This document includes floor plans and project notes for repair work at Chapel Building 3 on Joint Base Elmendorf-Richardson. The scope of work involves installing new laminate flooring in hatched areas on the floor plan, removing and replacing cove base to match existing height, repairing any wall damage from removing cove base, priming and painting walls in the main chapel area with two coats of white paint, and addressing any other interior repair needs according to the project notes. The related federal contract opportunity is solicitation number FA500023Q0064 for repair work at Chapel Building 3, issued by the Department of the Air Force Pacific Air Forces. The contractor will be responsible for addressing all requirements in the floor plans and project notes provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOINT BASE ELMENDORF-RICHARDSON
SCHEDULE OF DRAWINGS
SHEET NUMBER SHEET TITLE
1 LOCATION PLAN AND SCHEDULE OF DRAWINGS
2 FLOOR PLAN
673D CIVIL ENGINEER SQUADRON
PROJECT LOCATION
MAP KEY
LOCATION DESCRIPTION
RICHARDSON GATE & VISITORS CENTER
BONIFACE GATE & VISITORS CENTER
3 POST ROAD GATE - CONTRACTOR ACCESS (HAUL ROUTE)
JBER CONCRETE AND ASPHALT DISPOSAL AREA
1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.
2. AT NO TIME WILL THE CONTRACTORS WORK, STORAGE OF MATERIALS, PARKING OF VEHICLES OR OTHER ACTIVITIES BE ALLOWED TO INTERFERE WITH THE WORK ACTIVITIES OF GOVERNMENT
PERSONNEL OR TO DAMAGE GOVERNMENT OR PRIVATE PROPERTY.
3. PARKING SHALL BE ALLOWED IN APPROVED PARKING SPACES ONLY. VEHICLES OTHERWISE PARKED SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.
4. THE CONTRACTOR'S MATERIALS AND EQUIPMENT SHALL NOT BE STORED WITHIN 20 FEET O F ANY BUILDING, OBSTRUCT FIRE EXITS OR OTHERWISE INTERFERE WITH FIRE FIGHTING FACILITIES. ANY MATERIALS, EQUIPMENT OR VEHICLES DOING SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.
5. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE WORK AREA FREE FROM ACCUMULATION OF WASTE MATERIALS. DEBRIS SHALL BE REMOVED ON A DAILY BASIS.
6. ALL WELDING AND / OR THE USE OF FLAME PRODUCING DEVICES SHALL BE CLEARED THROUGH THE FIRE DEPARTMENT.
7. ALL CONSTRUCTION PERMITS, FEES AND COORDINATION OF ANCILLARY ITEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
8. THE WORK OF THIS CONTRACT SHALL COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES OR STANDARDS, INCLUDING BUT NOT LIMITED TO: ENVIRONMENTAL PROTECTION AGENCY, NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, NATIONAL FIRE PROTECTION ASSOCIATION, OSHA STANDARDS, FIRE CODES, INTERNATIONAL BUILDING CODE.
PROJECT NOTES:
A B C D E F G H I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DESIGN
CONCEPTUAL
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
U.S. AIR FORCE
REPAIR INTERIOR FINISHES RICHARDSON
FXSB 23-1029
5/1/2023
5/1/2023
5/1/2023
5/1/2023
CHAPEL B3
LOCATION PLAN AND SCHEDULE OF DRAWINGS
STORAGE
OFFICE 1
OFFICE 2
OFFICE 3OFFICE 4
RECEPTION
AREA
OFFICE 5
NW CHAPEL
MAIN CHAPEL
SACRISTY 2
SACRISTY 1
CONFERENCE
ROOM
LADIES
ROOM
MENS
ROOM
CW SERVICE
ENTRANCE.
MULTI-PURPOSE
ROOM
N
BUILDING: 3
FLOOR: 1
A B C D E F G H I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DESIGN
CONCEPTUAL
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
U.S. AIR FORCE
REPAIR INTERIOR FINISHES RICHARDSON
FXSB 23-1029
5/1/2023
5/1/2023
5/1/2023
5/1/2023
CHAPEL B3
NOTES
1. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL
MEASUREMENTS.
2. INSTALL NEW LAMINATE FLOORING IN HATCHED AREAS.
REMOVE AND REPLACE COVE BASE TO MATCH EXISTING
HEIGHT. REPAIR WALL DAMAGE CAUSED BY REMOVAL OF
EXISTING COVE BASE AS REQUIRED. TEXTURE AND PAINT TO
MATCH EXISTING WALL IF DAMAGE OCCURS.
3. PRIMER SHALL BE APPLIED TO WALLS PRIOR TO PAINTING IN
THE MAIN CHAPEL. PAINT SHALL BE TWO COATS OF A WHITE
COLOR. SPRAY APPLICATIONS NOT ALLOWED.
LEGEND
INTERIOR WALLS TO BE PAINTED
REMOVE AND REPLACE FLOORING
EXISTING CARPET
EXISTING VINYL SHEET
0 8' 16' 24'
SCALE: 1" = 8'
4'
FLOOR PLAN