Attachment 2-Building Floor Plan (HJZH 23-1029).pdf

PDF 3 MB Posted

Attached to
Repair Interior of Chapel Bldg 3
Solicitation number
FA500023Q0064
Issued by

About this file

This package includes construction drawings and specifications for repair work at Joint Base Elmendorf-Richardson Chapel Building 3 under Solicitation Number FA500023Q0064 from the Department of the Air Force Pacific Air Forces. The repair work includes installing new laminate flooring and baseboards in several areas totaling approximately 1,200 square feet, repainting interior walls in the main chapel and multi-purpose room, and addressing any wall damage from removing existing baseboards. The floor plan drawing delineates the areas for new flooring and notes repair requirements. The solicitation seeks bids for this repair work with an expected award date in May 2023.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOINT BASE ELMENDORF-RICHARDSON

SCHEDULE OF DRAWINGS

SHEET NUMBER SHEET TITLE

1 LOCATION PLAN AND SCHEDULE OF DRAWINGS

2 FLOOR PLAN

673D CIVIL ENGINEER SQUADRON

PROJECT LOCATION

MAP KEY

LOCATION DESCRIPTION

RICHARDSON GATE & VISITORS CENTER

BONIFACE GATE & VISITORS CENTER

3 POST ROAD GATE - CONTRACTOR ACCESS (HAUL ROUTE)

JBER CONCRETE AND ASPHALT DISPOSAL AREA

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

2. AT NO TIME WILL THE CONTRACTORS WORK, STORAGE OF MATERIALS, PARKING OF VEHICLES OR OTHER ACTIVITIES BE ALLOWED TO INTERFERE WITH THE WORK ACTIVITIES OF GOVERNMENT

PERSONNEL OR TO DAMAGE GOVERNMENT OR PRIVATE PROPERTY.

3. PARKING SHALL BE ALLOWED IN APPROVED PARKING SPACES ONLY. VEHICLES OTHERWISE PARKED SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

4. THE CONTRACTOR'S MATERIALS AND EQUIPMENT SHALL NOT BE STORED WITHIN 20 FEET O F ANY BUILDING, OBSTRUCT FIRE EXITS OR OTHERWISE INTERFERE WITH FIRE FIGHTING FACILITIES. ANY MATERIALS, EQUIPMENT OR VEHICLES DOING SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

5. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE WORK AREA FREE FROM ACCUMULATION OF WASTE MATERIALS. DEBRIS SHALL BE REMOVED ON A DAILY BASIS.

6. ALL WELDING AND / OR THE USE OF FLAME PRODUCING DEVICES SHALL BE CLEARED THROUGH THE FIRE DEPARTMENT.

7. ALL CONSTRUCTION PERMITS, FEES AND COORDINATION OF ANCILLARY ITEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

8. THE WORK OF THIS CONTRACT SHALL COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES OR STANDARDS, INCLUDING BUT NOT LIMITED TO: ENVIRONMENTAL PROTECTION AGENCY, NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, NATIONAL FIRE PROTECTION ASSOCIATION, OSHA STANDARDS, FIRE CODES, INTERNATIONAL BUILDING CODE.

PROJECT NOTES:

A B C D E F G H I

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

CONCEPTUAL

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DRAWING NO:

U.S. AIR FORCE

REPAIR INTERIOR FINISHES RICHARDSON

FXSB 23-1029

5/1/2023

5/1/2023

5/1/2023

5/1/2023

CHAPEL B3

LOCATION PLAN AND SCHEDULE OF DRAWINGS

STORAGE

OFFICE 1

OFFICE 2

OFFICE 3OFFICE 4

RECEPTION

AREA

OFFICE 5

NW CHAPEL

MAIN CHAPEL

SACRISTY 2

SACRISTY 1

CONFERENCE

ROOM

LADIES

ROOM

MENS

ROOM

CW SERVICE

ENTRANCE.

MULTI-PURPOSE

ROOM

N

BUILDING: 3

FLOOR: 1

A B C D E F G H I

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

CONCEPTUAL

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DRAWING NO:

U.S. AIR FORCE

REPAIR INTERIOR FINISHES RICHARDSON

FXSB 23-1029

5/1/2023

5/1/2023

5/1/2023

5/1/2023

CHAPEL B3

NOTES

1. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL

MEASUREMENTS.

2. INSTALL NEW LAMINATE FLOORING IN HATCHED/SHADED

AREAS. REMOVE THE EXISTING COVE BASE IN CONJUNCTION

WITH FLOORING REPLACEMENT. REPLACE WITH 4" COVE BASE.

REPAIR WALL DAMAGE CAUSED BY REMOVAL OF EXISTING

COVE BASE AS REQUIRED. TEXTURE AND PAINT TO MATCH

EXISTING WALL.

3. PRIMER SHALL BE APPLIED TO WALLS PRIOR TO PAINTING IN

THE MAIN CHAPEL. PAINT SHALL BE TWO COATS OF A WHITE

COLOR. SPRAY APPLICATIONS NOT ALLOWED.

LEGEND

INTERIOR WALLS TO BE PAINTED

REMOVE AND REPLACE FLOORING

EXISTING CARPET

EXISTING VINYL SHEET

0 8' 16' 24'

SCALE: 1" = 8'

4'

FLOOR PLAN

GEC

GEC

GEC

INSIDE STAIRWELL

NOT TO BE PAINTED

WHITE WALLS WITHIN THIS

ROOM SHALL BE PAINTED;

WALL TILES TO REMAIN IN

EXISTING CONDITIONS AND

WILL NOT BE PAINTED

AutoCAD SHX Text

LIFT

7. HJZH 23-1029_Drawings
Cover Sheet
Sheets and Views
Layout1
Floor Plan Rev1
Sheets and Views
1_AS-BUILT

File details come from the government source that posted it. Updated .