Performance Work Statement(PWS)_Bldg.11540_Flooring.pdf

PDF 120 KB Posted

Attached to
JBER Flooring Project
Solicitation number
FA500026Q0031
Issued by

About this file

This is a Performance Work Statement for flooring removal and installation services at Joint Base Elmendorf-Richardson, Alaska. The 3rd Maintenance Squadron (PACAF) requests the removal of existing glued-down broadloom carpet and installation of Luxury Vinyl Planking (LVP) in the 3 MXS Conference Room (Building 11540, Room 5). The rationale for this change is that carpet is impractical given the high volume of personnel traffic and the challenging weather conditions at the Alaska facility.

The scope of work includes removal of existing carpet, scraping and preparing the floor, removal of existing 6-inch rubber wall base, installation of new LVP flooring, installation of Black/Brown rubber transition at the doorway, and offsite disposal of all demolition materials. The contract is classified as non-personal services. The Air Force will provide support through the 3 MXS/MXMM maintenance personnel who will assist with removal and placement of chairs and tables, and the requestor will provide facility documentation as required. The designated work location is 3 MXS Conference Room, 11540 Slammer Avenue, JBER, AK 99506. The Performance Work Statement was issued on 27 March 2026 by TSgt Brett H. House, 3 MXS Programs Manager.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

3rd MAINTENANCE SQUADRON (PACAF)

JOINT BASE ELMENDORF-RICHARDSON, ALASKA

CUI

CUI

27 March 2026

MEMORANDUM FOR ALL PERSONNEL

FROM: TSGT BRETT H. HOUSE

SUBJECT: Performance Work Statement

1. Background: There is carpeting installed in the 3 MXS Conference room (Bldg.11540 Rm.5). The carpet is impractical for the quantity of personnel traffic and the weather that occurs at Joint Base Elmendorf Richardson. We are requesting the removal of carpeting and the installation of Luxury Vinyl Planking (LVP). LVP Is more durable and easier to maintain than carpet.

2. General: This is a non-personal service contract for removal and installation of flooring material. Which includes removal of existing glued down broadloom carpet, scrape and prep the floor, removal of existing 6" rubber wall base, Installation of new LVP, Black/Brown rubber transition at the doorway and the disposal of all demo materials offsite

3. Government Provided Equipment/Information

3.1. 3 MXS/MXMM will aid with the removal & placement of Chairs/Tables.

3.2. Requestor(AF) will provide facility documentation as required.

4. Designated Work Location 3 MXS Conference Room 11540 Slammer Ave

JBER, AK 99506

BRETT H. HOUSE, TSgt, USAF 3 MXS Programs Manager

2026-03-27T10:53:56-0800
HOUSE.BRETT.HAROLD.1471553413