I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Pre-Proposal Conference
FA5000-20-R-0019
Base Operations and Maintenance Services (BOMS)
Ms. Gina Parks
673 CONS/DBO
10 Sep 2020
Agenda
Introductions
Rules of Engagement
Solicitation Overview Contract Parameters Instructions to Offerors Evaluation Factors for Award
BOMS Contract Overview
Contract Oversight & Performance Evaluation
Questions
Final Remarks
Introductions
Around the ‘Room’
Key Personnel Lt Col Jon Hobart – 673d Contracting Squadron Commander Ms. Gina Parks – 673 CONS Director of Business Operations Ms. Della Simmons – 673 CONS Small Business Specialist Mr. Robert Peters – 673d CONS CES Services Section Supervisor MSgt Daniel Morphew – 673d CONS CES Services Contracting Officer TSgt Ryan Dearth – 673d CONS CES Services Contracting Officer Mr. William Farabaugh – 773d CES Infrastructure Element Chief Mr. Mark Campbell – 773d CES Service Contracts Supervisor Mr. Steve Kosterman – 773d CES Lead COR Mr. Dean Ash – 773d CES Functional Director
Rules of Engagement
All communications channeled through the Contracting Officer
Contractor questions:
All questions submitted in writing to:
daniel.morphew@us.af.mil and robert.peters.11@us.af.mil
Responses to questions will be posted at https://beta.sam.gov Questions may be asked during this briefing (use the chat box), however:
Written submission is still required We may defer response until later date Answers provided today are not official until incorporated in an amendment
Question submission deadline is 14 September 2020
Always refer to the solicitation for details and clarification
Solicitation Overview Contract Parameters
Award: Single contract
Duration: Five (5) years One (1) year base period - (comprised of one (1) month observation/prep/ 11 months full capability) Four (4) one year option periods Six (6) month extension of services
Pricing arrangement: Firm fixed price Contract CLIN structure
X001 – Preventive Maintenance: Equipment and Facilities X002 – Preventive Maintenance: Oil Water Separators X003 – Firm Fixed Price Work Tasks: labor and material(s) up to $5K X004 – Material(s) >$5K for any Work Tasks – material(s) only X005 – Over and Above Work – to be negotiated/finalized upon need 0006 – Phase-in for 30 days prior to Full Mission Capable
Instructions to Offerors
Proposals due: 2:00 PM (Alaska Time) on 1 Oct 2020
Email proposals to:
daniel.morphew@us.af.mil, and robert.peters.11@us.af.mil
Offeror’s responsibility to monitor https://beta.sam.gov and acknowledge all amendments.
Offerors are required to meet all solicitation requirements
Proposal shall consist of four (4) separate parts:
Part I – Summary and Misc Data Part II – Price Proposal Part III – Technical Proposal Part IV – Past Performance Proposal
*See Sections L & M for all pertinent information in regards to proposal requirements
Evaluation Factors for Award
Past Performance Recent within 3 years
Relevant contracts include those of similar scope, magnitude, and complexity of JBER’s requirement
Quality Assessment: PPQs, PPIRS, other data independently obtained
Will receive an integrated “Past Performance Confidence Assessment Rating”
Price All offers ranked by price
Price to include option periods and 6th month extension of services for a
TEP
Analyzed for unbalanced pricing
Government reserves the right to perform price realism analysis
Documents the fairness and reasonableness of the TEP
Subjective Tradeoff Technically Acceptable (STOTA) Source Selection All Technically Acceptable offers treated equally except for prices and past performance records
Tradeoffs amongst Price and Past Performance (Past Performance = Price)
The Government reserves the right to award to other than the lowest Total Evaluated Price (TEP)
In that event, the SSA will make an integrated assessment best value award decision
Technical Technical proposals evaluated on a pass/fail basis and rated “Acceptable or Unacceptable”
Failure to receive an “Acceptable” rating in any one subfactor will result in an “Unacceptable” rating for the Technical Proposal
BOMS
Contract Overview
673 Civil Engineer Group Mission 773 Civil Engineer Squadron JBER Factoids Improvements from Previous Contract How Contract Will Function Major Contract Elements Coordination with other contractors Government Furnished Services Desired Outcomes Contract Oversight & Performance Evaluation
Civil Engineer Group Mission
673 CEG mission is to provide facility, infrastructure and emergency services to sustain an arctic force projection platform and enable mission partner success. Train, and on order, deploy combat ready Engineers.
773 Civil Engineer Squadron
Emergency Management Operations Facilities Heavy Repair Infrastructure Systems Operations
Engineering Service Contracts
JBER Factoids
Joint Base Tenant Units In addition to the 673 Air Base Wing, JBER is comprised of multiple commands and 49 tenant units. U.S. Army Alaska, 4th
Brigade Combat Team, the 3rd Wing and the Alaska Army and Air National Guard are just some of the major units on JBER.
Location JBER is bordered by the city of Anchorage, Cook Inlet, Eagle
River, Chugiak, and the Chugach National Forest
75,000+ Acres/116 Sq Miles 61,032 on JBER-R
885 Buildings 478 on JBER-R
2,245 Total Facilities 1,323 on JBER-R
6,000+ daily personnel (Mil & Civ) Range Roads
Railroad Areas
Anchorage
Improvements from Previous Contract
Improvements from previous contract:
Data management to support Reliability Centered Maintenance (RCM) Contractor access to CES programs (No License Requirement)
NexGen IT APIMS (Air Program Information Management System)
GEOBASE
BUILDER
Automated Logic System (EMCS)
Ability to work beyond 32 hours (Construction Wage Rates) Ability to add Work Tasks within the scope of PWS (Over & Above’s) Inclusion of Oil Water Separators (OWS) on entire installation
Contract serves as an arm of the Operations Flight Provides operations and maintenance for JBER Richardson facilities and Oil
Water Separators
How the Contract Will Function
Program goal is to ensure facilities and infrastructure items operate as designed, free of defects, and function safely to support JBER mission requirements
Work requirements to repair, maintain, and/or inspect real property and real property installed equipment will be sent to the Contractor through NexGenIT
The Contractor will plan, program, administer, supervise, conduct quality control, and manage the completion of work requirements
The Contractor will update NexGenIT with work details, labor hours and material costs for each work requirement
The Contractor will update the current AF Sustainment Management System, BUILDER with changes in asset condition and replacement of existing assets
The Contractor will update NexGenIT to reflect that work requirements have been completed; the government will close out work tasks
Operations and Maintenance
Repair/Maintenance Complete/Closeout
Preventive Maintenance (PM) Work Tasks (WT) Facility Projects
(FOFP)
Service Call – Data Entry – Work Request Working Group (WRWG)
Work Priorities
Priority 1 – Emergency Work Unscheduled work (24 hrs) Water, Elec, Heat, A/C, outages Post Storm Damage, “don’t go home” type work until it is fixed
Priority 2 – Preventive Maintenance Work (A/B) 2A - Scheduled Maintenance 2B – Contingency Construction Projects
Priority 3 – Scheduled Sustainment Work (A/B/C) 3A – (High) Corrective Maintenance for direct mission support 3B – (Medium) Corrective Maintenance for Admin facilities, etc.
3C – (Low) Corrective Maintenance for Hobby Shop, Bowling, etc.
Priority 4 – Aesthetic Work (A/B) 4A – Enhancement work, not mission impacting (carpet, lighting upgrade) 4B – Not mission impacting (marquees, ornamental landscaping)
Local Priorities – Priority 3B reclassified to Priority 1 or 3A
Major Elements of Contract
Facility and Infrastructure Operation and Maintenance Oil Water Separators Roof Systems Heating, Ventilation and Air Conditioning (HVAC) Boilers Hydronic/Steam Base Laundry Solids Interceptor Range Roads Ammo Lightning Protection Aquatic Center/Pools
Over and Above Work Asset Management Deliverables
Roof Systems
Key Facilities (Pictures)
Key Areas:
Building 600 and HVAC systems Laundry Facility and mechanical systems Oil Water Separators Buildings 1 and 771 Building 652 Child Development Center Building 700
Ammo Lightning Protection
Building 600 Boiler/Mechanical Room
Laundry Facility & Mechanical Systems
Solids Interceptor
High- Pressure Steam Boilers
Oil Water Separators
Building 1 & Building 771
Building 1
Building 771
Bldg
Building 652
Child Development Center
Building 700
Coordination With Other Contractors
BOMS contractor will occasionally support construction, utility, and/or communication contractors on the installation with facility power/water/fire suppression isolations
Work will be identified by Work Tasks issued by Customer Service
Lines of demarcation:
Electricity: Downstream on the load side of facility first disconnect Natural Gas: Downstream of the regulator and/or meter Water: At the first valve downstream of the meter Wastewater: Five feet from the foundation wall or cleanout Storm water (Roof Drains): Five feet from the foundation wall or cleanout Fire Systems: Where the facility fire alarm system wires connect to the facility fire suppression system devices
Government Furnished Services
Government Furnished Services Work Space (Bldg 700) Security Forces (Police Services) Fire and Emergency Services Emergency Medical Service Utilities Custodial Service (Restrooms) Telephone Lines (Official Government Business) Refuse Collection (Dumpster Service) Snow Removal (Parking Areas) Local Area Network (Official Government Business)
Work Accomplished by Government on JBER-R
Fire Alarms
Intrusion Detection Alarms (Security Systems)
Facility Environmental Control Systems (except legacy Honeywell systems)
Locks
Signs
Entomology/Pest Management
Storm Sewers
Generators
Desired Outcomes
Facilities and supporting infrastructure are efficiently operated, repaired, and maintained
Facilities in “good” condition are kept “good” Facilities needing repairs or having “not good” systems are identified
Timely and accurate facility condition assessments are conducted and documented
Accurate reporting of labor, parts, and materials with a resolution description
No environmental violations
Contract Oversight & Performance Evaluation
Performance Objective PWS Paragraph Performace Threshold (Per Month)
Work Priority 1: Emergency Work. The Contractor shall perform priority 1, emergency Work Tasks
PWS 1.3, 1.6.1 inclusive Excellent: 0 defects Very Good: 1 defect Satisfactory : 2 defects
Work Priority 2A: Preventive Maintenance.
The Contractor shall perform priority 2A work, Preventative Maintenance (PM).
PWS 1.6.1. inclusive
Excellent: 0 defects Very Good: 1-2 defect
Satisfactory : 3 defects
Work Priority 3A (High). The Contractor shall perform priority 3A Work Tasks. PWS 1.6.1. inclusive
Excellent: 0 defects Very Good: 1-2 defect Satisfactory : 3 defects
Work Priority 3B (Med) and 3C (Low) The Contractor shall perform priority 3B (Med) and 3C (Low) Work Tasks,.
PWS 1.6.1. inclusive Excellent: 0 defects Very Good: 1-2 defect Satisfactory : 3 defects
Work Priority 4A/B: The Contractor shall perform Enhancement Work. PWS 1.6.1. inclusive
Excellent: 0 defects Very Good: 1-2 defect Satisfactory : 3 defects
Deliverables: The Contractor shall provide SMS BUILDER deliverables/reports to the
CO/COR.
PWS 1.6.4.6.2.3. inclusive Excellent: 0 defects Very Good: 1-2 defect Satisfactory : 3 defects
Service Delivery Summary Items
Performance Evaluation
Approach for managing performance Contract Performance Assessment Reports (CPARs) Contractor’s Quality Assurance (QA) Program, Contracting Officer Representative (COR) Inspections and Monthly Reports
Responsible for managing performance information:
CORs (773 CES Service Contracts Section) Contracting Officer
Level of experience of appointed personnel:
CORs are fully trained and have experience on this type of contract
Methods used to identify and remediate performance issues Random inspections, customer surveys, Quality Assurance (QA) reports Re-performance
How performance issues will be communicated and resolved QA Reports, Meetings as needed, CPARs, Corrective Action Reports (CARs), Contract Discrepancy Reports (CDRs)
Performance Evaluation
Inspection Methods and Frequency: Identified in SDS and QASP
Incentives for Successful Performance Options exercised Favorable CPARS
Unacceptable Performance - Failure to Meet Performance Standards Corrective Action Report Re-performance at no additional cost to the government Documented in CPAR evaluations
Quality Assurance Approach All CORs Standardized CO or QAPC led training CORs will inspect performance IAW Quality Assurance Surveillance Plan
Multi-Functional Team Meetings with Contractor To be held as needed (based on events and request) Emphasis on process improvement, partnering, and contractor performance
Questions
Questions from Attendees
Final Remarks
Monitor www.beta.sam.gov for all future updates/amendments Solicitation Number FA5000-20-R-0019
Questions from industry due No Later Than 14 September
Site Visit/Walk-Through on 17 September 2020 at 10:00 AM (Alaska Standard Time) Limitations of two (2) personnel from each company Please submit name and information as required (i.e. license, etc.)
Request any specific locations to be seen/taken to
Deadline for Site Visit/Walk-Through contractor submission is 4:00 PM, 11 September 2020 (Alaska Time)
Extras
Slides for Information
Work Priority
Work Classification
Definition Remarks Examples
1 Emergency Work All/Only Unscheduled (24 hrs)
• Needed to sustain/ensure continued mission operations
• “Don’t go home” type work until emergency is mitigated/fixed
Work ONLY to fix the emergency/sustain service
• Prioritize remainder work accordingly
• Performed in ALL facilities (all Tiers/priorities)
Water, Elec outages, no A/C & heat etc.
• Imminent Life/Health/Safety
• Post-storm damage repair
• Broken stop sign at major intersection
• Sweep intersection following accident 2A Preventive
Maintenance
(PM)
Right-sized PM (right work/frequency)
• Risk-based PM
• Condition-based PM
• Number one priority for scheduled direct hours
HVAC supporting network server gets PM to sustain, while HVAC supporting office space receives lesser maintenance
• Ex. Water & waste, HVAC, 2B N/A at JBER
3A (High)
Scheduled Sustainment Work Corrective Maintenance
(CM)
High Mission/Equip Sustainment Risk
• RAC 1-3 (Unabated)
• FSD 1 & 2
• High Return on Investment
(ROI) CM
Not ALL work in Tiers 1 and 2 are supporting the MDI mission set (e.g.
office space)
• Alleviate RAC/FSD then reprioritize remainder of work if needed
• 1st priority is work centered around installation’s primary mission
• Analysis to determine PM
• Rpr Elec circuit to research laboratories
• HVAC supporting network servers or telecommunications nodes
• RPIE generator sets
• Repair of broken fire system in
CDC
• Street lighting (at intersections)
• Perimeter security fencing
• Broken windows or doors
3B (Med)
Scheduled Sustainment Work (CM)
• Medium Mission/Equip Sustainment Risk
• RAC 4 and 5 (Unabated
• Same concept as Pri 3A work but at slightly lower category/mission dependency
• Not intended to substitute for
HVAC at Admin Facility
• Base Gym
3C (Low)
Scheduled Sustainment Work (CM)
Low Mission/Equip Sustainment Risk
• RAC 4 and 5 (Unabated)
• Same concept as Pri 3B work but at lower category/mission dependency
• Not intended to substitute for projects not scoring well on the
IPL
• Rpr broken window in Club
• Road/Parking signs, other NTSB-driven requirements
• Warehouse spaces
• Bowling Alley, Auto Hobby Shop
4A/B Enhancement Work
Work that is to enhance/sustain mission operations
Incorporates Wing CC priorities specific to local mission
• Replace carpet
• Lighting upgrades