE ENCOUNTERED DURING THE DEMOLITION WORK. CONTRACTING OFFICER TO HAVE THE FINAL JUDGEMENT WHETHER THE EQUIPMENT INCLUDED IN THIS DEMOLITION WORK IS ADEQUATELY DEFINED IN THE OVERALL SCOPE OF WORK IN THE CONTRACT DOCUMENTS AND WHETHER THESE ITEMS DISCOVERED DURING THE DEMOLITION

EFFORT WARRANT ADDITIONAL COST TO THE GOVERNMENT.

4. FIRE ALARM WIRING AND CONDUITS WITHIN THE EXISTING FILTRATION BUILDINGS/BAGHOUSES TO BE RE-UTILIZED FOR CONNECTION TO THE NEW FIRE ALARM SYSTEM SLC AND NAC CIRCUITS. INITIATION DEVICES TO BE REPLACED WITH COMPONENTS COMPATIBLE WITH THE NEW FIRE ALARM CONTROL PANEL. THE NOTIFICATION DEVICES WILL REMAIN FOR RE-CONNECTION TO A NEW NAC PANEL CONNECTED TO AND CONTROLLED FROM THE

MAIN FACP WHERE THERE WILL BE ONE NEW NAC PANEL PER BUILDING.

5. MANY OF THE AREAS WITHIN THE FACILITY WILL REQUIRE LIFTS, TALL LADDERS OR SCAFFOLDING TO ACCESS THE EXISTING INFRASTRUCTURE FOR DEMOLITION. CONTRACTOR IS STRONGLY ENCOURAGED FOR THE CONTRACTOR AND/OR SUBCONTRACTORS TO CONDUCT A SITE VISIT TO INVESTIGATE THE SITE CONDITIONS AND WORKING

ENVIRONMENT PRIOR TO BID SO THEY ARE AWARE OF THESE CONDITIONS.

6. CONTRACTOR SHALL TAKE CARE IN PRESERVING THE EXISTING FIRE ALARM CONTROL PANELS FOR TURNOVER TO THE GOVERNMENT AT THE END OF THE DEMOLITION WORK AS MANY OF THESE COMPONENTS MAY BE RE-USABLE

FOR OTHER SYSTEMS OF SIMILAR TYPES AT THE BASE.

7. THIS IS AN OPERATIONAL POWER PLANT FACILITY, WHERE AREAS ARE HEATED BUT NOT UNDER CLIMATE CONTROLS, AND TEMPERATURES AS HIGH AS 112 DEGREES FAHRENHEIT HAVE BEEN MONITORED. SCHEDULING FOR THIS WORK SHOULD BE ANTICIPATED TO BE COMPLETED FOR THE MOST PART DURING FALL/WINTER/SPRING MONTHS AS THE INTERIOR PLANT CONDITIONS ARE MORE FAVORABLE. THE CONTRACTOR'S PROJECT SPECIFIC WORK PLAN DEVELOPED IN ACCORDANCE WITH PROJECT DOCUMENTS AND SUBMITTED FOR APPROVAL SHALL

ADDRESS THE CONTRACTOR'S METHODS AND MEANS TO ADDRESS INTERIOR TEMPERATURES.

JA-2 Page 3 of 50

PUMP START - IN METRON PANEL

DIESEL FIRE PUMP ACTUATION - UP TO FPCAP ZN. 13

ELECTRIC FIRE PUMP ACTUATION - UP TO FPCAP ZN. 11

ELECTRIC FIRE PUMP TROUBLE - UP TO FPCAP ZN. 12

WET SPRINKLER TAMPER SWITCH-3 - UP TO FPCAP ZN. 6

WET SPRINKLER TAMPER SWITCH-4 - UP TO FPCAP ZN. 7

UP TO FACP

ZONE 11

UP TO FACP

ZONE 13

UP TO FACP

ZONE 10

M

AT

C H

LI

N

E F

M

AT

C H

LI

N

E F

DIESEL FIRE PUMP TROUBLE - UP TO FPCAP ZN. 14

WET SPRINKLER WATER FLOW

UP TO FPCAP ZONE 3

(TURBINE GENERATOR BASEMENT)

WET SPRINKLER

TAMPER SWITCH-1

UP TO FPCAP ZONE 4

WET SPRINKLER

TAMPER SWITCH-2

UP TO FPCAP ZONE 5

WET SPRINKLER WATER FLOW

& TAMPER SWITCH

UP TO FPCAP ZONE 1

LP1 POWER PANEL

(FEED UP TO CDCP)

WET SPRINKLER

TAMPER SWITCH-7

UP TO FPCAP ZONE 10

WET SPRINKLER

TAMPER SWITCH-6

UP TO FPCAP ZONE 9

WET SPRINKLER

TAMPER SWITCH-5

UP TO FPCAP ZONE 8

WET SPRINKLER

WATER FLOW & TAMPER SWITCH

RECLAIM CONVEYOR #2

UP TO FPCAP ZONE 2

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

EAST

FILTRATION

BUILDING

ELEV. 531'-0"

WEST

FILTRATION

BUILDING

A

I CG E

J

FIRE PUMP ROOM

FDC

F102

F/A DEMO PLAN, BASEMENT LEVEL AREA 2 - 531'-0"

3/32" = 1-0"

JA-2 Page 4 of 50

M

AT

C H

LI

N

E F

M

AT

C H

LI

N

E F

XP

XP

XP

XP

XP

XP

XP

TO FACP

ZONE 7

F/A CONTROL PANEL (FACP)

F/A CODE TRANSMITTER

XP

N

AC

XP

UP

DOWN

ZONE 9

ZONE 9

ZONE 8

CENTRAL DELUGE CONTROL PANEL (CDCP)

D

DELUGE SOLENOID VALVE FOR RECLAIM

CONVEYOR #2 ZONE #14

WATER FLOW & TAMPER SWITCH FOR

RECLAIM CONVEYOR #2 ZONE #9

TO CDCP

DELUGE SOLENOIDS TO BE REPLACED WITH

UNITS WHICH ARE COMPATIBLE AND LISTED

COMBINATIONS FOR CONNECTION TO THE NEW

SUPPRESSION SYSTEM RELEASING PANEL(S)

F103

F/A DEMO PLAN, FIRE FLOOR AREA 1 (COAL HANDLING) - 545'-6"

3/32" = 1-0"

F103

F/A DEMO PLAN GROUND LEVEL 543'-9", EAST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

F103

F/A DEMO PLAN CEILING LEVEL 578'/601', WEST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

FC

P

X M

T

RETURN TO FCP

NAC A

FC

P

X M

T

P

RETURN TO

FCP

NAC A

155 155 155 155 155 155 155 155

P

RETURN TO

FCP

NAC B

FROM FCP

NAC B

CEILING ELEVATION

DETECTION DEVICES

F103

F/A DEMO PLAN GROUND LEVEL 543'-9", WEST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

F103

F/A DEMO PLAN CEILING LEVEL 578'/601', EAST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

UP TO CEILING

HEAT DETECTOR

UP TO CEILING

HEAT DETECTOR

155 155 155 155 155 155 155 155 155

RETURN TO FCP

NAC B

FROM FCP

NAC B

DOWN TO PULL STATION

DOWN TO PULL

STATION

UP TO CEILING

HEAT DETECTOR

UP TO CEILING

HEAT DETECTOR

DOWN TO PULL

STATION

DOWN TO PULL STATION

UPPER CATWALK

ENTRY POINT

UPPER

STAIRWELL

ENTRY POINT

JA-2 Page 5 of 50

A

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

190 190 190 190 190

190 190 190 190

190190

190 190 190 190

XP

XP

XP

XPXPXPXPXPXPXPXPXP

XP

TO FACP

ZONE 6

TO FACP

ZONE 5

F/A CONTROL PANEL (FACP)

XP

ON SUSPENDED CEILING

BELOW

N

AC

J

U

XP

XP

ZONE 8

J

LP3

POWER

PANEL

2 #12

120 VAC

CIRCUIT 1928 CONDUCTORS

24 TO CDCP

4 TO FAP

8 CONDUCTORS TO

METRON PANEL

LOWER LEVEL

CENTRAL DELUGE CONTROL PANEL (CDCP)

XP

J

DEVICE CONNECTIONS TO NEW SORBENT

BUILDING MODULES SCHEMATIC ONLY

CONTRACTOR TO VERIFY AS REQUIRED

2 #12

120 VAC

CIRCUIT 21

(F/A BELLS)

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

CRANE

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

ELEV. 545'-6"

WEST

FILTRATION

BUILDING

A

I CG E

J

FIRE PROTECTION CONTROL

AND ALARM PANELS

EXISTING DEVICES TO BE REPLACED WITH

NEW DEVICES CONNECTED TO CLASS A

CIRCUITS PER DEVICE. EXISTING CIRCUIT

CONDUCTORS NOT RE-USED (TYP)

DEMO EXISTING NAC AND

NOTIFICATION DEVICES

F104

F/A DEMO PLAN, TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"

3/32" = 1-0"

EAST FILTRATION BUILDING SHOWN ON SHEET F103

WEST FILTRATION BUILDING SHOWN ON SHEET F103

JA-2 Page 6 of 50

C H

LI

N

E F

M

AT

C H

LI

N

E F

XP

XP

XP

XP

DN

DOWN TO ZONE 8

DEVICES

J

WN TO

ACP

EL

J

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

EOL

J

DEMO THERMAL CABLES (LHC)

OVER CONVEYOR (TYP)

TO CDCP ZONE #5

D

DELUGE SOLENOID VALVE FOR

CONVEYOR TO STORAGE ZONE #10

WATER FLOW & TAMPER SWITCH FOR

CONVEYOR TO STORAGE ZONE #15

TO CDCP

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

J

J

J

DEMO THERMAL CABLES (LHC)

OVER CONVEYOR (TYP)

D

DELUGE SOLENOID VALVE FOR

RECLAIM CONVEYOR #2 ZONE #14

WATER FLOW & TAMPER SWITCH FOR

RECLAIM CONVEYOR #2 ZONE #9

HORN, MANUAL PULL STATION

& BEACON ELEVATION 543'-6"

(ACTUAL LOCATION NOT DEPICTED)

CONVEYOR TO STORAGE ROUTED UPHILL

FROM BUILDING TO DROP COAL TO PILE ON

GROUND ABOVE RECLAIM CONVEYOR #2

COLLECTION BUCKET BELOW GRADE

CONVEYOR TO STORAGE ROUTED

DOWNHILL FROM BUILDING TO COLLECT

COAL FROM PILE ON GROUND,

COLLECTION BUCKET BELOW GRADE

DELUGE SOLENOIDS TO BE REPLACED WITH

UNITS WHICH ARE COMPATIBLE AND LISTED

COMBINATIONS FOR CONNECTION TO THE NEW

SUPPRESSION SYSTEM RELEASING PANEL(S)

J

J

J

J

ROOF

FIFTH LEVEL

FOURTH LEVEL

THIRD LEVEL

SECOND FLOOR

FIRST FLOOR

BASEMENT

PENTHOUSE ZONE 1

ZONE 1

ZONE 2

ZONE 3

ZONE 4

F/A CONTROL PANEL

OPERATING LEVEL

WATER TREATMENT

DRUM/PLC LEVEL

FAN DECK

BUCKET ELEVATION

CATWALK

LEVEL

DEVICES

F105

F/A DEMO PLAN, WATER TREATMENT/PLC LEVEL AREA 1 COAL HANDLING - 560'-6"

3/32" = 1-0"

F105 NO SCALE

CONVEYOR TO

STORAGE STARTS

AT CATWALK LEVEL

TICK MARKS REPRESENT

# OF CONDUCTORS (TYP)

GENERAL SHEET F105 NOTES

1. EXISTING THERMAL CABLES ASSOCIATED WITH AND CONNECTED TO THE EXISTING FIRE SUPPRESSION

SYSTEMS IN HIGH ANGLE CONVEYOR, RECLAIM CONVEYOR #2 AND CONVEYOR TO STORAGE TO REMAIN IN-PLACE UNTIL NEW OPERATIONAL SYSTEMS INCLUDING NEW DETECTION CABLES ARE INSTALLED AND READY FOR CUT-OVER TO CONNECT INITIATION SYSTEMS OVER TO THE NEW RELEASING PANEL.

JA-2 Page 7 of 50

C H

LI

N

E F

M

AT

C H

LI

N

E F

D

190190190190190

190190190

J JJ

JJJ

J

J

DOWN TO

FACP

ZONE 4

DEVICES

UP TO

NEXT LEVEL

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

I G E

C

J

F106

F/A DEMO PLAN, WATER TREATMENT/PLC LEVEL AREA 2 - 560'-6"

3/32" = 1-0"

JA-2 Page 8 of 50

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

ELEV. 571'-3"

A

I CG E

F107

F/A DEMO PLAN, COAL SCALE DECK AREA 2 - 571'-3"

3/32" = 1-0"

DEMO EXISTING FIRE PANEL

CONNECTIONS TO EXISTING

CO2 SUPPRESSION SYSTEM

AFTER NEW SYSTEMS ARE

CONNECTED TO AND

MONITORING THIS SYSTEM

JA-2 Page 9 of 50

190 190 190 190

190190190190

190 190 190 190

190190

J J

J

J JJ

N

AC

J

J

ZONE 3

DEVICES

DOWN

UP

EAST

FILTRATION

BUILDING

ELEV. 575'-6"WEST

FILTRATION

BUILDING

B

A

I G E

C

J

ELEV. 575'-6"

ELEV. 581'-2"

EAST

FILTRATION

BUILDING

ELEV. 575'-6"

ELEV. 581'-2"

WEST

FILTRATION

BUILDING

A

I CG E

J

F108

F/A DEMO PLAN - ROOTS BLOWER, CONTACTOR DECK, & DRUM LEVELS - 570'-6", 575'-6" & 581'-2" 3/32" = 1-0"

JA-2 Page 10 of 50

190190190190190

J

J

DOWN

UP

ZONE 2

DEVICES

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

ELEV. 600'-0" EAST

FILTRATION

BUILDING

ELEV. 600'-0"WEST

FILTRATION

BUILDING

A

I CG E

J

DETECTORS AT ROOF LEVEL (TYP)

DETECTORS AT ROOF LEVEL (TYP)

F109

F/A DEMO PLAN, FAN DECK LEVEL - 600'-0"

3/32" = 1-0"

JA-2 Page 11 of 50

190190190190 190 190 190 190

190190190190

XP XPXPXP

XP

J

DOWN

UP

J

ZONE 1

DEVICES

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

ELEV. 600'-0" EAST

FILTRATION

BUILDING

ELEV. 600'-0"WEST

FILTRATION

BUILDING

A

I CG E

J

DOWN

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

I G E

C

J

F110

F/A DEMO PLAN, TRIPPER/BUNKER LEVEL - 616'-0"

3/32" = 1-0"

F110

F/A DEMO PLAN, PENTHOUSE LEVEL - 636'-0"

3/32" = 1-0"

JA-2 Page 12 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

XP

UP TO AMM CABINET

COAL HANDLING OFFICE

XP

A0G-1

A0H-1

XP

A0H-2

A0F-1

XP

A0G-1

TO AMM MODULE IN

BASEMENT LEVEL (GRIDS 1E)

XP

A0F-1

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

4WP

M A

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

J

J

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

J

LH

C

LH

C

LH

C

LH

C

LH

C

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

S

LC

D D

WATER FLOW & TAMPER SWITCH FOR HIGH ANGLE CONVEYOR

PROVIDE COMPATIBLE DELUGE SOLENOID VALVE FOR HIGH ANGLE CONVEYOR

WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #1 (NO WORK FOR THIS ITEM)

DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #1 (NO WORK FOR THIS ITEM)

WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO BUCKET ELEVATOR #1

PROVIDE COMPATIBLE DELUGE SOLENOID VALVE FOR CONVEYOR TO BUCKET ELEVATOR #1

J

UP TO FIRE SUPPRESSION RELEASING PANEL

D

PROVIDE LONG LINE THERMAL DETECTION CABLES (TYP-2)

F201

F/A INITIATION PLAN, BASEMENT LEVEL AREA 1 - 531'-0"

3/32" = 1-0"

F201

F/A INITIATION PLAN, SUPPRESSION SYSTEMS - 531'-0"

3/32" = 1-0"

D

JA-2 Page 13 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

PUMP START - IN METRON PANEL

DIESEL FIRE PUMP ACTUATION

DIESEL FIRE PUMP TROUBLE

ELECTRIC FIRE PUMP ACTUATION

ELECTRIC FIRE PUMP TROUBLE

WET SPRINKLER TAMPER SWITCH-3

WET SPRINKLER TAMPER SWITCH-4

AREA HAS SPRINKLERS

NO ADDITIONAL DETECTION

ONE DETECTOR IN ROOM THE

OTHER ON CEILING ABOVE ROOM

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

EAST

FILTRATION

BUILDING

ELEV. 531'-0"

WEST

FILTRATION

BUILDING

A

I CG E

J

B1A-1 B2A-1

B2A-2

B4A-1B5A-1B6A-1B9A-1B10A-1B13A-1 B14A-1

B15A-1

B14φ -1

B15φ -2

B16A-1

B16B-1 B14B-2

B14B-1

B13B-1

B12C-1

B11B-1 B9B-1

B6B-2

B6B-1

B5B-1 B4B-1 B2B-1

B1B-1

B1B-2

B1C-1

B3C-1

B3C-2

B4C-1B5C-1B8C-1

B9C-1

B15C-1 B16C-1

B9E-1

B10E-1

B8E-1

B9G-1

B9H-1

B7C-1

B6D-1 B5D-1

B6E-1 B3E-1 B2E-1

B2D-1

B2G-1B5G-1B6G-1

B6H-1 B5H-1 B3H-1

B1H-1

B2G-1

B1E-2

B1E-1

TO LOW TEMPERATURE ALARMS IN

BUCKET ELEVATOR AREAS (2),

DRAWINGS 1/F201 & 1/F203

B15φ -1

AMM

AMM

B8D-1

AMM

B5D-2

B3D-2

AMM

B1C-2

WET SPRINKLER

WATER FLOW/TAMPER

(TURBINE GENERATOR BASEMENT)

WET SPRINKLER

TAMPER SWITCH-1

WET SPRINKLER

TAMPER SWITCH-7

WET SPRINKLER

TAMPER SWITCH-6

WET SPRINKLER

TAMPER SWITCH-5

AMM

B9A-2

AMM

AMM

TO WET SPRINKLER

WATER FLOW & TAMPER SWITCH

RECLAIM CONVEYOR #2, 1/F204

WET SPRINKLER

TAMPER SWITCH-2

AMM

B1F-2

B1F-1

WET SPRINKLER

WATER FLOW

& TAMPER SWITCH

BOILER BASEMENT

FLOOR ID - B

AMM

AMM

F202

F/A INITIATION PLAN, BASEMENT LEVEL AREA 2 - 531'-0"

3/32" = 1-0"

JA-2 Page 14 of 50

XP

TO SLC LOOP DEVICES

IN MAIN PLANT F204

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

WEST

FILTRATION

BUILDING

B

TO SLC LOOP DEVICES

IN MAIN PLANT F204

XPXP

XP

UP TO HAZARDOUS AREA INITIATION DEVICES

LOCATED IN COAL HANDLING AREA

M A

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

D

WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #2

DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #2

C0D-1

C0D-2

C0H-3

C 0H

-1

C0G-2

C0G-1

C0H-2

C0I-1 C0I-2

C0I-3

C0G-1

10A-1

10A-2

10A-5

10A-410A-3

C0H-A

C0G-A

C0D-3

TO AMM MODULE IN BASEMENT LEVEL (GRIDS 1E)

WP FLOOR ID - 1

1 12

TO PANEL 'BREAK'

THERE IS AN AREA HEATING UNIT AND STEAM PIPING

IN THIS AREA WHICH MAY HAVE ADVERSE EFFECT

ON HEAT DETECTORS AND TRIGGER FALSE ALARMS.

COORDINATE LOCATION WITH OPERATIONS AND

LOCATE NEW DETECTOR TO MITIGATE FALSE

ALARMS DUE TO EXISTING HEAT SOURCES.

F203

F/A INITIATION PLAN, FIRE FLOOR AREA 1 (COAL HANDLING) - 545'-6"

3/32" = 1-0"

HEAT DETECTION ABOVE CATWALK.

SEE DRAWING 1/F205

F203

F/A INITIATION PLAN GROUND LEVEL 543'-9", EAST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

F203

F/A INITIATION PLAN CEILING LEVEL 578'/601', WEST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

F203

F/A INITIATION PLAN GROUND LEVEL 543'-9", WEST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

F203

F/A INITIATION PLAN CEILING LEVEL 578'/601', EAST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

UPPER CATWALK

ENTRY POINT

UPPER

STAIRWELL

ENTRY POINT

UP TO CEILING

HEAT DETECTOR

UP TO CEILING

HEAT DETECTOR

155 155 155 155 155 155 155 155 155

DOWN TO PULL STATION

DOWN TO PULL

STATION

P

UP TO CEILING

HEAT DETECTOR

UP TO CEILING

HEAT DETECTOR

155 155 155 155 155 155 155 155 155

P

CEILING ELEVATION

DETECTION DEVICES

DOWN TO PULL

STATION

DOWN TO PULL STATION

CONNECT LOOP TOGETHER WHEN

EXISTING INITIATION DEVICES

REPLACED AND EXISTING FACP

REMOVED FROM SERVICE

CONNECT REVISED CIRCUIT TO

NEW FACP SLC CIRCUIT, 1/F208

CONNECT REVISED CIRCUIT TO

NEW FACP SLC CIRCUIT, 1/F208

CONNECT LOOP TOGETHER WHEN

EXISTING INITIATION DEVICES

REPLACED AND EXISTING FACP

REMOVED FROM SERVICE

EXISTING DETECTORS MANUAL STATIONS

REPLACED WITH NEW AND CONNECTED

TO EXISTING SLC CIRCUIT (TYP)

EXISTING MANUAL STATIONS REPLACED

WITH NEW AND CONNECTED TO NEW SLC

CIRCUIT IN MAIN FACILITY(TYP)

EXISTING DETECTORS MANUAL STATIONS

REPLACED WITH NEW AND CONNECTED TO

NEW SLC CIRCUIT IN MAIN FACILITY (TYP)

EXISTING DETECTORS MANUAL STATIONS

REPLACED WITH NEW AND CONNECTED

TO EXISTING SLC CIRCUIT (TYP 2)

E9B-1 E8B-1 E7B-1 E6B-1 E5B-1 E4B-1

E4B-2

E3B-1 E2B-1 E1B-2

W9A-4

W9A-2

W9A-3

E9B-4

E9B-3

E9B-2

W9A-1 W8A-1 W7A-1 W6A-1 W5A-1 W4A-1

W4A-2

W3A-1 W2A-1 W1A-1

W1A-2

E1B-1FLOOR ID - E

FLOOR ID - E

FLOOR ID - W

FLOOR ID - W

AOM

AOM

AOM

AOM

GENERAL SHEET F203 NOTES

1. WIRING TO EXISTING INITIATION DEVICES IN THE EAST AND WEST BAG HOUSES TO REMAIN FOR RECONNECTION TO

NEW ADDRESSABLE FIRE ALARM INITIATION DEVICES IN EXISTING LOCATIONS TO BE COMPATIBLE WITH NEW FIRE ALARM CONTROL PANELS. PROVIDE INTELLIGENT INTERFACE RELAYS AS REQUIRED TO CONNECT TO FAN SHUT-DOWN SYSTEMS CURRENTLY IN SERVICE FOR THESE FACILITIES. COMPLETED SYSTEM WILL PROVIDE FOR A COMPREHENSIVE FIRE ALARM SYSTEM WITHIN THE CH&PP INCLUDING THE EAST AND WEST BAG HOUSES.

2. TRANSITION FROM EXISTING FIRE ALARM SYSTEM IN THE EAST AND WEST BAG HOUSES TO THE NEW FIRE ALARM SYSTEM SHALL OCCUR ONLY AFTER THE MAJORITY OF THE NEW SYSTEM IS INSTALLED AND FUNCTIONAL SO THESE AREAS ARE NOT WITHOUT FIRE DETECTION FOR SUBSTANTIAL PERIODS DURING THIS TRANSITION.

SPECIFIC NOTES

COORDINATE FINAL LOCATION OF NAC PANELS, AMM MODULES, DELUGE RELEASING CONTROL PANELS AND OTHER INSTALLED EQUIPMENT WITH POWER PLANT OPERATIONS PRIOR TO FINAL INSTALLATION. NOTE FINAL INSTALLED LOCATION MAY DIFFER FROM WHAT IS SHOWN ON THIS DRAWING.

TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR RECLAIM CONVEYOR #2. SEE DRAWING SHEETS F201 & F205.

TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR CONVEYOR TO STORAGE. SEE DRAWING SHEET F205.

TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR HIGH ANGLE CONVEYOR. SEE DRAWING SHEETS F201 & F205.

TO LINEAR HEAT DETECTION CABLE AND DELUGE SOLENOID FOR BUCKET ELEVATOR #1. SEE DRAWING SHEET F201.

JA-2 Page 15 of 50

XP XP

XP XP

XPXPXPXPXPXPXPXPXPXPXP

XP

XP

190 190 190 190

190 190 190 190

190 190 190 190

190 190

190 190 190

LOCATED ABOVE PLATFORM

OVER OFFICES ON

STRUCTURAL CEILING

XP

RAP

CONTINUATION OF SLC CIRCUIT

ON SHEET F203

LOCATED ON

STRUCTURAL CEILING

ADDRESSABLE MONITOR MODULE

(AAM) WITH 30 CLASS A INPUTS

INSIDE CONTROL ROOM

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

CRANE

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

ELEV. 545'-6"

WEST

FILTRATION

BUILDING

A

I CG E

J

SLC LOOP TO AMM IN

COAL LOADING OFFICE

INITIATION DEVICES IN SORBENT FACILITY AND

COAL THAWING AREA TO BE CONNECTED TO AAM

MODULE WITH NEW CONDUCTORS & CONDUIT

SO EACH DEVICE HAS A UNIQUE ADDRESS (TYP)

M A

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

FLOOR ID - 1

113φ-1

114φ-2

114φ-1

114φ-3

114φ-4

114φ-5

115φ-2115φ-3

115φ-1 115φ-4

115φ-5

12A-1

13A-1

13A-2 11A-114A-116A-118A-1110A-1111A-1113A-1115A-1

116A-2

116A-1

116B-1 113B-1 111B-1

110B-2

110B-1 18B-1 16B-1 14B-1 13B-2

13B-1

12B-2

12B-1

11B-2

11B-1

11C-1

12C-1

16C-1 14C-119C-1

110D-1

19E-1

17E-1

16E-1 14E-1 13E-1

13F-115F-116F-119F-1

110G-1

110H-2 16H-1 14H1 13H-1

11F-2 11F-1

11D-1

12G-1

12H-1

S10G-1

S11H-1S12H-1

S12G-1

S14G-1S15G-1

S16G-1

S16G-2

S16H-1

116I-1 115I-1

116I-2

114I-1 112I-1 111I-1 110I-1 18I-1 16I-1 14I-1 13I-1 11I-1

LOCATED ON CEILING ABOVE

FIRE PANEL LOCATION

110H-A

XP

XP

DETECTORS MOUNTED TO

BOTTOM OF BEAMS ON

EITHER SIDE OF AREA (TYP)

190 DEGREE HEAT DETECTORS

MOUNTED IN TURBINE BAY AREA

ON STRUCTURAL MEMBERS (TYP)

DETECTOR

INSIDE ROOM

ON CEILING

DETECTORS

INSIDE ROOMS

ON CEILING (TYP)

110H-1

LOCATE DETECTOR

FOR PROTECTION

OF NAC PANEL

DETECTORS LOCATED ON

ROOF OF BUILDING UP 3

LEVELS FROM FLOOR (TYP)

DETECTORS LOCATED

ON ROOF OF SILOS (TYP)

WET SPRINKLER

WATER FLOW &

TAMPER SWITCH

RECLAIM CONVEYOR #2

AMM

11D-2

TO SLC LOOP

BASEMENT LEVEL

ELECTRICAL PANEL FOR

FEEDING FACP - THIS LEVEL

NAC5 - BASEMENT LEVEL

TO SPARE

BREAKER

THERE IS AN AREA HEATING UNIT AND STEAM PIPING IN THIS

AREA WHICH MAY HAVE ADVERSE EFFECT ON HEAT

DETECTORS AND TRIGGER FALSE ALARMS. COORDINATE

LOCATION WITH OPERATIONS AND LOCATE NEW DETECTOR TO

MITIGATE FALSE ALARMS DUE TO EXISTING HEAT SOURCES.

F204

F/A INITIATION PLAN, TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"

3/32" = 1-0"

EAST FILTRATION BUILDING SHOWN ON SHEET F203

WEST FILTRATION BUILDING SHOWN ON SHEET F203

JA-2 Page 16 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

XP

J

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LH

C

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

J

J

J

J

XP

XP

XP

XP

XP

XP

XP

XP

XP

DOWN TO ADDRESSABLE MONITOR MODULE

(AAM) WITH 30 CLASS A INPUTS LOCATED IN

COAL HANDLING OFFICE

DOWN TO DELUGE RELEASING CONTROL PANEL

LOCATED IN COAL HANDLING OFFICE BREAK ROOM

PROVIDE LONG LINE LINEAR HEAT DETECTOR CABLES (TYP)

D

PROVIDE DELUGE SOLENOID VALVE FOR CONVEYOR TO STORAGE

WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO STORAGE

20G-1

20H-1 20H-2

20I-1

20I-2

20I-4

20I-5

20I-6

20I-3

20D-1

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

LHC

F205

F/A INITIATION PLAN, WATER TREATMENT/PLC LEVEL COAL HANDLING - 560'-6"

3/32" = 1-0"

SPECIFIC NOTES

NEW LINEAR HEAT DETECTION CABLES TO BE INSTALLED IN MOUNTING CLIPS, MESSENGER WIRE, TENSIONING TURNBUCKLES AND SUPPORTING SYSTEMS IN SIMILAR CONFIGURATIONS AND LOCATIONS TO EXISTING SYSTEMS INSTALLED AT THE SITE AND PER THE MANUFACTURERS RECOMMENDATIONS. PHOTO BELOW SHOWS A REPRESENTATIVE SUPPORT EYELET AND INSULATOR AFFIXED TO A SPRINKLER PIPE IN THE CONVEYOR TO STORAGE AREA WITHOUT A CABLE IN THE SUPPORT. DISTANCE BETWEEN SUPPORT TYPICALLY RANGE FROM 15 FEET TO 20 FEET.

SUPPORTING EYELET

F205

PHOTO OF TYPICAL LINEAR HEAT DETECTION CABLE SUPPORT

NO SCALE

JA-2 Page 17 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

DOWN TO FACP

UP TO SLC CIRCUIT

ON LEVEL 571'-3"

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

I G E

C

J

21A-1

FLOOR ID - 2

22A-1

21B-1

21B-2

22B-1

21C-221C-1

22C-1

22E-1

22F-1

22H-1

F206

F/A INITIATION PLAN, WATER TREATMENT/PLC LEVEL AREA 2 - 560'-6"

3/32" = 1-0"

JA-2 Page 18 of 50

DOWN TO SLC CIRCUIT

ON LEVEL 560'-6"

MONITOR MODULE FOR CO2

SUPPRESSION SYSTEM

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

ELEV. 571'-3"

A

I CG E

FLOOR ID - 4

43G-1

45G-1

45F-1

47G-1

49G-1

410E-1

49D-1 47D1 45D-1 43D-1

43F-1

44F-1

F207

F/A INITIATION PLAN, COAL SCALE DECK - 571'-3"

3/32" = 1-0"

JA-2 Page 19 of 50

190 190 190 190 190 190 190

190 190 190 190 190 190 190

190 190 190 190 190 190 190

190 190 190 190 190 190 190

190 190 190 190

190 190 190

DOWN TO FACP

TRANSITION UP TO

BOTTOM OF ROOF LEVEL

TRANSITION UP TO

BOTTOM OF ROOF LEVEL

TRANSITION UP

TO BOTTOM OF

ROOF LEVEL

EAST

FILTRATION

BUILDING

ELEV. 575'-6"WEST

FILTRATION

BUILDING

B

A

I G E

C

J

ELEV. 575'-6"

ELEV. 581'-2"

EAST

FILTRATION

BUILDING

ELEV. 575'-6"

ELEV. 581'-2"

WEST

FILTRATION

BUILDING

A

I CG E

J

UP TO PULL

STATION ON

LEVEL 600'-0"

UP TO PULL

STATION &

DETECTOR ON

LEVEL 600'-0"

CONNECT CIRCUIT TO

REVISED SLC CIRCUIT IN

EAST FILTRATION

BUILDING, SEE 3/F203

CONNECT CIRCUIT TO REVISED

SLC CIRCUIT IN WEST FILTRATION

BUILDING, SEE 5/F203

UP TO HEAT

DETECTOR ON

LEVEL 600'-0"

51A-1

FLOOR ID'S - 3, 5 & 6

53A-154A-155A-156A-158A-159A-1

59B-1 58B-1 56B-1 55B-1 54B-1 53B-1 51B-1

31I-153I-154I-155I-156I-158I-159I-1

59I-2 58I-2 56I-2 55I-2 54I-2 53I-2 31I-2

61H-1

63G-165G-167G-169G-1

63D-165D-167D-169D-1

610D-1

62E-1 63E-1

62F-1

61C-1

F208

F/A INITIATION PLAN - ROOTS BLOWER, CONTACTOR DECK, & DRUM LEVELS - 570'-6", 575'-6" & 581'-2" 3/32" = 1-0"

JA-2 Page 20 of 50

UP TO PULL

STATION ON

LEVEL ABOVE

71F-1

72G-1

FLOOR ID - 7

79F-1

710C-1

81E-1

DETECTORS LOCATED ON ROOF

ABOVE OPEN SPACE (TYP)

DETECTORS LOCATED ON ROOF

ABOVE OPEN SPACE (TYP)

DOWN TO FACP

82H-183H-185H-1

86H-1

89H-1

89G-1 86G-1

85G-1 83G-1 82G-1

82D-183D-185D-186D-189D-1

89C-1 86C-1 85C-1 83C-1 82C-1

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

ELEV. 600'-0" EAST

FILTRATION

BUILDING

ELEV. 600'-0"WEST

FILTRATION

BUILDING

A

I CG E

J

DOWN TO

LEVEL 581'-6"

DETECTORS FLOOR ID '8'

ARE LOCATED ON ROOF

ABOVE OPEN SPACE (TYP)

DOWN TO

LEVEL 581'-6"

ELEVATOR MACHINE ROOM IS AT

LEVEL ABOVE BUT SHOWN ON THIS

LEVEL FOR CLARITY AS OTHER

EQUIPMENT IS IN THIS SAME SPACE

ON THE TRIPPER/BUNKER LEVEL

UP TO NEXT LEVEL

F209

F/A INITIATION PLAN, FAN DECK LEVEL - 600'-0"

3/32" = 1-0"

JA-2 Page 21 of 50

XP-190 XP-190 XP-190XP-190XP-190 XP-190

XP-190

DOWN TO AAM MODULE IN

COAL HANDLING OFFICE

DETECTORS INSIDE TRIPPER ROOM

LOCATED ON CEILING (TYP)

DOWN SLC LOOP ON 600'-0"

89F-1 87F-1 86F-1 84F-1 83F1 82F-2

82F-1

81E-1

810C-1

TRIPPER

ROOM

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

A

I CG E

J

ELEV. 616'-0"

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

TRIPPER

ROOM

A

I G E

C

J

DOWN TO NEXT LEVEL

XP-190

XP-190

DOWN TO AAM MODULE IN

COAL HANDLING OFFICE

90D-1

90E-1

F

WEST

FILTRATION

BUILDING

B

I G E

C

J

F210

F/A INITIATION PLAN, TRIPPER/BUNKER LEVEL - 616'-0"

3/32" = 1-0"

F210

F/A INITIATION PLAN, PENTHOUSE LEVEL - 636'-0"

3/32" = 1-0"

JA-2 Page 22 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

XP-150

XP-150

XP-150

XP-150

TO NAC(1.1) ON 545'-6"

A0F-1

A0H-1

A0I-1 A0I-2

TO H/S D0H-1 545'-6"

TO RECLAIM CONVEYOR #2

TO NAC(1.2) ON 545'-6"

NAC(1.2)

F301

F/A NOTIFICATION PLAN, BASEMENT LEVEL AREA 1 COAL HANDLING - 531'-0"

3/32" = 1-0"

JA-2 Page 23 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

WP-75

WP-75 WP-75WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75 WP-75 WP-75

WP-75

WP-75 WP-75 WP-75

WP-75

WP-75

WP-75

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

EAST

FILTRATION

BUILDING

ELEV. 531'-0"

WEST

FILTRATION

BUILDING

A

I CG E

J

NAC5

SIGNAL

FROM

FACP

FLOOR ID - B

B3A-1

B15φ-1

B16φ-1

B15A-1

B15C-1

B13B-1 B10B-1

B9C-1

B6B-1

B5C-1

B5A-1

B3C-1

B1A-1

B1C-1

B1F-1

B2F-1

B2G-1

B4F-1

B4G-1

B5F-1

B5G-1B9G-1

B9F-1

B2A-1

WP-75

WP-75

WP-75

B6C-1

MOUNT ON

COLUMN

WP-75

B15B-1

NAC(5.3)

NAC(5.2)

NAC(5.1)

NAC(6.1)

EXISTING PANELBOARD 'K'

(ON TURBINE LEVEL ABOVE)

F302

F/A NOTIFICATION PLAN, BASEMENT LEVEL AREA 2 - 531'-0"

3/32" = 1-0"

SPECIFIC NOTES

UTILIZE EXISTING 20/1 SQUARE D QO TYPE BREAKER IN

EXISTING PANELBOARD 'K' ON TURBINE LEVEL TO POWER NEW

NAC5 PANEL BASEMENT LEVEL. SPARE BREAKERS ARE

AVAILABLE IN THIS PANEL. PROVIDE AN UPDATED

PANELBOARD SCHEDULE WITH INFORMATION AS TO WHICH

SPARE WAS UTILIZED FOR THIS WORK. FOR EXISTING

IDENTIFICATIONS USED ON THE PANEL SCHEDULE CONFIRM

WITH POWER PLANT OPERATIONS FOR ACCURACY OF THESE

EXISTING LABELS PRIOR TO CREATING THE NEW LEGEND.

FIELD ROUTE CONDUITS BETWEEN THESE TWO LOCATIONS.

JA-2 Page 24 of 50

WP-30

XP-150

XP-150

XP-150

M A

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

TO D0I-1 560'-6"

WP-30

SIGNAL

FROM

FACP

C0D-1

C0H-1 C0H-2

COH-3

C0G-1

C0I-1

10A-1 10A-2

LOOP CONTINUES

ON SHEET F304

TO BUCKET ELEVATOR PIT 531'-0"

NAC(1.2)

TO D0I-1

NAC(1.3)

TO 531'-0" NAC(1.1)

TO C0F-1 545'-6" NAC(1.2)

TO 560'-6" NAC(1.4)

NAC(1.3)

NAC(1.2)

N A

C

BREAK-1

NEW PANELBOARD 'BREAK',

SEE DRAWING E100

F303

F/A NOTIFICATION PLAN, FIRE FLOOR AREA 1 (COAL HANDLING) - 545'-6"

3/32" = 1-0"

HEAT DETECTION ABOVE CATWALK.

SEE DRAWING 1/F305

F303

F/A NOTIFICATION PLAN GROUND LEVEL 543'-9", EAST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

F303

F/A NOTIFICATION PLAN CEILING LEVEL 578'/601', WEST FILTRATION BUILDING (BAGHOUSE) 3/32" = 1-0"

F303

F/A NOTIFICATION PLAN GROUND LEVEL 543'-9", WEST FILTRATION BUILDING (BAGHOUSE)

3/32" = 1-0"

F303

F/A NOTIFICATION PLAN CEILING LEVEL 578'/601', EAST FILTRATION BUILDING (BAGHOUSE) 3/32" = 1-0"

UPPER CATWALK

ENTRY POINT

UPPER

STAIRWELL

ENTRY POINT

RETURN TO NAC6

RETURN TO NAC6

FROM NAC6

RETURN TO

NAC7

RETURN TO

NAC7

FROM NAC7

ELEV. 578'-3"

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

ELEV. 543'-9"

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

ELEV. 578'-3"

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

ELEV. 543'-9"

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

W9A-1

W7A-1

W6A-1

W4A-1

W1A-1

W1A-2

W4A-1

W6A-1W8A-1

E9B-2 E7B-1

E4B-1

E1B-2

E1B-1

E2B-1

E3B-1

E6B-1

E8B-1

E9B-1

N A

C

N A

C

GENERAL SHEET F303 NOTES

1. WIRING TO EXISTING NOTIFICATION DEVICES TO REMAIN FOR RECONNECTION TO NEW NAC PANELS WHICH ARE

COMPATIBLE WITH NEW FIRE ALARM CONTROL PANELS. COMPLETED SYSTEM WILL PROVIDE FOR A COMPREHENSIVE FIRE ALARM NOTIFICATION SYSTEM WITHIN THE CH&PP INCLUDING THE EAST AND WEST BAGHOUSES.

2. TRANSITION FROM EXISTING FIRE ALARM SYSTEM IN THE BAG HOUSES TO THE NEW FIRE ALARM SYSTEM SHALL OCCUR ONLY AFTER THE MAJORITY OF THE NEW SYSTEM IS INSTALLED AND FUNCTIONAL SO THESE AREAS ARE NOT WITHOUT

FIRE DETECTION FOR SUBSTANTIAL PERIODS DURING THIS TRANSITION.

3. CONNECT NEW NAC PANELS (NAC6 & NAC7) TO EXISTING NAC POWER CIRCUIT IN THE BAGHOUSE FACILITIES.

JA-2 Page 25 of 50

WP-75

75 75

XP-150

XP-150

XP-150

XP-150

XP-150

XP-150

XP-150

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75

WP-75 WP-75

WP-75

WP-75

WP-75

RAP

MOUNT NEAR CEILING ON

STRUT BRACKET OR

EXISTING COLUMN SO

NOT INTERFERING WITH

SLIDING DOORS

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

CRANE

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

ELEV. 545'-6"

WEST

FILTRATION

BUILDING

A

I CG E

J

M A

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

NAC2

SIGNAL

FROM

FACP

FLOOR ID - 1

114φ-1

115φ-1

112A-1

112A-1

19B-1

17C-1

16A-1

12A-1 11A-1

11B-1

13B-1

14B-1

14C-1

13C-1

11D-1

11F-1

14E-1

11G-1

12H-1

11I-1

14H-117H-1

18I-1

15I-1 111I-1116I-1

114I-1

110D-1

110G-1

WP-75

15E-1

WP-75

MOUNT ON BEAM

ABOVE FLOOR

16E-1

MOUNT ON COLUMN

WP-75

18H-1

WP-75

ADDITIONAL

H/S ON THIRD LEVEL

OF FACILITY TO

CONNECT TO NEW

NAC8 PANEL

NAC8

NAC(FACP 0.1)

NAC(FACP 0.2)

NAC(2.1)

NAC(2.2)

NAC(2.4)

NAC(2.3)

WP-75

110aG-1

111G-1

114G-1115G-1

115G-2

ELECTRICAL PANEL CP-K FOR

POTENTIAL POWER FOR NAC2

EXISTING

PANELBOARD 'K'

ELECTRICAL PANELS C-1 THROUGH C-4

POTENTIAL POWER FOR NAC2

F304

F/A NOTIFICATION PLAN, TURBINE LEVEL/FIRE FLOOR AREA 2 - 545'-6"

3/32" = 1-0"

EAST FILTRATION BUILDING SHOWN ON SHEET F303

WEST FILTRATION BUILDING SHOWN ON SHEET F303

SPECIFIC NOTES

UTILIZE EXISTING 20/1 SQUARE D QO TYPE

BREAKER IN EXISTING PANELBOARD 'K' TO

POWER NEW FACP THIS LEVEL AND NAC5

PANEL ON BASEMENT LEVEL. SPARE

BREAKERS ARE AVAILABLE IN THIS PANEL.

PROVIDE AN UPDATED PANELBOARD

SCHEDULE WITH INFORMATION AS TO

WHICH SPARES WERE UTILIZED FOR THIS

WORK. FOR EXISTING IDENTIFICATIONS

USED ON THE PANEL SCHEDULE CONFIRM

WITH POWERPLANT OPERATIONS FOR

ACCURACY OF THESE EXISTING LABELS

PRIOR TO CREATING THE NEW LEGEND.

FIELD ROUTE CONDUITS BETWEEN THESE

TWO LOCATIONS.

FOR POWERING NEW NAC2 PANEL, THERE

ARE EXISTING PANELS IDENTIFIED ON THE

DRAWING PANEL 'CP-K' AND PANELS 'C-1'

THROUGH 'C-4'. COORDINATE THE FINAL

CONNECTION POINT FOR THIS NAC PANEL

WITH THE POWER PLANT OPERATIONS TO

DETERMINE WHICH PANEL IS AVAILABLE

AND PREFERRED FOR CONNECTIONS OF

THIS NEW NAC POWER CIRCUIT. PROVIDE

AN UPDATED PANELBOARD SCHEDULE

WITH INFORMATION AS TO WHICH SPARES

WERE UTILIZED FOR THIS WORK. FOR

EXISTING IDENTIFICATIONS USED ON THE

PANEL SCHEDULE CONFIRM WITH

POWERPLANT OPERATIONS FOR

ACCURACY OF THESE EXISTING LABELS

PRIOR TO CREATING THE NEW LEGEND.

UTILIZE EXISTING CIRCUIT FOR POWERING

NAC PANEL CONNECTED TO EXISTING NAC

PANEL. PROVIDE AN UPDATED

PANELBOARD SCHEDULE WITH

INFORMATION AS TO WHICH SPARES /

NEW BREAKERS WERE UTILIZED FOR THIS

WORK. FOR EXISTING IDENTIFICATIONS

USED ON THE PANEL SCHEDULE CONFIRM

WITH POWERPLANT OPERATIONS FOR

ACCURACY OF THESE EXISTING LABELS

PRIOR TO CREATING THE NEW LEGEND.

JA-2 Page 26 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F

XP-150

XP-150

XP-150

XP-150

XP-150

XP-150

XP-150

D0D-1

D0C-1

D0B-1

D0B-2

D0E-1

D0G-1

D0I-1

TO NAC(4.1)

ON 600'-0"

TO NAC(1.4)

ON 545'-6"

TO C0I-1 545'-6"

TO NAC(1.3)

ON 545'-6"

F305

F/A NOTIFICATION PLAN, WATER TREATMENT, PLC LEVEL AREA 1 COAL HANDLING - 560'-6"

3/32" = 1-0"

JA-2 Page 27 of 50

TC

H

LI

N

E F

M A

TC

H

LI

N

E F3

WP-75

WP-75

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

I G E

C

J

TO NAC(3.2) ON 571'-3"

FLOOR ID - 2

23A-1 21A-1

22B-1

22C-1

22H-1

F306

F/A NOTIFICATION PLAN, WATER TREATMENT, PLC LEVEL AREA 2 - 560'-6"

3/32" = 1-0"

JA-2 Page 28 of 50

WP-75 WP-75

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

ELEV. 571'-3"

A

I CG E

N A

C

TO 575'-6" NAC(3.3)

TO 560'-6" NAC(3.1)

410E-1

FLOOR ID - 4

45E-2 45E-1

WP-75WP-75

WP-75WP-75

45D-147D-1

47G-1 45G-1

TO 581'-2" NAC(3.4)

NAC(3.2)

TO 560'-6" NAC(3.2)

PANEL 'LP-4'

F307

F/A NOTIFICATION PLAN, COAL SCALE DECK LEVEL - 571'-3"

3/32" = 1-0"

SPECIFIC NOTES

PROVIDE NEW 20/1 SQUARE D QO TYPE BREAKER IN EXISTING PANELBOARD LP-4

TO POWER NEW NAC PANEL. SPARE SLOTS ARE AVAILABLE IN THIS PANEL.

PROVIDE AN UPDATED PANELBOARD SCHEDULE WITH INFORMATION AS TO WHICH

SPACE WAS UTILIZED FOR THIS WORK. FOR EXISTING IDENTIFICATIONS USED ON

THE PANEL SCHEDULE CONFIRM WITH POWERPLANT OPERATIONS FOR

ACCURACY OF THESE EXISTING LABELS PRIOR TO CREATING THE NEW LEGEND.

JA-2 Page 29 of 50

WP-75

WP-75

EAST

FILTRATION

BUILDING

ELEV. 575'-6"WEST

FILTRATION

BUILDING

B

A

I G E

C

J

ELEV. 575'-6"

ELEV. 581'-2"

EAST

FILTRATION

BUILDING

ELEV. 575'-6"

ELEV. 581'-2"

WEST

FILTRATION

BUILDING

A

I CG E

J

WP-75

TO 571'-3" NAC(3.4)

FLOOR ID'S - 3, 5 & 6

610C-1

67E-1

61E-1

67F-1

610G-1

WP-75

WP-75WP-75

WP-75

WP-75

WP-75WP-75

TO 571'-3" NAC(3.3)

510I-1

56I-1 53I-1

51I-1

56H-1

53B-1

54A-156A-1

510B-1

WP-75

62H-1

WP-75

WP-75

WP-75

64E-1

64F-1

F308

F/A NOTIFICATION PLAN - ROOTS BLOWER, CONTACTOR DECK, & DRUM LEVELS - 570'-6", 575'-6" & 581'-2" 3/32" = 1-0"

JA-2 Page 30 of 50

WP-75

WP-75

WP-75 72G-1WP-75

WP-75WP-75

75G-177G-1

710G-1

710D-1 74D-1 75D-1 72D-1

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

A

I G E

C

J

ELEV. 600'-0" EAST

FILTRATION

BUILDING

ELEV. 600'-0"WEST

FILTRATION

BUILDING

A

I CG E

J

NAC(4.1)

NAC(4.2) ON 616'-0"

NAC(4.3) ON 616'-0"

WP-30

1578G-1

71G-1

ELEVATOR MACHINE ROOM IS AT

LEVEL ABOVE BUT SHOWN ON THIS

LEVEL FOR CLARITY AS OTHER

EQUIPMENT IS IN THIS SAME SPACE

ON THE TRIPPER/BUNKER LEVEL

N A

C

ELECTRICAL PANEL 'ROOF' FOR

POTENTIAL POWER FOR NAC4

ELECTRICAL PANEL ASSOCIATED WITH

BOILER 6 CONTROL ROOM FOR

POTENTIAL POWER FOR NAC4

F309

F/A NOTIFICATION PLAN, FAN DECK LEVEL - 600'-0"

3/32" = 1-0"

SPECIFIC NOTES

THERE IS NO CEILING FOR THIS LEVEL EXCEPT IN THE BOILER 6

CEMS/COMS MODULE AND ALL OPEN TO STRUCTURE ABOVE

WITH ONLY CATWALKS AND THE TRIPPER ROOM ON THE NEXT

UPPER LEVEL. THE ONLY OTHER ROOM WITH A CEILING IS THE

BLOWER ROOM ON THIS LEVEL.

UTILIZE EXISTING OR PROVIDE NEW 20/1 SQUARE D QO TYPE

BREAKERS IN EXISTING PANELBOARD 'ROOF' OR 'BOILER 6' TO

POWER NEW NAC4 PANEL ON THIS LEVEL. SPARE BREAKERS

MAY BE AVAILABLE IN ONE OF THESE PANELS. COORDINATE

WITH POWERPLANT OPERATORS TO DETERMINE WHICH

PANELBOARD IS AVAILABLE FOR CONNECTIONS OF THIS NEW

LOAD. PROVIDE AN UPDATED PANELBOARD SCHEDULE WITH

INFORMATION AS TO WHICH SPARES OR NEW BREAKERS

WERE UTILIZED FOR THIS WORK. FOR EXISTING

IDENTIFICATIONS USED ON THE PANEL SCHEDULE CONFIRM

WITH POWERPLANT OPERATIONS FOR ACCURACY OF THESE

EXISTING LABELS PRIOR TO CREATING THE NEW LEGEND.

FIELD ROUTE CONDUITS BETWEEN THESE TWO LOCATIONS.

JA-2 Page 31 of 50

WP-75

WP-75

TO NAC(4.2) ON 600'-0"

TO 600'-0" NAC(4.2)

COAL CONVEYOR IS ABOVE THIS

FLOOR LEVEL AND ACCESSED WITH

A VERTICAL LADDER AND PLATFORM

82F-1

XP-150

91E-1

83E-1

89F-1

810E-1

UP TO PENTHOUSE

XP-150

82E-1

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

TRIPPER

ROOM

A

I G E

C

JTRIPPER

ROOM

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

A

I CG E

J

ELEV. 616'-0"

COAL CONVEYOR

TO NAC(4.3) ON 600'-0"

TO P0E-1 ON 636'-0"

NAC(4.3)

XP-150

P0D-1

XP-150

P0E-1

EAST

FILTRATION

BUILDING

WEST

FILTRATION

BUILDING

B

I G E

C

J

TO NAC(4.3) ON 600'-0"

TO 91E-1 616'-0" NAC(4.3)

F310

F/A NOTIFICATION PLAN, TRIPPER/BUNKER LEVEL - 616'-0"

3/32" = 1-0"

F310

F/A NOTIFICATION PLAN, PENTHOUSE LEVEL - 636'-0"

3/32" = 1-0"

JA-2 Page 32 of 50

190190190190190190190190190190190190190190190190190190190 P

190 190

190 190 190 190 190 190 190

FAN DECK LEVEL - 600'-0"

P 190

190 190 190 190 190 190 190 190 190 P

P

TRIPPER/BUNKER LEVEL - 616'-8"

190190190190190190190190190190

190 190 190 190 190 190 190 190 190 190

BASEMENT LEVEL AREA 2 - 531'-0"

PP

P P P

P

P P P

TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"

190190190190190190 190190190190190

SIXTY INPUT

ADDRESSABLE

MONITOR MODULE

(30 CLASS A CIRCUITS)

190 190 190 190 190 190 190 190 190

BASEMENT LEVEL AREA 1 - 531'-0"XP

PENTHOUSE LEVEL 636'-0"

TRIPPER/BUNKER LEVEL 616'-0"

190190190190190190190190190190190190190

190 190 190

WATER TREATMENT/PLC LEVEL AREA 2 - 560'-6"

P

COAL SCALE DECK LEVEL - 571'-3"

AMM

P

BAGHOUSE LEVEL - 578'-3"

DRUM LEVEL - 581'-2"

155155 P155155155155155155

PP EAST BAGHOUSE LEVEL 543'-9"

155 155 155

P

155155 155 155 155 155

WEST BAGHOUSE LEVEL 543'-9"

SIXTY INPUT

ADDRESSABLE

MONITOR MODULE

(30 CLASS A CIRCUITS)

SLC CIRCUIT 1

MONACO M-2 WITH MAAP+

ADDRESSABLE FIRE ALARM

CONTROL PANEL (FACP) &

INTEGRAL RADIO TRANSCEIVER

SLC CIRCUIT 2

SLC CIRCUIT 3

SLC CIRCUIT 4

SLC CIRCUIT 5

SLC CIRCUIT 6

SLC CIRCUIT 7

MONACO TRANSMITTER

ABOVE ROOF OF TURBINE

GENERATOR BUILDING

SLC CIRCUIT 8

PP

PP

TWENTY INPUT

ADDRESSABLE

MONITOR MODULE

(10 CLASS A CIRCUITS)

OR

(20 CLASS B CIRCUITS)

B16A-1B15φ-2B14φ-1B14A-1B13A-1B10A-1B9A-1B6A-1B5A-1B4A-1B2A-1B2A-2B1A-1B1B-1

B2B-1B1B-2 B4B-1 B5B-1 B6B-1 B6B-2 B9B-1 B11B-1 B12C-1 B13B-1 B14B-1 B14B-2 B16B-1 B16C-1 B15C-1

B15A-1

B9C-1B9E-1B10E-1B8E-1B9G-1B9H-1B7C-1B6D-1B5D-1B6E-1B3E-1B2E-1B3C-1B2D-1B2G-1

B5G-1 B6G-1 B6H-1 B5H-1 B3H-1 B1H-1 B2G-1 B1F-1 B1E-1 B1C-1 B3C-1 B4C-1 B5C-1 B8C-1

E4B-2E4B-1E5B-1E6B-1E7B-1E8B-1E9B-1E3B-1E2B-1E1B-2

E1B-1 E9B-4 E9B-3 E9B-2

59A-158A-156A-155A-154A-153A-151A-151B-153B-154B-155B-156B-158B-159B-169D-167D-165D-163D-161C-162E-1 63E-162F-1

71F-1 72G-1

61H-1

31I-1 31I-2

53I-2 54I-2 55I-2

W3A-1 W2A-1 W1A-1

W1A-2

W9A-1 W8A-1 W7A-1 W6A-1 W5A-1

P W9A-2 W9A-3 W9A-4

W4A-1 P

W4A-2

56I-2 58I-2 59I-2 59I-1 58I-1 56I-1 55I-1 54I-1 53I-1 63G-1 65G-1 67G-1

79F-1

68G-1 61D-1

710C-1

115φ-5115φ-4115φ-3115φ-2114φ-5114φ-4114φ-3114φ-2113φ-1114φ-1115φ-1

115A-1113A-1111A-1110A-118A-116A-114A-113A-111A-110A-5

190190190

10A-4 10A-3 10A-2 10A-1 12A-1 13A-1 11B-1 11B-2 12B-1 12B-2 13B-1 13B-2 14B-1 16B-1 18B-1 110B-4 110B-2 111B-1 113B-1 116B-1

190 190 190 190 190

116A-2

116A-1

110D-119E-117E-116E-114E-113E-113F-115F-116F-119F-1110G-1

110H-A 110H-1 16H-1 14H-1 13H-1 C0H-1C0H-A C0H-2 C0G-1 C0G-2 C0H-3 11F-1 11F-2 11D-1 11C-1 12C-1 14C-1 16C-1 19C-1

22A-121A-121B-121B-221C-121C-222C-122E-122F-122H-1

43F-143G-145G-1

45F-1

47G-149G-1410G-149D-147D-145D-143D-1

22B-1

810C-189H-186H-185H-183H-182H-182G-182F-183G-185G-186G-189G-1

89D-1 86D-1 85D-1 83D-1 82D-1 82C-1 83C-1 85C-1 86C-1 89C-1

DELUGE PANEL OUTPUTS

DELUGE SYSTEM WATERFLOW / TAMPER

ZN-1ZN-2ZN-3ZN-4

ZN-1ZN-2ZN-3ZN-4

XP

XP XP XP

XP XP

XP XP XP

XP

XP XP

XP XP

XP XP XP

116I-1

116I-2

115I-1

114I-1

XP

112I-1

111I-1

110I-1

18I-1

16I-1

14I-1

13I-1

11I-1

S15G-1

S14G-1

S12G-1

S12H-1

S11H-1

12G-1

12H-1

S10G-1

XP

XP

XP

S16G-2

S16G-1

S16H-1

INDIVIDUAL CLASS A CIRCUIT

TO EACH DEVICE (TYP)

C0G-A

A0G-1

XP

A0H-1

XP

A0H-2

A0F-1

FIRE FLOOR AREA 1 - 545'-6"

C0D-1

XP

C0D-2

XP

C0D-3

C0I-1

XP

C0G-1

XP XP

C0I-2

20D-1

XP

20H-1 20I-1 20G-120I-2

XP XP

20I-3

20H-2

XP

20I-4

XP

20I-5 20I-6

XP XP XP

XP XP

WATER TREATMENT/PLC LEVEL AREA 1

COAL HANDLING - 560'-6"

89F-1

XP-190

87F-1

XP-190

86F-1 84F-1

XP-190 XP-190 XP-190

83F-1

XP-190

82F-2 81F-1

XP-190

90D-1

XP-190

90E-1

XP-190

DELUGE PANEL SUPERVISORY

SUPRTRBLALRM

INDIVIDUAL CLASS A CIRCUIT

TO EACH DEVICE (TYP)

INDIVIDUAL CLASS A CIRCUIT

TO EACH DEVICE (TYP)

INDIVIDUAL CLASS B CIRCUIT

TO DELUGE PANEL CONTACTS

USED FOR MONITORING (TYP)

XP

A0G-1

WPAMM

B1E-2

WP

B15φ-1

44F-1

CO2 SUPPRESSION PANEL

82F-1

XP

A0F-1

110H-2

ROOTS BLOWER LEVEL - 570'-6" CONTACTOR DECKS- 575'-6"

F401

F/A RISER DIAGRAM - SIGNAL LINE CIRCUITS & DEVICES

NO SCALE

B14φ -4 AMM

B14A -2

WET SPRINKLER

WATER FLOW/TAMPER

(TURBINE GENERATOR BASEMENT)

AMM

B9A -2 AMM

TAMPER SWITCHES IN

FIRE PUMP ROOM

WET SPRINKLER

TAMPER SWITCH-1

AMM WET SPRINKLER

TAMPER SWITCH-5

B8D-1

11D-2 AMM

B1C-1 WET SPRINKLER

TAMPER SWITCH-2

AMM

B3D -2 AMM

WET SPRINKLER

WATER FLOW & TAMPER SWITCH

RECLAIM CONVEYOR #2

WET SPRINKLER

TAMPER SWITCH-7

AMM WET SPRINKLER

TAMPER SWITCH-6

B5D-2

B1F-2 AMM

WET SPRINKLER

WATER FLOW & TAMPER SWITCH

BOILER BASEMENT

AOM AOMAOM AOM

B14φ -3 AMM

DIESEL FIRE PUMP

FIRE PUMP ROOM

B14φ -2 AMM

ELECTRIC FIRE PUMP

FIRE PUMP ROOM

JA-2 Page 33 of 50

FAN DECK LEVEL - 600'-0"

FAN DECK LEVEL - 616'-8"

BASEMENT LEVEL AREA 2 - 531'-0"

TURBINE/FIRE FLOOR LEVEL AREA 2 - 545'-6"

PLC LEVEL AREA 2 - 560'-6"

SCALE DECK LEVEL - 571'-3"

BAGHOUSE LEVEL - 578'-3"

DRUM LEVEL - 581'-2"

PENTHOUSE LEVEL - 636'-0"

1530WP-75WP-75WP-75WP-30WP-30

30WP-75WP-75

1.1

NAC1

1.2

XP-150 XP-150 XP-150

1.3

1.4

0.2

0.1

TO NAC6

TO NAC7

TO NAC8

(E)(E)(E)(E)

NAC7

7.2

7.1

BAGHOUSE LEVEL - 543'-9"

(E)(E)(E)(E)

(E)(E)(E)(E) (E)

NAC6

6.2

6.1

(E)(E)(E)(E) (E)

MONACO M-2 WITH MAAP+

ADDRESSABLE FIRE ALARM

CONTROL PANEL (FACP) &

INTEGRAL RADIO TRANSCEIVER

MONACO TRANSMITTER

NAC

ADDRESSABLE

MODULE

(E)

COAL SCALE DECK - 571'-3"

EAST/WEST CONTACTOR DECKS - 575'-6"

115Φ-1114Φ-1112A-116A-112A-110A-110A-2

11B-113B-114B-1119B-1112A-1

30WP-75

IN COAL HANDLING

A0I-1A0I-2A0H-1

XP-150 XP-150 XP-150

A0F-1C0D-1COH-1

XP-150 XP-150

C0I-1D0I-1COH-2

1530 15

COH-3COG-1

XP-150 XP-150 XP-150

D0G-1D0E-1D0B-2

2.1

NAC2

2.2

2.3

2.4

NEAR BOILER 6

XP-150 XP-150 XP-150

114I-1116I-1111I-1

XP-150 XP-150 XP-150

115I-111I-118I-1

WP-75WP-75WP-75WP-75

17H-114H-112H-111G-111F-1

XP-150

WP-75WP-75WP-75WP-75

16E-115E-114C-117C-1110G-1

WP-75 WP-75

14E-1

WP-75

11D-1

WP-75

13C-1

WP-75

110D-1

5.1

NAC5

5.2

5.3

5.4

NEAR FIRE PUMP ROOM

WP-75WP-75WP-75WP-75

B9F-1B9G-1B5G-1B2G-1B2F-1

WP-75WP-75WP-75

B9C-1B6C-1B1F-1B2F-1

WP-75 WP-75

B5C-1

WP-75

B3C-1

WP-75

B1C-1

WP-75

B2G-1

3.1

NAC3

3.2

3.3

3.4

NEAR CMADA

D0D-1 D0C-1 D0B-1

WP-75WP-75WP-75

53B-154A-156A-1510B-1

WP-75WP-75WP-75

61E-164E-167F-164F-1

WP-75 WP-75

64E-1

WP-75

610C-1

WP-75

610G-1

WP-75

62H-1

WP-75

WP-75

WP-75

45E-1

22H-1

410E-147G-1

WP-75 WP-75

45D-1

WP-75

45E-1

WP-75

47D-1

WP-75

45G-1

WP-75WP-75WP-75WP-75

B15B-1B15C-1B1A-1B2A-1B5A-1

WP-75

B13B-1

WP-75

B10B-1

WP-75

B6B-1B3A-1

3030WP-75

B15A-1

WP-75

B15Φ-1

WP-75

B16Φ-1

SPARE

WP-75 WP-75

B5F-1

WP-75

B4F-1

WP-75

B4G-1

WP-75

22C-1

WP-75

22B-1

WP-75

21A-1

WP-75

23A-1

WP-75WP-75WP-75WP-75

510I-156I-153I-151I-1

WP-75

4.1

NAC4

4.2

4.3

4.4

NEAR BLOWER ROOM

WP-75WP-75WP-75

72G-172D-177G-175G-1

WP-75 WP-75

75D-1

WP-75

77D-1

WP-75

710D-1

XP-150 XP-150 XP-150

89F-183E-182E-1

XP-150 XP-150

XP-150

91E-1

P0E-1P0D-1

SPARE

TO NAC3

TO NAC4

TO NAC5

TO NAC1

TO NAC2

NAC8

8.1

WESTEAST

E1B-1 E2B-1 E3B-1 E6B-1 E8B-1 E9B-1 W7A-1 W4A-1 W1A-1 W6A-1 W9A-1

W4A-1W1A-2W6A-2W8A-1E9B-2E7B-1E4B-1E1B-2

SORBENT BUILDING

F402

F/A RISER DIAGRAM - NOTIFICATION DEVICES & CIRCUITS

NO SCALE

WP-75

115G-2 115G-1

114G-1

75 WP-75

111G-1

WP-75

110aG-1

TO PANEL 'K'

TO EXISTING NAC

120V CIRCUIT

TO PANEL 'LP-4'

TO PANEL(S)

'CP-K', 'C-1':'C-4'

TO PANEL 'BREAK'

710G-1

WP-7515

78G-1

TO EXISTING NAC

120V CIRCUIT

TO PANEL 'ROOF'

(OR POSSIBLE 'B-6 CP')

TO EXISTING NAC

120V CIRCUIT

SPECIFIC NOTES

PROVIDE 120V 20A CIRCUIT TO POWER EQUIPMENT FROM PANEL(S) IDENTIFIED ON

DRAWING. COORDINATE WITH POWER PLANT PERSONNEL FOR FINAL CIRCUIT TO

BE UTILIZED FOR FEEDING POWER TO NEW FACP OR NAC PANELS.

TO PANEL 'K' 1

JA-2 Page 34 of 50

BASEMENT LEVEL AREA 1 - 531'-0"

D

PROVIDE DELUGE SOLENOID VALVE FOR HIGH ANGLE CONVEYOR

WATER FLOW & TAMPER SWITCH FOR HIGH ANGLE CONVEYOR

D D

PROVIDE DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #1

WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #1

PROVIDE DELUGE SOLENOID VALVE FOR CONVEYOR TO BUCKET ELEVATOR #1

WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO BUCKET ELEVATOR #1

J J

J J

HIGH ANGLE CONVEYOR

PLC LEVEL AREA 1 - 560'-6"

D

PROVIDE DELUGE SOLENOID VALVE FOR CONVEYOR TO STORAGE

WATER FLOW & TAMPER SWITCH FOR CONVEYOR TO STORAGE

D

PROVIDE DELUGE SOLENOID VALVE FOR RECLAIM CONVEYOR #2

WATER FLOW & TAMPER SWITCH FOR RECLAIM CONVEYOR #2

OPERATING LEVEL AREA 1 - 545'-6"

J LHC LHC LHC J

RECLAIM CONVEYOR #2

J J

CONVEYOR TO STORAGE

LHC LHC LHC

LHC LHC LHC

LHC LHC LHC

SLC SLC

SLC SLC SLC SLC SLC SLC SLC

SLC SLC

SLC SLC SLC SLC SLC SLC SLC

DELUGE RELEASING CONTROL PANEL #1 (DRCP1)

S

LC

S

LC

S

LC

SLC

SLC

S

LC

S

LC

S

LC

SLC SLC SLC SLC SLC SLC

SLC

S

LC

S

LC

S

LC

SLC SLC

S

LC

S

LC

S

LC

SLC SLC SLC SLC SLC

AUX RLY 1 - SUPERVISORY

AUX RLY 2 - TROUBLE

AUX RLY 3 - ALARM

AUX RLY 4 - ALARM (NOT ASSIGNED)

AUX RLY 1 - ZONE 1 OUTPUT

AUX RLY 1 - ZONE 2 OUTPUT

AUX RLY 1 - ZONE 3 OUTPUT

AUX RLY 1 - ZONE 4 OUTPUT

ZONE INPUTS

(SPARE)

(SPARE)

Z-1 OUTPUT - RECLAIM CONVEYOR #2

AUX RLY 1 - SUPERVISORY

AUX RLY 2 - TROUBLE

AUX RLY 3 - ALARM

AUX RLY 4 - ALARM (NOT ASSIGNED)

AUX RLY 1 - ZONE 1 OUTPUT

AUX RLY 1 - ZONE 2 OUTPUT

AUX RLY 1 - ZONE 3 OUTPUT

AUX RLY 1 - ZONE 4 OUTPUT

SPECIFIC NOTES

THIS CONVEYOR REMOVED FROM SERVICE PERMANENTLY AND NOT REQUIRE NEW

DELUGE PROTECTION, BUT EXISTING DELUGE SUPPRESSION TO REMAIN BUT BE

DISABLED SO NO ACTIVATION CONNECTED FROM NEW SUPPRESSION RELEASING PANEL.

SUPERVISORY

TROUBLE

ALARM

RECLAIM CONVEYOR #2

CONVEYOR TO STORAGE

COMMON ADDRESSED OUTPUTS TO

FIRE ALARM MONITORING MODULE

SPECIFIC ADDRESSED DELUGE OUTPUTS

TO FIRE ALARM MONITORING MODULE

CONVEYOR TO BUCKET ELEVATOR #1

HIGH ANGLE CONVEYOR

(SPARE)

(SPARE)

(SPARE)

(SPARE)

RECLAIM CONVEYOR #2

CONVEYOR TO STORAGE

Z-2 OUTPUT - CONVEYOR TO STORAGE

Z-3 OUTPUT - SPARE

Z-4 OUTPUT - SPARE

ZONE 1

ZONE 2

ZONE 3

ZONE 4

Z-1 OUTPUT - HIGH ANGLE CONVEYOR

Z-2 OUTPUT - CONVEYOR TO BUCKET ELEVATOR #1

Z-3 OUTPUT - SPARE

Z-4 OUTPUT - SPARE

ZONE INPUTS

(SPARE)

(SPARE)

CONVEYOR TO BUCKET ELEVATOR #1

HIGH ANGLE CONVEYOR

ZONE 1

ZONE 2

ZONE 3

ZONE 4

RECLAIM CONVEYOR #2

CONVEYOR TO STORAGE

SPECIFIC ADDRESSED WATERFLOW/TROUBLE

OUTPUTS TO FIRE ALARM MONITORING MODULE HIGH ANGLE CONVEYOR

CONVEYOR TO BUCKET ELEVATOR #1

CONVEYOR TO BUCKET ELEVATOR #1

F403

F/A RISER DIAGRAM - DELUGE SYSTEM CIRCUITS & DEVICES

NO SCALE

DELUGE RELEASING CONTROL PANEL #2 (DRCP2)

JA-2 Page 35 of 50

REFERENCED GRIDLINES

BAGHOUSE

BAGHOUSE

CHEMICAL STORAGE AREA TO

BE INCLUDED IN WP AREA

CLASSIFICATION HOWEVER

DETECTORS INSTALLED SHALL

BE THE SAME TYPE INSTALLED

IN THE CLASS II DIV 1 AREAS

OPEN TO BELOW

ROOF

BAGHOUSE

BAGHOUSE

OPEN TO BELOW

OPEN TO BELOW

BAGHOUSE BAGHOUSE

ROOF

ROOF

ROOF

F500 NO SCALE

F500 NO SCALE

F500 NO SCALE

F500 NO SCALE

F500 NO SCALE

F500 NO SCALE

F500 NO SCALE

F500 NO SCALE

CLASS II DIV 1 GROUP F AREA

UNCLASSIFIED AREA, BUT EQUIPMENT TO BE INSTALLED AS WEATHERPROOF TO

INCLUDE RACEWAYS, BACK BOXES, CONNECTIONS AND SHALL ALSO INCLUDE

SECONDARY ENCLOSURES FOR ANY PACKAGED EQUIPMENT WHICH IS PROVIDED IN

NEMA 1 TYPE ENCLOSURES TO PROVIDE ADDITIONAL PROTECTION FROM DUST

INFILTRATION INTO THESE COMPONENTS, DEVICES AND/OR ANCILLARY SYSTEMS

CLASS I DIV 2 GROUP D AREA

UNCLASSIFIED AREA

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

ELEV. 575'-6"

ELEV. 581'-2"

ELEV. 600'-0"

ELEV. 616'-0"

WEST

FILTRATION

BUILDING

ELEV. 578'-3"

ELEV. 543'-9"

ELEV. 636'-0"

B

TRIPPER

ROOM

CRANE

ELEV. 543'-9" ELEV. 543'-9"

ELEV. 556'-2"

ELEV. 581'-2"

ELEV. 600'-0"

ELEV. 616'-0"

TRIPPER

ROOM

EAST

FILTRATION

BUILDING

COAL

THAWING

ROOM

ELEV. 575'-6"

ELEV. 556'-2"

ELEV. 545'-6"

ELEV. 531'-0"

ELEV. 581'-2"

ELEV. 600'-0"

ELEV. 616'-0"

WEST

FILTRATION

BUILDING

ELEV. 571'-3"

ELEV. 575'-6" ELEV. 578'-3"ELEV. 578'-3"

TURBINE

GENERATOR

ROOM

AREA CLASSIFICATION: AREA CLASSIFICATION:

AREA CLASSIFICATION: AREA CLASSIFICATION: AREA CLASSIFICATION:

AREA CLASSIFICATION: AREA CLASSIFICATION:

GENERAL SHEET F500 NOTES

1. COAL HANDLING AREAS ARE AT VARIOUS ELEVATIONS WITH EXTERNAL CONVEYORS ARE NOT LEVEL.

2. AREA CLASSIFICATIONS BASED ON TYPES OF MATERIALS NORMALLY PRESENT AT THE LOCATIONS, i.e. PREDOMINANTLY COAL DUSTS. OTHER NON EXPLOSIVE BASED DUSTS AND DIRT ARE ALSO PRESENT WITHIN THE PLANT AREAS WHERE DEVICES ARE NOTED TO HAVE WEATHERPROOF ENCLOSURES TO PREVENT THIS DUST INFILTRATION INTO THESE SYSTEMS.

3. AREA CLASSIFICATIONS FOR THE SORBENT FACILITIES HAS NOT BEEN VERIFIED AS THESE LOCATIONS ARE STILL NOT COMPLETED AND TURNED OVER TO THE GOVERNMENT AND AS SUCH AS-BUILT INFORMATION IS NOT AVAILABLE.

JA-2 Page 36 of 50

FIRE ALARM SYSTEMS MATRIX

SY

ST

EM

O

U

TP

U T/

R

ES

PO

N

SE

TR

A

N S

M

IT

A

LA

R M

T O

S E

C U

R

IT

Y F

O R

C E

S

SYSTEM INPUT:

ALARM:

MANUAL PULL STATION O

SMOKE DETECTOR

HEAT DETECTOR

O

O

OFIRE SPRINKLER WATERFLOW (ANY ZONE)

ELECTRIC FIRE PUMP ACTUATION

DIESEL FIRE PUMP ACTUATION

O

O

O

TR

A

N S

M

IT

S U

P E

R V

IS

O

R Y

T O

S E

C U

R

IT

Y F

O R

C E

S

TR

A

N S

M

IT

T R

O U

B

LE

T O

S E

C U

R

IT

Y F

O R

C E

S

A C

TI

V

A

TE

A

LL

V

IS

U A

L A

N D

A U

D

IB

LE

A

LA

R

M S

A C

TI

V

A

TE

L O

C A

L S

U P

E R

V

IS

O R

Y A

N N

U N

C

IA

TO

R

A C

TI

V

A

TE

L O

C A

L

TR

O U

B

LE

A N

N U

N C

IA

TO

R

LO

C

A L

S P

R

IN

K

LE

R B

E

LL

A C

TI

VA

TE

D

W

AT

ER

F

LO

W

O

CMADA CO2 SYSTEM ACTUATION

SUPERVISORY:

LOW TEMPERATURE ALARM (ANY LOCATION) O

SPRINKLER TAMPER SWITCH (ANY LOCATION) O

TROUBLE:

FIRE ALARM PRIMARY POWER SOURCE FAILURE

FIRE ALARM PANEL BATTERY FAILURE

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .