Attachment 4_Industry QA.pdf

PDF 106 KB Posted

Attached to
Repair Interior of Chapel Bldg 3
Solicitation number
FA500023Q0064
Issued by

About this file

This document contains an industry question and answer session pertaining to a federal contract opportunity to repair the interior of a chapel building at Joint Base Elmendorf-Richardson in Alaska. The solicitation seeks to remove and replace flooring throughout the building, with the exception of the altar wall which is no longer included in the scope of work. Bidders should include asbestos abatement costs for all flooring work in their base pricing, as abatement will be required. The staging area will be coordinated with the user prior to construction. While known asbestos containing materials are defined, additional abatement encountered outside those areas will not be covered by contract modification. All work must comply with historic preservation standards for the property.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Interior of Chapel Industry Q&A

1. If abatement is needed for this project will this be captured as a mod or is it assumed that abatement is to be included in the base bid pricing?

- Assume abatement is required for all of the flooring work and include that abatement in the base bid pricing.

2. Does the flooring in the arctic entry by multi-purpose room get removed/replaced? It is not shown to removed and replaced in the existing flooring drawings.

- Yes, the flooring in the arctic entry will be removed/replaced. Please see the revised drawings.

3. Is there any historic property that needs to be preserved?

- The chapel itself is historic property, so the work shall be limited to only what is defined in the SOW. All work must follow the JBER Historic Facilities Maintenance and Repair Plan and the Secretary of the Interior’s Standards for the Treatment of Historic Properties.

4. Where is the staging/ lay down area?

- The staging area will be coordinated with the user prior to construction.

5. If asbestos is encountered outside of the known ACM containing joint compound, will the required abatement be covered under a contract modification?

- No, the required abatement encountered outside of the known ACM containing joint compound will not be covered under a contract modification as all abatement necessary to complete the work is already included under the original

SOW.

6. The drawings and SOW have been updated to reflect the following changes:

- The original drawings show the areas that need to be painted including the alter wall. The updated drawings do not include the alter wall as needing to be painted.