Questions and Responses 008.doc

DOC document 31 KB Posted

Attached to
RECOVERY--Z--COAL CRUSHER REPLACEMENT AT CLEAR AIR STATION, ALASKA
Solicitation number
FA5004-09-R-C009
Issued by

View the file

Other files

File Type Posted
Questions and Responses 009.doc DOC document
Attachment JA-1 Specifications —
JA-2 Wage Determination 5 June 2009.pdf PDF
P0005 Amendment 5.pdf PDF
Questions and Responses 006.doc DOC document
Questions and Responses 005.doc DOC document
Combined Specifications —
0004.pdf PDF
Questions and Responses 004.doc DOC document
Attachment JA-1 Specifications —
JA-2 Wage Determination 29 April 09.doc DOC document
Questions and Responses 003.doc DOC document
Amendment 2.pdf PDF
JA-8.6.pdf PDF
JA-8.5.pdf PDF
JA-8.2.pdf PDF
JA-8.1.pdf PDF
JA-8.8.pdf PDF
JA-8.3.pdf PDF
JA-8.7.pdf PDF
JA-8.4.pdf PDF
JA-8.9.pdf PDF
Site Visit Attendance Sheet —
Amendment 1.pdf PDF
Attachment JA-7 Drawings.pdf PDF
Notice of Question Submittal Due Date.pdf PDF
Attachment JA-2 Schedule of Wage Rates.pdf PDF
Attachment JA-1 Specifications.pdf PDF
Solicitation.pdf PDF
Attachment JA-3 Past Performance Questionaire.pdf PDF
Attachment JA-4 Financial Institution Reference Sheet.pdf PDF
Attachment JA-5 Haz Mat Sheet.pdf PDF
Attachment JA-6 AF Form 66.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND RESPONSES

FOR

COAL CRUSHER REPLACEMENT

AT

CLEAR AIR STATION, ALASKA

SOLICITATION NO. FA5004-09-R-C009

It shall be noted to all interested parties that the following questions have been received in writing regarding the subject acquisition. Additionally, responses have been provided to the below listed questions.

As a reminder, it is the responsibility of all Interested Parties to review this website (http://www.fedbizopps.gov) frequently for any updates and/or amendments to any and all subject documents.

Question 1:

New crushers specified have a larger profile and will require moving floor openings including floor beams. Also redesigning chute profiles, effecting slopes and possibly flow of coal. Design loads for building are unknown therefore assumed to be outside the scope of engineering by contractor. Besides manufacturers recommendations for maintenance are there any other requirements for clearance for plant personnel or will it be a best fit situation in relation to other equipment that exists.

Answer 1:

General note 2 below details 2 and 3 sheet M2.3 notes requirements for accommodating and supporting new crushers that do not exactly fit the existing opening. The successful bidder is required to provide sealed drawings by a Registered Structural Engineer to accommodate any variances in support or floor openings for the new crushers. The Government will make available to the successful bidder, all available structural information on the existing building and support system.

Section 15800, 3.2, B requires the contractor to reconfigure coal chute sizes and construction to accommodate the new coal crusher inlet and outlet configurations.

Questions and Responses 008 Solicitation No. FA5004-09-R-C009