Attachment 2_Building Floor Plan (HJZH 23-1029).pdf

PDF 3 MB Posted

Attached to
Repair Interior of Chapel Bldg 3
Solicitation number
FA500023Q0064
Issued by

About this file

This document includes floor plans and project notes for repair work at Chapel Building 3 on Joint Base Elmendorf-Richardson. The scope of work involves installing new laminate flooring in hatched areas on the floor plan, removing and replacing cove base to match existing height, repairing any wall damage from removing cove base, priming and painting walls in the main chapel area with two coats of white paint, and addressing any other interior repair needs according to the project notes. The related federal contract opportunity is solicitation number FA500023Q0064 for repair work at Chapel Building 3, issued by the Department of the Air Force Pacific Air Forces. The contractor will be responsible for addressing all requirements in the floor plans and project notes provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOINT BASE ELMENDORF-RICHARDSON

SCHEDULE OF DRAWINGS

SHEET NUMBER SHEET TITLE

1 LOCATION PLAN AND SCHEDULE OF DRAWINGS

2 FLOOR PLAN

673D CIVIL ENGINEER SQUADRON

PROJECT LOCATION

MAP KEY

LOCATION DESCRIPTION

RICHARDSON GATE & VISITORS CENTER

BONIFACE GATE & VISITORS CENTER

3 POST ROAD GATE - CONTRACTOR ACCESS (HAUL ROUTE)

JBER CONCRETE AND ASPHALT DISPOSAL AREA

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

2. AT NO TIME WILL THE CONTRACTORS WORK, STORAGE OF MATERIALS, PARKING OF VEHICLES OR OTHER ACTIVITIES BE ALLOWED TO INTERFERE WITH THE WORK ACTIVITIES OF GOVERNMENT

PERSONNEL OR TO DAMAGE GOVERNMENT OR PRIVATE PROPERTY.

3. PARKING SHALL BE ALLOWED IN APPROVED PARKING SPACES ONLY. VEHICLES OTHERWISE PARKED SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

4. THE CONTRACTOR'S MATERIALS AND EQUIPMENT SHALL NOT BE STORED WITHIN 20 FEET O F ANY BUILDING, OBSTRUCT FIRE EXITS OR OTHERWISE INTERFERE WITH FIRE FIGHTING FACILITIES. ANY MATERIALS, EQUIPMENT OR VEHICLES DOING SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

5. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE WORK AREA FREE FROM ACCUMULATION OF WASTE MATERIALS. DEBRIS SHALL BE REMOVED ON A DAILY BASIS.

6. ALL WELDING AND / OR THE USE OF FLAME PRODUCING DEVICES SHALL BE CLEARED THROUGH THE FIRE DEPARTMENT.

7. ALL CONSTRUCTION PERMITS, FEES AND COORDINATION OF ANCILLARY ITEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

8. THE WORK OF THIS CONTRACT SHALL COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES OR STANDARDS, INCLUDING BUT NOT LIMITED TO: ENVIRONMENTAL PROTECTION AGENCY, NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, NATIONAL FIRE PROTECTION ASSOCIATION, OSHA STANDARDS, FIRE CODES, INTERNATIONAL BUILDING CODE.

PROJECT NOTES:

A B C D E F G H I

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

CONCEPTUAL

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DRAWING NO:

U.S. AIR FORCE

REPAIR INTERIOR FINISHES RICHARDSON

FXSB 23-1029

5/1/2023

5/1/2023

5/1/2023

5/1/2023

CHAPEL B3

LOCATION PLAN AND SCHEDULE OF DRAWINGS

STORAGE

OFFICE 1

OFFICE 2

OFFICE 3OFFICE 4

RECEPTION

AREA

OFFICE 5

NW CHAPEL

MAIN CHAPEL

SACRISTY 2

SACRISTY 1

CONFERENCE

ROOM

LADIES

ROOM

MENS

ROOM

CW SERVICE

ENTRANCE.

MULTI-PURPOSE

ROOM

N

BUILDING: 3

FLOOR: 1

A B C D E F G H I

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

CONCEPTUAL

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DRAWING NO:

U.S. AIR FORCE

REPAIR INTERIOR FINISHES RICHARDSON

FXSB 23-1029

5/1/2023

5/1/2023

5/1/2023

5/1/2023

CHAPEL B3

NOTES

1. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL

MEASUREMENTS.

2. INSTALL NEW LAMINATE FLOORING IN HATCHED AREAS.

REMOVE AND REPLACE COVE BASE TO MATCH EXISTING

HEIGHT. REPAIR WALL DAMAGE CAUSED BY REMOVAL OF

EXISTING COVE BASE AS REQUIRED. TEXTURE AND PAINT TO

MATCH EXISTING WALL IF DAMAGE OCCURS.

3. PRIMER SHALL BE APPLIED TO WALLS PRIOR TO PAINTING IN

THE MAIN CHAPEL. PAINT SHALL BE TWO COATS OF A WHITE

COLOR. SPRAY APPLICATIONS NOT ALLOWED.

LEGEND

INTERIOR WALLS TO BE PAINTED

REMOVE AND REPLACE FLOORING

EXISTING CARPET

EXISTING VINYL SHEET

0 8' 16' 24'

SCALE: 1" = 8'

4'

FLOOR PLAN

GEC

GEC

GEC

File details come from the government source that posted it. Updated .